Fabricated steel structure house system

The dense-ribbed shear wall structure is restrained by T-O combined special-shaped columns and π-shaped steel frames, combined with full bolt connection and precast concrete technology, to solve the problems of low construction efficiency and insufficient joint strength of the steel structure residential system, and to achieve efficient and earthquake-resistant building components. .

CN118728145AActive Publication Date: 2024-10-01CHINA MCC17 GRP CO LTD +2

Patent Information

Application Number
CN202411062752.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-10-25
Filing Date
2024-08-05
Publication Date
2024-10-01
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The existing steel structure residential system has low construction efficiency and the connection nodes do not meet the requirements of "strong nodes and weak components".

Method used

The T-O combined special-shaped column cross-section form is used, combined with H-shaped steel beams and π-shaped steel frames to restrain the dense-ribbed shear wall structure. Through full bolt connection and precast concrete technology, on-site welding is reduced and the joint strength and seismic performance are improved.

Benefits of technology

It improves the compression and bending load-bearing capacity of columns, reduces the overall floor thickness, enhances the crack resistance and seismic performance of connecting nodes, reduces construction difficulty and construction period, and meets the needs of high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728145A_ABST
    Figure CN118728145A_ABST
Patent Text Reader

Abstract

The invention discloses a fabricated steel structure residential system, and belongs to the technical field of fabricated buildings. The system comprises a frame part and a shear wall part, wherein the frame part comprises a special-shaped column, a steel beam and a floor system; the special-shaped column comprises a steel pipe and a plurality of pieces of T-shaped steel arranged along the peripheral wall of the steel pipe. According to the T-O combined special-shaped column section form provided by the invention, relative separation of the pressed column and the bent column on the combined section can be realized, and the T-O combined special-shaped column section form has better flexural capacity and rigidity. And by utilizing the characteristics of the T-shaped steel on the outer side, the steel beam and the special-shaped column can be connected in a full-bolt mode. Meanwhile, the reinforcing component is arranged at the beam-column joint, so that the rigidity and the strength of the joint area are improved. Besides, the concrete structures of the floor system and the shear wall are optimized, and a corresponding node connecting mode is provided, so that the fabricated steel structure residential system which can be quickly assembled and is stable in connection is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated buildings, and more specifically, relates to a prefabricated steel structure residential system. This application claims priority, and the application number of the prior application is: 2023113971671, title: A prefabricated steel structure residential system, and the priority date is October 25, 2023. Background Art

[0002] Prefabricated buildings are the direction of transformation and upgrading of the construction industry, and are an emerging sunrise industry that the country is vigorously promoting. At present, steel structure prefabricated buildings account for about 30% of prefabricated buildings, most of which are public buildings, and residential products are almost negligible. According to the goal of reaching 30% of prefabricated buildings in new buildings by 2025, the development prospects of steel structure prefabricated houses are huge.

[0003] At present, the domestic steel structure building system is still stuck in the conventional steel support-frame system, steel frame-concrete core tube system, steel frame-steel plate shear wall system, etc. The above existing steel structure systems have a large workload of on-site welding, which not only makes it difficult to ensure the welding quality, but also leads to a low degree of assembly. In addition, in the existing steel structure system, each connection node cannot achieve a strong connection effect such as pull-out resistance, which does not meet the requirements of the current specification of "strong nodes, weak components".

[0004] After searching, the application with Chinese patent publication number CN 218952584 U discloses an assembled steel tube concrete component. The application includes an outer tube and a concrete tube, the inner surface of the outer tube is fixedly mounted with a concrete tube, the inner surface of the concrete tube is fixedly mounted with an inner tube, the surface of the outer tube is fixedly mounted with a mounting seat, and the surface of the outer tube is fixedly mounted with an insert. The application is designed into an assembled structure through the mutual cooperation of the mounting seat, the insert and the slot, which is convenient for on-site docking and reduces the amount of on-site welding. However, in this application, the internal concrete at the vertical connection node cannot achieve a strong connection effect such as pull-out resistance, which does not meet the requirements of the current specification of "strong nodes, weak components".

[0005] For another example, the application with Chinese patent publication number CN 209603378 U discloses a multi-cavity rectangular steel tube concrete special-shaped column structure. The application includes an assembled special-shaped column and an H-shaped steel beam. The assembled special-shaped column includes an upper column and a lower column. The lower end of the upper column is provided with a protrusion, and the upper end of the lower column is provided with a recessed portion. The protrusion is inserted into the recessed portion, and the upper column and the lower column are inserted together. The connection between the upper column and the lower column is fixedly connected with a node plate by bolts, and the node plate is welded to the outer wall of the upper column and the lower column. The H-shaped steel beam includes a beam body, and the end of the beam body is provided with an end plate. After the upper column and the lower column are connected, the end plate is connected to the edge of the connection between the upper column and the lower column by bolts. The structure of the application can effectively reduce the amount of steel used, but the application still needs to perform welding operations during the assembly process, thereby improving the assembly efficiency. At the same time, the node uses long bolts to pass through the screw holes in the node area to achieve a stable connection. However, it has very high requirements on processing accuracy, and efficient connection on site is difficult to achieve; the distance between the long bolts and the side wall of the multi-cavity steel pipe column is small, making it difficult to ensure the workability of the freshly mixed concrete.

[0006] For another example, after searching, the application with Chinese patent publication number CN 211396201 U discloses a connection structure between an embedded steel beam and a prefabricated composite floor. In this application, it includes a steel beam and a composite floor; the cross section of the steel beam is I-shaped; the composite floor includes a prefabricated board and a cast-in-place composite layer; a steel truss is embedded in the prefabricated board; the lower chord steel bars of the steel truss are embedded in the prefabricated board; the upper chord steel bars of the steel truss are located above the prefabricated board, and the two ends of the upper chord steel bars exceed the two sides of the prefabricated board respectively; the left and right sides of the prefabricated board are respectively provided with connecting parts; the connecting parts include a horizontal plate and a vertical plate; the vertical plate is tightly attached to the side of the corresponding side of the prefabricated board, and is welded and connected to the lower chord steel bars in the prefabricated board; the connecting parts on both sides of the prefabricated board are respectively laid on the upper flanges of the steel beams on both sides and fixed by bolts. In this application, the connecting plate is overlapped on the steel beam and connected to the steel beam, providing shear resistance without welding bolts, simplifying the connection structure and reducing the workload. However, in this application, the prefabricated floor is connected to the upper flange of the steel beam through connectors, resulting in a thicker overall thickness, which also affects the use of floor height. In addition, in this application, the prefabricated floor is only connected by connectors, and its connection strength needs to be further improved.

[0007] For another example, after searching, the application case with Chinese patent publication number CN 209129208 U discloses an L-shaped shear wall skeleton and a steel-concrete L-shaped shear wall. The L-shaped shear wall skeleton of the application case includes a steel wall head, a first rectangular steel pipe, a first horizontally distributed steel bar, a second horizontally distributed steel bar, a first steel frame, a second steel frame and a vertically distributed steel bar. In the application case, the steel-concrete L-shaped shear wall is prefabricated in a factory. First, the L-shaped shear wall skeleton is prepared, and then the L-shaped shear wall skeleton is clamped with a template and concrete is poured to obtain a steel-concrete L-shaped shear wall prefabricated part. The L-shaped shear wall skeleton and the steel-concrete L-shaped shear wall of the application case are both completed in the factory, which can reduce on-site wet work and facilitate construction, shortening the construction period by at least half. However, its earthquake resistance still needs to be further mentioned.

[0008] In summary, although the above-mentioned relevant documents can improve the on-site construction efficiency to a certain extent, the connection strength at each node needs to be further improved to meet the requirements of "strong nodes, weak components". Summary of the invention

[0009] 1. Problems to be solved

[0010] In view of at least some of the problems existing in the above-mentioned prior art, the present invention proposes an assembled steel structure residential system, the purpose of which is to solve the problems of the existing steel structure system, the low on-site construction efficiency and the connection nodes not meeting the requirements of "strong nodes, weak components".

[0011] 2. Technical solution

[0012] In order to solve the above problems, the technical solution adopted by the present invention is as follows:

[0013] The present invention provides an assembled steel structure residential system, comprising a frame part and a shear wall part, wherein the frame part comprises a special-shaped column, a steel beam and a floor slab, wherein:

[0014] The special-shaped column comprises a steel pipe and a plurality of T-shaped steels arranged along the peripheral wall of the steel pipe;

[0015] The steel beam is an H-shaped steel beam, which is connected to the T-shaped steel by bolts;

[0016] The floor slab is a composite floor slab, which includes a prefabricated lower cover plate, a cast-in-place upper cover plate and a steel truss. The lower cover plate is provided with a lower notch in the span direction for overlapping the lower flange of the steel beam. The web of the steel beam is provided with a reinforcement hole for the first overlapping steel bar to pass through. After the first overlapping steel bar passes through the corresponding reinforcement hole, its two ends are respectively overlapped on the lower cover plates on both sides of the steel beam.

[0017] Furthermore, a reinforcing member is provided at the connection node between the steel beam and the T-steel, and the reinforcing member includes a sleeve and a stiffening rib arranged on the sleeve; wherein the sleeve is fixedly sleeved on the steel pipe, the side surface of the stiffening rib is connected to the web of the T-steel, and the end thereof is connected to the wing plate of the T-steel.

[0018] Furthermore, the special-shaped columns are connected in the vertical direction through column nodes, and the column nodes include ring ribs and connecting steel bars;

[0019] There are multiple connecting steel bars distributed in a ring, one end of which is located inside the steel pipe and the other end extends outside the steel pipe for connecting to another steel pipe;

[0020] The ring rib is arranged on the inner wall of the steel pipe. After the pouring is completed, when the steel pipe concrete is subjected to the tensile force, the ring rib plays an anchoring role for the connecting steel bars.

[0021] The T-shaped steels of the upper and lower special-shaped columns are connected by splicing cover plates.

[0022] Furthermore, the lower cover plate is provided with an upper notch in the width direction, and the upper notches of the two lower cover plates are spliced ​​into a groove; a connecting member is provided in the groove, and the connecting member splices the two lower cover plates in the width direction through cast-in-place concrete.

[0023] Furthermore, the connecting member includes bent bars and a steel frame; wherein the upper notch is an L-shaped groove, the bent bars are located in the respective L-shaped grooves, and the bent bars are formed by bending the bottom steel bars of the plate during prefabrication; the steel frame is located in the groove after splicing.

[0024] Furthermore, the connecting member includes bent bars and a steel frame; wherein the upper notch is an L-shaped groove, the bent bars are located in the respective L-shaped grooves, and the bent bars are formed by bending the bottom steel bars of the plate during prefabrication; the steel frame is located in the groove after splicing.

[0025] Furthermore, the shear wall part is a π-shaped steel frame constrained dense-rib shear wall, which includes a wall body and a separate composite component arranged on both sides of the wall body, the separate composite component includes two steel components arranged opposite to each other, the two steel components are connected by connecting stirrups, one of the steel components is pre-embedded at the edge of the wall body, and a casting space is formed between the two steel components, and an integral component is formed by pouring concrete into the casting space; wherein the steel component is π-shaped steel, the flanges of the two π-shaped steels are arranged opposite to each other, and the flanges of the π-shaped steel are provided with through-rib holes for the connecting stirrups to pass through.

[0026] Furthermore, an overhanging steel beam is provided at one end of the steel member away from the wall, and the overhanging steel beam is connected to the steel beam through a spliced ​​cover plate;

[0027] In the vertical direction of the wall, the separated combined components of the upper and lower walls are connected by splicing cover plates, and the reinforced concrete dense ribs of the upper and lower walls are overlapped by the upper and lower side protruding steel bars.

[0028] Furthermore, the wall is a dense-rib wall, and a self-resetting energy-absorbing support is arranged in the dense-rib gaps of the dense-rib wall. The self-resetting energy-absorbing support includes two support tubes, one end of the support tube is provided with a connecting end plate, and the other end is provided with a steel connecting piece. The flanges of the two steel connecting pieces are connected by a connecting cover plate, and an elastic reset piece is provided between the two steel connecting pieces.

[0029] Furthermore, the steel connecting piece is a π-shaped steel, and a connecting slot is provided on the flange of the π-shaped steel; the elastic reset piece is a self-reset spring, and the self-reset spring is arranged between the two flanges of the π-shaped steel.

[0030] Furthermore, the shear wall part is a combined H-shaped steel frame constrained shear wall, which includes a wall body and steel components arranged on both sides of the wall body, and the steel components are T-shaped steels; the flanges of the T-shaped steels on adjacent walls are aligned and then spliced ​​and installed through splicing cover plates, and concrete is poured later to complete the connection of the wall in the horizontal direction;

[0031] Furthermore, a corrugated pipe is embedded in the wall, and a special steel frame is provided in the corrugated pipe, and the connection between the upper and lower walls is completed by pouring concrete into the corrugated pipe; wherein the special steel frame includes stirrups and longitudinal steel bars, and connection reinforcements are provided on the outside of the stirrups.

[0032] Furthermore, the shear wall part is a π-O special-shaped column frame constrained concrete shear wall, which includes a wall body and steel tube concrete columns and steel components respectively arranged on both sides of the wall body, wherein the steel components are π-shaped steels, and the steel tube concrete columns are provided with a first connecting steel plate, and the first connecting steel plate is connected to the π-shaped steel by connecting stirrups.

[0033] Furthermore, the walls are connected in the horizontal direction through horizontal connection nodes, and the horizontal connection nodes include L-shaped steels arranged on π-shaped steels. The two L-shaped steels on the connected walls are arranged in a centrally symmetrical manner, and elastic pads are provided at the connection between the two L-shaped steels, and concrete is poured afterwards.

[0034] Furthermore, the walls are connected in the horizontal direction through horizontal connection nodes, and the horizontal connection nodes include a second connecting steel plate arranged on the π-shaped steel of one side wall, and a third connecting steel plate arranged on the π-shaped steel of the other side wall. The second connecting steel plate and the third connecting steel plate are staggered and overlapping, and the two are connected by bolts and then poured with concrete.

[0035] Furthermore, the steel tube concrete column includes a steel tube, concrete arranged in the steel tube, the centrifugal formed concrete and core concrete arranged in the centrifugal formed concrete; wherein the centrifugal formed concrete is prefabricated in a factory and the core concrete is cast on site.

[0036] 3. Beneficial effects

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] (1) The present invention provides a prefabricated steel structure residential system. The TO combined special-shaped column cross-section form proposed can achieve relative separation of column compression and bending on the combined cross-section. The circular steel tube concrete part in the combined cross-section has a large axial stiffness. The outer T-shaped steel greatly increases the height of the combined cross-section, thereby having better bending bearing capacity and stiffness. At the same time, by utilizing the characteristics of the outer T-shaped steel, the steel beam and the special-shaped column can be connected in a full bolt connection form, thereby solving the problem of complex welding process, large internal stress, affecting node performance and low assembly efficiency when the traditional steel node is prefabricated or welded on site. In addition, the lower cover plate is overlapped on the lower flange of the H-shaped steel beam through the lower notch on the lower cover plate, which can effectively reduce the overall floor thickness. In addition, the provision of the first overlap steel bar can effectively transmit the normal use load of the floor plate, avoid the formation of a single-span plate, and effectively reduce the mid-span deflection; it can also avoid cracking at the connection of the lower cover plate of the composite floor.

[0039] (2) In the present invention, an assembled steel structure residential system is provided with an upper notch in the width direction, and the upper notches of the two lower cover plates are spliced ​​into a groove; a connecting member is provided in the groove, and the connecting member splices the two lower cover plates in the width direction by cast-in-place concrete. The present invention adopts a connection method with a preset connecting member, which not only ensures the crack resistance and stress performance of the connection; in addition, compared with the traditional assembled composite floor slab connection construction, which requires seams, has dense beard ribs at the seams, and is difficult to overlap, the connection method of the present invention is simpler and more convenient to construct.

[0040] (3) The prefabricated steel structure residential system of the present invention optimizes the load transfer path at the beam-column node by setting up reinforcing components, so that the force can be directly transferred from the stiffening rib to the sleeve, and then the load is transferred to the core steel tube concrete node part through the sleeve, which can effectively prevent the steel tube outside the concrete from being directly subjected to the normal load, thereby greatly improving the stiffness and strength of the node domain and ensuring safety.

[0041] (4) The prefabricated steel structure housing system of the present invention is provided with ring ribs and connecting steel bars in the steel pipe of the special-shaped column, and can be prefabricated in the factory; compared with the traditional connection nodes, it completely avoids on-site welding operations and improves the efficiency of assembly; at the same time, after pouring and curing, when the steel tube concrete is subjected to tension, the ring ribs play an anchoring role for the connecting steel bars, thereby ensuring the connection strength at the connection node; for the connection between the T-shaped steels on the outside of the special-shaped columns, high-strength bolts and splicing cover plates can be used to connect them in a full bolt connection mode; similarly, no on-site welding is required, which can improve the assembly efficiency. In addition, the connection between the T-shaped steels not only ensures the strength of docking, but also helps the core steel tube concrete to be positioned for construction.

[0042] (5) An assembled steel structure residential system of the present invention adopts a π-shaped steel frame to constrain a dense-rib shear wall structure. Separate composite components are arranged on both sides of the wall. The separate composite components and the wall together form a frame-constrained shear wall. The frame-constrained shear wall can be completely prefabricated in a factory, with less wet work on site. At the same time, the separate composite components are used to provide constraints on the shear wall, thereby increasing the overall energy consumption capacity of the wall and enabling it to be applied to high-rise structures. The steel component is a π-shaped steel, so that both sides of the shear wall are steel components. An overhanging steel beam can be preset on the π-shaped steel and screw holes can be set, and then it can be connected to the steel connecting beam by splicing the cover plate, so that the connection operation between the shear wall and the connecting beam is convenient and quick, reducing the construction difficulty.

[0043] (6) The prefabricated steel structure residential system of the present invention can enhance the lateral stiffness of the shear wall, increase the natural frequency, and reduce the wind vibration response during normal use through the self-resetting energy-absorbing support set inside the multi-rib wall; under the action of rare earthquakes, it can significantly improve the energy absorption capacity of the wall, and after the strong earthquake, it has a certain reset ability to avoid the second-order effect of the vertical load-bearing components due to excessive deformation, which may cause the structure to collapse. At the same time, through the setting of the self-resetting energy-absorbing support, the wall thickness is reduced, solving the problem of insufficient indoor space caused by the excessive thickness of the shear wall in some high-rise buildings.

[0044] (7) An assembled steel structure residential system of the present invention uses a combined H-shaped steel frame to constrain a dense-ribbed shear wall. By burying a T-shaped steel with a slotted hole at the end of the wall, and then splicing and installing it on site and pouring concrete, a combined H-shaped steel concrete component can be formed at the node between the dense-ribbed shear walls, so that the node has high rigidity and energy dissipation capacity, and can also effectively reduce wet work on site, and achieve efficient installation on site. At the same time, the energy dissipation performance at the node can be further improved by friction energy dissipation through the slotted sliding node. In addition, in terms of the form of vertical connection nodes, by pre-embedding a corrugated pipe in the middle of each rib of the dense-ribbed wall, and then inserting a special steel cage on site and pouring concrete, a corrugated pipe reinforced concrete composite column component can be formed in the shear wall node and the wall. The corrugated pipe and the outer reinforced concrete provide lateral constraints, which improves the mechanical properties of the vertical splicing node, so that the vertical splicing node of the shear wall and the wall itself have better energy dissipation capacity.

[0045] (8) The present invention provides an assembled steel structure residential system, which optimizes the structure of the wall corner connection by pre-embedding connecting steel at the bottom of the dense-ribbed wall and burying anchor bolts at the foundation pedestal. The connecting steel and the anchor bolts are mechanically connected during on-site connection, thereby replacing the traditional steel bar binding overlap with the mechanical connection between the anchor bolts and the connecting steel, thereby achieving efficient on-site installation of the dense-ribbed shear wall and the foundation pedestal. At the same time, the integrity and strength of the node are further ensured by post-casting concrete.

[0046] (9) The present invention provides an assembled steel structure residential system, which uses a π-shaped steel frame to constrain a dense-rib shear wall. By arranging steel tube concrete columns and π-shaped steel at both ends of the wall, the wall performance can be enhanced as constrained edge components. At the same time, the two are connected by connecting stirrups to form a PBL shear key, so that the two can work together, which can further improve the seismic performance of the wall, making it suitable for use in high-rise buildings. In addition, by hiding the steel tube concrete columns and π-shaped steel in the wall, the columns are not exposed and occupy a small space, which can increase the indoor usable space and enhance the flexibility of apartment layout.

[0047] (10) The present invention provides a prefabricated steel structure residential system, which further optimizes the specific structure of the steel tube concrete column, and includes a steel tube, centrifugally formed concrete, and core concrete; wherein the steel tube and centrifugally formed concrete are prefabricated in a factory to form a prefabricated hollow ultra-high strength steel tube concrete component. Subsequently, the core concrete is cast on site to form an ultra-high strength steel tube concrete composite column component, thereby improving the core concrete material performance and reducing the cross-sectional size and steel consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a structural schematic diagram of the frame part of an assembled steel structure residential system of the present invention;

[0049] Figure 2 It is a schematic diagram of the cross-section of the special-shaped column in the present invention;

[0050] Figure 3 It is a schematic diagram of the structure of the node of the special-shaped column in the present invention;

[0051] Figure 4 for Figure 3 It is the cross-sectional view along the AA direction;

[0052] Figure 5 for Figure 3 It is a cross-sectional view along the middle BB direction;

[0053] Figure 6 This is a schematic diagram of the connection of the T-shaped steel on the outside of the special-shaped column in the present invention;

[0054] Figure 7 It is a force mechanism diagram of the vertical connection node of the special-shaped column in the present invention;

[0055] Figure 8 A comparison diagram of earthquake damage when there are no ring ribs at the nodes of the special-shaped columns in the present invention;

[0056] Fig. 9 It is the node hysteresis curve after the stress is applied to the node of the special-shaped column in the present invention;

[0057] Fig.10 It is a schematic diagram of the "pinching" of the hysteresis curve of the vertical connection node of the special-shaped column after being subjected to force in the present invention;

[0058] Fig.11 It is a structural schematic diagram of a flange provided at the node of a special-shaped column in the present invention;

[0059] Fig.12 It is a structural schematic diagram of the beam-column connection node in the present invention;

[0060] Fig.13 It is a structural schematic diagram of the reinforcing component in the present invention;

[0061] Fig.14 It is an enlarged schematic diagram of the positive angle of the beam-column node in the present invention;

[0062] Fig.15 It is an enlarged schematic diagram of the inner corner of the beam-column node in the present invention;

[0063] Fig.16 It is a schematic diagram of the ultimate stress state of the reinforced component in the present invention;

[0064] Fig.17 This is a schematic diagram of the stress state of the core steel pipe at the beam-column node of the present invention;

[0065] Fig.18 It is a schematic diagram of the internal structure of the composite floor in the present invention;

[0066] Fig.19 for Fig.18 The cross-sectional view at 1-1 in the middle;

[0067] Fig. 20 for Fig.18 The cross-sectional view at 2-2 in the middle;

[0068] Fig.21 for Fig.18 The cross-sectional view at 3-3 in the middle;

[0069] Fig. 22 It is an implementation method of the connection member at the plate-to-plate connection node in the present invention;

[0070] Fig.23 Another embodiment of the connecting member at the plate-to-plate connecting node in the present invention;

[0071] Fig.24 It is an implementation method of the foam strip at the board-to-board connection node in the present invention;

[0072] Fig.25 It is a structural schematic diagram of a π-shaped steel frame constrained dense-rib shear wall in the present invention;

[0073] Fig.26 It is a structural schematic diagram of the separation and combination component in the present invention;

[0074] Fig. 27 It is a schematic diagram of the vertical connection of the π-shaped steel frame constrained dense-rib shear wall in the present invention;

[0075] Fig.28 It is a schematic diagram of the connection between the π-shaped steel frame-constrained dense-rib shear wall and the steel beam in the present invention;

[0076] Fig.29 It is a connection method between the π-shaped steel frame-constrained dense-rib shear wall and the floor slab in the present invention;

[0077] Fig.30 It is another connection method between the π-shaped steel frame-constrained dense-rib shear wall and the floor slab in the present invention;

[0078] Fig.31 It is a structural schematic diagram of a self-resetting energy-absorbing support provided inside a π-shaped steel frame-constrained dense-rib shear wall in the present invention;

[0079] Fig.32 It is a structural schematic diagram of the self-resetting energy-consuming support in the present invention;

[0080] Fig.33 It is a schematic diagram of the shear-to-weight ratio of each layer in the π-shaped steel frame-constrained multi-rib shear wall structural system of the present invention;

[0081] Fig.34 It is a schematic diagram of the inter-story displacement angle in the π-shaped steel frame constrained multi-rib shear wall structure system of the present invention;

[0082] Fig.35 It is a structural schematic diagram of a combined H-shaped steel frame constrained dense-rib shear wall of the present invention;

[0083] Fig.36 It is an enlarged schematic diagram of the "I" horizontal node of the combined H-shaped steel frame constraining the dense-rib shear wall of the present invention;

[0084] Fig.37 It is an enlarged schematic diagram of the "L-shaped" horizontal splicing node of the combined H-shaped steel frame constrained multi-rib shear wall of the present invention;

[0085] Fig.38 It is an enlarged schematic diagram of the "T-shaped" horizontal splicing node of the combined H-shaped steel frame constrained dense-rib shear wall of the present invention;

[0086] Fig.39 This is a schematic diagram of the longitudinal shear force distribution at the horizontal joints of the composite H-shaped steel frame-constrained multi-rib shear wall under horizontal seismic loads;

[0087] Fig.40 It is a schematic diagram of friction hysteresis energy dissipation at the horizontal joints of the combined H-shaped steel frame-constrained multi-rib shear wall in the present invention;

[0088] Fig.41 It is the friction energy dissipation hysteresis curve at the horizontal joint node of the combined H-shaped steel frame constrained multi-rib shear wall in the present invention;

[0089] Fig.42 It is a structural schematic diagram of the vertical joints of the combined H-shaped steel frame constraining the dense-rib shear wall in the present invention;

[0090] Fig.43 It is a schematic diagram of the structure of the special steel bar skeleton in the present invention;

[0091] Fig.44 It is a structural schematic diagram of the corner joint of the multi-rib shear wall constrained by the combined H-shaped steel frame in the present invention;

[0092] Fig.45 for Fig.44 A local enlarged schematic diagram in FIG.

[0093] Fig.46 It is a structural schematic diagram of the connecting steel in the present invention;

[0094] Fig.47 It is a structural schematic diagram of a π-O special-shaped column frame-constrained concrete shear wall in the present invention;

[0095] Fig.48It is a schematic diagram of the internal structure of the π-O special-shaped column frame constrained concrete shear wall in the present invention;

[0096] Fig.49 The L-shaped cross section of the π-O special-shaped column frame constrained concrete shear wall in the present invention is formed.

[0097] Fig.50 It is an implementation method of the horizontal connection node of the π-O special-shaped column frame constrained concrete shear wall in the present invention;

[0098] Fig.51 for Fig.50 A magnified view of the structure at the mid-level node;

[0099] Fig.52 Another implementation method of the horizontal connection node of the π-O special-shaped column frame constrained concrete shear wall in the present invention;

[0100] Fig.53 for Fig.52 A magnified view of the structure at the mid-level node;

[0101] Fig.54 It is a cross-section formation of the steel tube concrete column in the present invention.

[0102] In the figure: 1, special-shaped column; 11, steel pipe; 12, T-shaped steel; 13, concrete; 131, centrifugally formed concrete; 132, core concrete; 14, first connecting steel plate;

[0103] 2. Steel beam; 21. Connecting plate; 3. Reinforcement member; 31. Casing; 32. Stiffening rib;

[0104] 4. Column node; 41. Ring rib; 42. Connecting steel bar; 43. End plate; 431. Long end plate; 432. Short end plate; 44. Standoff steel bar; 45. Positioning flange;

[0105] 5. floor cover; 51. lower cover plate; 511. lower notch; 512. upper notch;

[0106] 52. upper cover plate; 53. steel bar truss; 54. first lap steel bar; 55. lightweight filling body;

[0107] 56. Connecting member; 561. Bending bar; 562. Steel bar skeleton; 563. Second lap steel bar; 564. Anchor plate; 57. Foam strip; 58. Top steel bar; 59. Bottom steel bar;

[0108] 61. Wall; 611. Internal stirrups of transverse ribs; 62. Steel member; 63. Connecting stirrups; 64. Outer steel beam; 65. First slot; 66. Corrugated pipe; 67. Special steel bar skeleton; 671. Stirrups; 672. Longitudinal steel bars; 673. Connecting reinforcements;

[0109] 681, L-shaped steel; 682, elastic pad; 683, second connecting steel plate; 684, third connecting steel plate;

[0110] 7. Self-resetting energy-absorbing support; 71. Support pipe; 72. Connecting end plate; 73. Steel connecting piece; 74. Connecting cover plate; 75. Elastic reset piece; 76. Second slot;

[0111] 8. Corner joint; 81. Connecting steel; 82. Anchor bolts; 83. Bottom plate; 84. Reinforcement ribs; 85. Foundation pedestal; 9. Spliced ​​cover plate. DETAILED DESCRIPTION

[0112] like Figure 1 As shown, an assembled steel structure residential system of the present invention mainly includes a frame part and a shear wall part, wherein the frame part includes a special-shaped column 1, a steel beam 2 and a floor slab 5. Among them, the special-shaped column 1 is a steel tube concrete special-shaped column, the steel beam 2 is an ordinary H-shaped steel beam, the floor slab 5 is a composite floor slab, and the shear wall is a frame-constrained shear wall. At the same time, the content of the present invention also covers the cross-sectional structure of columns, walls, and slabs, as well as key connection parts in the building structure such as inter-column nodes, beam-column nodes, beam-slab nodes, slab-slab connection nodes, inter-wall nodes, and wall-connecting beam nodes, so as to provide an assembled steel structure residential system that can be quickly assembled and has stable connections.

[0113] The present invention is further described below in conjunction with specific embodiments.

[0114] Example 1

[0115] A prefabricated steel structure residential system of this embodiment, referring to Figure 2 As shown, the special-shaped column 1 is a TO steel tube concrete special-shaped column, hereinafter referred to as a TO special-shaped column. The TO special-shaped column comprises a steel tube 11 and a plurality of T-shaped steels 12 arranged outside the steel tube 11. The inner cavity of the steel tube 11 is used for pouring concrete 13. The T-shaped steel 12 is welded to the outer wall of the steel tube 11 through its web, and the welding operation can be performed in a factory.

[0116] The specific distribution of the T-shaped steel 12 is varied, and this embodiment lists several conventional cross-sectional forms of TO special-shaped columns. Of course, other cross-sectional forms may also be used according to actual construction requirements.

[0117] like Figure 2 As shown in (a), two T-shaped steels 12 are symmetrically arranged, and the webs of the two T-shaped steels 12 form a straight line; Figure 2 As shown in (b), there are also two T-shaped steels 12, but the webs of the two T-shaped steels 12 are vertical to form an L shape; Figure 2As shown in (d), there are three T-shaped steels 12, and the webs of the three T-shaped steels 12 are arranged in a T shape; Figure 2 As shown in (c), there are four T-shaped steels 12, and the webs of the four T-shaped steels 12 are arranged in a cross shape.

[0118] Example 2

[0119] The prefabricated steel structure residential system of this embodiment, based on the above embodiment, provides a column node 4, which is the same as the vertical connection between TO special-shaped columns. The column node 4 mainly includes the connection of the inner core steel tube concrete and the connection of the outer T-shaped steel 12. Of course, the column node 4 needs to be staggered with the beam-column node described below.

[0120] Among them, for the TO special-shaped columns, hot-rolled ribbed steel bars are used and concrete is poured to connect them. For the connection between the T-shaped steels 12 outside the special-shaped columns, holes can be punched on the T-shaped steels 12, combined with high-strength bolts and spliced ​​cover plates 9, and connected in a full bolt connection manner.

[0121] Specifically, refer to Figure 3 , Figure 4 As shown, the steel pipe 11 is provided with an annular rib 41 and a connecting steel bar 42. The annular rib 41 is arranged on the inner wall of the steel pipe 11 and is close to the end of the steel pipe 11. There are a plurality of connecting steel bars 42 distributed in an annular manner, one end of which is located in the steel pipe 11 and the other end extends out of the steel pipe 11 for connecting another steel pipe 11. After the concrete 13 is poured, when the steel pipe concrete is subjected to tension, the annular rib 41 plays an anchoring role for the connecting steel bars 42.

[0122] The annular rib 41 is preferably a steel tube rib, and a variety of cross-sectional forms may be selected, such as T-shaped steel, channel steel, solid circular / rectangular steel rod, etc.

[0123] In the present embodiment, a prefabricated steel structure housing system is provided, and the inner core steel tube concrete part is connected by internally provided connecting steel bars 42 and poured with concrete. The key to achieving a strong connection such as tensile strength is whether the steel tube 11 has sufficient anchoring effect on the internally provided connecting steel bars 42.

[0124] According to the previous refined finite element analysis, the anchoring force is transmitted by setting the ring rib 41 at the inner end of the steel pipe 11, so that the shear force between the two can be effectively transmitted, thereby enhancing the anchoring force of the connecting steel bar 42. The specific force mechanism can be referred to Figure 7 .

[0125] To further improve the anchoring effect, the steel pipe 11 is preferably made of a material with a surface friction coefficient of not less than 0.5, such as a threaded steel pipe. For cold-bent / hot-bent straight-seam welded steel pipes, sandblasting (shot) can also be performed on the plate before the bending process to increase the friction coefficient, thereby achieving the best anchoring effect.

[0126] In order to reduce the influence of the welding accuracy of the ring rib 41 in the factory on the on-site construction, a certain welding space needs to be reserved. It is recommended to arrange the ring rib 41 about 30 mm away from the end of the steel pipe 11.

[0127] At the same time, in order to minimize the volume of concrete above the ring rib and its damage (under earthquake loads, tensile damage is likely to occur, while the concrete below the ring rib is mainly under pressure, which can effectively exert the performance of concrete materials), according to the previous theoretical and experimental research of the inventors, the distance between the position of the ring rib 41 and the end of the steel pipe 11 should be less than 0.3l R Among them, l R is the steel bar anchorage length, where the anchorage length refers to the depth of the connecting steel bar 42 located in a single steel pipe 11.

[0128] In addition, the spacing between the connecting steel bar 42 and the ring rib 41 should not be greater than the difference between the anchor length of the steel bar and the depth of the ring rib 41. The reason is that the transmission of the anchoring force is mainly transmitted by the shear force between the concrete units and the pressure between the upper and lower units. The maximum direction of the combined force of the above two is 45 degrees. At this time, the spacing between the connecting steel bar 42 and the ring rib 41 is just equal to the difference between the anchor length of the steel bar and the depth of the ring rib 41. When the distance between the connecting steel bar 42 and the ring rib 41 exceeds this value, the anchoring force cannot be effectively transmitted, and local shear failure will occur in the concrete inside the node.

[0129] refer to Figure 6 As shown, the web and wing plates of the T-shaped steel 12 are provided with assembly holes. After the upper and lower layers of the T-shaped steel 12 are aligned, they are connected by using the splicing cover plate 9 and fasteners. After the upper and lower layers of the T-shaped steel 12 are aligned and fastened, the upper and lower cross-sections of the core steel tube concrete are also in an aligned state. Among them, the fasteners are preferably high-strength bolts.

[0130] In the present embodiment, a prefabricated steel structure residential system is provided with a ring rib 41 and a connecting steel bar 42 in the steel tube for the connection of the inner core steel tube concrete, and the system can be prefabricated in a factory. Compared with the traditional connection nodes, the on-site welding operation is completely avoided, and the assembly efficiency is improved. At the same time, after the pouring and curing are completed, when the steel tube concrete is subjected to tensile force, the ring rib 41 anchors the connecting steel bar 42, thereby ensuring the connection strength at the connection node.

[0131] The outer T-shaped steels 12 are connected by full bolt connection, which also does not require on-site welding, thereby improving assembly efficiency. In addition, the connection between the T-shaped steels 12 not only ensures the strength of the butt joint, but also helps the core steel tube concrete to be positioned during construction.

[0132] The inventors conducted a refined finite element modeling analysis on the vertical connection nodes of this embodiment to evaluate its mechanism and impact on this type of connection nodes. The total number of entity elements in the model is about 150,000, which can more accurately reflect the mechanical properties of the node. The analysis results are as follows: Figure 8-10 shown.

[0133] Depend on Figure 8 It can be seen that after the steel tube rib reinforcement connection is set at the end of the steel tube 11, the concrete damage is significantly reduced; at the same time, the hysteresis curve is relatively full ( Fig. 9 ), indicating that this type of node has a strong ability to dissipate seismic energy.

[0134] In addition, according to the model analysis results, when the diameter of the connecting steel bar 42 exceeds 22mm, the hysteresis curve will show obvious "pinching" phenomenon ( Fig.10 ), significantly reducing the energy dissipation capacity of the node, so it is recommended that the diameter of the steel bar should not exceed 22mm. The reason for this "pinching" phenomenon is that under the premise of equal reinforcement ratio, excessive steel bar size will lead to a reduction in the number of steel bars, and the steel bar-concrete bond slip effect around a single steel bar is significant, and the bond stress is significantly increased, making the concrete around the steel bar prone to damage, reducing the overall energy dissipation capacity of the node, so the hysteresis curve "pinches".

[0135] Example 3

[0136] In order to facilitate the positioning of the connecting steel bar 42 and ensure that the connecting steel bar 42 has sufficient stability when pouring concrete, this embodiment further improves the specific structure of the column node 4 on the basis of the embodiment 3.

[0137] refer to Figure 3 As shown, an end plate 43 is provided at the end of the connecting steel bar 42. During assembly, the end of the end plate 43 is pressed against the inner wall of the steel pipe 11 to achieve positioning of the connecting steel bar 42 and ensure its verticality.

[0138] The inner side of the connecting steel bar 42 is also provided with an annular erecting steel bar 44, and the erecting steel bar 44 is provided in multiple groups along the length direction of the connecting steel bar 42. That is, through the provision of the erecting steel bar 44, multiple connecting steel bars 42 are combined into a whole, which can be prefabricated as a whole in the factory, thereby further saving the construction time on site.

[0139] Since the plurality of connecting steel bars 42 are connected into a whole ring by the erecting steel bars 44, it is not necessary to position each connecting steel bar 42 individually, but only the entire connecting steel bar ring needs to be positioned as a whole. In other words, as long as the end of a part of the end plate 43 can abut against the inner wall of the steel pipe 11, the verticality of the entire connecting steel bar 42 can be ensured.

[0140] Specifically in this embodiment, refer to Figure 5 As shown, the end plate 43 includes a long end plate 431 and a short end plate 432, and the long end plate 431 and the short end plate 432 are arranged alternately. By setting the long end plate 431 and the short end plate 432, not only the anchoring force of the connecting steel bar 42 can be improved, but also the connecting steel bar 42 can be positioned to ensure its verticality.

[0141] In addition, in order to prevent the connection steel bar 42 from moving downward due to the impact of concrete during the pouring process, in this embodiment, a support rib (not shown in the figure) is provided on the outer side of the connection steel bar 42, and the connection steel bar 42 is hung on the ring rib 41 through the support rib, so that the connection steel bar 42 can be effectively supported.

[0142] The prefabricated steel structure housing system of the present embodiment, through the common limitation of the connecting steel bars 42 by the end plates 43, the frame steel bars 44 and the support bars, not only ensures the verticality of the connecting steel bars 42, but also increases the stability of the connecting steel bars 42, and can effectively prevent the displacement of the connecting steel bars due to the scouring of concrete during the pouring of concrete, thereby affecting the final connection effect.

[0143] Example 4

[0144] refer to Fig.11 As shown, in order to further facilitate the positioning of the core steel tube concrete, a positioning flange 45 is provided on the outer side of the end of the steel tube 11, and the positioning flanges 45 can also be connected by high-strength bolts.

[0145] Compared with the traditional direct connection with flanges, the flange in this embodiment does not require much space and only plays a role in positioning and bearing construction loads during the construction process. After the concrete is poured and maintained to reach the design strength, the tension / bending moment is mainly borne by the combined effect of the internal steel bars and the external steel pipes, thereby reducing the requirements for the mechanical properties of the flange part nodes, reducing the space occupied by the nodes, reducing the amount of steel used, and reducing the cost of the connection nodes.

[0146] In addition, in order to further reduce the space occupied by the node, the flange can also be removed after the maintenance is completed. Of course, the setting of the positioning flange 45 in this embodiment and whether to perform the later removal operation can be selected according to actual construction requirements.

[0147] Example 5

[0148] This embodiment is an implementation method of a beam-column connection node.

[0149] Specifically, Fig.12 As shown, the steel beam 2 is an H-shaped steel beam, and a connecting plate 21 is provided at its end, and a mounting hole is provided on the connecting plate 21; the relative position of the wing plate of the T-shaped steel 12 is also provided with a mounting hole, and the assembly operation between the steel beam 2 and the special-shaped column 1 can be completed by high-strength bolts. This solves the problem of complex welding process, large internal stress, affecting node performance and low assembly efficiency when the traditional steel node is prefabricated or welded on site.

[0150] Since the out-of-plane bending resistance of the flange of the T-shaped steel 12 and the wall of the steel pipe 11 is relatively poor, in this embodiment, a reinforcing member 3 is provided at the connection node between the steel beam 2 and the special-shaped column 1 to enhance the rigidity and strength of the node area.

[0151] refer to Fig.13 , Fig.14 , Fig.15 As shown, the reinforcing member 3 comprises a sleeve 31 and a stiffening rib 32 arranged on the sleeve 31. The sleeve 31 is fixedly sleeved on the steel pipe 11, and the end of the stiffening rib 32 is connected to the inner side of the wing plate of the T-shaped steel 12.

[0152] Of course, the specific distribution of the stiffening ribs 32 is consistent with the cross-sectional form of the corresponding special-shaped column 1. In other words, the commonly used cross-sectional forms of the stiffening ribs 32 are also straight-shaped, L-shaped, T-shaped and cross-shaped.

[0153] In this embodiment, a reinforcement member 3 with an L-shaped cross section is used as an example to match an L-shaped special-shaped column 1. The stiffening ribs 32 are arranged in pairs, and are located on both sides of the same web of the T-shaped steel 12; and each end of the steel beam 2 is equipped with two pairs of stiffening ribs 32, and the arrangement position of each pair of stiffening ribs 32 is the same height as the corresponding steel beam flange.

[0154] In the present embodiment, a prefabricated steel structure residential system is provided with stiffening ribs 32 at the same height as the inner side of the special-shaped column 1 and the flange of the steel beam, which can optimize the load transfer path and enhance the stiffness and strength of the node area. However, considering that the intersection of the stiffening ribs 32 and the steel pipe 11 is prone to tearing of the steel pipe, it needs to be strengthened.

[0155] Specifically, for the circular steel tube concrete, a sleeve 31 is provided at the intersection of the stiffening rib 32 and the steel tube 11, and the sleeve 31 is sleeved over the steel tube 11. This allows the force to be directly transferred from the stiffening rib 32 to the sleeve 31, and then the load is transferred to the core steel tube concrete node part through the sleeve 31. This method can prevent the steel tube 11 from being directly subjected to the normal load, thereby improving its safety.

[0156] Of course, for rectangular or square steel tube concrete, the end of the stiffening rib 32 can be flush with the rectangular steel tube, and a force transmission connecting steel plate can be set on the side. The steel plate can directly transfer the steel beam flange load to the side of the rectangular steel tube, instead of letting the tube side intersecting with the stiffening rib 32 bear the normal load.

[0157] In the present embodiment, a prefabricated steel structure residential system is proposed, and the beam-column connection node completely eliminates the on-site welding connection, and adopts full bolt connection to achieve the rigid connection between beam and column; in addition, through the setting of the reinforcing member 3, the sleeve 31 drives the steel tube concrete to bear the force as a whole, and realizes the efficient transmission of the bending moment of the steel beam. At the same time, it also avoids the connection method of setting a reinforcing ring on the outside of the steel tube concrete, reduces the cross-sectional width of each component at the beam-column node, and increases the use space inside the building.

[0158] Example 6

[0159] In order to avoid the reduction of mechanical properties of the beam-column node domain caused by excessive residual stress of factory welding, in this embodiment, the stiffening rib 32 and the sleeve 31 are directly made into steel castings. The use of integral steel castings has the following two main advantages: 1) Each part of the casting is a whole, which can significantly reduce the impact of welding of small parts on its internal stress; 2) When the casting and the prefabricated TO special-shaped column are welded in the factory, the number and length of welds are small, which significantly improves the performance of the node domain. At the same time, the welding deformation of the casting and the TO special-shaped column caused by welding stress is small, and the difficulty of deformation correction and on-site installation is small.

[0160] In addition, the height of the sleeve 31 at the node should be higher than the height of the top surface of the steel beam flange to avoid welding in the node area. At the same time, the sleeve 31 should be set throughout the length to ensure the effective transmission of the bending moment at the beam end.

[0161] Specifically in this embodiment, the sleeve 31 has the same wall thickness as the steel pipe 11, the thickness of the stiffening rib 32 is the same as the thickness of the steel beam flange, and the steel strength grade is Q345. The end of the sleeve 31 exceeds the end of the steel beam flange by 0.35D, where D is the outer diameter of the steel pipe 11. According to the finite element analysis results, when the end of the sleeve 31 exceeds the end of the steel beam flange by more than 0.35D, the column will yield before the node under the action of the bending moment, meeting the seismic requirements of the node.

[0162] The finite element analysis of the beam-column joint is carried out. Fig.16 , Fig.17 As shown. Strengthening the node in the above manner can reduce the stress level in the node area. When the wall thickness of the casing 31 is equivalent to that of the steel pipe 11, the pipe fitting will not be torn. In contrast, the Mises stress of the steel pipe in the upper and lower parts of the node area is relatively large, which can be reduced by locally increasing the wall thickness during prefabrication or using an inner ring plate.

[0163] According to the finite element calculation results, during the design, the stiffening rib 32 and the sleeve 31 are key load-bearing components. To ensure their safety during service, the thickness of the stiffening rib 32 should not be greater than the thickness of the sleeve 31, that is, t 加劲肋 ≦t 套管 , so as to ensure that the sleeve 31 is not prone to local tearing under the tensile force along the longitudinal direction of the stiffening rib 32.

[0164] Among them, the determination of the wall thickness of the casing 31 should take into account the influence of four key factors: the outer wall thickness of the core steel tube concrete, the thickness of the stiffening ribs, the node domain height, and the core concrete strength, that is, t 套管 =α1α2α3t 钢管 , where α1, α2 and α3 represent the influence coefficients of stiffening rib thickness, node domain height and core concrete strength respectively. Stiffening rib thickness is an important parameter affecting the failure mode and failure load of steel tubes in the node domain. The ratio of stiffening rib thickness to the outer steel tube wall thickness of the core steel tube concrete is t 加劲肋 / t 外钢管 is the basic independent variable of the calculation formula of the influence coefficient, that is, α1=A*(t 加劲肋 / t 外钢管 ), the coefficient A should be determined based on the regression analysis of test data, and can be taken as 1 when there is a lack of test data. Similarly, the calculation method of α2 and α3 is determined based on the common node domain height and concrete strength, that is, α2 = B*(h 节点域 / 300), α3=C*(fc / 30), coefficients B and C should be determined based on regression analysis of test data, and can be taken as 1 when there is a lack of test data. 节点域 and fc are the node domain height and the 28-day axial compressive strength of the core concrete, respectively. The denominators 300 and 30 are the commonly used node height and concrete strength for dimensionless height and strength. It should be noted that in actual projects, the main beam height is usually higher than 300mm (that is, the node domain height is higher than 300mm). This value varies with the span and is roughly between 300 and 1000mm. In order to steadily promote the engineering application of this node and its structural system, a safe choice is 300mm.

[0165] In summary, the present embodiment is a prefabricated steel structure residential system, in which the column components are a combination of T-shaped steel and steel tube concrete: the core part of the steel tube concrete mainly bears the pressure, and the T-shaped steel is used to expand the cross-sectional size of the column, so that the cross-sectional width of each component (i.e. the core part of the steel tube concrete and the outer T-shaped steel part) is relatively small under the premise of having sufficient bending resistance. The smaller cross-sectional width allows the column components to be hidden in the wall, increasing the indoor use space and enhancing the flexibility of the layout of the house and the placement of indoor furniture. From the perspective of the force mechanism, the cross-sectional area of ​​the proposed column components is reasonable, and the division of labor of the bending / compression parts is clear, which greatly plays the advantages of the easy expansion of the steel section and the high bearing capacity and high rigidity of the steel tube concrete cross-sectional area, so that it uses less steel and has lower cost than traditional composite structural components. On this basis, a vertical connection node between columns and a beam-column node form matching the above-mentioned structural system are proposed, which ensures a high assembly rate of the node system while giving it better mechanical properties and integrity. Finally, a new type of special-shaped column structure with superior seismic resistance, small amount of steel, good integrity, high assembly rate, large usable space and flexible structural layout was obtained, which promoted the high-quality development of the construction industry.

[0166] Example 7

[0167] This embodiment is an implementation method of a beam-slab node.

[0168] Specifically, Fig.18 , Fig. 20 As shown, the floor 5 includes a prefabricated lower cover plate 51, a cast-in-place upper cover plate 52, and a steel truss 53. The lower cover plate 51 is provided with a bottom steel bar 59, and the upper cover plate 52 is provided with a top steel bar 58 to increase the overall strength of the floor 5. The top steel bar 58 and the bottom steel bar 59 both include transverse bars and longitudinal bars.

[0169] refer to Fig.19 , Fig. 20 As shown, the lower cover plate 51 is provided with a lower notch 511 in the span direction for lap jointing on the lower flange of the steel beam 2. The web of the steel beam 2 is provided with a through-reinforcement hole for the first lap joint steel bar 54 to pass through, and after the first lap joint steel bar 54 passes through the corresponding through-reinforcement hole, its two ends are respectively lap jointed on the lower cover plates 51 on both sides of the steel beam 2.

[0170] Specifically in this embodiment, the steel beam 2 is a welded steel beam, and the width of the lower flange is slightly wider than the upper flange, so as to facilitate the placement of the lower cover plate 51.

[0171] In addition, in order to reduce the deadweight of the whole floor 5 and save the foundation cost, in this embodiment, a lightweight filler 55 is arranged between the steel trusses 53. The lightweight filler 55 needs to have the characteristics of heat preservation, sound insulation, and lightness, so polystyrene board, polyurethane foam material, rock wool, etc. can be selected. Although polyurethane foam material has the best performance and the longest life, if the economic efficiency and material bulk density are comprehensively considered, polystyrene board is preferred.

[0172] In the assembled steel structure residential system of the present embodiment, the thickness of the entire floor slab 5 can be effectively reduced by placing the lower cover plate 51 of the composite floor slab on the lower flange of the steel beam 2. At the same time, the floor slab 5 is connected to the steel beam 2 in the span direction by using a PBL shear key with good connection performance to ensure the connection strength.

[0173] In addition, this embodiment also proposes an implementation method of a plate-to-plate node.

[0174] Specifically, refer to Fig.21 As shown, the lower cover plate 51 is provided with an upper notch 512 in the width direction, and the upper notches 512 of the two lower cover plates 51 are spliced ​​into a groove. A connecting member 56 is provided in the groove, and the connecting member 56 splices the two lower cover plates 51 in the width direction by cast-in-place concrete.

[0175] The assembled steel structure housing system of the present embodiment abandons the traditional assembled concrete floor splicing construction method and adopts a connection method of pre-set connection components 56 plus post-casting to ensure the crack resistance and stress performance of the connection. At the same time, the connection method is simple and easy to construct.

[0176] In this embodiment, a prefabricated steel structure residential system, the beam-slab node and the plate-slab node are specifically made as follows:

[0177] First, the lower cover plate 51 is prefabricated in the factory. Prestressed steel bars can be set in the lower cover plate 51 and the plate is made by pre-tensioning method to reduce the deflection of the plate during the construction stage. At the same time, in order to improve the rigidity of the bottom plate, the top steel bars in the steel truss can be replaced with large-sized steel bars or steel pipes (high-grade mortar can be poured inside); especially when the span of the plate is large, this method can effectively improve the rigidity of the bottom plate and control the deflection.

[0178] While prefabricating the lower cover plate 51, the H-shaped steel beam is manufactured. A row of reinforcing bar holes is set on the lower side of the web of the H-shaped steel beam for subsequent reinforcing bar insertion. Since the spacing of the reinforcing bar holes determines the number and spacing of the reinforcing bars inserted, they need to be set according to the floor slab design requirements. Of course, in order to ensure the joint operation of the H-shaped steel beam and the post-cast concrete superposition layer, studs can be welded on the top of the steel beam. The size and spacing of the studs must comply with the relevant provisions of the "Combined Structure Design Code" JGJ138.

[0179] After the lower cover plate 51 and the H-shaped steel beam are manufactured, the H-shaped steel beam and the prefabricated lower cover plate 51 are installed. The connection of the prefabricated lower cover plate 51 in the span direction requires that the plate be placed on the lower flange of the H-shaped steel beam first, and then the first lap steel bar 54 is inserted into the corresponding position of the H-shaped steel beam through-bar hole according to the design requirements. The first lap steel bar 54 can effectively transfer the normal use load of the floor slab, avoid the formation of a single-span slab, and effectively reduce the mid-span deflection; it can also avoid the cracking of the bottom plate of the composite floor slab at the support. In order to further enhance the strength of the lap joint, the size of the first lap steel bar 54 should be larger than the bottom steel bar 59 of the slab.

[0180] The connection of the lower cover plate 51 of the composite floor in the width direction requires the upper notch 512 to be set at the connection point first, and then spliced ​​to form a groove, and the connecting member 56 is placed in the groove. It is worth noting that the splicing and installation of the lower cover plate 51 requires the setting of formwork support at the bottom according to the design requirements of the construction stage to reduce the stress of the plate and avoid local crushing. After the formwork support is set, a lightweight filling body 55 is set between the steel trusses 53, and then the top steel bars 58 of the plate are laid and the cast-in-place composite layer (upper cover plate 52) of concrete is poured. The maintenance of the cast-in-place composite layer must meet the requirements of the current specifications.

[0181] Example 8

[0182] This embodiment is used as an implementation mode of the connecting member 56 and is used in conjunction with the L-shaped upper notch 512 .

[0183] Specifically, refer to Fig. 22 As shown, the connecting member 56 includes a bending rib 561 and a steel frame 562; wherein the bending rib 561 is located in the respective upper notches 512, the bending rib 561 is in an inverted U shape as a whole, and both ends thereof extend into the lower cover plate 51. The steel frame 562 is located in the groove after splicing and covers the entire bending rib 561 area.

[0184] The steel bar skeleton 562 includes longitudinal bars and stirrups; and the bent bars 561 are formed by bending the bottom steel bars 59 during prefabrication to resist the torque at the connection.

[0185] In the assembled steel structure residential system of this embodiment, when the composite floor is used as a two-way slab, there may be significant bending moment or torsion load at the connection, and the arrangement of the steel frame stirrups and the bending bars 561 can effectively resist the load and ensure rigidity. Therefore, the size of the stirrups in the steel frame should not be smaller than the size of the composite floor bottom steel bars 59 in the width direction, and the spacing should not be larger than the spacing of the composite floor bottom steel bars 59.

[0186] Example 9

[0187] This embodiment is another embodiment of the connecting member 56 .

[0188] refer to Fig.23 The connection member 56 includes at least three groups of second overlapping steel bars 563, and each group of second overlapping steel bars 563 is provided with a plurality of them along the width direction of the floor slab.

[0189] Among them, the first group and the second group are prefabricated in their respective lower cover plates 51, and their free ends extend to their respective upper notches 512 areas; the third group is located in the groove after splicing, and its two ends are staggered and overlapped with the free ends of the other two groups.

[0190] Since the stress of the bottom plate steel bar 59 is mainly transmitted by the second lap steel bar 563, in order to reduce the lap length, meet the on-site installation dimension requirements and avoid the reduction of the bottom plate strength / rigidity due to excessively large grooves, an anchor plate 564 needs to be set at the end of the second lap steel bar 563.

[0191] According to the previous tests, the total lap length can be reduced by 85% by lap jointing the anchor plate 564. For the common plate bottom steel bar size of Φ8-Φ10, the lap length is only about 50mm. At this time, the length of the upper notch 512 can be 100mm, which is only about 10% of the width of the conventional laminated plate, and has little effect on the plate itself.

[0192] Example 10

[0193] In addition, it is considered that in actual construction, the joints of the composite floor slab (that is, the joints in the width direction of the lower cover plate 51) are prone to leakage and the L-shaped notches are prone to stress concentration at the inner corners and damage.

[0194] To solve the above problem, in this embodiment, the upper notch 512 is trapezoidal in shape as a whole, and the trapezoidal upper notch 512 is used in conjunction with the connecting member 56 in embodiment 3. In addition, a foam strip 57 is also provided at the joint.

[0195] Specifically, refer to Fig.24 As shown, the bottoms of the two adjacent lower cover plates 51 are provided with overlapping grooves that match each other along the width direction. The two lower cover plates 51 are overlapped through the overlapping grooves, and a foam strip 57 is provided at the overlapping position.

[0196] During on-site construction, foam strips 57 are placed at the joints, and the pressure between the superimposed panels is used to compress the foam strips 57, thereby achieving a water-stopping effect. For panels with low thickness of post-cast concrete and low local pressure on the foam strips 57 during construction, the foam strips can also be placed directly on the trapezoidal notches (such as Fig.23 shown).

[0197] Embodiment 11

[0198] This embodiment is an implementation method of a shear wall structure.

[0199] refer to Fig.25 , Fig.26 As shown, the shear wall in this embodiment is a π-shaped steel frame constrained dense-rib shear wall, which includes a wall body 61 and separate composite components arranged on both sides of the wall body 61.

[0200] Among them, the separated composite component includes two steel components 62 arranged opposite to each other, and the two steel components 62 are connected by connecting stirrups 63. One of the steel components 62 is pre-buried at the edge of the wall 61, and a casting space is formed between the two steel components 62. By pouring concrete into the casting space, an integral component is formed.

[0201] Specifically in this embodiment, the steel member 62 is a π-shaped steel, the flanges of the two π-shaped steels are arranged opposite to each other, and the flanges of the π-shaped steels are provided with through-rib holes for connecting stirrups 63 to pass through, and the above-mentioned casting space is formed between the webs of the two π-shaped steels. The π-shaped steel should be hidden in the wall, so the flange width should not be greater than 250mm.

[0202] In this embodiment, a prefabricated steel structure residential system is formed by pre-embedding a π-shaped steel member with a reinforcement hole at the edge of the wall 61, then inserting a connecting stirrup 63 into the hole and pouring concrete to form a π-shaped steel separated composite member. This member can be used as an edge constraint member of the wall 61, and forms a π-shaped steel frame-constrained dense-rib shear wall with the wall 61, so that it has better seismic resistance. The π-shaped steels in this member are mainly connected by a PBL shear connection key formed by connecting stirrups 63 and concrete, so that the two can work together and give full play to their respective performance.

[0203] Compared with conventional cast-in-place concrete shear walls, the π-shaped steel frame constrained dense-rib shear wall in this embodiment can change the wall stiffness by adjusting the π-shaped steel spacing, the number and size of π-shaped steel screw holes, the cross-sectional size of the steel, the number of ribs in the wall, etc., so that it can control the inter-layer displacement under small earthquakes and have sufficient deformation and energy absorption capacity under large earthquakes.

[0204] Example 12

[0205] This embodiment is an implementation method for constraining the dense-rib shear wall in the vertical direction and the connection node between the π-shaped steel frame and the steel beam 2.

[0206] Among them, as a wall-beam connection node, since both sides of the shear wall are steel components, a full bolt connection method can be adopted, which can further reduce wet operations, reduce construction difficulty, and improve on-site construction efficiency.

[0207] Specifically, refer to Fig. 27 , Fig.28As shown, an extended steel beam 64 is arranged on the π-shaped steel far away from the wall 61, and the extended steel beam 64 and the π-shaped steel can be welded in the factory, and the extended steel beam 64 is an H-shaped steel matched with the steel beam 2. By presetting screw holes for the extended steel beam 64 and the steel beam 2, and then splicing the extended steel beam 64 and the steel beam 2 together through high-strength bolts and the splicing cover plate 9, the connection between the shear wall and the steel beam 2 is completed.

[0208] The vertical connection between walls mainly considers the connection between π-shaped steel separated composite components and the connection between reinforced concrete dense ribs. For the π-shaped steel separated composite components, the upper and lower side walls can be connected to the splicing cover plate 9 by bolts through the extended π-shaped steel. The reinforced concrete dense ribs are overlapped by the upper and lower extended steel bars, and after the connection is completed, they are poured together with the concrete floor slab between the walls to achieve a stable vertical connection.

[0209] Embodiment 13

[0210] This embodiment is an implementation method of the connection node between the π-shaped steel frame constrained dense-rib shear wall and the floor slab 5.

[0211] Specifically, refer to Fig.29 As shown, the inner stirrups 611 of the transverse ribs of the wall 61 are extended outwards and overlapped with the steel bars in the cast-in-place upper cover plate 52 to resist the negative bending moment at the node; at the same time, the prefabricated lower cover plate 51 of the composite floor is provided with pre-set holes, and studs are pre-set in the holes, and then the composite layer is cast in situ to achieve a stable connection between the floor slab and the bottom plate. The wall 61 is also provided with an angle steel connector for positioning and supporting the prefabricated lower cover plate 51 of the composite floor.

[0212] In addition, in addition to connecting at the transverse ribs, a cast-in-place space can be reserved at the corresponding position on the wall 61 to avoid protruding steel bars outside the surface and facilitate transportation (such as Fig.30 shown).

[0213] In the present embodiment of a prefabricated steel structure residential system, when connecting the wall-beam, wall-board, and wall-wall vertical nodes, attention should be paid to the installation sequence:

[0214] First, the wall 61 and the steel beam 2 are spliced ​​by full bolt connection, so that the wall 61 and the steel beam 2 on the same layer form a structural whole to prevent the wall from collapsing during the construction stage;

[0215] Subsequently, the upper wall is hoisted, positioned and spliced ​​with the lower wall on site with bolts. When splicing, it is necessary to consider whether the node strength and deformation (before and after pouring concrete) can meet the requirements of the construction stage. If not, it is possible to consider embedding steel plate stiffeners inside the π-shaped steel separation composite member to strengthen it;

[0216] Next, the prefabricated lower cover plate 51 is laid on the steel beam 2 and then concrete is poured. The poured concrete is cured for about 7 days, at which time the concrete strength is expected to reach more than 50% of the design strength to ensure the safety of subsequent construction steps.

[0217] Embodiment 14

[0218] In order to further improve the earthquake resistance of the wall 61, a prefabricated steel structure residential system of the present embodiment is provided with a self-resetting energy-absorbing support 7 in the dense-rib gap of the dense-rib wall on the basis of the above-mentioned embodiment.

[0219] Specifically, Fig.31 , Fig.32 As shown, the self-resetting energy-absorbing support 7 includes two support tubes 71, one end of the support tube 71 is provided with a connecting end plate 72, and the other end is provided with a steel connector 73, the flanges of the two steel connectors 73 are connected by a connecting cover plate 74, and an elastic reset member 75 is provided between the two steel connectors 73.

[0220] Specifically in this embodiment, the steel connector 73 is a π-shaped steel, and a second slot 76 is provided on the flange of the π-shaped steel; the elastic reset member 75 is a self-reset spring, and the self-reset spring is arranged between the two flanges of the π-shaped steel.

[0221] In order to ensure that the energy dissipation capacity of the wall meets the structural stress requirements and does not suffer torsional damage under horizontal loads, after the wall is installed, the center of mass of the dense ribbed part of the wall and the center of mass of the support must be basically on the same vertical plane, and the eccentricity does not exceed β×max(L / 1000,B). In the formula, L is the calculated length of the support, B is the length of the long side of the rib grid, and β is the safety factor (the value range is 0.5 to 0.8).

[0222] According to previous studies, the supports are arranged in a triangular shape, and the horizontal angle γ of the self-resetting energy-absorbing supports needs to be between 30 and 60 degrees to ensure that the supports can work efficiently under horizontal reciprocating loads.

[0223] In this embodiment, the self-resetting energy-absorbing support 7 is mainly composed of a self-resetting spring unit and a slot-connected energy-absorbing unit, wherein the slot-connected energy-absorbing unit mainly realizes energy absorption through friction and sliding between the connected cover plates. In order to prevent the cover plate from local buckling under the action of reciprocating load, the width-to-thickness ratio of the cover plate is preferably Among them, fy is the steel strength grade. In addition, since the component is a component that directly bears the earthquake dynamic load, the welding rod used for the weld should be a low-hydrogen type welding rod. At the same time, in order to increase the energy dissipation capacity, brass gaskets or high-damping rubber gaskets can be used between the inner screw hole of the support and the bolt. After the earthquake, the support is reset by the self-reset spring to restore the deformation of the dense rib wall to its original state. In the normal use stage, the support can enhance the lateral stiffness of the shear wall, increase the natural frequency, and reduce the wind vibration response; under the action of rare earthquakes, it can also significantly improve the energy dissipation capacity of the wall, and after the strong earthquake, it has a certain reset ability to avoid the aggravation of the second-order effect of the vertical load-bearing components due to excessive deformation, causing the collapse of the structure, thereby enhancing the stability of the structure and components.

[0224] In the prefabricated steel structure residential system of the present invention, when the seismic fortification intensity is low (6-7 degrees) and the building height does not exceed 100m, it is possible to consider using a π-shaped steel separation composite member frame to constrain a dense rib wall. When the seismic fortification intensity is low (8-9 degrees) and the building height is higher than 100m, a self-resetting energy-absorbing support can be used to strengthen the dense rib wall, and the wall body is provided with a self-resetting energy-absorbing support in the dense rib gap.

[0225] Based on PKPM software, a typical high-rise residential building with shear wall structure is used to verify the proposed multi-rib wall system to prove the feasibility of the present invention. Assuming a 26-story high-rise building with a floor height of 3m and a total height of 78m, the project is located in Changsha, Hunan Province, the earthquake fortification intensity is 6 degrees, and the basic wind pressure is 0.25kN / m 2 , the site type is Class B; the load setting complies with the "Load Code", the columns are steel tube concrete columns, the beams are hot-rolled light I-beams, and the floor slabs are assumed to be rigid. Since the PKPM software cannot directly simulate the multi-rib composite wall panels, the diagonal rod unit in the PKPM software is now used for stiffness equivalence. The rest of the model follows the default settings of PKPM. After trial calculations, it was found that the proposed multi-rib wall system can fully meet the performance requirements of high-rise buildings. The shear weight ratio of each layer and the inter-layer displacement angle are as follows Fig.33 , Fig.34 shown.

[0226] In summary, the prefabricated steel structure residential system of this embodiment effectively solves the problems of traditional cast-in-place concrete shear wall components having more rigidity than energy dissipation capacity, as well as the problems of more wet work on site, heavy component weight, and dense steel bar arrangement and difficulty in construction at the edge of the constrained component. In addition, by setting up self-resetting energy dissipation supports to enhance the rigidity and energy dissipation capacity of the wall, the problem of excessive deformation of the dense rib wall under rare earthquakes, which aggravates the second-order effect and causes structural collapse, is solved; at the same time, the wall thickness is reduced, solving the problem of insufficient indoor space caused by excessively thick shear walls in some high-rise buildings.

[0227] Embodiment 15

[0228] This embodiment is another implementation method of the shear wall structure.

[0229] The shear wall in this implementation adopts a structure-based combined H-shaped steel frame to constrain the dense rib shear wall. First of all, it should be noted that different cross-sections can be formed according to the requirements of the non-connected nodes. The following lists three commonly used cross-sections. Fig.36 , Fig.37 , Fig.38 As shown, they are respectively a "straight" connection node, an "L" connection node and a "T" connection node. For the convenience of introduction, the specific structure and connection method of the "straight" connection node are described in detail in this embodiment.

[0230] refer to Fig.35 , Fig.36 As shown, the combined H-shaped steel frame constrained dense-rib shear wall includes a wall body 1 and a steel member 62 arranged at the end of the wall body 1, wherein the steel member 62 is a T-shaped steel.

[0231] Specifically, the T-shaped steel is embedded in the end of the wall 61 through its web, and a first slot 65 for the connecting bolt to pass through is opened on the flange of the T-shaped steel.

[0232] During assembly, the wing plates of the T-shaped steel on the adjacent walls 61 are aligned, and then the two wing plates are connected by connecting bolts and the splicing cover plate 9, and concrete is poured afterwards, thereby completing the horizontal expansion of the wall 61 and forming a combined H-shaped steel concrete member at the node. Preferably, the connecting bolts are high-strength bolts.

[0233] In order to prevent the post-cast concrete from cracking seriously under the action of earthquake loads, which would affect the overall bearing capacity and durability of the components, a steel skeleton needs to be configured in the concrete pouring area. The specific structure of the steel skeleton is the existing technology, and its size and stirrup spacing are implemented in accordance with national standards, which will not be repeated here.

[0234] At the same time, shear studs need to be installed between the T-steels and the dense rib wall and the post-cast concrete on both sides of the combined H-steel concrete joint, and the connection between the studs and the concrete must meet the requirements of a fully shear connection to ensure the coordinated work between steel and concrete.

[0235] In the present embodiment of a prefabricated steel structure residential system, when the ribbed shear wall is manufactured, the size and spacing of the first slot 65 can be designed according to the requirements of a complete shear connection, that is, the shear bearing capacity of the bolts must be higher than the tensile / compressive bearing capacity of the single-sided T-shaped steel member. The longitudinal shear force distribution at the combined H-shaped steel connection under horizontal seismic load can be referred to Fig.39 .

[0236] In rare earthquakes, the node can be slid through the first slot 65 to dissipate energy by friction, thereby having better energy dissipation capacity. Fig.40 , Fig.41 It can be seen that the structure connected by multiple first slots 65 at the T-steel connection nodes shows a certain energy dissipation capacity. When the first slots 65 are used for connection, the lateral stiffness of the entire wall 61 may be small, and the outer concrete may crack due to uncoordinated deformation under wind loads or frequent earthquakes. At this time, the stress inside the concrete can be released to a certain extent by not setting connecting bolts or setting fewer bolts. In addition, in order to avoid cracking of the outer concrete material, partitions can be set only on the outside of the node, such as ALC boards, aerated concrete blocks, etc.

[0237] In this embodiment, a prefabricated steel structure residential system is implemented, by burying a T-shaped steel with a first slot 65 at the end of the wall 61, and then splicing and installing it on site and pouring concrete, a combined H-shaped steel concrete member can be formed at the node between the dense rib shear walls. This node has high rigidity and significant energy dissipation capacity. Under frequent earthquakes, the shear wall is in the elastic stage, limiting the inter-layer displacement of the structure; under rare earthquakes, it mainly relies on the core combined H-shaped steel member to dissipate energy, meeting the requirement of "not collapsing in a major earthquake" in the current specifications.

[0238] Example 16

[0239] Most of the existing vertical connection methods of shear walls use pre-buried steel bar grouting sleeves and splicing and grouting on site, but this method is prone to problems such as deviation between the position of the steel bar and the sleeve or loose grouting resulting in low strength at the connection during on-site installation. To address this problem, based on the above embodiment, this embodiment provides a vertical splicing node of a combined H-shaped steel frame constrained dense-rib shear wall.

[0240] Specifically, Fig.42 As shown, the vertical joint includes a corrugated pipe 66 embedded in the wall 61 and a special steel frame 67 located in the corrugated pipe 66 ; the connection between the upper and lower walls 61 is completed by pouring concrete into the corrugated pipe 66 .

[0241] like Fig.43 As shown, the special steel frame 67 includes stirrups 671 and longitudinal steel bars 672 , wherein a connection reinforcement 673 is provided on the outer side of the stirrups 671 of the special steel frame 67 .

[0242] According to the model analysis results, when the diameter of the steel bar exceeds 22mm, the hysteresis curve will show obvious "pinching", which significantly reduces the energy dissipation capacity of the node. Therefore, it is recommended that the diameter of the longitudinal steel bar 672 should not be greater than 22mm to ensure the energy dissipation capacity of the connection node. At the same time, combined with the diameter limit of the corrugated pipe 66 (about 100mm), the longitudinal steel bar 672 is preferably Φ14-Φ16 steel bar. If the diameter is too large, the space inside and outside the steel cage is small, which is not convenient for concrete pouring.

[0243] The stirrups 671 can also enhance the interaction between the steel bar and the corrugated pipe through its bending deformation, so large diameter stirrups should be used, and it is recommended that the stirrup diameter be no less than Φ10.

[0244] In addition, within a range of not less than 300mm from the connection node, connection reinforcements 673 are provided approximately every 200mm, and the connection reinforcements 673 can be connected to the stirrups 671 by welding. This is because the width of the concrete rib is normally about 250mm. According to the Saint-Venant principle, the height of the influence zone of the local stress at the connection node is equal to the cross-sectional width, which is about 250mm. In order to enhance the performance within the node domain, the setting range of the reinforcement should not be less than 250mm, but considering unfavorable factors such as construction quality, it is increased to 300mm here. At the same time, considering that the anchoring force of the reinforcement is transmitted at an oblique 45 degrees, the vertical influence range is also about 200mm, so the reinforcements are set at intervals of 200mm.

[0245] Preferably, the connection reinforcement 673 can be made of a small steel bar, and the minimum side length of the steel bar is not greater than 0.4 times the distance between the longitudinal reinforcement 672 and the inner wall of the corrugated tube 66, so as to reduce the stress near the steel bar and alleviate the damage to the concrete under the action of reciprocating load.

[0246] In the assembled steel structure housing system of this embodiment, the bellows 66 needs to be pre-buried in the concrete ribs in advance, and the distance between the outer edge of the bellows 66 and the steel bars in the ribs should not be less than 1.3 times the maximum particle size of the cast concrete aggregate; at the same time, the concrete cast in the bellows 66 should be fine stone concrete with a nominal aggregate size not exceeding 16mm to ensure the quality of concrete casting. And the grade of the post-cast concrete in the bellows 66 should be higher than the concrete grade of the prefabricated dense rib shear wall to ensure the strength of the connection, so that the bearing capacity of the formed bellows composite column node should meet the requirements of the specification.

[0247] In the assembled steel structure housing system of the present embodiment, the bellows 66 and the outer reinforced concrete ribs are processed and cast in the factory, and only a special steel cage needs to be inserted and concrete needs to be cast on site to complete a reliable connection. Since the longitudinal stiffness of the bellows 66 is relatively low, its contribution to the axial resistance is relatively small. According to the Von-Mises yield criterion, the vertical stress is relatively small and the constraint stress is relatively large under the limit state. Therefore, it has a significant enhancing effect on the mechanical properties of the wall itself and the nodes. Since the wall of the bellows 66 is generally thin, it is easy to collide and cause local buckling during transportation, while the outer reinforced concrete ribs can provide an effective support for the bellows 66, making it convenient to transport and work with the remaining ribs. Therefore, the steel bars of the outer steel reinforcement skeleton of the bellows 66 can be smaller steel bars, and it is only necessary to achieve the support and positioning of the core bellows during transportation and installation. The core reinforced concrete part of the corrugated pipe is mainly used to bear vertical loads and seismic energy dissipation. According to existing research, the steel content of the cross section of the corrugated pipe 66 should not be less than 1%, and the steel reinforcement ratio of the core reinforced concrete in the corrugated pipe 66 should not be less than 1%.

[0248] Compared with the traditional corrugated steel pipe sleeve connection, the connection method adopted in this embodiment only needs to set one corrugated pipe 66 on the same longitudinal rib of the shear wall. The corrugated pipe 66 has a larger diameter, which is convenient for inserting the special steel frame 67, and has a lower precision requirement, which is convenient for construction; in addition, the special steel frame is used to enhance the performance of the vertical connection node of the shear wall, which can work in coordination with the corrugated pipe 66 and has good seismic performance.

[0249] Embodiment 17

[0250] On the basis of the above-mentioned embodiments, this embodiment provides a dense-rib shear wall corner splicing node 8 for completing a stable and efficient connection between the wall 61 and the foundation pedestal 85 .

[0251] Specifically, refer to Figure 44-Figure 46 As shown, the corner joint 8 includes a connecting steel 81 and an anchor bolt 82. The connecting steel 81 is embedded in the bottom of the wall 61, and the anchor bolt 82 is embedded in the foundation pedestal 85. The connecting steel 81 is connected to the anchor bolt 82 through the bottom plate 83 at the bottom thereof. Then, concrete is poured to complete the connection between the wall 61 and the foundation pedestal. Of course, screw holes for the anchor bolt 82 to pass through need to be provided on the bottom plate 83.

[0252] Since the bending moment at the corner joint 8 is large and the local stress at the connection between the bottom plate 83 and the steel is high, studs can be welded on the connecting steel 81, and reinforcing ribs 84 are provided at the connection between the bottom plate 83 and the connecting steel 81 to form a rigid wall foot connection, thereby enhancing its performance. In addition, the strength grade of the post-cast concrete should not be lower than the strength grade of the cap concrete.

[0253] In the assembled steel structure housing system of this embodiment, when the foundation pedestal 85 is cast, anchor bolts 82 need to be pre-buried, and the position and number of the bolts correspond to the screw holes on the bottom plate 83. During on-site installation, the prefabricated multi-rib shear wall is first hoisted to the corresponding position, and the anchor bolts 82 are passed through the bottom plate 83 to be connected by mechanical connection; then, the concrete bottom plate is cast to form a whole with the connection steel 81 and the foundation pedestal 85, thereby enhancing the mechanical properties of the node.

[0254] The following points should be noted during prefabrication and installation: 1) Large screw holes can be used for the screw holes on the base plate 83, whose diameter is about 5 mm larger than the nominal diameter of the bolts, to avoid installation problems caused by construction errors; 2) Shear connectors (bolts, channel steels or PBL shear connectors) should be preset on the connecting steel; 3) Anchor bolts 82 and base plate 83 should comply with the relevant provisions of the "Steel Structure Design Standard" GB50017.

[0255] An assembled steel structure residential system of the present embodiment pre-buries a connecting steel 81 at the bottom of the dense-ribbed wall and embeds anchor bolts 82 at the foundation pedestal 85; the traditional steel bar binding overlap is replaced by a mechanical connection between the anchor bolts 82 and the connecting steel 81, thereby optimizing the structure of the connection and achieving efficient on-site installation of the prefabricated multi-layer dense-ribbed shear wall and the foundation pedestal; at the same time, the integrity and strength of the node are further ensured by post-cast concrete.

[0256] A connection method of a combined H-shaped steel frame-constrained dense-rib shear wall of this embodiment includes:

[0257] S1, first hoist the bottom wall 61 to the predetermined position and connect the foundation anchor bolts 82;

[0258] S2, connecting the edge T-shaped steel members to the adjacent walls to form a combined H-shaped steel member at the node;

[0259] S3, pouring the bottom slab concrete and the concrete at the nodes, forming a pre-buried rigid wall foot at the wall foot, and forming a combined H-shaped steel-concrete connection node at the horizontal extension of the wall;

[0260] S4. After the construction of the first layer of wall panels (the actual natural floor will vary according to the design requirements, generally 2-3 floors) is completed, the second layer of wall panels is hoisted;

[0261] S5. After the wall panels are hoisted in place, insert the steel skeleton into the embedded corrugated pipe and pour in concrete. After pouring, the steel skeleton must be higher than the top surface of the second layer of wall panels, and the height must meet the requirements of relevant specifications;

[0262] S6. Perform horizontal and vertical connections of subsequent standard layer walls in sequence.

[0263] Embodiment 18

[0264] This embodiment is another implementation method of the shear wall structure.

[0265] like Fig.47 As shown, this embodiment adopts the structure of a π-O special-shaped column frame constrained concrete shear wall. The shear wall comprises a wall body (61), and steel tube concrete columns and steel components 64 respectively arranged on both sides of the wall body, wherein the steel tube concrete columns comprise a steel tube 11 and a first connecting steel plate 14 arranged on the outer peripheral wall of the steel tube 11, and the first connecting steel plate 14 is connected to the steel component 64 through a connecting stirrup 63.

[0266] Specifically, Fig.48 As shown, the steel member 64 is a π-shaped steel. The first connecting steel plates 14 of the steel tube concrete column are provided with two, and the first connecting steel plates 14 correspond to the two flanges of the π-shaped steel respectively, and the first connecting steel plates 14 and the flanges of the π-shaped steel are provided with through-rib holes for connecting stirrups 63 to pass through.

[0267] In this embodiment, by setting steel tube concrete columns and π-shaped steel at both ends of the wall, a π-O special-shaped column frame is used to constrain the concrete shear wall, which can be used as a constrained edge member to enhance the performance of the wall. And the two are connected by connecting stirrups 63 to form a PBL shear key, so that the two can work together, which can further improve the seismic performance of the wall, so that it is suitable for high-rise buildings. At the same time, this connection method can avoid the setting of the web, save the amount of steel, and increase the section inertia moment and bending stiffness by adjusting the distance between the steel tube concrete column and the π-shaped steel, so that the overall structure can effectively control deformation during normal use. Under the action of rare earthquakes, the reinforced concrete wall can effectively limit the out-of-plane buckling of the steel, so that it can give full play to its energy consumption capacity, and can also achieve the performance coordination of the shear wall part and the frame part. In addition, by hiding the steel tube concrete column and the π-shaped steel in the wall, the column is not exposed and occupies a small space, which can increase the indoor use space and enhance the flexibility of the apartment layout.

[0268] It should be noted that the π-O special-shaped column frame-constrained concrete shear wall in this embodiment can be formed with different cross-sections according to actual needs, for example, an L-shaped shear wall structure (such as Fig.49 shown).

[0269] Embodiment 19

[0270] On the basis of the above-mentioned embodiments, this embodiment provides a horizontal connection node of a π-O special-shaped column frame constrained concrete shear wall, and the horizontal connection node is used to expand the wall 61 in the horizontal direction based on the characteristics of π-shaped steel.

[0271] Specifically, refer to Fig.50, Fig.51 As shown, the horizontal connection node includes two L-shaped steels 681 arranged in a central symmetric manner. One end of the L-shaped steel 681 is welded to the respective π-shaped steels, and the other end is a free end. The free ends of the two L-shaped steels 681 are mutually staggered and overlapped, and an elastic pad 682 is provided at the overlap. Preferably, the elastic pad 682 is a rubber block.

[0272] In this embodiment, during production, the L-shaped steel 681 is welded to the π-shaped steel at the end of the shear wall, and then the two L-shaped steels 681 are spliced, and rubber blocks are set at the splicing point to ensure that the shear wall connection node has sufficient energy dissipation capacity under a large earthquake. Finally, a steel skeleton 65 is set in the node area and concrete is poured, and the post-poured concrete grade is not lower than the concrete grade of the shear wall itself, further enhancing the node performance. The connection method of this embodiment has clear force, simple connection, convenient on-site construction, and saves construction time.

[0273] An assembled steel structure residential system in this embodiment is formed by setting steel tube concrete columns and π-shaped steel at both ends of the wall 61, and forming a PBL shear key between the two by connecting stirrups 63, so as to form a π-O special-shaped column frame constrained concrete shear wall. Not only can the seismic performance of the wall be improved, but also the column is not exposed and occupies a small space, which can increase the indoor use space and enhance the flexibility of the apartment layout. In addition, in this embodiment, on the basis of the π-O special-shaped column frame constrained concrete shear wall, a horizontal connection node connection node between the walls is proposed, which ensures a high assembly rate of the node system while giving it better mechanical properties and integrity. Finally, a new structural system with superior seismic performance, small steel consumption, good integrity, high assembly rate, large use space, and flexible structural layout is proposed to promote the high-quality development of the construction industry.

[0274] Embodiment 20

[0275] This embodiment is another implementation method of the horizontal connection node of the π-O special-shaped column frame constrained concrete shear wall.

[0276] refer to Fig.52 , Fig.53 As shown, the horizontal connection node includes a second connection steel plate 683 arranged on the π-shaped steel of the wall 61 on one side, and a third connection steel plate 684 arranged on the π-shaped steel of the wall 61 on the other side. The second connection steel plate 683 and the third connection steel plate 684 are staggered and overlapped, and the two are connected by bolts and then poured with concrete.

[0277] Specifically in this embodiment, the second connecting steel plate 683 and the third connecting steel plate 684 are both "straight" steel plates. There is one second connecting steel plate 683 and two third connecting steel plates 684; and the free end of the second connecting steel plate 683 extends into the gap between the two third connecting steel plates 684.

[0278] A π-O special-shaped column frame constrained concrete shear wall flat connection node of the present embodiment is manufactured by welding two "I-shaped" steel plates to the π-shaped steel at the end of the shear wall, welding one "I-shaped" steel plate to the π-shaped steel at the end of the other shear wall, and connecting the "I-shaped" with bolts; then, a steel frame 65 is set in the node area and concrete is poured.

[0279] Of course, it is necessary to open screw holes for bolts to pass through at the corresponding positions of the "I-shaped" steel plates. The spacing between the screw holes should not be too small (not less than 3d, d is the nominal diameter of the bolt) so that the shear bearing capacity of each bolt can be fully exerted; and the spacing between the screw holes should not be too large (not more than 10d, d is the nominal diameter of the bolt) to ensure that the node area has sufficient bearing and energy dissipation capacity.

[0280] Embodiment 21

[0281] Based on the above embodiments, a new cross-section formation of a steel tube concrete column is provided.

[0282] like Fig.54 As shown, the steel tube concrete column includes a steel tube 11 and concrete 13 disposed in the steel tube 11. The concrete 13 includes a centrifugally formed concrete 131 and a core concrete 132 disposed in the centrifugally formed concrete 131; wherein the centrifugally formed concrete 131 is prefabricated in a factory, and the core concrete 132 is cast on site.

[0283] Specifically in this embodiment, the strength of the core concrete 132 is C30-C60, preferably C60 concrete; the centrifugally formed concrete 131 is ultra-high strength concrete, and its strength does not exceed C120 to ensure the ductility of the component.

[0284] In this embodiment, a prefabricated hollow ultra-high-strength steel tube concrete component is formed by steel tube 11 and centrifugally formed concrete 131. The component can be prefabricated in a factory. Subsequently, core concrete 132 is poured on site to form an ultra-high-strength steel tube concrete composite column component, thereby improving the core concrete material performance and reducing the cross-sectional size and steel consumption.

[0285] Embodiment 22

[0286] On the basis of the above-mentioned embodiment, the specific composition and process of the centrifugal concrete 131 are further optimized and designed.

[0287] Specifically, the centrifugally formed concrete 22 may be prepared in the following proportions: water 200-250 kg / m 3 , cement 800~1000kg / m 3 , Natural sand / mechanical sand 750~1125kg / m 3 Silica fume 135~170kg / m 3 1. The dosage of high-efficiency polycarboxylate water-reducing agent is 0.5% to 1% of cement dosage, and the dosage of steel fiber is 1% (1 cubic meter of concrete contains 0.01 cubic meter of steel fiber). Considering that the price of natural sand / machine-made sand is relatively high in some areas, some natural sand can also be replaced by natural stone, and the proportion of natural stone mass to total aggregate mass (the sum of coarse and fine aggregate mass) shall not exceed 20%.

[0288] The specific preparation process is as follows: 1) First, put all the aggregates, silica fume and steel fibers into the mixing device and mix for 10 minutes to make the aggregates, silica fume and steel fibers evenly distributed; 2) Slowly pour water during the mixing process, and the amount of water poured is 1 / 2 of the total water volume. The water selected is the water used by urban residents. The water temperature is recommended to be no less than 15 degrees Celsius to ensure the effective development of concrete strength. For mixing plants with conditions, the water temperature can be raised to 30 degrees Celsius. This water temperature can ensure that the cubic compressive strength of the concrete reaches 50MPa within 3 days, ensuring the development of later strength. 3) The water addition and mixing process needs to last for 10 minutes to ensure the full reaction of silica fume; 4) Then add cement into the mixing device, and then add all the remaining water and stir for 5 minutes; 5) Finally, add a water reducer. It is recommended to use a high-efficiency polycarboxylic acid liquid water reducer to improve the fluidity of the concrete and facilitate pumping.

[0289] The characteristics and advantages of the above preparation method are mainly two points: 1) In traditional steel fiber ultra-high strength concrete, the steel fiber content is usually high (volume content greater than 2%). At this time, the material preparation cost is high and cannot be well used in actual projects. By improving the preparation method, increasing the mixing time and the order of admixture, the mechanical properties of concrete can be reduced without significant changes when the steel fiber content is reduced. According to previous experimental studies, when the steel fiber content is less than 0.5%, the improvement in the mechanical properties of concrete is very limited, while at about 1%, it shows a significant beneficial effect. Compared with not adding steel fibers, the deformation capacity of the material can be increased by more than 50%, ensuring the seismic performance of ultra-high strength concrete components when used in shear wall structures. 2) The order of material addition is different from the traditional method of adding all admixtures at one time. The preparation process of first adding aggregate and steel fiber, then adding part of warm water, and finally adding the remaining water, silica fume, and cement is selected. The process first mixes steel fibers with aggregates, and when there is no water involved in the mixing, it can be evenly distributed by continuous stirring, then water is added to fix the relative positions of the steel fibers through the adhesion of water, and finally the remaining admixtures are added for full reaction. The distribution of fibers in steel fiber ultra-high strength concrete is guaranteed, and the fiber content is reduced under the same performance control conditions.

[0290] The steel fiber ultra-high strength concrete produced by the above method was tested. The test results are shown in the table below. It can be seen that when the steel fiber is added by the above method, the splitting strength is increased by 54%.

[0291]

[0292] Embodiment 23

[0293] Due to the restraining effect of the steel tube 11, the core concrete 132 can use recycled concrete to replace ordinary concrete materials, and the replacement rate of coarse and fine aggregates can be 100%, thereby reducing overall carbon emissions and improving the comprehensive recycling and disposal capacity of urban construction waste. According to the inventor's previous research, the impact of adding recycled aggregates on the bearing capacity of steel tube concrete does not exceed 15%. Through reasonable design, the performance of recycled concrete composite special-shaped columns can be made equivalent to that of ordinary concrete without basically increasing costs.

[0294] Among them, the proportion of recycled concrete: water 180~200kg / m 3 , cement 360~600kg / m 3 , Natural coarse aggregate 1080~1240kg / m 3 , Natural fine aggregate 610~710kg / m 3 The dosage of Nai series water reducer is 0.5% to 1% of cement dosage, i.e. 2 to 6 kg / m 3The recycled coarse and fine aggregates in the above proportions can be replaced by volume or mass. The mass of the corresponding natural aggregate components can be converted into the mass of the recycled aggregate components in combination with the density of the recycled aggregate itself and the required replacement rate.

[0295] In the above mix ratio, the recycled coarse aggregate is pretreated by the saturated surface drying method, and the recycled fine aggregate is treated by pre-soaking. The pre-soaking water volume (this water volume is the additional water volume, which is not included in the water in the above mix ratio) is 0.5 to 1.0 times the difference between the saturated water absorption of the recycled fine aggregate and the natural water content. This method can make the reduction of concrete performance controllable, and at the same time, the slump of the fresh concrete is not less than 150mm, ensuring that it has sufficient workability in actual engineering.

[0296] It should be noted that the recycled aggregates referred to in this embodiment are all green aggregates obtained by crushing and screening waste concrete, and aggregates obtained by processing waste bricks, glass, and building blocks are not within the scope of this embodiment.

[0297] In addition, considering that there are certain differences in the physical properties of recycled coarse and fine aggregates and their high water absorption rate, which may affect the workability of fresh concrete and the mechanical properties of concrete after hardening, the preparation method of recycled concrete can adopt a three-stage mixing method: 1) First, put the recycled fine aggregate, natural aggregate (if any) and 1 / 2 of the total water volume (water volume in the mix ratio + additional water volume) into a stirring device and stir for 5 minutes to allow the recycled fine aggregate to fully absorb water; 2) Then put the recycled coarse aggregate into a mixing pot and stir for 5 minutes to make it fully moist. At this time, cement is added, and the active ingredients in the cement will react with the water on the surface of the aggregate. The produced hydration products will seal the pores on the surface of the aggregate, so that it will not exchange moisture with the free water inside the concrete during the setting and hardening of the concrete; 3) Finally, the remaining water and water reducer are added. The amount of water reducer can be adjusted as appropriate according to the replacement of recycled aggregate. When the replacement rate of recycled coarse and fine aggregates does not exceed 50%, the amount of water reducer can be 5% of the cement mass. When it exceeds 50%, it can be taken as 1% to ensure that the concrete is pumpable.

[0298] The biggest difference from the traditional mix ratio is that the above mix ratio can simultaneously increase the replacement rate of recycled coarse and fine aggregates to 100%, with almost no impact on material performance, and increase the recycling rate of construction waste. Through a large number of preliminary tests, it was found that when the above method is used, the material has good workability, the holes on the surface of the recycled coarse aggregate can be filled with recycled fine aggregate and the hydration products of a small amount of unhydrated cement it contains, the microstructure is dense after hardening, and the difference in compressive strength between recycled concrete and ordinary concrete does not exceed 10%.

[0299] The recycled concrete produced by the above method was tested, and the test results are shown in the following table:

[0300]

[0301] The present invention and its embodiments are described schematically above, and the description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by it and designs a structural method and an embodiment similar to the technical solution without creativity without departing from the purpose of the invention, they shall all fall within the protection scope of the present invention.

Claims

1. An assembled steel structure residential system, comprising a frame part and a shear wall part, characterized in that: The frame part comprises a special-shaped column (1), a steel beam (2) and a floor slab (5), wherein: The special-shaped column (1) comprises a steel pipe (11) and a plurality of T-shaped steels (12) arranged along the peripheral wall of the steel pipe (11); The steel beam (2) is an H-shaped steel beam, and the steel beam (2) is connected to the T-shaped steel (12) by bolts; The floor slab (5) is a composite floor slab, which comprises a prefabricated lower cover plate (51), a cast-in-place upper cover plate (52) and a steel truss (53); the lower cover plate (51) is provided with a lower notch (511) in the span direction for overlapping the lower flange of the steel beam (2); the web of the steel beam (2) is provided with a reinforcement hole for passing a first overlapping reinforcement bar (54); and after the first overlapping reinforcement bar (54) passes through the corresponding reinforcement hole, its two ends are respectively overlapped on the lower cover plate (51) on both sides of the steel beam (2).

2. The assembled steel structure residential system according to claim 1, characterized in that: The steel beam (2) is bolted to the flange of the T-shaped steel (12) through a connecting plate (21) at its end, and a reinforcing member (3) is provided at the connection node between the two. The reinforcing member (3) comprises a sleeve (31) and a stiffening rib (32) arranged on the sleeve (31); wherein the sleeve (31) is fixedly sleeved on the steel pipe (11), the side surface of the stiffening rib (32) is connected to the web of the T-shaped steel (12), and the end thereof is connected to the flange of the T-shaped steel (12).

3. The assembled steel structure residential system according to claim 1 is characterized in that: The special-shaped columns (1) are connected in the vertical direction via column nodes (4), and the column nodes (4) include ring ribs (41) and connecting steel bars (42); There are a plurality of connecting steel bars (42) distributed in a ring shape, one end of which is located inside the steel pipe (11) and the other end of which extends outside the steel pipe (11) for connecting to another steel pipe (11); The annular rib (41) is arranged on the inner wall of the steel tube (11). After the pouring is completed, when the steel tube concrete is subjected to tensile force, the annular rib (41) plays an anchoring role for the connecting steel bars (42); The T-shaped steels (12) of the upper and lower special-shaped columns (1) are connected by splicing cover plates (9).

4. The assembled steel structure residential system according to claim 1, characterized in that: The lower cover plate (51) is provided with an upper notch (512) in the width direction, and the upper notches (512) of the two lower cover plates (51) are spliced ​​into a groove; a connecting member (56) is provided in the groove, and the connecting member (56) splices the two lower cover plates (51) in the width direction by cast-in-place concrete.

5. The assembled steel structure residential system according to claim 4 is characterized in that: The connecting member (56) comprises a bending rib (561) and a steel frame (562); wherein the upper notch (512) is an L-shaped groove, the bending rib (561) is located in the respective L-shaped groove, and the bending rib (561) is formed by bending the bottom steel bar (59) during prefabrication; the steel frame (562) is located in the groove after splicing.

6. The assembled steel structure residential system according to claim 4 is characterized by: The upper notch (512) is a trapezoidal notch, and the connecting member (56) includes at least three groups of second overlapping steel bars (563), wherein the first group and the second group are respectively prefabricated in their respective lower cover plates (51), and their free ends extend into their respective trapezoidal notches; the third group is located in the groove after splicing, and its two ends are respectively overlapped with the free ends of the other two groups in an offset manner.

7. An assembled steel structure residential system according to any one of claims 1 to 6, characterized in that: The shear wall part is a π-shaped steel frame constrained multi-rib shear wall, which includes a wall body (61) and a separate composite component arranged on both sides of the wall body (61), the separate composite component includes two steel components (62) arranged opposite to each other, the two steel components (62) are connected by connecting stirrups (63), one of the steel components (62) is pre-buried at the edge of the wall body (61), and a casting space is formed between the two steel components (62), and concrete is poured into the casting space to form an integral component; wherein the steel component (62) is a π-shaped steel, the flanges of the two π-shaped steels are arranged opposite to each other, and the flanges of the π-shaped steel are provided with through-rib holes for the connecting stirrups (63) to pass through.

8. The assembled steel structure residential system according to claim 7 is characterized by: An outwardly extending steel beam (64) is provided at one end of the steel member (62) away from the wall (61), and the outwardly extending steel beam (64) is connected to the steel beam (2) via a spliced ​​cover plate (9); In the vertical direction of the wall (61), the separated combined components of the upper and lower walls (61) are connected by a spliced ​​cover plate (9), and the reinforced concrete ribs of the upper and lower walls (61) are overlapped by upper and lower side protruding steel bars.

9. The assembled steel structure residential system according to claim 8, characterized in that: The wall (61) is a dense-rib wall, and a self-resetting energy-absorbing support (7) is arranged in the dense-rib gap of the dense-rib wall. The self-resetting energy-absorbing support (7) comprises two support tubes (71), one end of the support tube (71) is provided with a connecting end plate (72), and the other end is provided with a steel connecting piece (73), the flanges of the two steel connecting pieces (73) are connected by a connecting cover plate (74), and an elastic reset piece (75) is provided between the two steel connecting pieces (73).

10. The assembled steel structure residential system according to claim 9, characterized in that: The steel connecting piece (73) is a π-shaped steel, and a connecting slot (76) is provided on the flange of the π-shaped steel; the elastic reset piece (75) is a self-reset spring, and the self-reset spring is arranged between the two flanges of the π-shaped steel.

11. An assembled steel structure residential system according to any one of claims 1 to 6, characterized in that: The shear wall part is a combined H-shaped steel frame constrained shear wall, which includes a wall body (61) and steel components (62) arranged on both sides of the wall body, and the steel components (62) are T-shaped steels; the flanges of the T-shaped steels on adjacent walls (61) are aligned and then spliced ​​and installed through a splicing cover plate (9), and then concrete is poured.

12. The assembled steel structure residential system according to claim 11, characterized in that: A corrugated pipe (66) is pre-buried in the wall (61), and a special steel frame (67) is provided in the corrugated pipe (66). The connection between the upper and lower walls (61) is completed by pouring concrete into the corrugated pipe (66); wherein the special steel frame (67) includes stirrups (671) and longitudinal steel bars (672), and a connection reinforcement piece (673) is provided on the outside of the stirrups (671).

13. An assembled steel structure residential system according to any one of claims 1 to 6, characterized in that: The shear wall part is a π-O special-shaped column frame constrained concrete shear wall, which includes a wall (61) and steel tube concrete columns and steel components (62) respectively arranged on both sides of the wall (61), wherein the steel component (62) is a π-shaped steel, and the steel tube concrete column is provided with a first connecting steel plate (14), and the first connecting steel plate (14) is connected to the π-shaped steel via a connecting stirrup (63).

14. The assembled steel structure residential system according to claim 13, characterized in that: The walls (61) are connected in the horizontal direction via a horizontal connection node, wherein the horizontal connection node comprises an L-shaped steel (681) arranged on a π-shaped steel, the two L-shaped steels (681) on the connected wall (1) are arranged in a centrally symmetrical manner, and an elastic pad (682) is provided at the connection between the two L-shaped steels (681), and concrete is poured afterwards.

15. The assembled steel structure residential system according to claim 13, characterized in that: The walls (61) are connected in the horizontal direction via horizontal connection nodes, and the horizontal connection nodes include a second connection steel plate (683) arranged on the π-shaped steel of one side wall (61), and a third connection steel plate (684) arranged on the π-shaped steel of the other side wall (61). The second connection steel plate (683) and the third connection steel plate (684) are staggered and overlapped, and are connected by bolts and then poured with concrete.

16. The assembled steel structure residential system according to claim 13, characterized in that: The steel tube concrete column comprises a steel tube (11), concrete (13) arranged in the steel tube (11), the concrete (13) is centrifugally formed concrete (131), and core concrete (132) is arranged in the centrifugally formed concrete (131); wherein the centrifugally formed concrete (131) is prefabricated in a factory, and the core concrete (132) is cast on site.

Citation Information

Patent Citations

  • Structural frame system for supporting buildings and assemble method thereof

    CN105544733A

  • Lateral-force-resisting-and-antigravity-separated residence steel structure system and construction method thereof

    CN106149882A

  • Novel multi-storey and high-rise hot-rolling-type steel-composite light steel shear wall composite structure system

    CN107190884A

  • Through fully-prefabricated floor fabricated steel-concrete composite floor system

    CN110761464A

  • High-performance combined structure residence system

    CN111173125A

Cited By

  • External reinforcement type concrete filled steel tubular column and peak bearing capacity calculation method

    CN120443795A