Construction system and method for underground rock roadway tunneling of phosphorite
By using a construction method that combines a fully mechanized tunnel excavation machine and a dry dust removal system underground in a phosphate mine, the problems of complicated rock tunnel excavation construction and harsh dust environment in the underground phosphate mine have been solved, and efficient, safe, and low-cost excavation results have been achieved.
Patent Information
- Application Number
- CN202411092700.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-01
AI Technical Summary
The existing underground rock tunnel excavation method in phosphate mines has problems such as complicated construction links, harsh dust environment, high cost, low efficiency, and large disturbance to the surrounding rock by blasting methods. It is not suitable for the conditions where phosphate rock easily muddies when exposed to water.
A construction system combining a fully mechanized excavator, a press-in air duct and an extractable air duct is used, a dry concrete spraying machine is used for tunnel support, a "meter"-shaped cutting method is used to improve the excavation efficiency, and dry dust removal is used Water curtain reduces dust concentration.
It improves the mechanization level of underground rock tunnel excavation in phosphate mines, reduces costs and dust concentration, improves excavation efficiency and flatness, simplifies the support process, and ensures the safety of the operating environment.
Smart Images

Figure CN118728376A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground fully-mechanized mining of phosphate mines, and in particular to a construction system and method for underground rock tunnel excavation of phosphate mines. Background Art
[0002] Phosphate is an important strategic resource of the country and one of the 20 minerals listed by the Ministry of Land and Resources as unable to meet the needs of national economic development after 2010. It is widely used in my country's grain production, modern chemical industry, new energy, new materials and national defense. Since the geological conditions of phosphate mines are different from those of coal mines, such as the hardness of phosphate rock is generally higher than that of coal rock, and phosphate rock is easily muddied when it comes into contact with water, underground phosphate mining is challenging.
[0003] Rock tunnel excavation is the core process in the comprehensive mining operation of the mine, and is the basis for ensuring the smooth progress of the underground comprehensive mining operation. Its excavation efficiency and safety directly determine the economy of the underground comprehensive mining operation. The existing methods of underground rock tunnel excavation in phosphate mines mostly adopt the drilling and blasting rock breaking method, which mainly includes four links: drilling, blasting, slag removal, and support. Use a rock drilling trolley to drill holes and charge explosives. After blasting, the ore is shoveled by a shovel loader and transported out of the tunnel by a mine car. Use an anchor trolley to drill holes, then carry out anchor bolt and anchor net construction, and finally complete the shotcrete support. This method has strong adaptability to geological conditions and is widely used, but it has the following disadvantages: ① The construction links are numerous and complex, the single cycle time is long, there are many operators, and the labor intensity is high; ② The blasting operation environment is dusty, which poses great harm to operators and on-site equipment; ③ The blasting method has poor tunnel flatness, is prone to over-excavation and under-excavation, causes great disturbance to the surrounding rock, makes support inconvenient and increases costs; ④ Blasting can easily disturb the surrounding goaf and ground construction facilities, increase the probability of roof collapse and block falling in the goaf and affect the safety of ground facilities; ⑤ The overall economic cost is high.
[0004] The tunnel boring machine is a comprehensive mechanized equipment that integrates multiple functions such as tunneling, rock loading, coal transportation, and even support and nailing. It is widely used in coal mine rock tunneling. However, when the tunnel boring machine breaks the harder rock layer, the tunneling speed is limited, the rock breaking speed is slow, and the tunneling efficiency is low. In addition, since phosphate rock is easily muddied when it meets water, the existing water curtain dust removal with good dust removal effect is not suitable for phosphate mining. Summary of the invention
[0005] In view of this, in order to address the deficiencies of the above-mentioned prior art, the object of the present invention is to provide a construction system and method for underground rock tunnel excavation in phosphate mines which is safe, efficient, simple to construct, has low dust concentration in the working environment, and has low construction cost.
[0006] In order to achieve the above-mentioned object, the first aspect of the present invention provides a construction system for underground rock tunnel excavation in a phosphate mine, which comprises a comprehensive excavation machine, a secondary conveyor belt conveyor, a rock transport vehicle, a concrete spraying machine, a forced-in air duct and an exhaust air duct; the feed port of the secondary conveyor belt conveyor is connected to the discharge port of the transport part of the comprehensive excavation machine; the secondary conveyor belt conveyor and the concrete spraying machine are movable; the forced-in air duct is connected to a blower, and the exhaust air duct is connected to an exhaust fan; the forced-in air duct and the exhaust air duct are arranged respectively The pressure-type air duct is arranged at the upper part of the tunnel section on both sides of the tunneling direction of the comprehensive excavation machine, and the exhaust-type air duct is arranged at the lower part of the tunnel section. The air outlet of the pressure-type air duct lags behind the tunneling section by 30 to 42 meters. The distance between the air inlet of the exhaust-type air duct and the tunneling head is less than 3 meters. The air outlet of the exhaust-type air duct lags behind the air outlet of the pressure-type air duct by 2 to 3 meters. A dry dust collector is arranged in the middle section of the exhaust-type air duct, and the air outlet of the exhaust-type air duct is connected to a dust removal water tank.
[0007] Further, in a preferred embodiment of the present invention, the multi-purpose excavator is selected from the SCR260 multi-purpose excavator produced by Sany Heavy Industries.
[0008] Furthermore, in a preferred embodiment of the present invention, the movability of the secondary belt conveyor and the concrete spraying machine is realized by crawler-type movability.
[0009] Furthermore, in a preferred embodiment of the present invention, the concrete spraying machine is a dry concrete spraying machine. Compared with the wet concrete spraying machine, the dry concrete spraying machine has the advantages of being smaller in size and more flexible in movement.
[0010] Furthermore, in a preferred embodiment of the present invention, a water curtain is arranged in the dust removal water tank to remove dust using the water curtain, and the spray water pressure is ≥2MPa.
[0011] In a second aspect, the present invention further provides a construction method for underground rock tunnel excavation in a phosphate mine, which comprises the following steps:
[0012] (1) Arranging a push-in air duct and an exhaust air duct, wherein the arrangement positions of the push-in air duct and the exhaust air duct refer to claim 1, and turning on the air supply fan and the exhaust fan;
[0013] (2) Select the cutting teeth model of the cutting head of the excavator according to the conditions of the ore and rock, and ensure that the installed cutting teeth can smoothly cut the ore and rock; use the cutting head of the excavator to cut the rock mass, and the cutting method is that the cutting head cuts linearly from the center point of the excavation section to the surrounding areas, and repairs the edge of the tunnel after the cutting is completed;
[0014] (3) The ore and rock that fall from cutting and cutting are shoveled by the shovel section of the tunneling machine to the transport section of the tunneling machine, and then transported to the secondary conveyor belt conveyor, and then transported to the ore and rock transfer vehicle and transported out of the working surface;
[0015] (4) After the completion of steps (2) and (3), a concrete spraying machine is used to support the top surface of the tunnel.
[0016] Preferably, the cutting method in step (2) is that the cutting head first forms a circular hole in the middle of the excavation section, and then cuts a cutting groove surface in the horizontal and vertical directions of the excavation section with the circular hole as the starting point to open the cutting space, and then the cutting head cuts the ore rock in a radial manner around the excavation section with the circular hole as the center.
[0017] Furthermore, the diameter of the circular hole is 1080 mm and the depth is 1050 mm.
[0018] Preferably, the support operation in step (4) adopts a composite support method of temporary plain spraying of 50 mm and permanent anchor spraying of 80 mm. Further, the concrete spraying machine sprays the top surface of the tunnel in a spiral trajectory, the spraying rotation diameter of the concrete spraying machine is 180 to 220 mm, and the distance between the nozzle of the concrete spraying machine and the sprayed surface is 0.6 to 1 m.
[0019] The construction system for underground rock tunnel excavation in a phosphate mine provided by the present invention greatly improves the mechanization level of rock tunnel excavation and reduces the excavation cost of the phosphate mine rock tunnel by using a multi-purpose excavator to excavate the phosphate mine rock tunnel; the arrangement of the pressure-in type air duct and the exhaust type air duct constructs an air curtain for suppressing dust overflow at a position close to the excavation head, a large amount of dust is extracted by the exhaust type air duct and discharged after being treated by a dry dust collector and a dust removal water tank, which significantly reduces the dust concentration in the tunnel and effectively improves the environmental quality at the head of the excavation tunnel. The construction method provided by the present invention realizes the rapid cutting of the phosphate mine tunnel by the comprehensive excavator by selecting suitable cutting teeth of the cutting head of the comprehensive excavator in a "M"-shaped cutting and cutting manner, thereby improving the excavation efficiency and the flatness of the tunnel cutting; at the same time, the improvement of the flatness of the cut tunnel can also simplify the subsequent support process and reduce the support cost; although the dry concrete spraying machine is small in size and easy to move, the strength of the sprayed concrete is low, which affects the support quality. The support operation of the present invention adopts a composite support method of temporary plain spraying of 50mm and permanent anchor spraying of 80mm, which ensures that even if the dry concrete spraying machine is used to spray concrete, the quality of the tunnel support will not be affected.
[0020] In summary, compared with the prior art, the present invention has the following advantages:
[0021] The present invention provides a comprehensive excavation construction system and method suitable for underground rock tunnel excavation in phosphate mines. Compared with the existing drilling and blasting excavation technology for underground rock tunnel excavation in phosphate mines, the mechanization level of phosphate rock tunnel excavation is greatly improved, the excavation cost is reduced, the working environment is improved, the explosion risk existing in the existing drilling and blasting excavation technology is eliminated, and the safety of the operators is guaranteed; the comprehensive excavation construction technology provided by the present invention is economical and efficient, safe and environmentally friendly, the dust removal method is simple and practical, and the ore transportation method is portable and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the equipment layout for underground rock tunnel excavation construction in a phosphate mine according to Example 1 of the present invention;
[0023] Figure 2 This is a schematic diagram of a cross section of an excavation tunnel according to Embodiment 1 of the present invention;
[0024] Figure 3 A schematic diagram of a cutting method used by a multi-purpose excavator in accordance with Embodiment 1 of the present invention;
[0025] Figure 4 It is a three-dimensional scanning diagram of the fully-mechanized tunneling roadway of Example 1 of the present invention and the existing blasting tunneling roadway;
[0026] Figure 5 These are on-site photos of the comprehensive excavation tunnel of Example 1 of the present invention and the existing blasting excavation tunnel.
[0027] Legend:
[0028] 1-excavator; 11-cutting head; 12-shovel section; 13-transport section; 2-secondary conveyor belt; 3-ore and rock transfer vehicle; 4-pressed air duct; 5-extractive air duct; 51-dry dust collector; 52-dust removal water tank; 6-round hole; 7-cutting groove. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with specific embodiments and drawings. However, it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention, rather than limiting the claims of the present invention.
[0030] The present invention adopts a comprehensive mechanized rock tunnel operation line for the underground rock tunnel excavation construction process of the phosphate mine. Figure 1 and Figure 2The construction system includes a tunnel boring machine 1, a secondary conveyor belt 2, a rock transport vehicle 3, a concrete spraying machine, a forced-in air duct 4 and an exhaust air duct 5; the feed port of the secondary conveyor belt 2 is connected to the discharge port of the tunnel boring machine transport part 13; the secondary conveyor belt 2 and the concrete spraying machine are movable; the forced-in air duct 4 is connected to the air supply fan, and the exhaust air duct 5 is connected to the exhaust fan; the forced-in air duct 4 and the exhaust air duct 5 are respectively arranged on both sides of the tunnel boring machine 1 in the excavation direction and The pressure-in type air duct 4 is arranged at the upper part of the tunnel section, and the exhaust type air duct 5 is arranged at the lower part of the tunnel section. The air outlet of the pressure-in type air duct 4 lags behind the excavation section by 30 to 42 meters. The distance between the air inlet of the exhaust type air duct 5 and the excavation head is less than 3 meters. The air outlet of the exhaust type air duct 5 lags behind the air outlet of the pressure-in type air duct 4 by 2 to 3 meters. A dry dust collector 51 is arranged in the middle section of the interior of the exhaust type air duct 5, and the air outlet of the exhaust type air duct 5 is connected to a dust removal water tank 52.
[0031] The construction technology of underground rock tunnel excavation of phosphate mine provided by the present invention is to use a comprehensive rock tunnel excavator integrating rock cutting, rock loading and rock transportation to excavate the tunnel, and the secondary conveyor belt conveyor, ore and rock transfer vehicle, concrete spraying machine and dust removal air duct are used to jointly carry out rock tunnel operations. Specific examples are as follows:
[0032] Example 1: Rock tunneling construction in phosphate mine
[0033] 1. Tunnel section design: see Figure 2 As shown, the tunnel is designed as an arched tunnel, and the tunnel section is designed as an arched section.
[0034] 2. Supporting equipment for working face
[0035] The working face is equipped with a comprehensive rock tunnel boring machine (SCR260 type comprehensive tunnel boring machine), behind which is installed a crawler-type movable 80-type belt conveyor, and a rock and ore transfer vehicle is configured to receive the gangue transported by the belt conveyor and transport it out. It is also equipped with a crawler-type movable dry concrete spraying machine.
[0036] Pressure-in air ducts and exhaust air ducts are arranged on both sides of the tunneling direction of the multi-purpose tunneling machine. The pressure-in air duct is arranged at the upper part of the tunnel section, and the exhaust air duct is arranged at the lower part of the tunnel section. The air outlet of the pressure-in air duct lags behind the tunneling section by 30 to 42 meters, the distance between the air inlet of the exhaust air duct and the tunneling head is less than 3 meters, and the air outlet of the exhaust air duct lags behind the air outlet of the pressure-in air duct by 2 to 3 meters. A dry dust collector is arranged in the middle section of the exhaust air duct, and the air outlet of the exhaust air duct is connected to a dust removal water tank.
[0037] 3. Construction technology
[0038] First, the operators should make preparations and conduct safety inspections to ensure a safe working environment, including good ventilation, adequate water supply, safe power supply, and stable ore and rock. They should also check the equipment status and wait until the equipment can operate normally before starting the operation. The specific construction methods are as follows:
[0039] 3.1. Ventilation and dust removal
[0040] The supply fan connected to the pressure-in fan duct and the exhaust fan connected to the exhaust fan duct are kept turned on to ensure that fresh air is continuously pressed into the excavation working face and an air curtain is formed near the excavation head; see Figure 1 The air outlet of the pressure-type air duct 4 is arranged on the left side of the excavation direction, lagging behind the excavation section by about 30 to 42 meters; the exhaust-type air duct 5 is arranged on the right side of the excavation direction, and the air inlet end of the exhaust-type air duct 5 adopts a relatively hard air duct. A dry dust collector 51 is arranged in the middle section of the exhaust-type air duct 5. The air inlet of the exhaust-type air duct 5 is not more than 3 meters away from the excavation head, and the air outlet is arranged 2 meters behind the air outlet of the pressure-type air duct 4, and is connected to a high-pressure dust removal water tank 52, which is equipped with a spray system, and the spray water pressure is not less than 2MPa.
[0041] Effect:
[0042] The dust concentration at the operating platform during the tunneling operation of the tunneling machine was measured to be between 2.2 and 8.0 mg / m 3 Within the range, the dust concentration at the cutting point is 206.6mg / m 3 After being extracted by the exhaust fan 5 and dusted with high-pressure water, the dust concentration is reduced to 2.4-3.6 mg / m 3 ; The dust concentration of drilling operation during drilling and blasting is 9.6~10.4mg / m 3 , the dust concentration of mining operation is 22.8~45.0mg / m 3 , which is much higher than the dust concentration in the comprehensive excavation environment.
[0043] 3.2 Cutting and excavation:
[0044] First, determine the type of pick for the cutting head 11 of the tunnel boring machine 1 according to the ore and rock conditions to ensure that the installed pick can smoothly cut the ore and rock. Figure 3 , a SCR260 type comprehensive excavator is used to first form a circular hole 6 with a diameter of 1080mm and a depth of 1050mm in the middle of the excavation section, and then a cutting groove 7 is cut in the horizontal and vertical directions to open the feed space, and the ore rock is cut from the middle position to the surrounding area in a radial manner. The cutting head 11 must be in a rotating state to cut the ore. The cutting head is not allowed to start with load, and the advancement speed should not be too large. The machine advancement speed should be controlled according to the hardness of the ore layer to avoid overloading the cutting motor and prohibit overload operation. Finally, the surrounding areas are repaired to meet the designed rock tunnel profile standards.
[0045] Effect:
[0046] The test tunnel was inspected using a KW-100I 3D laser scanner. The results are shown in Figure 4 It can be seen that compared with the blasting tunnel obtained by the existing drilling and blasting technology, the flatness and integrity of the fully-mechanized tunnel are significantly improved. Figure 5 Through on-site testing, it can be found that the flatness of the tunnel cut by the multi-purpose excavator is ≤50mm, the integrity is good, there is no obvious crushing on the tunnel surface, and the cutting operation has basically no effect on the anchor net and anchor rods of the previous cycle; the tunnel blasted by the drilling and blasting method is uneven, most of the flatness is ≥80mm, the local over-excavation is serious, the integrity is poor, there is obvious crushed ore and rock on the tunnel surface, and it is easy to fall off after the anchor net and anchor rod construction or blasting operation disturbance.
[0047] 3.3、Ore loading and transportation:
[0048] The cut ore and rock are shoveled to the transport part 13 by the shovel part 12 of the multi-purpose excavator 1, and then transmitted to the secondary conveyor belt 2 installed at the rear end of the multi-purpose excavator, and then transported to the rear ore and rock transfer vehicle 3 by the secondary conveyor belt 2, and then transported out of the current working surface.
[0049] 3.4. Support technology:
[0050] A composite support method of temporary plain spraying of 50mm plus permanent anchor spraying of 80mm is adopted. After the cross-section repair and mining are completed, the staff stands under reliable support and uses a special top-finding tool of appropriate length to clean the active gangue on the top. After the gangue is discharged, a dry concrete spraying machine + mixed material is used to spray the top of the tunnel in a plain spraying support. During the plain spraying support operation, the spray is carried out from the bottom to the top from the two sides of the tunnel to the top of the tunnel in a spiral trajectory, and the rotation diameter is preferably about 200mm; during the spraying operation, the distance between the nozzle and the sprayed surface is maintained at 0.6-1m, and the direction of the nozzle should be as orthogonal to the sprayed surface as possible. After the concrete solidifies and stabilizes, the anchor rod eyes are arranged according to the designed spacing, in rows horizontally and vertically, with a spacing error of ±100mm, and the uneven parts around the eye mouth are repaired and leveled with a hand pick. The support sequence of top first and then side is adopted. An anchor rod construction above the arch line must be anchored immediately. Finally, the permanent concrete spraying support is completed, and a tunneling cycle construction is completed.
[0051] 4. Comparative analysis of economic benefits
[0052] Table 1. Cost consumption table of different excavation construction processes
[0053]
[0054]
[0055] It can be seen from Table 1 above that the cost of comprehensive excavation construction for excavating a 5m tunnel is 9594.4 yuan, while the cost of drilling and blasting excavation construction is 17547 yuan. The present invention greatly saves the excavation cost of the phosphate mine tunnel.
[0056] 5. Efficiency comparison of different cutting methods
[0057] The same tunneling machine cutting head was used to excavate a 2m long tunnel with different cutting methods for the same ore and rock. The excavation time was recorded and the results are shown in Table 2 below.
[0058] Table 2. Efficiency comparison of different cutting methods
[0059] Cutting cutting path Cross S-Shape Wraparound Spiral Working footage (m) 2 2 2 2 Working hours (h) 3.1 4.5 4.1 3.9 Cutting teeth consumption (pcs) 0.8 1 1.5 1.5
[0060] It can be seen from Table 2 above that the "M"-shaped cutting method of the present invention significantly improves the tunnel excavation efficiency compared to the existing "S-shaped", "circular" and "spiral" cutting methods.
[0061] In summary, the construction system and construction method provided by the present invention effectively improve the efficiency and safety of underground rock tunnel excavation in phosphate mines, reduce excavation costs, greatly improve the economy of underground rock tunnel excavation in phosphate mines, and have great application and promotion value.
[0062] The above are only preferred embodiments of the present invention. It should be noted that the above preferred embodiments should not be regarded as limiting the present invention, and the protection scope of the present invention should be based on the scope defined by the claims. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the spirit and scope of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A construction system for underground rock tunnel excavation in a phosphate mine, characterized by: It includes a tunnel boring machine, a secondary conveyor belt, a rock transporter, a concrete spraying machine, a push-in air duct and an exhaust air duct; the feed port of the secondary conveyor belt is connected to the discharge port of the transport part of the tunnel boring machine; the secondary conveyor belt and the concrete spraying machine are movable; the push-in air duct is connected to a blower, and the exhaust air duct is connected to an exhaust fan; The pressure-in type air duct and the exhaust type air duct are respectively arranged on both sides of the excavation direction of the tunnel boring machine, and the pressure-in type air duct is arranged at the upper part of the tunnel section, and the exhaust type air duct is arranged at the lower part of the tunnel section. The air outlet of the pressure-in type air duct lags behind the excavation section by 30 to 42 meters, the distance between the air inlet of the exhaust type air duct and the excavation head is less than 3 meters, and the air outlet of the exhaust type air duct lags behind the air outlet of the pressure-in type air duct by 2 to 3 meters. A dry dust collector is arranged in the middle section of the exhaust type air duct, and the air outlet of the exhaust type air duct is connected to a dust removal water tank.
2. A construction system for underground rock tunnel excavation in a phosphate mine according to claim 1, characterized in that: The multi-purpose excavator is selected from the SCR260 multi-purpose excavator produced by Sany Heavy Industry.
3. A construction system for underground rock tunnel excavation in a phosphate mine according to claim 1, characterized in that: The movable type is crawler-type movable.
4. A construction system for underground rock tunnel excavation in a phosphate mine according to claim 1, characterized in that: The concrete spraying machine is a dry concrete spraying machine.
5. The construction system for underground rock tunnel excavation in a phosphate mine according to claim 1, characterized in that: A water curtain is arranged in the dust removal water tank, and the spray water pressure is ≥2MPa.
6. A construction method for underground rock tunnel excavation in a phosphate mine, characterized in that: The following steps are involved: (1) Arranging a push-in air duct and an exhaust air duct, wherein the arrangement positions of the push-in air duct and the exhaust air duct refer to claim 1, and turning on the air supply fan and the exhaust fan; (2) Select the cutting teeth model of the cutting head of the excavation machine according to the conditions of the ore and rock to ensure that the cutting teeth can smoothly cut the ore and rock; use the cutting head of the excavation machine to cut the rock mass, and the cutting method is that the cutting head cuts linearly and radially from the center point of the excavation section to the surrounding areas, and after the cutting and cutting is completed, the edge of the tunnel is repaired; (3) The ore and rock that fall from cutting and cutting are shoveled by the shovel section of the tunneling machine to the transport section of the tunneling machine, and then transported to the secondary conveyor belt conveyor, and then transported to the ore and rock transfer vehicle and transported out of the working surface; (4) After the completion of steps (2) and (3), a concrete spraying machine is used to support the top surface of the tunnel.
7. The construction method according to claim 6, characterized in that: The cutting method in step (2) is that the cutting head first forms a circular hole in the middle of the excavation section, and then cuts a cutting groove surface in the horizontal and vertical directions of the excavation section with the circular hole as the starting point to open the cutting space, and then the cutting head cuts the ore and rock in a radial manner around the excavation section with the circular hole as the center.
8. The construction method according to claim 7, characterized in that: The diameter of the circular hole is 1080 mm and the depth is 1050 mm.
9. The construction method according to claim 6, characterized in that: The support operation in step (4) adopts a composite support method of plain spraying and anchor spraying, the spraying layer thickness of the plain spraying is 50 mm, and the spraying layer thickness of the anchor spraying is 80 mm.
10. The construction method according to claim 6, characterized in that: The concrete spraying machine sprays the top surface of the tunnel in a spiral trajectory, the spraying rotation diameter of the concrete spraying machine is 180-220 mm, and the distance between the nozzle of the concrete spraying machine and the sprayed surface is 0.6-1 m.