Power transmission and transformation line repair tower and manufacturing process thereof

By designing an adjustable tower structure and modular design on the emergency repair tower, the problem of a small applicable range of the emergency repair tower is solved, its flexibility and installation convenience are improved, and the emergency repair efficiency and the reliability of the power system are significantly improved.

CN118728167APending Publication Date: 2024-10-01GUANGDONG ELECTRIC LINE APPLIANCE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410795559.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The base and tower body of existing emergency repair towers are usually of fixed design, resulting in a narrow scope of application and affecting the progress of emergency repair work.

Method used

An adjustable emergency repair tower structure is designed. By setting a rotating connecting plate and a traction assembly at the bottom of the tower, the angle of the tower is allowed to be adjusted, and the flexibility and stability of the tower are improved through modular design and the use of reinforcement plates. sex.

Benefits of technology

It improves the flexibility and adaptability of the emergency repair tower, simplifies the transportation and installation process, shortens the emergency repair time, improves the emergency repair efficiency and the reliability of the power system, and reduces the duration of power interruption and economic losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728167A_ABST
    Figure CN118728167A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power construction tools, and discloses a power transmission and transformation line emergency repair tower which comprises a first tower body, the top of the first tower body is fixedly connected with a conical section, the bottom of the conical section is fixedly connected with a bottom plate, the bottom of the bottom plate is highly connected with first connecting plates in bilateral symmetry, and rotating shafts are rotationally connected into the first connecting plates. The two ends of the rotating shaft are rotationally connected with second connecting plates, the bottoms of the second connecting plates are fixedly connected with a base, the two sides of the interior of the base are fixedly connected with ground nuts, and one sides of the outer walls of the second connecting plates are fixedly connected with first supporting plates which are in bilateral symmetry. The bottom plate is connected with the tower body, and the tower body is connected to the base through the first connecting plate and the second connecting plate, so that the tower body can rotate through the rotating shaft between the first connecting plate and the second connecting plate and is controlled and fixed in an auxiliary mode through the traction steel cable, and the problem that the application range of an emergency repair tower is small due to the fixed design of the base and the tower body of the emergency repair tower is solved; and the flexibility and adaptability of the first-aid repair tower are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power construction tools, in particular to a power transmission and transformation line repair tower and a manufacturing process thereof. Background Art

[0002] Electricity is an important energy source related to the national economy and people's livelihood, and it has the characteristics of immediacy. Once the transmission line is damaged and the transmission is interrupted, it will cause huge economic losses and serious social impacts. The extent of damage to transmission towers caused by extreme weather has long been a concern for people. Collapse and damage occur from time to time, resulting in the need to rebuild the line. When the line crosses local roads or buildings, in order to reduce economic losses, temporary support structures such as repair towers are often needed.

[0003] Existing emergency repair towers can be quickly erected in a short period of time to promptly repair damaged transmission and transformation lines, reduce power outage time caused by line failures, and improve power supply reliability. At the same time, they usually adopt a modular design to facilitate the transportation and installation of emergency repair towers, and can be assembled and adjusted according to actual needs to adapt to different emergency repair tasks, so that the lines can be repaired in a timely manner, which helps to maintain the stable operation of the power grid.

[0004] However, the base and the tower body of the existing emergency repair tower are usually fixed designs. However, in some special cases, when the tower body needs to be tilted, this fixed design will make the use of the emergency repair tower inconvenient, thereby affecting the applicable scope of the emergency repair tower and, to a certain extent, affecting the progress of the emergency repair work, which is not conducive to the widespread use of the emergency repair tower. Therefore, a power transmission and transformation line emergency repair tower and its manufacturing process are proposed to solve the above problems. Summary of the invention

[0005] In view of the deficiencies of the prior art, the present invention provides a power transmission and transformation line repair tower and a manufacturing process thereof, which solves the problem that the base and tower body of the repair tower in the prior art are usually fixed designs, resulting in a small application range of the repair tower.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a power transmission and transformation line repair tower and a manufacturing process thereof, comprising a tower body one, a conical section fixedly connected to the top of the tower body one, a bottom plate fixedly connected to the bottom of the conical section, a left-right symmetrical connecting plate one highly connected to the bottom of the bottom plate, a rotating shaft rotatably connected inside the connecting plate one, connecting plates two are rotatably connected at both ends of the rotating shaft, a base is fixedly connected to the bottom of the connecting plate two, ground nuts are fixedly connected to the inside of the base at both sides, a left-right symmetrical supporting plate one is fixedly connected to one side of the outer wall of the connecting plate two, the bottom of the supporting plate one is fixedly connected to the top of the base, a left-right symmetrical supporting plate two is fixedly connected to one side of the outer wall of the connecting plate one, the top of the supporting plate two is fixedly connected to the tower body two, a plurality of fixing rings are fixedly connected to the tower body two and the outer wall of the tower body one, a traction assembly is arranged inside the fixing ring, and the traction assembly is used to adjust and pull the tower body one.

[0007] Preferably, the traction assembly includes a spring buckle and a traction steel cable, one end of the traction steel cable is fixedly connected to one side of the outer wall of the fixing ring, and the inner wall of the spring buckle is in contact with the inner wall of the fixing ring.

[0008] Preferably, a plurality of first cross beams are fixedly connected inside the tower body one, and a plurality of second cross beams are fixedly connected inside the tower body two.

[0009] Preferably, the top of the first beam on the top side fits with the bottom of the second beam on the bottom side, and a splicing plate 1 is fixedly connected to the inner wall of the second beam.

[0010] Preferably, the inner wall of the first beam is fixedly connected with a second splicing plate, and the bottom of the first splicing plate is in contact with the inner wall of the second splicing plate.

[0011] Preferably, the top of the splicing plate 1 and the bottom of the splicing plate 2 are both fixedly connected with a rectangular array of fixed plate 1, and the top of the splicing plate 1 and the bottom of the splicing plate 2 are both fixedly connected with a rectangular array of fixed plate 2.

[0012] Preferably, a fixing column is fixedly connected between the fixing plates 2 on both sides, a rectangular array of side wrapping plates is fixedly connected to the outer wall of the tower body 1, and one side of the inner wall of the side wrapping plate is fixedly connected to one side of the outer wall of the tower body 2.

[0013] The power transmission and transformation line repair tower and its manufacturing process include the following steps:

[0014] Step 1: Based on the engineering drawings and technical documents provided, the layout department will conduct a preliminary review of the drawings to ensure the accuracy of the tower list, foundation configuration table and processing and installation requirements;

[0015] Step 2: Review and check the drawings, paying special attention to the welding form of the tower feet and the size and form of the hanging points, to ensure that all structural dimensions and interfaces meet the technical requirements;

[0016] Step 3: Complete the tower layout calculation, including overall slope calculation and verification of main control dimensions, as well as tower processing mobile cards and process files produced based on the layout results.

[0017] Preferably, further comprising:

[0018] Machining of aluminum alloy and steel materials, including cutting, stamping, hole making, corner cutting, etc., ensuring that each operation step is carried out according to the layout results and process card requirements;

[0019] Use CNC equipment and laser cutting technology to accurately cut aluminum alloy plates and angle steels, and perform stamping and drilling work on materials according to the standards in the technical documents.

[0020] Preferably, process documents such as tower processing mobile cards, templates and flange processing drawings are prepared and used to guide each processing step in production;

[0021] The final confirmation of the layout calculation and drawing is carried out through the drawing review records and technical briefing.

[0022] The present invention provides a power transmission and transformation line repair tower and a manufacturing process thereof. It has the following beneficial effects:

[0023] 1. The present invention connects the tower body through a bottom plate, and connects it to the base through a connecting plate 1 and a connecting plate 2, so that it can be rotated through a rotating shaft between the connecting plate 1 and the connecting plate 2, and is assisted in control and fixation by a traction steel cable, thereby solving the problem that the fixed design of the base and the tower body of the emergency repair tower leads to a small application range of the emergency repair tower, and improving the flexibility and adaptability of the emergency repair tower.

[0024] 2. The present invention realizes modular design through tower body 1 and tower body 2, and is connected by splicing plate 1 and splicing plate 2 inside crossbeam 1 and crossbeam 2, and fixed by screws, and reinforced by fixing plate 2 and fixing column, and fixed by side packing plate on the outside, so that the transportation and installation of the repair tower are simpler, the convenience and speed of transportation and installation of the repair tower are improved, and the repair time is greatly shortened, thereby avoiding waste of resources.

[0025] 3. The process of the present invention ensures that the repair tower can be deployed quickly and safely in an emergency, greatly improving the efficiency and reliability of power transmission and transformation line repair. This not only reduces the duration of power outages, but also significantly reduces the economic losses and social impacts caused by power system failures. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1A perspective view of the present invention;

[0027] Figure 2 It is a schematic diagram of the base structure of the present invention;

[0028] Figure 3 for Figure 1 Enlarged view of point A in the middle;

[0029] Figure 4 It is a schematic diagram of the tower structure of the present invention;

[0030] Figure 5 It is a flow chart of computer lofting of the present invention.

[0031] Among them, 1. Tower body one; 2. Tower body two; 3. Bottom plate; 4. Traction steel cable; 5. Conical section; 6. Base; 7. Crossbeam one; 8. Crossbeam two; 9. Splicing plate one; 10. Splicing plate two; 11. Fixed plate one; 12. Fixed plate two; 13. Fixed column; 14. Side package plate; 15. Support plate one; 16. Connecting plate one; 17. Support plate two; 18. Rotating shaft; 19. Connecting plate two; 20. Ground nut; 21. Fixed ring; 22. Spring buckle. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] Embodiment 1:

[0034] Please refer to the attached Figure 1 -Attached Figure 4 The embodiment of the present invention provides a power transmission and transformation line repair tower. In the embodiment of the present invention, the power transmission and transformation line repair tower realizes fast and stable traction adjustment by setting a plurality of fixing rings 21 on the tower body. Specifically, one end of the traction cable 4 is fixedly connected to one side of the outer wall of the fixing ring 21, and the other end of the traction cable 4 is hooked to the fixing ring 21 through a spring buckle 22. This design enables the traction cable 4 to be quickly and reliably connected to the tower body, so that when the angle of the tower body needs to be adjusted, the tower body can achieve flexible angle adjustment through the traction force of the traction cable 4.

[0035] In addition, the bottom structural design of the tower body ensures the stability and firmness of the tower body. The tops of the tower body 1 and the tower body 2 are fixedly connected with the bottom plate 3, and the bottom plate 3 is connected to the base 6 through the highly symmetrical connecting plate 1 16 and the connecting plate 2 19. The inside of the base 6 is fixedly connected with ground nuts 20 on both sides, which are used to firmly fix the base 6 on the ground to ensure the stability of the overall structure.

[0036] The connecting plate 16 is fixed to the bottom of the bottom plate 3 and is further reinforced by the supporting plate 17. The top of the supporting plate 17 is fixedly connected to the bottom plate 3. In this way, the connection between the bottom plate 3 and the connecting plate 16 is effectively reinforced, thereby enhancing the stability of the bottom plate 3. The connecting plate 19 is fixed to the top of the base 6 and is further reinforced by the supporting plate 15. The bottom of the supporting plate 15 is fixedly connected to the top of the base 6, thereby strengthening the connection between the base 6 and the connecting plate 19, making the entire structure more solid and reliable.

[0037] The connecting plate 16 and the connecting plate 2 19 are connected through the rotating shaft 18, so that the bottom plate 3 and the base 6 can realize relative rotation through the connecting plate 1 16 and the connecting plate 2 19. Through this structural design, when the angle of the tower body needs to be adjusted, the traction steel cable 4 hooks the fixing ring 21 through the spring buckle 22 on the fixing ring 21 and applies traction, so that the angle of the tower body can be adjusted according to actual needs. This design not only improves the flexibility of the tower body, but also allows the tower body to be adjusted more quickly during the emergency repair process, thereby improving the efficiency and safety of the emergency repair.

[0038] In summary, the power transmission and transformation line repair tower of the present invention realizes the rapid installation and stable connection of the tower body through ingenious structural design, and at the same time has a flexible angle adjustment function, is suitable for various complex repair environments, and provides a strong guarantee for the rapid repair of power transmission and transformation lines.

[0039] A plurality of cross beams 17 are fixedly connected inside the tower body 1, and a plurality of cross beams 28 are fixedly connected inside the tower body 2. The top of the top cross beam 17 fits with the bottom of the bottom cross beam 28. A splicing plate 19 is fixedly connected to the inner wall of the cross beam 28, and a splicing plate 2 10 is fixedly connected to the inner wall of the cross beam 7. The bottom of the splicing plate 19 fits with the inner wall of the splicing plate 2 10. A rectangular array of fixed plates 11 are fixedly connected to the top of the splicing plate 19 and the bottom of the splicing plate 2 10. A rectangular array of fixed plates 12 are fixedly connected to the top of the splicing plate 19 and the bottom of the splicing plate 2 10. Fixed columns 13 are fixedly connected between the fixed plates 2 12 on both sides. A rectangular array of side wrapping plates 14 are fixedly connected to the outer wall of the tower body 1, and one side of the inner wall of the side wrapping plate 14 is fixedly connected to one side of the outer wall of the tower body 2.

[0040] When the cross beam 17 at the top of the tower body 1 is aligned and fitted with the cross beam 28 at the bottom of the tower body 22, ensure that the fitting surfaces of the two are in close contact without obvious gaps. During the fitting process, a temporary fixing device can be used to keep the relative positions of the cross beam 17 and the cross beam 28 stable to prevent displacement in subsequent operations. The splicing plate 19 inside the cross beam 28 is also fitted with the splicing plate 210 inside the cross beam 17. The bottom of the splicing plate 19 is in close contact with the inner wall of the splicing plate 210, ensuring that the contact surface is flat and has no gaps.

[0041] On the opposite side of the outer wall of the splicing plate 1 9 and the splicing plate 2 10, a fixing plate 1 11 is set. The fixing plates 1 11 should be evenly distributed to ensure that the splicing plate can obtain sufficient support and fixing force on the entire fitting surface. Use screws to penetrate the fixing plate 1 1, the splicing plate 1 9 and the splicing plate 2 10 in sequence. The spacing of the screws should be uniform to ensure that each connection point can provide sufficient fixing force. The length of the screw should be long enough to ensure that it can penetrate all the fixing layers and will not loosen after tightening. Add a fixing plate 2 12 on the same outer wall of the splicing plate 1 9 and the splicing plate 2 10. The fixing plate 2 12 is similar to the fixing plate 1 11 and also needs to be evenly distributed to ensure the fixing effect of the entire splicing plate. Use screws to penetrate the fixing plate 2 12, the splicing plate 1 9 and the splicing plate 2 10, and ensure the tightness of the screws. Add a fixing column 13 between the fixing plate 2 12 on the upper and lower sides. The function of the fixing column 13 is to increase the stability of the structure and prevent the splicing plate from deforming when subjected to force. The fixing column 13 is connected to the fixing plate 2 12 by screws that penetrate through it, ensuring the tightness and stability of the entire structure. A side panel 14 is installed at the connection between the tower body 1 and the tower body 2. The function of the side panel 14 is to protect the connection, prevent the influence of external factors on the connection, and increase the aesthetics of the overall structure. The side panel 14 is fixed at the connection between the tower body 1 and the tower body 2 by four screws. The positions of the screws should be evenly distributed, and the two screws on both sides are fixed inside the tower body 1 and the tower body 2 to ensure that the side panel fits tightly with the tower body. Among the two screws on the inside, one passes through the crossbeam 2 8 to be fixed to the tower body 2, and the other passes through the crossbeam 1 7 to be fixed to the tower body 1. This fixing method can ensure that the connection between the side panel and the tower body is tighter and not easy to loosen.

[0042] After all the fixing operations are completed, a comprehensive inspection is carried out to ensure that each screw is tightened and all the splicing plates and fixing plates are not loose. A structural stability test is carried out to verify whether the splicing of the tower body 1 and the tower body 2 is firm and without shaking by applying a certain external force.

[0043] Embodiment 2:

[0044] Refer to the attached Figure 5 The second embodiment provides a power transmission and transformation line repair tower and a manufacturing process thereof, comprising the following steps:

[0045] Step 1: Drawing review and layout calculation

[0046] Preliminary review

[0047] Technical Document Check: First check all technical documents, including detailed specifications, material requirements and design drawings of the tower. Check the completeness of the engineering drawings to ensure that there are no missing pages or data, and confirm that all design symbols and annotations meet engineering standards.

[0048] Review of material specifications and quality standards: Check whether incoming materials have corresponding quality certificates and chemical and physical property test reports that meet the standards, against design requirements.

[0049] Detailed drawing review and verification

[0050] Structural and interface inspection: Carefully inspect all structural connection points, welding forms and hanging points to ensure design rationality and feasibility. Use software for 3D simulation to predict possible structural stress and potential weaknesses.

[0051] Precise Dimension Calculation: Use CAD and other engineering software to perform precise dimension and interface verification. All key dimensions such as tower foot, tower top and cross arm positions are calculated in detail to ensure precise matching during assembly.

[0052] Stakeout calculation

[0053] Application of lofting principle: Lofting calculation is carried out according to the design drawings to ensure that the size and shape of each component are in accordance with the design drawings. This includes all-round calculation from the main structure to the non-main accessories.

[0054] Process document preparation: According to the calculation results, prepare the tower processing mobile card and related process guidance documents, and record the production parameters and processing requirements of each component in detail.

[0055] Step 2: Material processing and component production

[0056] Cutting and pre-processing

[0057] Precise cutting: Use high-precision CNC cutting machines and laser cutting machines to accurately cut aluminum alloy and steel materials. Each part is cut according to pre-determined dimensions and angles.

[0058] Hole position and mark stamping: After cutting, the parts are drilled and marked. These operations must be carried out strictly according to the instructions of the process card to ensure the accuracy of each hole and the readability of the mark.

[0059] Fine processing

[0060] CNC machining: After the rough machining of the parts is completed, CNC machine tools are used for further fine processing, such as edge smoothing, angle adjustment and the production of complex shapes.

[0061] Surface treatment and quality control: All processed parts need to be surface treated, including deburring, anti-rust coating and necessary heat treatment to enhance the weather resistance and strength of the material.

[0062] Step 3: Application and final confirmation of process documents

[0063] Process Documentation Execution

[0064] Process guidance and monitoring: During the production process, we strictly follow the process documents, monitor the processing quality of each step, and ensure that the size and quality of all parts meet the design requirements.

[0065] Technical briefing and records: Technical briefings at all key production stages must be recorded, including solutions to technical problems and adjustment records.

[0066] Quality inspection and assembly testing

[0067] Component Inspection Before Assembly: Before assembly, all components are thoroughly quality inspected to ensure they are free of defects.

[0068] Trial installation and functional testing: The repair tower is trial installed in the factory to test the stability of its structure and function by simulating actual use conditions.

[0069] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A power transmission and transformation line repair tower, comprising a tower body (1), characterized in that: The top of the tower body (1) is fixedly connected to a conical section (5), the bottom of the conical section (5) is fixedly connected to a bottom plate (3), the bottom of the bottom plate (3) is highly connected to a left-right symmetrical connecting plate (16), the inside of the connecting plate (16) is rotatably connected to a rotating shaft (18), both ends of the rotating shaft (18) are rotatably connected to a connecting plate (19), the bottom of the connecting plate (19) is fixedly connected to a base (6), both sides of the inside of the base (6) are fixedly connected to ground nuts (20), and one side of the outer wall of the connecting plate (19) is fixedly connected to left-right symmetrical connecting plates (16). A support plate (15) is provided, the bottom of the support plate (15) is fixedly connected to the top of the base (6), one side of the outer wall of the connection plate (16) is fixedly connected to a left-right symmetrical support plate (17), the top of the support plate (17) is fixedly connected to a bottom plate (3), the top of the tower body (1) is fixedly connected to a tower body (2), the tower body (2) and the outer wall of the tower body (1) are both fixedly connected to a plurality of fixing rings (21), a traction assembly is arranged inside the fixing ring (21), and the traction assembly is used to adjust and traction the tower body (1).

2. The power transmission and transformation line repair tower according to claim 1, characterized in that: The traction assembly comprises a spring buckle (22) and a traction steel cable (4), one end of the traction steel cable (4) is fixedly connected to one side of the outer wall of the fixing ring (21), and the inner wall of the spring buckle (22) is in contact with the inner wall of the fixing ring (21).

3. The power transmission and transformation line repair tower according to claim 1, characterized in that: The tower body 1 (1) has a plurality of first cross beams (7) fixedly connected inside, and the tower body 2 (2) has a plurality of second cross beams (8) fixedly connected inside.

4. The power transmission and transformation line repair tower according to claim 3, characterized in that: The top of the cross beam 1 (7) on the top side fits with the bottom of the cross beam 2 (8) on the bottom side, and the inner wall of the cross beam 2 (8) is fixedly connected with a splicing plate 1 (9).

5. The power transmission and transformation line repair tower according to claim 1, characterized in that: The inner wall of the cross beam one (7) is fixedly connected with the splicing plate two (10), and the bottom of the splicing plate one (9) is in contact with the inner wall of the splicing plate two (10).

6. The power transmission and transformation line repair tower according to claim 1, characterized in that: The top of the splicing plate one (9) and the bottom of the splicing plate two (10) are both fixedly connected with a rectangular array of fixed plate one (11), and the top of the splicing plate one (9) and the bottom of the splicing plate two (10) are both fixedly connected with a rectangular array of fixed plate two (12).

7. The power transmission and transformation line repair tower according to claim 1, characterized in that: A fixing column (13) is fixedly connected between the fixing plates (12) on both sides, a rectangular array of side wrapping plates (14) are fixedly connected to the outer wall of the tower body (1), and one side of the inner wall of the side wrapping plate (14) is fixedly connected to one side of the outer wall of the tower body (2).

8. A power transmission and transformation line repair tower and a manufacturing process thereof, wherein the power transmission and transformation line repair tower according to any one of claims 1 to 7 is characterized in that: The following steps are involved: Step 1: Based on the engineering drawings and technical documents provided, the layout department will conduct a preliminary review of the drawings to ensure the accuracy of the tower list, foundation configuration table and processing and installation requirements; Step 2: Review and check the drawings, paying special attention to the welding form of the tower feet and the size and form of the hanging points, to ensure that all structural dimensions and interfaces meet the technical requirements; Step 3: Complete the tower layout calculation, including overall slope calculation and verification of main control dimensions, as well as tower processing mobile cards and process files produced based on the layout results.

9. The manufacturing process of the power transmission and transformation line repair tower according to claim 1, characterized in that: Further includes: Machining of aluminum alloy and steel materials, including cutting, stamping, hole making, corner cutting, etc., ensuring that each operation step is carried out according to the layout results and process card requirements; Use CNC equipment and laser cutting technology to accurately cut aluminum alloy plates and angle steels, and perform stamping and drilling work on materials according to the standards in the technical documents.

10. The power transmission and transformation line repair tower and its manufacturing process according to claim 1, characterized in that: Further includes: Make and use process documents such as tower processing moving cards, samples and flange processing drawings to guide each processing step in production; The final confirmation of the layout calculation and drawing is carried out through the drawing review records and technical briefing.