Mining method for overlying filling body and steeply inclined thick and large phosphorus ore body below
By setting up boundary triangular ore pillars and triangular ore pillars on both sides of the ore house in the phosphate mine, combined with anchor netting and medium-deep fan drilling technology, the stability problem of the filling body under mining disturbances was solved, and the filling body was realized. The safe and efficient mining of steeply inclined and thick phosphate ore bodies improves the overall production efficiency and safety of the stope.
Patent Information
- Application Number
- CN202410855673.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
AI Technical Summary
In phosphate mines, the filling bodies of grade V rock mass and grade IV rock mass can easily cause local collapse under mining disturbance, leading to resource waste and safety hazards. The shape and size of the ore pillars designed by the existing technology are unreasonable, affecting mining efficiency and safety. Security.
A boundary triangular ore pillar is left at the floor of the ore body, and together with the triangular ore pillars on both sides of the ore house, it supports the overlying filling body. By mining along the rock drilling tunnel at the stop line of the ore body, the anchor network and the middle Deep fan-shaped drilling is carried out in batches to form cutting grooves and fan-shaped drilling holes to ensure the stability and safety of the filling body.
It improves the stability and recovery rate of the filling body, reduces waste rock transportation costs, shortens the stope operation cycle time, improves the overall production capacity and safety of the stope, and reduces the ore loss rate.
Smart Images

Figure CN118728384A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground mining of phosphate mines, and in particular relates to a mining method for a steeply inclined thick phosphate ore body under an overlying filling body. Background Art
[0002] As the country pays more attention to mining safety and environmental protection, more and more phosphate mines choose or switch to backfilling mining. In order to save investment and speed up production, many mines use double middle sections from bottom to top and then backfill mining to mine the ore body, leaving a large number of pillars under the backfill between the two middle sections, resulting in a large waste of mineral resources. According to statistics, the amount of ore bodies covered or affected by backfill in China accounts for 20% to 40% of the total reserves of mines. The recovery of steeply inclined thick phosphate ore bodies under backfill has always been a difficult problem in the mining industry. Its structural integrity and stability are not only affected by the secondary distribution of stress and mining disturbance during the mining process, but also closely related to the quality of the top connection of the adjacent middle section backfill body. Therefore, it shows an extremely complex stress state, which aggravates the safety hazards of mining.
[0003] At present, domestic and foreign scholars have conducted a lot of research on the mining technology of ore bodies under the overlying hard rock layer based on the thin plate theory, Pu's theory and mutation theory, and have made certain progress. It is often unreasonable to use these theories to design the shape and size of the pillars under the filling body. If the size is too large, it will cause a lot of waste of resources, and if the size is too small, it will bring great safety hazards to the safe production of the mining site. Secondly, for the filling body of Class V rock mass and the ore body of Class IV rock mass, the direct top filling body has low strength and loose rock quality. It is easy to cause local collapse under the action of mining disturbance, which brings challenges and difficulties to production safety. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that the filling body of the V-level rock mass and the ore body of the IV-level rock mass are prone to local collapse under the action of mining disturbance, and propose a mining method for a steeply inclined thick phosphate ore body under the overlying filling body, by leaving a boundary triangular ore pillar at the bottom plate position of the ore body, and supporting the overlying filling body together with the triangular ore pillars on both sides of the mine room, thereby improving the stability of the filling body; and by mining the ore body in the middle of the slope along the rock drilling tunnel at the stop mining line position of the ore body, the two side ore pillars left are used to support the upper end filling body, ensuring that the reserved triangular ore pillars can support the top plate filling body, solving the problem that the filling body of the V-level rock mass and the ore body of the IV-level rock mass are prone to local collapse under the action of mining disturbance. The safe and efficient mining of the steeply inclined thick phosphate ore body under the filling body is achieved, and the recovery rate of the ore body under the filling body pressure is improved.
[0005] In order to solve the above technical problems, the present invention provides a mining method for a steeply inclined thick phosphate ore body under an overlying filling body, comprising the following steps:
[0006] S1. Divide the ore blocks based on the vertical ore body strike, and excavate a rock drilling tunnel in the center filling body at the top of the mine room as a mining tunnel. Excavate a mining tunnel parallel to the rock drilling tunnel at the bottom of the mine room. Cut a skylight from the rock drilling tunnel to the mining tunnel on the top of the ore body to form a cutting skylight, and form a full-section cutting groove along the strike of the ore body, thereby forming a mining passage;
[0007] S2, based on the cutting groove obtained in S1 as the free surface, fan-shaped drill holes are arranged downward in the rock drilling tunnel parallel to the free surface to form blast holes, and backward stepwise mining is carried out along the end of the vein, and each blasting provides a free surface for the next blasting;
[0008] S3, based on the fan-shaped drill hole, carry out blasting and mining in stages in the fan-shaped drill hole, and finally leave triangular pillars on both sides of the mine room to support the overlying filling body;
[0009] S4. When the ore body is mined to the stop mining line, a boundary triangular pillar 16 is left at the bottom plate of the ore body and together with the triangular pillars on both sides of the mine room, the overlying filling body is supported; at the stop mining line of the ore body, the ore body in the middle of the slope is mined along the rock drilling tunnel, and the two side pillars left are used to support the upper end filling body;
[0010] S5. After the mine is ventilated, the mine is cleared and the collapsed ore is loaded into underground trucks by underground scrapers. The trucks are transported from the segmented transport tunnel to the ramp outside the vein, and then from the ramp outside the vein to the main horizontal tunnel. Finally, the ore is transported to the surface ore storage yard through the main horizontal tunnel.
[0011] S6. Fill the goaf with filling slurry or recovered waste rock at the end of the rock drilling tunnel.
[0012] It is understandable that when mining the ore body in the mine room, it is necessary to wait until the filling body solidifies and stabilizes, and then excavate a drilling tunnel in the central filling body on the top of the mine room, and arrange medium and deep fan-shaped drill holes downward in the drilling tunnel. The ore block is both the mine room and the mining area, with a length of 40m, a single detonation distance of 5m, and 8 blastings to mine the mine room; follow the principle of recovering the ore body with the maximum recovery rate, leave triangular ore pillars on both sides of the mine room to support the overlying filling body to ensure the safe mining of the ore body; when the ore body is mined to the second stop mining line, leave a boundary triangular ore pillar to support the overlying filling body to prevent the end filling body from being cut off and collapsed under the action of gravity.
[0013] Preferably, the blast holes are arranged according to the distribution of the ore bodies in the mine room, the blast holes have a diameter of 50 mm, the row spacing between the blast holes is 2.0 m to 2.2 m, and adjacent blast holes are arranged in a staggered manner.
[0014] Preferably, the blastholes are charged in an interval charging manner, the height of a single layer of charge is 1.5 m, and the distance between the single layers of charge is 1.2 m.
[0015] Preferably, the staged blasting and mining includes the first blasting to blast at the width of the rock drilling tunnel and mining the ore body in the fan-shaped drill hole, and the remaining blasting to blast at a certain angle to both sides of the mine room and mine the ore body. This is one of the eight blasting and mining, and the subsequent seven mining plans in the fan-shaped drill holes are to cycle the previously designed mining angles until the mining of the entire mine room is completed.
[0016] Preferably, the remaining blasting is performed at a certain angle inclined to both sides of the mine room, including blasting in the fan-shaped borehole at an inclination angle of 0°, 8°, and 15° to recover the ore body in the fan-shaped borehole.
[0017] Preferably, the length of the ore block is 40 m, the width is 15 m and the height is 15 m.
[0018] Beneficial effects of the present invention:
[0019] 1. This scheme involves excavating a rock drilling tunnel in the backfill, supporting the tunnel with anchor rods and anchor nets, cutting a ceiling downward near the boundary of the ore body roof, forming a full-section cutting groove along the direction of the ore body, and providing a free surface for blasting; arranging medium-deep fan-shaped drill holes downward in the rock drilling tunnel, and carrying out interval charging, leaving triangular pillars for the mining units to carry out retreat-type multi-stage mining to ensure the stability of the mining area roof; leaving boundary pillars near the bottom of the ore body to support the stability of the boundary backfill body, and when the ore body is mined, filling the goaf with tailings and recovered waste rock to reduce the transportation cost of waste rock, thereby ensuring the production safety and efficiency of the mining area.
[0020] 2. This scheme improves the stability of the filling body by leaving a boundary triangular pillar at the bottom of the ore body, and together with the triangular pillars on both sides of the mine room, supports the overlying filling body, thereby preventing the end filling body from being cut off and collapsing under the action of gravity; considering that the mass of the ore body left on the slope is too large, the greater the gravity component along the slope, the more the ore body slides down the slope, so at the stop line of the ore body, the ore body in the middle of the slope is mined along the rock drilling tunnel, and the two side pillars left are used to support the upper end filling body. It is ensured that the reserved triangular pillars can support the top plate filling body, solving the problem that the filling body of the V-level rock body and the ore body of the IV-level rock body are prone to local collapse under the action of mining disturbance.
[0021] 3. The present invention adopts anchor rods and anchor nets to support the rock drilling tunnel, leaves triangular pillars on both sides of the mine room for top control support, optimizes the parameters of anchor rods and anchor nets and triangular pillars, and ensures the safety of the mining area under the filling body. The use of medium-deep fan-shaped drilling and blasting mining improves the overall stability of the mining area and the comprehensive production capacity of the mining area, speeds up the mining time, shortens the operation cycle time of the mining area by 4-6 days, and reduces the cycle time by about 25%. The layout of the mining area is more flexible and simple, the on-site organization and management are simple, and it is easy to improve the operating efficiency; the use of the filling mining method with triangular pillars can also increase the overall recovery rate of the mining area to 63.5%, reducing ore losses. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings. The drawings are only for the purpose of illustrating preferred embodiments and are not to be considered as limiting the present invention. Also, the same reference symbols are used throughout the drawings to represent the same parts.
[0023] Figure 1 for Figure 3 Middle II section;
[0024] Figure 2 for Figure 1 Section III-III in the figure;
[0025] Figure 3 for Figure 1 Middle II-II section;
[0026] Figure 4 This is a top view of the pillars left after blasting and mining in the stope;
[0027] Figure 5 This is a front view of the quarry after the first blasting in the fan-shaped borehole;
[0028] Figure 6 This is the front view of the second blasting recovery of the fan-shaped borehole;
[0029] Figure 7 This is the front view of the third blasting recovery of the fan-shaped drilling hole;
[0030] Figure 8 It is a side view of the ore body in the later stage of mining in the present invention;
[0031] Fig. 9 The front view of the boundary triangular pillar 16 left in the stope at the end of mining.
[0032] Description of Figure Numbers:
[0033] 1-segmented transport tunnel; 2-exit tunnel; 3-ramp; 4-ore body; 5-filling body; 6-blast hole; 7-rock drilling tunnel; 8-cutting shaft; 9-scraper; 10-stop mining line 1; 11-triangular pillar; 12-stop mining line 2; 13-ore body roof; 14-cutting groove; 15-ore body bottom plate; 16-boundary triangular pillar. DETAILED DESCRIPTION
[0034] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific implementation method described herein is only an optimal embodiment of the present invention, which is only used to explain the present invention and does not limit the scope of protection of the present invention. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0035] Example 1: Figures 1 to 3 As shown, a mining method for a steeply inclined thick phosphate ore body under an overlying filling body comprises the following steps:
[0036] Step 1, divide the ore body 4 into blocks vertically along its direction, each block being a stope, and the length of a single stope is 40m, the width is 15m, and the height is 15m; excavate a drilling tunnel 7 with a rectangular cross-section in the filling body 5 at the center of the top of the mine room, and use anchor rods and anchor nets to support the two sides of the tunnel and the roof 13, so as to reduce the deformation of the tunnel roof 13 and the two sides of the surrounding rock during the mining of the ore body 4, and ensure the safe working environment of manpower and equipment in the tunnel; cut a shaft 8 from the drilling tunnel 7 to the mining tunnel on the roof 13 of the ore body along the direction of the ore body 4, forming a cutting shaft 8 and a full-section cutting groove 14, connecting the stage transportation tunnel with the mining tunnel 2, the cutting groove 14, and the drilling tunnel 7, and connecting the mining units to form a passage.
[0037] Step 2, using the cutting groove 14 obtained in step 1) as a free surface, arrange medium-deep fan-shaped drill holes downward in the rock drilling tunnel 7 parallel to the free surface to form blasting drill holes. According to the distribution of the ore body 4 in the mine room, the diameter of the blast hole 6 is 50 mm, the row spacing between the blast holes 6 is between 2.0 and 2.2 m, and the adjacent blast holes 6 are staggered with each other; interval charging is used in the blast holes 6, the height of a single layer of charging is 1.5 m, and the next layer of charging is loaded at an interval of 1.2 m, and retreat mining is adopted along the end of the vein, and each blasting provides a free surface for the next blasting.
[0038] Step 3: Using the fan-shaped borehole obtained in step 2), blasting is performed in stages in the fan-shaped borehole: the first blasting scheme is to mine the ore body 4 in the fan-shaped borehole with the width of the roadway, as shown in FIG. Figure 4The parameters of the second blasting plan are to dig out the ore body 4 at an angle of 8° to both sides of the mine room, and the parameters of the third blasting plan are to dig out the ore body 4 at an angle of 15° to both sides of the mine room, leaving triangular pillars 11 on both sides of the mine room; the subsequent seven fan-shaped drilling plans are to cycle the previously designed mining angles. In order to ensure that the triangular pillars 11 can support the filling body 5 on the mining site within the limit, the fan-shaped drilling holes are used to dig out the ore body 4 in the fan-shaped drilling holes in batches with inclinations of 0°, 8°, and 15°.
[0039] Step 4, when the ore body 4 is mined to the stop mining line 10, due to the large span of the mine room, the triangular ore pillars 11 left along both sides of the mine room are not enough to support the upper filling body 5, which may easily cause the ore pillars to become unstable, resulting in large-scale movement of the roof 13 filling body 5, causing the roof 13 filling body 5 to delaminate, fall, and collapse, hindering the mining progress and production efficiency of the mine. Therefore, a boundary triangular ore pillar 16 is left at the position of the ore body bottom plate 15, and together with the triangular ore pillars 11 on both sides of the mine room, it supports the overlying filling body 5 to improve the stability of the filling body 5; considering that the mass of the ore body 4 left on the inclined surface is too large, the greater the gravity component along the inclined surface, the greater the amount of the ore body 4 slides down the inclined surface, so, at the stop mining line 2 12 of the ore body 4, the ore body 4 in the middle of the inclined surface is mined along the rock drilling tunnel 7, and the ore pillars on both sides left are used to support the upper end filling body 5, such as Figure 8 shown.
[0040] Step 5, after the mine is ventilated, de-risking operations are carried out. The ore from the mine collapse is loaded into underground vehicles using underground shovel loaders 9. The vehicles are transported from the segmented transport tunnel 1 to the outer vein ramp 3, and then from the outer vein ramp 3 to the main horizontal shaft. Finally, the ore is transported to the surface ore storage yard through the main horizontal shaft to complete the out-of-mine transportation.
[0041] Step 6, after the ore in the mining area is transported to the surface ore storage yard through step 5, the goaf is filled with filling slurry or recovered waste rock at the end of the rock drilling tunnel 7 to control the large-scale exposure of the goaf and thus avoid a series of disasters such as mine tremors. After the goaf is filled, the recovery is completed.
[0042] In step 1, in order to reduce the destructive effect of tunnel blasting construction on the surrounding rock, the number of blast holes 6 in each row in the surrounding rock of the tunnel to be excavated is controlled at 24 to 26, among which the eye spacing of the peripheral holes is controlled at 900 to 1000 mm, and the eye spacing of the auxiliary holes is controlled at 600 to 900 mm. The rock drilling trolley is used for upper and lower construction, first drilling the upper hole, then the lower hole, and then arranging the auxiliary hole and the groove hole. The peripheral holes should be drilled more and charged less to minimize the damage to the surrounding rock caused by blasting. The eye depth of the groove hole is 3m, and the depth of the other holes is controlled at 2.5m.
[0043] In step 1, the cross-sectional specification of the rock drilling tunnel 7 is 4m×4.5m. In steps 2 and 3, in order to reduce the damage caused by the mining of the ore body 4 to the roof 13 filling body 5, fan-shaped drill holes with different inclination angles are arranged in the mining unit body according to the designed shape and size of the triangular ore pillars 11, and explosives of different heights are loaded in the drill holes to carry out blasting mining in batches.
[0044] In steps 2 and 3, the ore body 4 in the mining room is mined 8 times along the end of the vein, and the single caving interval is 5m (which can be appropriately adjusted according to the amount of ore discharge required), and a triangular ore pillar 11 is left in the mining room to support the upper filling body 5. When the ore body 4 is mined to the stop mining line 10, the ore body 4 at the center of the slope of about 36° is mined in the slope of the ore body bottom plate 15, and boundary triangular ore pillars 16 are left on both sides of the slope to support the end filling body 5 to reduce the depletion loss of the ore body 4.
[0045] In steps 5 and 6, the mine is ventilated through the tunnels formed by development, and the air volume of the local ventilator is adjusted according to the wind requirements of the working face to exhaust the toxic smoke generated by the blasting, and then the working face is cleared for danger. Finally, the shovel loader 9 and underground trucks are used to transport the collapsed ore to the ground and fill the goaf with tailings.
[0046] In steps 5 and 6, ventilation is carried out through the main horizontal shaft → downward inclined ramp 3 → segmented stone gate → segmented transport horizontal shaft → mining tunnel 2 → cutting shaft 8 → rock drilling tunnel 7 → ground and other required wind routes to ventilate and remove polluted air from the working face, and then the shovel loader 9 is used in the mining tunnel 2 to load the collapsed ore into the underground mining truck, and the truck transports the ore to the ground ore storage yard through the segmented transport horizontal shaft → segmented stone gate → ramp 3 → main horizontal shaft and other routes, and finally a filling pipe is set up in the rock drilling tunnel 7 to fill the goaf.
[0047] Furthermore, Example 3 is an extension of Example 2, and is specifically as follows: Figure 1 As shown, including:
[0048] The average thickness of the ore body 4 in a phosphate mine in Guizhou is 15m, with a dip angle of 45°. It is mainly composed of steeply inclined thick phosphate ore bodies, and the mining conditions of the ore body 4 in the mine are complex. The direct top of the mine is the phosphogypsum filling body 5, which is identified as a Grade V rock mass by rock engineering quality appraisal, and the ore body 4 is a Grade IV rock mass. The direct bottom of the ore body 4 is the phosphogypsum filling body 5 using the upward layered filling mining method. The overall stability of the ore body 4 is relatively stable, and the direct top filling body 5 has low strength and loose rock quality. It is easy to cause local collapse under the action of mining disturbance, which brings challenges and difficulties to production safety.
[0049] In step 1, the mining field is arranged perpendicular to the direction of the ore body 4, the length of the mining field is 40m, the width of the mining field is 15m, the segmented height of the mining field is 15m, a rock drilling tunnel 7 is excavated in the central filling body 5 at the top of the mining field, and a mine exit tunnel 2 is excavated in the lower part of the mining field. Anchor rods are used to support both sides of the rock drilling tunnel 7 and the roof 13 to suppress the deformation of the tunnel surrounding rock caused by mining disturbance and ensure safe and efficient operation in the rock drilling tunnel 7.
[0050] See also Figure 1 to Figure 3 , arrange ramps 3, rock drilling tunnels 7, cutting shafts 8, mine exit tunnels 2, and segmented transportation tunnels 1, complete the layout of the development and cutting project, solve the problems of pedestrian, ventilation, transportation, and filling in the mining unit, and form the necessary mining space. Among them, since anchor net support is adopted in the tunnel of the filling body 5, the triangular ore pillars 11 left on both sides of the mine room can play a supporting role in supporting and controlling the filling body 5. Therefore, under the preferred situation, the anchor rods of the rock drilling tunnel 7 are staggered, which further reduces the number of drilling holes, the amount of excavation work and the loss of materials, and reduces the production investment cost. At the same time, when the mining unit collapses, the "eight" radial triangular ore pillars 11 are left on both sides of the mining unit to increase the recovery of the ore body 4 in the mining field. At the same time, the triangular ore pillars 11 left can effectively control the stability of the filling body 5 and ensure the safe working environment of the mining field.
[0051] In the development and cutting project, the net cross-sectional dimensions of the rock drilling tunnel 7 in the filling body 5 are 4m×4.5m, the cross-sectional dimensions of the cutting groove 14 are 15m×2m, the anchor rod is 1.5m long and 43mm in diameter. It should be noted that the cross-sectional shape of the rock drilling tunnel 7 in the filling body 5 is a rectangular tunnel, and the preferred length of the anchor rod is 43mm.
[0052] After completing the tunnel support work in the filling body 5 and setting up the triangular ore pillars 11 of the mining unit, the mining area is mined. In step 4, fan-shaped drilling arrangements are first carried out. In the rock drilling tunnel 7, starting from the cutting groove 14 at the position of the ore body roof 13, medium-deep fan-shaped drilling holes are arranged downward by a rock drilling rig to form blasting holes, wherein the diameter of the blasthole 6 is 50 mm, the row spacing between the blastholes 6 is 2.0 to 2.2 m, and adjacent blastholes 6 are staggered to achieve the maximum ore discharge; 8 blastings are designed in the entire mine room, each blasting length is 5 m, and interval charging is used in the blasthole 6. The height of each layer of charging is 1.5 m, and the next layer of charging is loaded at an interval of 1.2 m. The blocking height of each layer of blasthole 6 is 1.2 m.
[0053] At the start and end of mining, in order to prevent the span of the stope from being too large, the triangular pillars 11 set on both sides of the mining unit should be used mainly for support. Boundary triangular pillars are set at the bottom of the ore body, and together with the triangular pillars on both sides of the mine room, they support the overlying filling body, thereby improving the stability of the filling body and preventing the top cutting and collapse of the end filling body under the action of gravity. Fan-shaped drill holes are arranged downward along the rock drilling tunnel, and the drilling angle can be designed according to the width of the mining unit. For details, see Figures 4 to 9 It should be noted that appropriate drilling inclination angles are reasonably designed on both sides and in the center of the mining unit according to the span of the mining unit and the triangular pillars 11 left to recover the ore body 4 at the maximum recovery rate. The preferred drilling angle parameters are 0°, 8°, and 15°.
[0054] See also Figure 8 , Fig. 9 After the mining is completed, the collapsed ore is formed in the mining tunnel 2. The shovel loader 9 shovels the collapsed ore from the mining tunnel 2 to the ore transport vehicle. The vehicle passes through the mining tunnel 2, the stage transportation tunnel, and the ramp 3 to pull the ore out of the ground. It should be noted that to ensure the ventilation of the mining area, the fresh air flow enters the mining tunnel 2 from the stage transportation tunnel 1 of the mining, and after flushing the working face in the mining area, the polluted air enters the cutting skylight 8 and is discharged to the return air tunnel and discharged to the ground surface.
[0055] In step 2, after the ore body 4 is mined, a retaining wall is built at the ore body bottom plate 15, and a filling pipe is set up in the rock drilling tunnel 7 to fill the mined goaf. After the filling body 5 is cured to a certain strength, the adjacent mine room can be mined. It should be noted that in order to avoid vibration damage to the filling body 5 caused by blasting during mining of the mine room, a triangular ore pillar 11 of a certain thickness needs to be left on both sides of the mine room to reduce the loss and depletion of the ore body 4.
[0056] A mining method for a steeply inclined thick phosphate ore body under an overlying backfill body is compared with a mining method in which the original roof is left with a primary ore body + vertical pillars. Taking the actual stope 1065-8# as an example, the design stope size is 29m×15m×15m in length×width×height. A mining method for a steeply inclined thick phosphate ore body under an overlying backfill body is adopted, and the recovery rate of 10% left is:
[0057] V 总 = Cross-sectional area of the mining area × length of the mining room = 15m × 15m × 29m = 6525m 3 ;
[0058] V 回采矿石 = Cross-sectional area of pillar × length of goaf
[0059] =(0.5×2.5×2×15+8×15)×9×2+(0.5×2.5×2×15+8×15)×3=4147.5m 3 .
[0060] That is, the loss rate is 36.5%.
[0061] The ore body recovery method with the original ore body as the roof + point pillar in the stope is as follows Figure 1 - Figure 4 As shown in the figure, the recovery rate and loss rate of the mining scheme are calculated using the volume method as follows:
[0062] V 总 = Cross-sectional area of the mining area × length of the mining room = 15m × 15m × 29m = 6525m 3 ,
[0063] V 损失矿石 =V point column + V top plate = (4×4×12×6)+(15×29×4) = 2892m 3 .
[0064] The recovery rate is 55.68%.
[0065] In terms of safety, the use of 5#a mining room mining method to arrange medium-deep holes downward in the ore body has more advantages than the use of upward blasthole arrangement in terms of the applicability of ore and rock, ore body production efficiency and safety of workers. The downward blasthole arrangement method can not only reduce the construction labor intensity of workers, but also overcome the technical difficulties of the upper charging method and reduce the risk factor of the large-span empty area at the front end of the 8#a mining room to workers.
[0066] In terms of the complexity of the mining process, the ore body is mined by blastholes arranged in an upward manner, and the main operation procedures in the mining area are all manual operations. When the FJY22-Ⅱ disc-type gas-liquid linkage rock drill is used for upward rock drilling, the workers have high labor intensity, low efficiency, high cost, and long mining area preparation time, resulting in multiple mining areas operating at the same time and complicated management work. When the blastholes are arranged in a downward manner, the KQG-115 mining down-the-hole drill is used for deep hole blasting and mining. The mechanized equipment is high, the production efficiency is high, and the mining efficiency is fast. The ore body in the mine room can be mined in a short time, reducing the management of the working face, and can quickly improve the production capacity of the mining area and the goal of mining operation efficiency. The next mining method of steeply inclined thick phosphate ore body under the overlying filling body can save 25% of the mining time compared with the mining method of leaving the original ore body + vertical pillars on the original roof.
[0067] The invention discloses a method for mining a steeply inclined thick phosphate ore body under a filling body. The method adopts anchor rods and anchor nets to support the rock drilling tunnel, and sets triangular pillars on both sides of the mine room as top control support. The parameters of the anchor rods and anchor nets and the triangular pillars are optimized to ensure the safety of the mining area under the filling body. The medium-deep fan-shaped drilling and blasting mining is adopted to improve the overall stability and comprehensive production capacity of the mining area, speed up the mining time, shorten the operation cycle time of the mining area, and make the layout of the mining area more flexible and simple, and the on-site organization and management are simple, which is easy to improve the operation efficiency. The filling mining method with triangular pillars can also improve the overall recovery rate of the mining area and reduce the ore loss and depletion rate.
[0068] The above specific implementations are preferred implementations of the present invention, and are not intended to limit the specific implementation scope of the present invention. The scope of the present invention includes but is not limited to the present specific implementations. All equivalent changes made in accordance with the shape, structure, and method of the present invention are within the protection scope of the present invention.
Claims
1. A mining method for a steeply inclined thick phosphate ore body under an overlying filling body, characterized in that: The steps include: S1. Divide the ore blocks based on the vertical strike of the ore body (4), and excavate a rock drilling tunnel (7) in the central filling body (5) at the top of the mine room as a recovery tunnel, excavate a mine exit tunnel (2) parallel to the rock drilling tunnel (7) at the bottom of the mine room, cut a skylight from the rock drilling tunnel (7) to the mine exit tunnel (2) at the top plate (13) of the ore body to form a cutting skylight (8), and form a full-section cutting groove (14) along the strike of the ore body (4), thereby forming a recovery passage; S2, based on the cutting groove (14) obtained in S1 as a free surface, fan-shaped drill holes are arranged downward in the rock drilling tunnel (7) parallel to the free surface to form blast holes (6), and backward stepwise mining is carried out along the end of the vein, and each blasting provides a free surface for the next blasting; S3, based on the fan-shaped drill hole, carry out blasting and mining in stages in the fan-shaped drill hole, and finally leave triangular pillars (11) on both sides of the mine room to support the overlying filling body (5); S4. When the ore body (4) is mined to the stop mining line 1 (10), a boundary triangular ore pillar (16) is left at the ore body bottom plate (15) and together with the triangular ore pillars (11) on both sides of the mine room, they support the overlying filling body (5); at the stop mining line 1 (10) of the ore body (4), the ore body (4) in the middle of the slope is mined along the rock drilling tunnel, and the two side ore pillars left are used to support the upper end filling body (5); S5, after the mine is ventilated, the mine is cleared and the collapsed ore is loaded into underground trucks using underground scrapers (9). The trucks are transported from the segmented transport tunnel (1) to the outer ramp (3), and then transported from the outer ramp (3) to the main horizontal tunnel. Finally, the ore is transported to the surface ore storage yard through the main horizontal tunnel; S6. Filling the goaf with filling slurry or recovered waste rock at the end of the rock drilling tunnel (7).
2. The mining method of a steeply inclined thick phosphate ore body under an overlying filling body according to claim 1 is characterized by: The blast holes (6) are distributed according to the ore body (4) in the mine room. The diameter of the blast holes (6) is 50 mm, the row spacing between the blast holes (6) is 2.0 m to 2.2 m, and adjacent blast holes (6) are arranged in a staggered manner.
3. The mining method of a steeply inclined thick phosphate ore body under an overlying filling body according to claim 2 is characterized in that: The blasthole (6) is charged with charges in an interval charging manner, the height of a single layer of charges is 1.5 m, and the distance between the single layers of charges is 1.2 m.
4. The mining method of a steeply inclined thick phosphate ore body under an overlying filling body according to claim 1, characterized in that: The stepwise blasting recovery includes a first blasting to blast at the width of the rock drilling tunnel (7) and recover the ore body (4) in the fan-shaped drill hole, and the remaining blasting to blast at a certain angle inclined to both sides of the mine room and recover the ore body (4).
5. The mining method of a steeply inclined thick phosphate ore body under an overlying filling body according to claim 4 is characterized in that: The remaining blasting is performed at a certain angle inclined toward both sides of the mine room, including blasting in the fan-shaped borehole at inclination angles of 0°, 8°, and 15° to recover the ore body (4) in the fan-shaped borehole.
6. The mining method of a steeply inclined thick phosphate ore body under an overlying filling body according to claim 1, characterized in that: The length of the ore block is 40m, the width is 15m and the height is 15m.
Citation Information
Cited By
Underground short-process mining, selecting and filling auxiliary system suitable for deep-well large-scale mine
CN119608371A
Ground pressure control method based on deep oversize underground mine frame type structure
CN119981886A