Guiding device

By using the guide surface of the guide device, the well wall limit stop and the design of the through-hole accommodation cavity to capture impurities in oilfield development, the problems of equipment tilt and damage during the lowering of water injection and water plugging strings have been solved, and efficiency and lifespan have been improved. , and achieved the cleanliness of the oil well.

CN118728294APending Publication Date: 2024-10-01DAQING NAIGU PETROLEUM MASCH EQUIP MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410849401.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the later stages of oilfield development, fragments generated due to the rupture of the rubber cylinder during the lowering of water injection and water plugging pipe strings caused equipment tilt and damage. The existing technology uses a horse tooth button structure to crush the fragments, but the efficiency is low and it is easy to get stuck, affecting Normal lifting and lowering of equipment.

Method used

Design a guide device, including a main structure and a guide structure. The guide structure has a through hole and a receiving cavity. The guide surface and the well wall limit stop ensure that the equipment can be lowered vertically, and impurities are captured through the through hole and the receiving cavity to avoid crushing. Improve the efficiency of equipment decentralization and prevent impurities from entering the equipment.

Benefits of technology

It effectively avoids tilt and damage during the lowering process of water injection and water blocking pipe strings, improves the lowering efficiency and service life of the equipment, and at the same time realizes the cleaning function of the oil well and avoids damage caused by impurities entering the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728294A_ABST
    Figure CN118728294A_ABST
Patent Text Reader

Abstract

The invention provides a guiding device which is arranged on mining equipment, a guiding structure of the guiding device is arranged on a main body structure in a sleeving mode and provided with a through hole, at least part of the peripheral face of the guiding structure is a guiding face, and in the process that the guiding device moves in an oil well along with the mining equipment, the guiding face and the inner wall of the oil well are limited and stopped. A gap S between the guide surface and the inner wall of the oil well meets the condition that S is greater than or equal to 0cm and less than or equal to 4cm; wherein a containing cavity is defined between the guide structure and the peripheral face of the main body structure and used for containing impurities, the through holes communicate with the containing cavity, at least part of the through holes are located in the side, away from the mining equipment, of the guide face, and the impurities enter the containing cavity through the through holes. The device effectively solves the problems that in the prior art, when it is ensured that a water injection and water plugging pipe column can be placed in the middle into an oil well, the pulling-out and putting-down efficiency of the water injection and water plugging pipe column can be affected due to the fact that the pipe column leans against the well wall, and a water plugging tool can be damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oilfield production equipment, in particular to a guide device. Background Art

[0002] At present, in the later stage of oil field development, water injection and water plugging technology is the main way to increase formation pressure to ensure normal production of oil fields. Conventional water injection and water plugging technology mainly relies on lowering water injection and water plugging strings into oil wells. The water injection and water plugging strings are mainly composed of packers, water distributors (production distributors) and bottom baffles. When the staff unseal the packer to lift the water injection and water plugging pipes from the oil well, the rubber tube on the packer often breaks and falls into the well. As the number of constructions increases, the suspended rubber tube fragments remaining in the well will become more and more. When the staff lower the water injection and water plugging pipes into the oil well again, the suspended rubber tube fragments may move to between the water injection and water plugging pipes and the well wall. The rubber tube fragments will not only rub and collide with the rubber tube on the packer, but also cause the water injection and water plugging pipes to tilt during the lowering process (that is, the tilted packer rubber tube will rub and collide with the well wall), which will cause the water injection and water plugging pipes to fail during the lowering process.

[0003] In the prior art, in order to ensure the normal development of the oil field in the later stage, a tooth-shaped structure is usually set on the water injection and water plugging pipes. During the lowering and lifting of the water injection and water plugging pipes, the tooth-shaped structure can crush the residual rubber tube in the well into pieces, thereby reducing the volume of the rubber tube fragments so that the fragments can move between the water injection and water plugging pipes and the well wall.

[0004] However, the above method cannot effectively prevent the water injection and water plugging pipes from tilting during the lowering process, and the tooth-shaped structure will generate greater resistance in the process of crushing the rubber cartridge fragments (that is, the rubber cartridge fragments will be squeezed against the wellbore wall by the tooth-shaped structure and generate friction), which will lead to a decrease in the efficiency of the normal lowering and pulling out of the water injection and water plugging pipes. If the tooth-shaped structure and the rubber cartridge fragments are stuck, the water injection and water plugging pipes cannot be lowered or pulled out, and major repairs are required. At the same time, the ground small pieces of rubber cartridge will also enter the cavity and valve body of the plugging pipe through the bottom blocking ball, causing damage to the plugging pipe. Summary of the invention

[0005] The main purpose of the present invention is to provide a guiding device to solve the problem in the prior art of ensuring that the water injection and water plugging pipes can be lowered centrally into the oil well. The pipes lean against the well wall, which not only affects the efficiency of lifting and lowering the water injection and water plugging pipes, but also causes damage to the water plugging tools.

[0006] In order to achieve the above-mentioned purpose, the present invention provides a guiding device, which is arranged on the mining equipment and moves synchronously with the mining equipment, and the guiding device comprises: a main structure; a guiding structure, which is sleeved on the main structure and has a through hole, at least part of the outer peripheral surface of the guiding structure is a guiding surface, and in the process of the guiding device following the mining equipment to move in the oil well, the guiding surface and the inner wall of the oil well limit the stop to guide the movement direction of the mining equipment, and the gap S between the guiding surface and the inner wall of the oil well satisfies: 0cm≤S≤4cm; wherein, a accommodating cavity is formed between at least part of the inner wall of the guiding structure and the outer peripheral surface of the main structure, and the accommodating cavity is used to accommodate impurities, the through hole is connected to the accommodating cavity, and at least part of the through hole is located on the side of the guiding surface away from the mining equipment, and the impurities enter the accommodating cavity through the through hole.

[0007] Furthermore, along the radial direction of the guide structure, at least part of the guide structure protrudes toward the side away from the main structure to form a guide portion, and at least part of the outer surface of the guide portion away from the main structure is a guide surface; wherein the through hole is arranged on the guide portion.

[0008] Furthermore, along the direction from one end to the other end of the guide structure, the through hole has an expansion section, a retaining section and a reduction section arranged in sequence; wherein, along the circumference of the guide structure, the distance between the hole wall on one side and the hole wall on the other side of the through hole is a preset distance H, the preset distance H of the expansion section gradually increases, the preset distance H of the retaining section remains unchanged, and the preset distance H of the reduction section gradually decreases.

[0009] Furthermore, there are multiple through holes, and the multiple through holes are arranged at intervals around the central axis of the guide structure. The multiple through holes divide the guide part into multiple sub-guide parts. The sub-guide parts are plate-shaped and include: a first sub-plate segment, a second sub-plate segment and a third sub-plate segment that are connected to each other, the second sub-plate segment is located between the first sub-plate segment and the third sub-plate segment, and the plate surface of the second sub-plate segment away from the main structure is the guide surface.

[0010] Furthermore, the first sub-plate segment is arranged at a first angle A1 with the second sub-plate segment, and the third sub-plate segment is arranged at a second angle A2 with the first sub-plate segment. The first angle A1 and the second angle A2 satisfy: 105°≤A1≤135°, 105°≤A2≤135°.

[0011] Furthermore, the guide structure can be movably mounted on the main structure, and at least a part of the guide structure is made of elastic material.

[0012] Furthermore, a first filter hole connected to the accommodating chamber is also provided on the guide structure, the main structure has a connecting chamber and a second filter hole connected to the connecting chamber, the connecting chamber is connected to the mining equipment, and the mining equipment is connected to the oil well in sequence through the connecting chamber, the second filter hole, the accommodating chamber and the second filter hole; and / or the mining equipment is connected to the oil well in sequence through the connecting chamber, the second filter hole, the accommodating chamber and the through hole.

[0013] Furthermore, the main structure is a cylindrical structure, the inner cavity of the cylindrical structure is a connecting cavity, and the guide device also includes: a blocking structure, which is arranged on an end of the main structure away from the mining equipment to block the end.

[0014] Furthermore, the sealing structure includes: a cylindrical connecting part, which is sleeved on the main structure; and a columnar sealing part, which is arranged on one end of the cylindrical connecting part away from the main structure. Along the direction from the main structure to the sealing structure, the diameter of at least part of the columnar sealing part gradually decreases, so that at least part of the outer peripheral surface of the columnar sealing part forms a conical guide surface.

[0015] Furthermore, the guide structure can be movably mounted on the main structure, and at least part of the guide structure is made of elastic material. The guide device also includes: a buffer structure, which is mounted on the main structure, and the two ends of the buffer structure are respectively connected to the guide structure and the blocking structure. The buffer structure is used to buffer the guide structure when the guide structure undergoes elastic deformation.

[0016] According to the technical solution of the present invention, the guide device is arranged on the mining equipment and moves synchronously with the mining equipment. The guide structure of the guide device is sleeved on the main structure and has a through hole. At least part of the outer peripheral surface of the guide structure is a guide surface. When the guide device follows the mining equipment to move in the oil well, the guide surface and the inner wall of the oil well are limited and stopped to guide the movement direction of the mining equipment. The gap S between the guide surface and the inner wall of the oil well satisfies: 0cm≤S≤4cm. Among them, a receiving cavity is formed between at least part of the inner wall of the guide structure and the outer peripheral surface of the main structure. The receiving cavity is used to receive impurities. The through hole is connected to the receiving cavity. At least part of the through hole is located on the side of the guide surface away from the mining equipment. Impurities enter the receiving cavity through the through hole. In this way, in the process of lowering the mining equipment into the well, the lowering direction of the mining equipment can be guided by limiting the stop between the guide surface and the well wall to ensure that the lowering direction of the mining equipment is parallel to the extension direction (vertical direction) of the oil well, thereby avoiding collision and damage between the mining equipment and the well wall of the oil well. Compared with the method used in the prior art to avoid the tilt of the mining equipment during lowering, the guide device in the present application does not need to crush the impurities, which not only greatly improves the lowering efficiency of the mining equipment, but also avoids the phenomenon that smaller impurities after crushing enter the mining equipment and cause damage to the mining equipment, thereby solving the problem of ensuring that the water injection and water plugging pipes can be lowered into the oil well in the center of the prior art. The pipes leaning against the well wall will not only affect the efficiency of lifting and lowering the water injection and water plugging pipes, but also cause damage to the water plugging tools. At the same time, the guide surface can also block impurities on the side of the guide surface away from the mining equipment. Since at least part of the through holes are located on the side of the guide surface away from the mining equipment, the impurities can move to the accommodating cavity under the action of buoyancy, so as to be captured by the accommodating cavity. The captured impurities can be fished out of the oil well as the mining equipment is removed, thereby realizing the function of cleaning the oil well. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0018] Figure 1 A partial cross-sectional schematic diagram showing an embodiment of a guide device according to the present invention;

[0019] Figure 2 Shows Figure 1 A partial cross-sectional schematic diagram of a guide structure of a guide device in FIG.

[0020] Figure 3 Shows Figure 2 An expanded view of a guide portion of a guide structure;

[0021] Figure 4Shows Figure 1 A partial cross-sectional schematic diagram of the main structure of the guide device in FIG.

[0022] The above drawings include the following reference numerals:

[0023] 10. Main structure; 11. Connecting cavity; 12. Second filter hole; 20. Guide structure; 21. Through hole; 211. Expanded diameter section; 212. Retaining section; 213. Reduced diameter section; 22. Guide surface; 23. Accommodating cavity; 24. Guide portion; 241. Sub-guide portion; 2411. First sub-plate segment; 2412. Second sub-plate segment; 2413. Third sub-plate segment; 25. First filter hole; 30. Sealing structure; 31. Cylindrical connecting portion; 32. Columnar sealing portion; 321. Conical guide surface; 40. Buffer structure; 50. Connecting structure. DETAILED DESCRIPTION

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0026] In the present invention, unless otherwise specified, the directional words used, such as "up" and "down", usually refer to the directions shown in the drawings, or to the vertical, perpendicular or gravity directions; similarly, for ease of understanding and description, "left" and "right" usually refer to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above directional words are not used to limit the present invention.

[0027] In order to solve the problem that the method used in the prior art to ensure that the water injection and water plugging pipes can be vertically lowered into the oil well not only affects the efficiency of lifting and lowering the water injection and water plugging pipes, but also causes damage to the water plugging pipes, the present application provides a drainage device.

[0028] like Figures 1 to 4As shown, the guide device is arranged on the mining equipment and moves synchronously with the mining equipment. The guide device includes a main structure 10 and a guide structure 20. The guide structure 20 is sleeved on the main structure 10 and has a through hole 21. At least part of the outer peripheral surface of the guide structure 20 is a guide surface 22. When the guide device follows the mining equipment to move in the oil well, the guide surface 22 and the inner wall of the oil well are limited and stopped to guide the movement direction of the mining equipment. The gap S between the guide surface 22 and the inner wall of the oil well satisfies: 0cm≤S≤4cm. Among them, a receiving cavity 23 is formed between at least part of the inner wall of the guide structure 20 and the outer peripheral surface of the main structure 10. The receiving cavity 23 is used to receive impurities. The through hole 21 is connected to the receiving cavity 23. At least part of the through hole 21 is located on the side of the guide surface 22 away from the mining equipment. Impurities enter the receiving cavity 23 through the through hole 21.

[0029] The technical solution of this embodiment is applied, the guide device is arranged on the mining equipment and moves synchronously with the mining equipment, the guide structure 20 of the guide device is sleeved on the main structure 10 and has a through hole 21, at least part of the outer peripheral surface of the guide structure 20 is a guide surface 22, when the guide device follows the mining equipment to move in the oil well, the guide surface 22 and the inner wall of the oil well are limited and stopped to guide the movement direction of the mining equipment, and the gap S between the guide surface 22 and the inner wall of the oil well satisfies: 0cm≤S≤4cm. Among them, a receiving cavity 23 is formed between at least part of the inner wall of the guide structure 20 and the outer peripheral surface of the main structure 10, and the receiving cavity 23 is used to receive impurities, and the through hole 21 is connected to the receiving cavity 23, and at least part of the through hole 21 is located on the side of the guide surface 22 away from the mining equipment, and impurities enter the receiving cavity 23 through the through hole 21. In this way, during the process of lowering the mining equipment into the well, the guide surface 22 and the well wall are used to limit the stop, so that the lowering direction of the mining equipment can be guided to ensure that the lowering direction of the mining equipment is parallel to the extension direction (vertical direction) of the oil well, thereby avoiding collision and damage between the mining equipment and the well wall of the oil well. Compared with the method used in the prior art to avoid the tilt of the mining equipment during lowering, the guide device in the present application does not need to crush the impurities, which not only greatly improves the lowering efficiency of the mining equipment, but also avoids the phenomenon that smaller impurities after crushing enter the mining equipment and cause damage to the mining equipment, thereby solving the problem of ensuring that the water injection and water plugging pipes can be lowered into the oil well in the center of the prior art. The pipes leaning against the well wall will not only affect the efficiency of lifting and lowering the water injection and water plugging pipes, but also cause damage to the water plugging tools. At the same time, the guide surface 22 can also block impurities on the side of the guide surface 22 away from the mining equipment. Since at least part of the through holes 21 are located on the side of the guide surface 22 away from the mining equipment, the impurities can move to the accommodating chamber 23 under the action of buoyancy, so that the impurities can be captured by the accommodating chamber 23, and the captured impurities can be fished out of the oil well along with the extraction process of the mining equipment, thereby realizing the function of cleaning the oil well.

[0030] In this embodiment, the mining equipment includes a water injection string and a water plugging string.

[0031] In this embodiment, the impurities are mainly rubber cartridge pieces formed after the rubber cartridge is broken in the oil well.

[0032] Specifically, the above-mentioned setting of the gap S can prevent larger rubber cartridge blocks from entering between the mining equipment and the oil well wall through the gap, thereby causing damage to the rubber cartridge of the mining equipment (i.e., larger rubber cartridge blocks will continuously collide with the rubber cartridge of the mining equipment under the pressure of the well wall), thereby extending the service life of the mining equipment and avoiding the problem of sealing failure after the mining equipment is lowered.

[0033] In this embodiment, the guide structure 20 is cylindrical so that the structure of the guide structure 20 can match the structure of the oil well.

[0034] It should be noted that the shape of the guide structure 20 is not limited thereto, and can be matched with the structure of the oil well.

[0035] In this embodiment, the main structure 10 is actually arranged at the bottom baffle ball of the water plugging column. By sealing the bottom baffle ball with the main structure 10, impurities can be prevented from entering the water plugging column through the bottom baffle ball and causing damage to the water plugging column, thereby extending the service life of the water plugging column.

[0036] In this embodiment, the guide device also has the function of preventing well wall deformation in advance, that is, when the well wall is deformed (the well wall diameter becomes smaller), the mining equipment cannot be lowered due to the limit stop between the guide device and the well wall, thereby avoiding the phenomenon of damage to the mining equipment due to collision and friction between the mining equipment and the deformed well wall, and further extending the service life of the mining equipment.

[0037] Specifically, the mining equipment is lowered and pulled out using the guide device in this embodiment. As the number of lowering and pulling out increases, the impurities in the oil well will be salvaged and continuously reduced, ultimately achieving the function of cleaning the oil well, providing great convenience for subsequent mining equipment construction, and can also prevent the rubber cartridge from falling into the well during the construction operation of pulling out the plugging pipe column.

[0038] like Figures 1 to 4As shown, along the radial direction of the guide structure 20, at least part of the guide structure 20 protrudes toward the side away from the main structure 10 to form a guide portion 24, and at least part of the outer surface of the guide portion 24 away from the main structure 10 is a guide surface 22. Among them, the through hole 21 is set on the guide portion 24. In this way, since the guide surface 22 is the outer surface of the guide portion 24 formed by the guide structure 20 itself protruding, there is a certain distance between the guide surface 22 and the outer peripheral surface of the non-protruding part of the guide structure 20. When the guide surface 22 and the oil well wall are limited and stopped, a channel can be formed around the outer peripheral surface of the non-protruding part and the oil well wall. In the process of the guide device following the lowering of the mining equipment, impurities will enter the channel under the action of buoyancy, and continue to move toward the guide portion 24 under the action of friction, and finally enter the accommodating cavity 23 through the through hole 21 set in the guide portion 24 under the extrusion of the well wall, ensuring to the greatest extent that most of the impurities in the oil well can enter the accommodating cavity 23, thereby improving the impurity capture reliability of the guide device.

[0039] Optionally, the through hole 21 is arranged on the guide portion 24, and along the direction from one end to the other end of the guide structure 20, the through hole 21 has an enlarged diameter section 211, a retaining section 212 and a reduced diameter section 213 which are arranged in sequence. Among them, along the circumference of the guide structure 20, the distance between the hole wall on one side and the hole wall on the other side of the through hole 21 is a preset distance H, the preset distance H of the enlarged diameter section 211 gradually increases, the preset distance H of the retaining section 212 remains unchanged, and the preset distance H of the reduced diameter section 213 gradually decreases. In this way, when the guide structure is lowered following the mining equipment, some impurities with larger volumes (impurities that cannot directly enter the accommodating chamber 23 through the through hole 21) will produce a cutting action similar to that between the inner walls of the enlarged diameter section 211 and the reduced diameter section 213 under the extrusion of the well wall and the movement of the guide device itself, so as to crush the impurities with larger volumes, ensure that most of the impurities can enter the accommodating chamber 23, and further improve the impurity catching reliability of the guide device.

[0040] Specifically, as the guide device moves, larger impurities that enter the channel will eventually get stuck in the through hole 21. As the guide device continues to move, the impurities stuck in the through hole 21 will move to the reduced diameter section 213 of the through hole 21. The two inner walls of the reduced diameter section 213 will act like a cutting edge to cut and crush the impurities.

[0041] Optionally, there are multiple through holes 21, and the multiple through holes 21 are arranged at intervals around the central axis of the guide structure 20. The multiple through holes 21 divide the guide part 24 into multiple sub-guide parts 241. The sub-guide parts 241 are plate-shaped and include a first sub-plate segment 2411, a second sub-plate segment 2412 and a third sub-plate segment 2413 that are connected to each other. The second sub-plate segment 2412 is located between the first sub-plate segment 2411 and the third sub-plate segment 2413. The plate surface of the second sub-plate segment 2412 away from the main structure 10 is the guide surface 22. The above arrangement increases the area of ​​the through holes 21 on the one hand, thereby improving the impurity capture efficiency of the guide device; on the other hand, it makes the number of through holes 21 more flexible and diverse to adapt to different working conditions and usage requirements, and also improves the processing flexibility of the staff.

[0042] In this embodiment, there are six through holes 21, and the six through holes 21 are evenly distributed around the central axis of the guide structure 20, so as to increase the total area of ​​the through holes 21 while enabling the through holes 21 to fully capture impurities between the guide device and the well wall, further improving the impurity capture efficiency of the guide device.

[0043] Specifically, the first sub-plate segments 2411 of two adjacent sub-guides 241 surround to form the diameter expansion segment 211 , the second sub-plate segments 2412 of two adjacent sub-guides 241 surround to form the retaining segment 212 , and the third sub-plate segments 2413 of two adjacent sub-guides 241 surround to form the diameter reduction segment 213 .

[0044] In this embodiment, through holes 21 (i.e., the enlarged diameter section 211 and the reduced diameter section 213) are actually provided on both sides of the guide surface 22 (the second sub-plate section 2412). In this way, when the guide device follows the mining equipment to be pulled out, the enlarged diameter section can be turned into a reduced diameter section, so that the guide device can also cut and catch impurities during the extraction process of the mining equipment.

[0045] Optionally, the first sub-plate segment 2411 and the second sub-plate segment 2412 are arranged at a first angle A1, and the third sub-plate segment 2413 and the first sub-plate segment 2411 are arranged at a second angle A2, and the first angle A1 and the second angle A2 satisfy: 105°≤A1≤135°, 105°≤A2≤135°. In this way, the above arrangement enables the sub-guide portion 241 to have a cutting guide function, that is, when impurities enter between the guide portion 24 and the well wall, as the guide device continues to move, the above angle setting of the first sub-plate segment 2411 increases the strength of squeezing the impurities, thereby enabling the inner wall of the through hole 21 to cut the impurities more thoroughly and efficiently.

[0046] Specifically, when the guide device follows the mining equipment to be pulled out, the above-mentioned angle setting of the third sub-plate segment 2413 enables it to produce the same cutting guide function as the first sub-plate segment 2411.

[0047] In this embodiment, the guide structure 20 is actually an integrally formed structure to enhance the overall structural strength of the guide structure 20 .

[0048] In this embodiment, the guide structure 20 can be movably mounted on the main structure 10, and at least part of the guide structure 20 is made of elastic material. In this way, the guide structure 20 will produce adaptive changes according to the actual situation of impurities between the guide structure 20 and the well wall to improve the fishing and guiding reliability of the guide device.

[0049] In this embodiment, the entire guide structure 20 is made of elastic material.

[0050] Specifically, the elastic deformation degree of the guide structure 20 is actually determined by the impurities between the guide structure 20 and the well wall. If the size or number of the impurities increases, the friction force exerted by the impurities on the guide structure 20 will increase, and the elastic deformation degree of the guide structure 20 will increase accordingly. When the elastic deformation degree of the guide structure 20 increases, the following five parameters will change accordingly:

[0051] 1. The gap S becomes smaller. Since the guide portion 24 protrudes toward the side away from the main structure 10, when the elastic deformation degree of the guide structure 20 increases, the protrusion degree will also increase, and the gap S between the guide surface 22 and the well wall will become smaller, so as to further prevent a large number of small impurities after cutting from entering between the guide surface 22 and the mining equipment through the gap S.

[0052] It should be noted that it is not a problem for a small amount of impurities to enter between the guide surface 22 and the mining equipment through the gap S. On the one hand, the above-mentioned setting of the gap S ensures that the impurities entering between the guide surface 22 and the mining equipment are all small impurities, which cannot knock or rub the rubber cylinder of the mining equipment; on the other hand, the guide device can further capture the impurities between the guide surface 22 and the mining equipment during the removal process of the mining equipment.

[0053] 2. The accommodating cavity 23 becomes larger, that is, when the elastic deformation degree of the guide structure 20 increases, it will bulge toward the side away from the main structure 10 as a whole, and the accommodating cavity 23 will become larger accordingly to accommodate more and larger impurities. When the elastic deformation of the guide structure 20 is restored, it can also squeeze the impurities in the accommodating cavity 23 to fix the impurities and facilitate subsequent fishing.

[0054] 3. The through hole 21 becomes larger, that is, when the elastic deformation degree of the guide structure 20 increases, the guide portion 24 will protrude toward the side away from the main structure 10, and the through hole 21 will become larger accordingly (the preset distance H becomes larger), so that more and larger impurities can enter the accommodating cavity 23 through the through hole 21.

[0055] 4. The rigidity of the guide structure 20 (mainly the sub-guide portion 241) is increased, so that the sub-guide portion 241 can cut the impurities more thoroughly and efficiently.

[0056] like Figure 1 and Figure 2 As shown, the guide structure 20 is also provided with a first filter hole 25 connected with the accommodating chamber 23, the main structure 10 has a connecting chamber 11 and a second filter hole 12 connected with the connecting chamber 11, the connecting chamber 11 is connected with the mining equipment, and the mining equipment is connected with the oil well through the connecting chamber 11, the second filter hole 12, the accommodating chamber 23 and the second filter hole 12 in sequence; and / or, the mining equipment is connected with the oil well through the connecting chamber 11, the second filter hole 12, the accommodating chamber 23 and the through hole 21 in sequence. In this way, the guide device can adapt to the actual working state of the mining equipment, on the one hand, it is convenient for the mining equipment to inject liquid into the oil well; on the other hand, the above-mentioned arrangement of the first filter hole 25 and the second filter hole 12 can prevent impurities in the oil well from entering the mining equipment through the bottom of the mining equipment, causing damage to the mining equipment, and further prolonging the service life of the mining equipment.

[0057] In this embodiment, the main structure 10 is a cylindrical structure, the inner cavity of the cylindrical structure is the connecting cavity 11, and the guide device further includes a blocking structure 30, which is arranged at one end of the main structure 10 away from the mining equipment to block the end. In this way, the above arrangement makes the structure of the main structure 10 simpler, easier to process and realize, thereby reducing the processing cost of the main structure 10 and the processing difficulty of the staff; on the other hand, by blocking the main structure 10 with the blocking structure 30, it is possible to prevent impurities in the oil well from directly entering the connecting cavity 11 through the end of the cylindrical structure, thereby improving the filtering reliability of the main structure 10.

[0058] like Figure 1 As shown, the plugging structure 30 includes a cylindrical connection part 31 and a columnar plugging part 32, and the cylindrical connection part 31 is sleeved on the main structure 10. The columnar plugging part 32 is arranged on one end of the cylindrical connection part 31 away from the main structure 10, and the diameter of at least part of the columnar plugging part 32 gradually decreases in the direction from the main structure 10 to the plugging structure 30, so that at least part of the outer peripheral surface of the columnar plugging part 32 forms a conical guide surface 321. In this way, the above arrangement enables the columnar plugging part 32 to be connected to the main structure 10 through the cylindrical connection part 31 on the one hand; on the other hand, during the movement of the guide device, the conical guide surface 321 can guide the movement direction of impurities in the oil well to ensure that the impurities can all move between the guide structure 20 and the well wall, further improving the impurity capture reliability of the guide device.

[0059] In this embodiment, an oil pipe buckle is provided on the inner wall of the cylindrical connecting portion 31 .

[0060] like Figure 1 As shown, the guide structure 20 can be movably mounted on the main structure 10, at least part of the guide structure 20 is made of elastic material, and the guide device also includes a buffer structure 40, which is mounted on the main structure 10, and the two ends of the buffer structure 40 are respectively connected to the guide structure 20 and the blocking structure 30, and the buffer structure 40 is used to buffer the guide structure 20 when the guide structure 20 undergoes elastic deformation. In this way, by buffering the guide structure 20 with the buffer structure 40, it is possible to avoid excessive elastic deformation of the guide structure 20, thereby preventing it from being damaged, thereby extending the service life of the guide device.

[0061] In this embodiment, the buffer structure 40 is a spring.

[0062] Specifically, the staff can also adjust the installation position of the plugging structure 30 (the buckle depth of the oil pipe buckle, that is, the screw-in depth of the thread) to adjust the distance between the plugging structure 30 and the guide structure 20, thereby adjusting the elastic force of the spring, and then adjusting the pre-deformation degree of the guide structure 20 to better adapt to oil wells with different working conditions.

[0063] In this embodiment, a connection structure 50 is further provided on one end of the main structure 10 close to the mining equipment, so as to facilitate the connection between the main structure 10 and the mining equipment.

[0064] From the above description, it can be seen that the above embodiments of the present invention achieve the following technical effects:

[0065] The guide device is arranged on the mining equipment and moves synchronously with the mining equipment. The guide structure of the guide device is sleeved on the main structure and has a through hole. At least part of the outer peripheral surface of the guide structure is a guide surface. When the guide device follows the mining equipment to move in the oil well, the guide surface and the inner wall of the oil well are limited and stopped to guide the movement direction of the mining equipment. The gap S between the guide surface and the inner wall of the oil well satisfies: 0cm≤S≤4cm. Among them, a receiving cavity is formed between at least part of the inner wall of the guide structure and the outer peripheral surface of the main structure. The receiving cavity is used to receive impurities. The through hole is connected to the receiving cavity. At least part of the through hole is located on the side of the guide surface away from the mining equipment. Impurities enter the receiving cavity through the through hole. In this way, in the process of lowering the mining equipment into the well, the lowering direction of the mining equipment can be guided by limiting the stop between the guide surface and the well wall to ensure that the lowering direction of the mining equipment is parallel to the extension direction (vertical direction) of the oil well, thereby avoiding collision and damage between the mining equipment and the well wall of the oil well. Compared with the method used in the prior art to avoid the tilt of the mining equipment during lowering, the guide device in the present application does not need to crush the impurities, which not only greatly improves the lowering efficiency of the mining equipment, but also avoids the phenomenon that smaller impurities after crushing enter the mining equipment and cause damage to the mining equipment, thereby solving the problem of ensuring that the water injection and water plugging pipes can be lowered into the oil well in the center of the prior art. The pipes leaning against the well wall will not only affect the efficiency of lifting and lowering the water injection and water plugging pipes, but also cause damage to the water plugging tools. At the same time, the guide surface can also block impurities on the side of the guide surface away from the mining equipment. Since at least part of the through holes are located on the side of the guide surface away from the mining equipment, the impurities can move to the accommodating cavity under the action of buoyancy, so as to be captured by the accommodating cavity. The captured impurities can be fished out of the oil well as the mining equipment is removed, thereby realizing the function of cleaning the oil well.

[0066] Obviously, the above-described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0067] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0068] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.

[0069] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A guide device, arranged on a mining device and moving synchronously with the mining device, characterized in that: The guiding device comprises: Main structure (10); A guide structure (20) is sleeved on the main structure (10) and has a through hole (21); at least part of the outer peripheral surface of the guide structure (20) is a guide surface (22); when the guide device follows the mining equipment to move in the oil well, the guide surface (22) and the inner wall of the oil well are limited and stopped to guide the movement direction of the mining equipment; the gap S between the guide surface (22) and the inner wall of the oil well satisfies: 0cm≤S≤4cm; A receiving cavity (23) is formed between at least part of the inner wall of the guide structure (20) and the outer peripheral surface of the main structure (10), and the receiving cavity (23) is used to receive impurities. The through hole (21) is connected to the receiving cavity (23), and at least part of the through hole (21) is located on a side of the guide surface (22) away from the mining equipment, and the impurities enter the receiving cavity (23) through the through hole (21).

2. The guide device according to claim 1, characterized in that: Along the radial direction of the guide structure (20), at least a portion of the guide structure (20) protrudes toward a side away from the main structure (10) to form a guide portion (24), and at least a portion of the outer surface of the guide portion (24) away from the main structure (10) is the guide surface (22); wherein the through hole (21) is arranged on the guide portion (24).

3. The guide device according to claim 2, characterized in that: Along the direction from one end to the other end of the guide structure (20), the through hole (21) has a diameter expansion section (211), a retaining section (212) and a diameter reduction section (213) which are arranged in sequence; Wherein, along the circumference of the guide structure (20), the distance between the hole wall on one side and the hole wall on the other side of the through hole (21) is a preset distance H, the preset distance H of the diameter expansion section (211) gradually increases, the preset distance H of the retaining section (212) remains unchanged, and the preset distance H of the diameter reduction section (213) gradually decreases.

4. The guide device according to claim 3, characterized in that: There are a plurality of through holes (21), and the plurality of through holes (21) are arranged at intervals around the central axis of the guide structure (20). The plurality of through holes (21) divide the guide portion (24) into a plurality of sub-guide portions (241), and the sub-guide portions (241) are plate-shaped and include: A first sub-plate segment (2411), a second sub-plate segment (2412) and a third sub-plate segment (2413) are connected to each other, the second sub-plate segment (2412) is located between the first sub-plate segment (2411) and the third sub-plate segment (2413), and the plate surface of the second sub-plate segment (2412) away from the main structure (10) is the guide surface (22).

5. The guide device according to claim 4, characterized in that: The first sub-plate segment (2411) and the second sub-plate segment (2412) are arranged at a first angle A1, and the third sub-plate segment (2413) and the first sub-plate segment (2411) are arranged at a second angle A2, and the first angle A1 and the second angle A2 satisfy: 105°≤A1≤135°, 105°≤A2≤135°.

6. The guide device according to claim 4, characterized in that: The guide structure (20) is movably mounted on the main structure (10), and at least a portion of the guide structure (20) is made of elastic material. When the guide structure (20) undergoes elastic deformation, the size of the gap S is adjusted; and / or, When the guide structure (20) undergoes elastic deformation, the size of the accommodating cavity (23) is adjusted; and / or, When the guide structure (20) undergoes elastic deformation, the size of the through hole (21) is adjusted; and / or, When the guide structure (20) undergoes elastic deformation, the distance between the sub-guide portion (241) and the main structure (10) is adjusted.

7. The guide device according to claim 1, characterized in that: The guide structure (20) is also provided with a first filtering hole (25) communicating with the accommodating cavity (23). The main structure (10) comprises a connecting cavity (11) and a second filter hole (12) connected to the connecting cavity (11); the connecting cavity (11) is connected to the mining equipment; the mining equipment is connected to the oil well in sequence through the connecting cavity (11), the second filter hole (12), the accommodating cavity (23) and the second filter hole (12); and / or the mining equipment is connected to the oil well in sequence through the connecting cavity (11), the second filter hole (12), the accommodating cavity (23) and the through hole (21).

8. The guide device according to claim 7, characterized in that: The main structure (10) is a cylindrical structure, the inner cavity of the cylindrical structure is the connecting cavity (11), and the guiding device further comprises: A blocking structure (30) is arranged on an end of the main structure (10) away from the mining equipment to block the end.

9. The guide device according to claim 8, characterized in that: The blocking structure (30) comprises: A cylindrical connecting portion (31) sleeved on the main structure (10); The columnar sealing portion (32) is arranged on one end of the cylindrical connecting portion (31) away from the main structure (10), and the diameter of at least part of the columnar sealing portion (32) gradually decreases in the direction from the main structure (10) to the sealing structure (30), so that at least part of the outer peripheral surface of the columnar sealing portion (32) forms a conical guide surface (321).

10. The guide device according to claim 8, characterized in that: The guide structure (20) is movably mounted on the main structure (10), and at least a portion of the guide structure (20) is made of elastic material. The guide device further comprises: A buffer structure (40) is sleeved on the main structure (10), and two ends of the buffer structure (40) are respectively connected to the guide structure (20) and the blocking structure (30), and the buffer structure (40) is used to buffer the guide structure (20) when the guide structure (20) undergoes elastic deformation.