Coal mine underground pipe-following type staged injection double-liquid slurry rapid pipe fixing process
By using the tube-type graded double-slurry injection process in underground water exploration boreholes in coal mines, and through successive grouting and interval consolidation through thin tubes, the problem of unqualified casing consolidation quality has been solved, and the slurry has been fully filled and consolidated. Stable consolidation.
Patent Information
- Application Number
- CN202310322989.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-01
AI Technical Summary
During the construction of underground water-release drilling in coal mines, the quality of casing consolidation was unqualified, especially the bottom area of the casing that could not be completely filled with slurry, resulting in unqualified consolidation.
The tube-following graded double-liquid slurry injection process is used. A hole is drilled at the bottom of the casing, and thin tubes of different lengths are sent into the annular gap. The grouting is successively injected and solidified at intervals until the slurry fully fills the hole wall and solidifies for 48 hours. above.
It effectively overcomes the problems of slurry loss and low consolidation quality, ensuring the integrity and stability of casing consolidation.
Smart Images

Figure CN118728267A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground water exploration drilling, and specifically relates to an underground coal mine following pipe type graded double-liquid slurry injection rapid pipe fixing process. Background Art
[0002] In the construction of underground water exploration and drainage drilling in coal mines, there are often designed upward drilling holes with a large angle and a casing length of 20m, which is a big problem for casing consolidation. When the traditional method of grouting is used to fix the pipe, the annular gap between the upward drilling casing and the hole wall cannot be completely filled with slurry, especially in the bottom area of the casing, which often forms a void, resulting in unqualified casing consolidation quality.
[0003] In view of the above problems, the present application proposes a coal mine underground pipe-following type graded double-liquid slurry injection rapid pipe solidification process to overcome the above problems. Summary of the invention
[0004] The object of the present invention is to provide a rapid pipe-fixing process for underground coal mine pipe-following type graded double-liquid slurry injection to solve the problems raised in the above-mentioned background technology.
[0005] In order to achieve the above object, the present invention provides the following technical solutions: a coal mine underground follow-up pipe type graded double-liquid slurry injection rapid pipe fixing process, S1. Drill 3 or 4 through holes with a diameter of 20 mm at a distance of 0.5 m from the bottom of the casing, and sequentially lower the casing into the water exploration borehole;
[0006] S2. Several thin tubes of different lengths are respectively inserted between the orifice pipe and the annular gap of the water exploration borehole. The heights of the several thin tubes in the annular gap are gradually increased and they are connected to the grouting pipes in ascending order to grout into the annular gap. The interval between two adjacent groutings is 2 hours. When the grout flows out of the casing during the grouting process of the last thin tube, the grouting is stopped and the orifice gate valve is closed;
[0007] S3. Connect the grouting pipe and the casing mouth, and then press grout into the hole through the casing to fully fill the annular gap. Solidify for more than 48 hours, and then conduct a pressure test through the hole.
[0008] Preferably, a gate valve and a pressure gauge are installed at the orifice of the orifice pipe.
[0009] Preferably, the orifice pipe is provided with a high-pressure lead pad for sealing between the orifice and the inner wall of the water exploration borehole.
[0010] Preferably, the heights of the plurality of thin tubes in the annular gap increase uniformly.
[0011] Preferably, the heights of the plurality of thin tubes in the annular gap increase non-uniformly;
[0012] If the cracks in the borehole wall are unevenly distributed, the spacing between the top ends of the sequentially arranged thin tubes can be reasonably adjusted, and the spacing does not need to be always equal.
[0013] Preferably, the capillary tube is a 4-point capillary tube.
[0014] Preferably, the capillary tube is a hard plastic tube or an iron tube.
[0015] The beneficial effects of the present invention are as follows:
[0016] The present invention uses multiple 4-point capillaries of different lengths to be sent into the annular gap, and injects grout into the capillaries in sequence, performs segmented grouting, and performs segmented consolidation, thereby overcoming the characteristics of grout loss and low grouting quality caused by excessive hole wall cracks during one grouting. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of grouting of the present invention.
[0018] In the figure: 1. Orifice pipe; 2. High-pressure lead pad; 3. Pressure gauge; 4. Flange; 5. Valve; 6. Eyelet. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] like Figure 1 As shown, the embodiment of the present invention provides a coal mine underground follow-up pipe type graded double-liquid slurry injection rapid pipe fixing process, and the specific operation steps in the implementation process are as follows:
[0021] 1. Drill 3 to 4 through holes (20mm in diameter) at 0.5m from the bottom of the casing, and lower the casing into the holes one by one;
[0022] 2. Three 4-inch thin tubes with lengths of 6m, 12m and 18m are bundled with the orifice pipe and sent into the annular gap between the orifice pipe and the water exploration borehole wall. (It can also be multiple 4-inch high-strength thin tubes with different lengths and a minimum length greater than 2m. The thin tubes include thin tubes or high-strength hard plastic tubes.) The orifice is sealed with a high-pressure lead pad.
[0023] 3. Install gate valve and pressure gauge at the orifice;
[0024] 4. Open the orifice gate valve and adjust the slurry;
[0025] 5. Connect the grouting pipeline and the 6m long 4-point capillary tube, and press grout into the annular gap through the 4-point capillary tube. After the 12m long 4-point capillary tube flows out slurry from the orifice, close the 6m long 4-point capillary tube, connect the grouting pipeline and the 12m long 4-point capillary tube, and press grouting. After the 18m long 4-point capillary tube flows out of the orifice, close the 12m long 4-point capillary tube, connect the grouting pipeline and the 18m long 4-point capillary tube, and press grouting. When the slurry flows out of the casing, close the 18m long 4-point capillary tube and the orifice gate valve. During the above grouting process, the interval between two adjacent groutings is 2 hours;
[0026] 6. Connect the grouting pipeline and the casing mouth, and then press grout into the hole through the casing to fully fill the annular gap.
[0027] 7. After solidification for more than 48 hours, perform a pressure test on the through hole.
[0028] Working principle:
[0029] Since there are many cracks around the borehole wall, leakage may occur during the grouting process, making it difficult to grout successfully in one go. Therefore, the method of inserting pipe and graded grouting is adopted, which is divided into three or more stages of grouting for segmented consolidation to overcome the unstable defects caused by cracks and aperture until the borehole casing is successfully consolidated.
[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A coal mine underground pipe-following type graded double-liquid slurry injection rapid pipe fixing process, characterized in that: S1. Drill 3 or 4 holes with a diameter of 20 mm at a distance of 0.5 m from the bottom of the casing, and lower the casing into the water exploration borehole in sequence; S2. Several thin tubes of different lengths are respectively inserted between the orifice pipe and the annular gap of the water exploration borehole. The heights of the several thin tubes in the annular gap are gradually increased and they are connected to the grouting pipes in ascending order to grout into the annular gap. The interval between two adjacent groutings is 2 hours. When the grout flows out of the casing during the grouting process of the last thin tube, the grouting is stopped and the orifice gate valve is closed; S3. Connect the grouting pipe and the casing mouth, and then press grout into the hole through the casing to fully fill the annular gap. Solidify for more than 48 hours, and then conduct a pressure test through the hole.
2. According to claim 1, a coal mine underground pipe-following type graded double-liquid slurry injection rapid pipe fixing process is characterized by: The orifice of the orifice pipe is equipped with a gate valve and a pressure gauge.
3. According to claim 1, a coal mine underground pipe-following type graded double-liquid slurry injection rapid pipe fixing process is characterized by: The orifice pipe is provided with a high-pressure lead pad for sealing between the orifice and the inner wall of the water exploration borehole.
4. The underground coal mine following pipe type graded double liquid slurry injection rapid pipe fixing process according to claim 1 is characterized by: The heights of the plurality of thin tubes in the annular gap increase uniformly.
5. The underground coal mine following pipe type graded double liquid slurry injection rapid pipe fixing process according to claim 1 is characterized by: The heights of the plurality of thin tubes in the annular gap increase non-uniformly.
6. The underground coal mine following pipe type graded double liquid slurry injection rapid pipe fixing process according to claim 1 is characterized by: The capillary tube is specifically a 4-point capillary tube.
7. The underground coal mine following pipe type graded double liquid slurry injection rapid pipe fixing process according to claim 6 is characterized by: The thin tube is a hard plastic tube or an iron tube.