By arranging anchor components and metal mesh in the tunnel, a combined arch structure is formed, which solves the stability and earthquake resistance problems of tunnel support in unstable strata, improves the overall stability of the tunnel and the bearing capacity of the surrounding rock, and reduces the security risks.
Patent Information
- Application Number
- CN202410894111.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-01
AI Technical Summary
During the coal mining process, tunnel support has problems with poor stability and earthquake resistance in unstable strata, leading to roof damage, high maintenance costs and high safety risks, affecting coal mining mechanization and production efficiency.
By setting anchor components and metal mesh in the tunnel, the grouting operation is performed to form a combined arch structure to stabilize the surrounding rock. A pouring concrete layer, steel bracket and sprayed concrete layer are set on the main body and top of the tunnel, combined with the anchor rod and grouting. The use of anchors enhances the overall stability of the tunnel.
It improves the stability of the tunnel and the bearing capacity of the surrounding rock, reduces the safety risks of the excavation working surface, forms a more stable reinforcement structure, adapts to deep high-stress environments, and reduces the stress and plastic deformation of the floor rock mass.
Smart Images

Figure CN118728397A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground mine tunnel construction, and in particular relates to a reinforced section and a reinforcement method for top-cut tunnel excavation. Background Art
[0002] As time goes by, the strata encountered in coal mining are different and tend to be more and more complex. In order to ensure safe and efficient production, it is necessary to invest more in scientific and technological research in tunnel support. Anchor support methods are becoming more and more mature, and many anchor combined support methods have emerged. For example, anchors and shotcrete each have outstanding characteristics, and they complement each other reasonably and have obvious effects, forming an anchor-spray support form; there are also combined supports such as anchors and various metal brackets. Anchor-spray support is also easy to combine with other support forms to form a variety of anchor-spray combined support forms. In addition, the combined support composed of multiple supports can be a support structure formed at the same time, or it can be a support structure formed successively, that is, secondary support.
[0003] Tunnel support in unstable strata with large loose zones has always been the focus of research for miners at home and abroad. With the expansion of my country's coal mining scope and the increase in mining depth, tunnel support in unstable strata has become more difficult, which has seriously affected the normal production of mines, causing some mines to fail to reach their design capacity for a long time and unable to achieve comprehensive mechanization of coal mining. The cost per ton of coal has increased significantly and accidents have occurred frequently; it has also caused a sharp increase in investment in some infrastructure mines and extended the production period.
[0004] Yuxi Mining Co., Ltd. (Dahongshan Copper Mine) used conventional rectangular cross-section top-cut tunnels in the process of large-diameter deep hole blasting to meet the needs of the KQG-150 down-the-hole drill for constructing downward vertical large holes. The on-site rectangular tunnel section experiment results were poor, mainly manifested in the poor stability of the roof rock and poor seismic resistance after the rectangular section excavation blasting. After the blasting in the mining area, the roof was severely damaged by the seismic waves, the top wall was prone to collapse, the tunnel maintenance cost was high, and the safety risk was high.
[0005] Therefore, in order to improve the regularity of the post-blasting formation to meet the requirements of the designed cross-sectional contour, maintain the stability of the rock mass, enhance the bearing capacity of the surrounding rock itself, and reduce the safety risks of the excavation working face, a method of reinforcing the tunnel is needed to form a stable cross-section. Summary of the invention
[0006] The first purpose of the present invention is to provide a reinforced section for cutting the top of the tunnel. By setting up corresponding anchor rod assemblies and performing grouting operations in the tunnel, the broken rocks can be formed into a combined arch due to the suspension and wedging effects, thereby stabilizing the surrounding rock and supporting the upper surrounding rock, making the internal structure of the tunnel more stable, effectively ensuring safety during the construction process, and creating favorable conditions for safe production.
[0007] The first purpose is to provide a cross-section reinforcement method for top-cut tunnel excavation, by setting corresponding anchor rod assemblies and metal mesh, grouting after pre-embedded reinforcement skeleton on the inner wall of the tunnel, and reasonably setting the corresponding hole positions to enhance the overall stability of the interior of the tunnel.
[0008] The object of the present invention is achieved in this way. A reinforced section for cutting top tunnel excavation includes a tunnel body and an arc-shaped tunnel top arranged on the tunnel body. The bottom of the tunnel body is provided with a rocking platform foundation pit, a concrete bottom plate and a horizontal bottom plate steel frame from top to bottom in sequence. The tunnel body and the arc-shaped tunnel top are an integrated structure. The tunnel body and the arc-shaped tunnel top are provided with a poured concrete layer, a steel support, a metal mesh and a sprayed concrete layer in sequence from the inside to the outside. The outer wall of the sprayed concrete layer is evenly provided with a plurality of anchor rods and a plurality of grouting anchor rods.
[0009] Furthermore, the steel support includes a main steel support and a top steel support, the main steel support includes two groups of vertically arranged main beams, the main beams include multiple mining I-beams, and the multiple mining I-beams are connected by straight line connectors; the top steel support includes multiple "U"-shaped mining I-beams, and the multiple "U"-shaped mining I-beams are connected by "U"-shaped connectors to form a semicircular structure; the "U"-shaped mining I-beams connected to the mining I-beams are connected by straight line connectors.
[0010] Furthermore, the straight connecting part includes an I-shaped main sleeve plate and a bottom mounting plate, and two adjacent mining I-beams are tightly sleeved by the I-shaped main sleeve plate and the bottom mounting plate, and the two sides of the I-shaped main sleeve plate and the bottom mounting plate are installed by inclined fastening bolts; the two inclined fastening bolts form a symmetrical figure-eight structure.
[0011] Furthermore, the "U"-shaped connecting member includes a "U"-shaped upper shell and a "U"-shaped bottom plate, and two adjacent "U"-shaped mining I-beams are tightly fitted through the "U"-shaped upper shell and the "U"-shaped bottom plate, and the outer connecting ends of the "U"-shaped upper shell and the "U"-shaped bottom plate are fixed and installed by bolts.
[0012] Furthermore, two anchor rods and one grouting anchor rod form an anchor rod unit, and the grouting anchor rod is arranged between the two anchor rods; the grouting anchor rod and the end of the anchor rod placed on the sprayed concrete layer are both provided with a tray.
[0013] A cross-section reinforcement method for cutting top tunnel excavation comprises the following steps: S1. Determine and install the anchor hole position: After the rocks on the main body and top of the tunnel are cleaned, the anchor hole position is selected, the hole is drilled to form the anchor hole, and the anchor hole is cleaned before installing the anchor; S2. Metal mesh installation: install metal mesh on the surface of tunnel rock mass and spray a sealing layer; S3. Grouting anchor installation: Drill holes for grouting anchors on the surface of the tunnel rock mass, clean the holes and install the grouting anchor components; S4. Grouting: After grouting the installed grouting anchor assembly, remove the outer tube of the ball valve in the grouting anchor assembly and carry out grouting of the next grouting anchor.
[0014] Furthermore, when the grouting anchor assembly is installed, the grouting anchor assembly is provided with a connecting pipeline and a grouting plug arranged on the connecting pipeline, and grouting is performed after a clean water test. After the grouting is completed, the grouting pipe is removed to perform grouting operations at the next hole position.
[0015] Furthermore, the number of grouting holes is determined according to the tunnel diameter and the crack development. The number of holes is 5 to 10, and the determination formula is: (N – number of grouting holes; D – net diameter of tunnel shaft; A – distance between grouting holes and shaft wall; L – spacing between grouting holes).
[0016] Furthermore, grouting is carried out using a tangential inclined hole at the top of the curved tunnel, and the inclination angle of the inclined hole position in the radial direction is determined by the following formula: (S is the distance that the final hole position exceeds the net diameter in the radial direction, S=E+m; E is the thickness of the well wall; m is the distance that the final hole position exceeds the rough diameter; H is the height of the grouting section; A is the distance between the grouting hole and the well wall).
[0017] Furthermore, the grouting raw material is single-liquid cement slurry with a water-cement ratio of 0.5 to 1.2, and a high-efficiency early-strength water-reducing agent is added to the single-liquid cement slurry at a rate of 1.5 to 2% by weight of cement.
[0018] The beneficial effects of the present invention are embodied in: 1. In the present invention, by arranging the pre-buried anchor rod assembly in the excavated tunnel and then grouting the anchor rods between the anchor rods, according to the anchor rod support mechanism, it can suspend the layered rock or form a composite beam, and the broken rock can be formed into a composite arch due to the suspension and wedging effect, so as to stabilize the surrounding rock and support the upper surrounding rock. By grouting in the gaps, these loose rock blocks are cemented into a whole, and the stiffness and elastic modulus of the rock mass are greatly improved. The three composite arches that can be formed are the anchor net spray arch, the anchor magma arch and the magma rock arch. The coordination of the three arches and the super-long anchoring formed by the original end anchor rod due to grouting will greatly improve its anchoring force and reliability, thereby further improving the supporting capacity of the three composite arches.
[0019] 2. In the present invention, a cast concrete layer, a steel support, a metal mesh and a sprayed concrete layer are sequentially arranged from the inside to the outside on the main body of the tunnel and the top of the arc-shaped tunnel; and molding is performed after grouting, so that a stable reinforcement layer is formed inside the tunnel; the stability of the tunnel is improved, wherein the grouting structure frame provided by the steel support and the metal mesh realizes the grouting molding.
[0020] 3. In the present invention, on the basis of anchor rod reinforcement, grouting anchor rods are also used. Grouting is injected into the bottom plate rock layer to allow the slurry to penetrate into the cracks of the broken rock layer and cement the broken rocks into a whole, thereby further improving the strength and bearing capacity of the bottom plate rock. At the same time, due to the blocking of the rock cracks, the influence of water on the bottom plate is reduced, and the bottom heave is better prevented and treated.
[0021] 4. In the present invention, the anchor-grouting rock mass can present ideal elastic-plastic characteristics, and no stress softening occurs after the peak. Under the condition of large axial and lateral strains, the axial stress can be maintained at a higher stress state, presenting stress strengthening characteristics. Therefore, the reinforced arch structure formed by anchor-grouting has both good structural and bearing capacity and excellent pressure-yielding properties, which can better meet the pressure-yielding requirements of deep high-stress tunnels, making the support structure flexible.
[0022] 5. In the present invention, grouting is used to fill the gaps and cracks in the surrounding rock. After solidification, the anchoring effect of the anchor rods can form a multi-layer effective composite arch structure, and the anchor rods in the support body are converted into full-length anchors. It connects the multi-layer composite arches into a whole to carry the load together, expands the effective load-bearing range of the support structure, and improves the integrity and load-bearing capacity of the support structure. The load acting on the arch structure can be effectively transferred to the bottom plate through the two walls; and because the thickness of the composite arch of the anchor-grouting reinforcement structure is much greater than the pressure arch formed by ordinary anchor-spraying support, the load concentration acting on the bottom plate rock mass is reduced, the stress and plastic deformation in the bottom plate rock mass are weakened, and the purpose of controlling the bottom drum of the roadway is achieved; the stability of the roadway bottom plate is conducive to the stability of the two sides, thereby ensuring the overall stability of the roadway anchor-grouting support structure, achieving effective constraints on deep fractured surrounding rocks, and exerting the structural effect of fractured surrounding rocks. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0024] Figure 1 This is a schematic diagram of the reinforced cross-section structure of the present invention; Figure 2 This is a schematic diagram of the steel support structure of the present invention; Figure 3This is a schematic diagram of the structure of the linear connector of the present invention; Figure 4 This is a schematic diagram of the structure of the "U"-shaped connector of the present invention; Figure 5 It is a schematic diagram of the structure of the grouting anchor rod assembly of the present invention.
[0025] In the attached drawings, 1-tunnel main body, 2-arc tunnel top, 3-shaking platform foundation pit, 4-concrete bottom plate, 5-bottom plate steel skeleton, 6-cast concrete layer, 7-steel bracket, 8-metal mesh, 9-sprayed concrete layer, 10-anchor rod, 11-grouting anchor rod, 12-main steel bracket, 13-top steel bracket, 14-main beam, 15-mining I-beam, 16-straight connector, 17-"U"-shaped mining I-beam, 18-"U"-shaped connector, 19-I-shaped main sleeve plate, 20-bottom mounting plate, 23-inclined fastening bolts, 24-"U"-shaped upper shell, 25-"U"-shaped bottom plate, 26-tray, 27-slurry stopper, 28-ball valve, 29-slurry discharge valve, 30-pressure gauge, 31-grouting pump, 32-slurry barrel, 33-slurry making barrel, 34-clean water barrel. DETAILED DESCRIPTION
[0026] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0027] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0028] Reference Figure 1-Figure 5 A reinforced section for top-cut tunnel excavation comprises a tunnel body 1 and an arc-shaped tunnel roof 2 arranged on the tunnel body 1, wherein the bottom of the tunnel body 1 is provided with a rocking platform foundation pit 3, a concrete bottom plate 4 and a horizontal bottom plate steel skeleton 5 in sequence from top to bottom, the tunnel body 1 and the arc-shaped tunnel roof 2 are an integrated structure, and the tunnel body 1 and the arc-shaped tunnel roof 2 are provided with a poured concrete layer 6, a steel support 7, a metal mesh 8 and a sprayed concrete layer 9 in sequence from inside to outside, and the outer wall of the sprayed concrete layer 9 is evenly provided with a plurality of anchor rods 10 and a plurality of grouting anchor rods 11.
[0029] It can be understood that by arranging the poured concrete layer 6, the steel support 7, the metal mesh 8 and the sprayed concrete layer 9 in sequence from the inside to the outside of the tunnel body 1 and the curved tunnel top 2; and performing molding after grouting, a stable reinforcement layer is formed inside the tunnel; the stability of the tunnel is improved, wherein the steel support 7 and the metal mesh 8 provide a grouting structure frame to realize grouting molding.
[0030] On the basis of the reinforcement of the anchor rod 10, a grouting anchor rod 11 is also driven. By grouting into the bottom rock layer, the slurry penetrates into the cracks of the broken rock layer, and the broken rocks are cemented into a whole, thereby further improving the strength and bearing capacity of the bottom rock. At the same time, due to the blocking of the rock cracks, the influence of water on the bottom plate is reduced, and the bottom heave is better prevented and controlled.
[0031] As a preferred embodiment of this embodiment, the bottom plate steel frame 5 adopts 11# I-beam.
[0032] Reference Figure 2 Preferably, the steel support 7 includes a main steel support 12 and a top steel support 13, the main steel support 12 includes two groups of vertically arranged main beams 14, the main beams 14 include a plurality of mining I-beams 15, and the plurality of mining I-beams 15 are connected by a straight connecting piece 16; the top steel support 13 includes a plurality of "U"-shaped mining I-beams 17, and the plurality of "U"-shaped mining I-beams 17 are connected by a "U"-shaped connecting piece 18 to form a semicircular structure; the "U"-shaped mining I-beams connected to the mining I-beams are connected by a straight connecting piece.
[0033] As a preferred embodiment of the present invention, the mining I-beam 15 is made of 12# channel steel, and the metal mesh is made of a welded mesh made of Φ6 metal wires.
[0034] It can be understood that the main steel support 12 is formed by setting two groups of vertically arranged main beams 14, and the main beams 14 are fixedly connected by multiple mining I-beams 15 under the connection of straight connecting parts 16, thereby enhancing the stability of the entire main steel support 12; similarly, the top steel support 13 is set to multiple "U"-shaped mining I-beams 17 spliced into a semicircle, and connected at the connection point of two adjacent "U"-shaped mining I-beams 17 through a "U"-shaped connecting part 18, thereby achieving a stable connection between the two connected "U"-shaped mining I-beams 17.
[0035] Preferably, the straight connecting member 16 includes an I-shaped main sleeve plate 19 and a bottom mounting plate 20, and two adjacent mining I-beams 15 are tightly fitted by the I-shaped main sleeve plate 19 and the bottom mounting plate 20, and the I-shaped main sleeve plate 21 and the two sides of the bottom mounting plate 20 are installed by inclined fastening bolts 23; the two inclined fastening bolts 23 form a symmetrical figure-eight structure.
[0036] Reference Figure 3 and Figure 4By setting the I-shaped main sleeve plate 21 and the bottom mounting plate 20 in the straight connecting member 16, the connecting ends of two adjacent mining I-beams 15 are fixedly connected; at the same time, the I-shaped main sleeve plate 21 and the bottom mounting plate 20 are relatively fastened by inclined fastening bolts 23 at the positions of the two ends that are tightly matched; and the two inclined fastening bolts 23 form a symmetrical eight-shaped structure, which not only strengthens the stable connection of the connecting ends of the two adjacent mining I-beams 15, but also facilitates installation and enhances stability.
[0037] Preferably, the "U"-shaped connecting member 18 includes a "U"-shaped upper shell 24 and a "U"-shaped bottom plate 25, and two adjacent "U"-shaped mining I-beams 17 are tightly fitted together by the "U"-shaped upper shell 24 and the "U"-shaped bottom plate 25, and the outer connecting ends of the "U"-shaped upper shell 24 and the "U"-shaped bottom plate 25 are fixed by bolts.
[0038] It can be understood that in order to achieve the relative connection setting of two adjacent "U"-shaped mining I-beams 17, it is necessary to set a "U"-shaped connecting piece 18 with the same curvature as the "U"-shaped mining I-beam 17 for relative fixed connection setting. Furthermore, the "U"-shaped mining I-beam 17 is set to be tightly fitted with a "U"-shaped upper shell 24 and a "U"-shaped bottom plate 25, and is fixed and installed by bolts at the outer connecting ends of the "U"-shaped upper shell 24 and the "U"-shaped bottom plate 25, thereby achieving a stable fixed connection setting of the curved "U"-shaped mining I-beam 17.
[0039] Preferably, two anchor rods and one grouting anchor rod form an anchor rod unit, and the grouting anchor rod is arranged between the two anchor rods; the grouting anchor rod and the end of the anchor rod placed on the shotcrete layer 9 are both provided with a tray 26. The arrangement of the tray 26 strengthens the stability of the grouting anchor rod or the end of the anchor rod in the grouting rock mass.
[0040] Anchor length calculation ①Theoretical calculation length of anchor rod The theoretical calculation length of the anchor rod is mainly determined based on the surrounding rock loosening circle theory. The calculation formula of the anchor rod length is: L=L1+L2+L3 Where: L—theoretical total length of anchor bolt, m; L1—The exposed length of the anchor rod is generally 0.1m; L2—the length of the anchor rod extending into the stable rock formation, L2=1 / 3L3; L3—thickness of surrounding rock shaping zone, m, i.e. Where: a—equivalent radius of tunnel section, m; φ—friction angle in surrounding rock, °; c—cohesion of surrounding rock, kPa; γ—weighted average bulk density of the overlying rock strata of the roadway, kPa; H—average buried depth of tunnel, m.
[0041] As a preferred mode of this embodiment, the length of the anchor rod 10 is selected to be 3100 mm, the spacing between two adjacent anchor rods 10 is 800 mm, the length of the grouting anchor rod 11 is selected to be 2100 mm, and the spacing between two adjacent grouting anchor rods 11 is 1650 mm.
[0042] The rod body material of anchor rod 10 is KHG500 left-handed anchor rod without longitudinal reinforcement; arch tray 26 is adopted; the tail thread length is 100-120mm; the resin anchor end length is ≥300mm; the anchoring force of a single anchor rod 10 is not less than 100KN, and the initial anchor preload force is not less than 40KN.
[0043] A cross-section reinforcement method for cutting top tunnel excavation comprises the following steps: S1. Determine and install anchor hole positions: After the rocks on the main body and top of the tunnel are cleaned, the anchor holes are selected, holes are drilled to form anchor holes, and the anchor holes are cleaned before installation; by installing the resin anchors, the metal mesh 8 is installed and set up for hanging mesh.
[0044] S2. Installation of metal mesh 8: Install metal mesh 8 on the surface of the tunnel rock mass and spray a sealing layer; after fixing and installing the metal mesh 8, the mine pressure can be observed, and then the installation time of the grouting anchor rod 11 can be confirmed; at the same time, the material of the sealing layer can be sprayed concrete or paint.
[0045] S3, installation of anchor rod 10 and grouting anchor rod 11: grouting anchor rod holes and anchor rod holes are drilled on the surface of the tunnel rock mass, and the hole positions are cleaned before installing the grouting anchor rod assembly and anchor rod 10; the grouting anchor rod assembly is provided with a grouting stop plug 27, a grouting stop ball valve 28, a pressure gauge 30 is installed and the grouting is connected.
[0046] S4, grouting: After grouting the installed grouting anchor assembly, remove the outer tube of the ball valve 28 in the grouting anchor assembly and carry out grouting of the next grouting anchor.
[0047] Preferably, when installing the grouting anchor rod 11 assembly, the grouting anchor rod 11 assembly is provided with a connecting pipeline and a grout stopper 27 provided on the connecting pipeline, and grouting is performed after a clean water test. After the grouting is completed, the grouting pipe is removed to perform the grouting operation of the next hole. The ball valve 28 is removed after 1 hour, and the valve removal time can be shortened when adding an early strength agent.
[0048] As a preferred mode of this embodiment, the grouting equipment can use a special grouting pump or a substitute pump, which can be a ZTGZ-60 / 210 type, a YZB40-2-25 type, a ZMJ-3 / 40 type high film metering pump, a KBY-30 / 120 type hydraulic grouting pump or a QZB-50 / 6 type pneumatic grouting pump.
[0049] Before grouting, the slurry needs to be stirred. It can be stirred manually or with a mixer. The grouting effect is better when a mixer is used in conjunction with a QB-152 pneumatic grouting pump. The grouting pressure mainly depends on the degree of development of the surrounding rock fissures, the surrounding rock materials or the supporting structure. If the fissures are developed and the surrounding rock is sealed with coatings or thin layers of sprayed concrete, the grouting pressure is generally 1.2-1.9 MPa. In some cases, it can be lower. For example, if the degree of development of the fissures is poor or the spraying layer is good or it is cast-in-place concrete, the grouting pressure is generally 3.2-3.8 MPa. When there is water, it needs to be 1.6-1.8 times greater than the water pressure. The instantaneous pump pressure is generally allowed to be slightly higher than the rated pressure of the pump.
[0050] Grouting quantity: The general cement slurry quantity can be determined according to controlled pressure grouting and constant grouting.
[0051] Controlled pressure grouting: When the grouting pressure reaches the designed final pressure, stop grouting after 10 to 15 minutes.
[0052] Constant injection pressure: When the grouting pressure does not reach the designed final pressure, generally 5 to 10 bags of cement are injected before suspending the grouting, and then re-injecting after 2 hours. If it still does not reach the designed final pressure, inject another 5 to 10 bags of cement, then stop the grouting and change the hole for grouting.
[0053] As a preference, the number of grouting holes is determined according to the tunnel diameter and the development of cracks, and the number of holes is 5 to 10, and the determination formula is: (N – number of grouting holes; D – net diameter of tunnel shaft; A – distance between grouting holes and shaft wall; L – spacing between grouting holes).
[0054] As a preferred embodiment of this embodiment, A=0.6m, L=1.2m, D=5.0m are substituted into the formula to obtain N=10.
[0055] As a preferred method, grouting is performed by using a tangential inclined hole at the top of the curved roadway, and the radial inclination angle of the inclined hole position is determined by the following formula: (S is the distance that the final hole position exceeds the net diameter in the radial direction, S=E+m; E is the thickness of the well wall; m is the distance that the final hole position exceeds the rough diameter; H is the height of the grouting section; A is the distance between the grouting hole and the well wall).
[0056] As a preferred method of this embodiment, in order to ensure the effective diffusion of the slurry, the grouting hole should have a certain angle, which is mainly determined according to the direction and distribution of the cracks, so that the grouting hole and the cracks intersect as much as possible. To this end, the radial inclined hole should be arranged to exceed the well side by a certain distance, and the radial inclination angle α of the inclined hole can be calculated as follows:
[0057] S-the distance that the final hole position exceeds the net diameter in the radial direction, S=E+m, m; E-well wall thickness, E=450mm; m-the distance that the final hole position exceeds the rough diameter, taken as 3.05m; H-grouting section height, 35m. After calculation, the radial inclination angle is taken as 8° and the tangential inclination angle is taken as 120°.
[0058] Preferably, the grouting raw material is single-liquid cement slurry with a water-cement ratio of 0.5-1.2, and a high-efficiency early-strength water-reducing agent is added to the single-liquid cement slurry at a rate of 1.5-2% by weight of cement.
[0059] As a preferred embodiment of this embodiment, the ratio of the single-liquid cement slurry can be set as follows: Single liquid cement slurry on-site mix ratio table By adopting the above reinforcement method, after the slurry solidifies, it can fill and seal the cracks in the surrounding rock, isolate the air, reduce the weathering of the broken surrounding rock, and prevent the surrounding rock from being soaked and softened by water, thereby reducing the inherent strength of the surrounding rock.
[0060] At the same time, after grouting, the loose and broken surrounding rock is cemented into a whole, the cohesion and internal friction angle of the rock mass are improved, thereby significantly improving the bearing capacity of the broken rock mass; and the filling behind the spray layer is dense, ensuring that the load acts evenly on the spray layer or the support, avoiding stress concentration and first destruction, so that the support and the spray layer can provide a uniform reaction force; secondly, the stress state of the rock block is transformed from point load, unidirectional load, two-way or three-way load under extremely low constraint force to a three-way stress state under higher constraint force, and its peak strength and deformation performance are significantly improved.
[0061] Grouting reinforcement is carried out on the broken rock mass in the post-peak softening and residual deformation section. The stress state of the rock mass in this range is relatively low, and it can be converted into an elastic body after reinforcement. Therefore, it is beneficial to the bearing capacity generated by the reinforcement body after solidification. After the bearing capacity is gradually improved, its ability to resist the deformation of the deep rock mass is also gradually improved, causing the stress inside the reinforcement body to increase, forming an effective constraint on the deep surrounding rock, and gradually increasing the residual stress of the broken rock mass, thereby preventing the reduction of the stress state of the rock mass in the post-peak softening section, and at the same time improving the peak strength of the rock mass in the pre-peak elastic-plastic zone, preventing the development of the plastic zone of the surrounding rock.
[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A reinforced section for a cut-top tunnel excavation, comprising a tunnel body (1) and an arc-shaped tunnel roof (2) arranged on the tunnel body (1), characterized in that: The bottom of the tunnel body (1) is provided with a rocking platform foundation pit (3), a concrete bottom plate (4) and a horizontal bottom plate steel frame (5) in sequence from top to bottom; the tunnel body (1) and the arc-shaped tunnel top (2) are an integrated structure; the tunnel body (1) and the arc-shaped tunnel top (2) are provided with a poured concrete layer (6), a steel support (7), a metal mesh (8) and a sprayed concrete layer (9) in sequence from inside to outside; and the outer wall of the sprayed concrete layer (9) is evenly provided with a plurality of anchor rods (10) and a plurality of grouting anchor rods (11).
2. The reinforced section of the cut-top tunnel excavation according to claim 1, characterized in that: The steel support (7) comprises a main steel support (12) and a top steel support (13); the main steel support (12) comprises two groups of vertically arranged main beams (14); the main beams (14) comprise a plurality of mining I-beams (15); the plurality of mining I-beams (15) are connected via a straight connecting piece (16); the top steel support (13) comprises a plurality of "U"-shaped mining I-beams (17); the plurality of "U"-shaped mining I-beams (17) are connected via a "U"-shaped connecting piece (18) to form a semicircular structure; the "U"-shaped mining I-beams connected to the mining I-beams are connected via a straight connecting piece.
3. The reinforced section of the cut-top tunnel excavation according to claim 2, characterized in that: The linear connector (16) comprises an I-shaped main sleeve plate (19) and a bottom mounting plate (20), two adjacent mining I-shaped steel beams (15) are tightly sleeved by the I-shaped main sleeve plate (19) and the bottom mounting plate (20), and the I-shaped main sleeve plate (21) and the bottom mounting plate (20) are installed on both sides by inclined fastening bolts (23); the two inclined fastening bolts (23) form a symmetrical "eight" structure.
4. The reinforced section of the cut-top tunnel excavation according to claim 2, characterized in that: The "U"-shaped connecting member (18) comprises a "U"-shaped upper shell (24) and a "U"-shaped bottom plate (25), and two adjacent "U"-shaped mining I-beams (17) are tightly fitted together by means of the "U"-shaped upper shell (24) and the "U"-shaped bottom plate (25), and the outer connecting ends of the "U"-shaped upper shell (24) and the "U"-shaped bottom plate (25) are fixedly installed by means of bolts.
5. The reinforced section of the cut-top tunnel excavation according to claim 1, characterized in that: Two anchor rods and one grouting anchor rod form an anchor rod unit, and the grouting anchor rod is arranged between the two anchor rods; the grouting anchor rod and the end of the anchor rod placed on the sprayed concrete layer (9) are both provided with a tray (26).
6. A cross-section reinforcement method for cutting top tunnel excavation, characterized in that: The method comprises the reinforced section as claimed in any one of claims 1 to 5, and further comprises the following steps: S1. Determine and install the anchor hole position: After the main body and top rock of the tunnel are cleaned, the anchor hole position is selected, the hole is drilled to form the anchor hole, and the anchor hole is cleaned before installing the anchor; S2. Metal mesh installation: install metal mesh on the surface of tunnel rock mass and spray a sealing layer; S3. Grouting anchor installation: Drill holes for grouting anchors on the surface of the tunnel rock mass, clean the holes and install the grouting anchor components; S4. Grouting: After grouting the installed grouting anchor assembly, remove the outer tube of the ball valve in the grouting anchor assembly and carry out grouting of the next grouting anchor.
7. The cross-section reinforcement method for cutting top tunnel excavation according to claim 6, characterized in that: When installing the grouting anchor assembly, the grouting anchor assembly is provided with a connecting pipeline and a grouting stopper provided on the connecting pipeline, and grouting is performed after a clean water test. After the grouting is completed, the grouting pipe is removed to perform the grouting operation of the next hole position.
8. The cross-section reinforcement method for cutting top tunnel excavation according to claim 6, characterized in that: The number of grouting holes is determined according to the tunnel diameter and the development of cracks. The number of holes is 5 to 10. The determination formula is: (N – number of grouting holes; D – net diameter of tunnel shaft; A – distance between grouting holes and shaft wall; L – spacing between grouting holes).
9. The cross-section reinforcement method for cutting top tunnel excavation according to claim 6, characterized in that: The tangential inclined hole method is used for grouting at the top of the curved tunnel. The formula for determining the radial inclination angle of the inclined hole position is as follows (S is the distance that the final hole position exceeds the net diameter in the radial direction, S=E+m; E is the thickness of the well wall; m is the distance that the final hole position exceeds the rough diameter; H is the height of the grouting section; A is the distance between the grouting hole and the well wall).
10. The cross-section reinforcement method for cutting top tunnel excavation according to claim 6, characterized in that: The grouting raw material is single-liquid cement slurry with a water-cement ratio of 0.5 to 1.2, and a high-efficiency early-strength water-reducing agent is added to the single-liquid cement slurry at a rate of 1.5 to 2% by weight of cement.