Tunnel lining spiral supporting rod force transmission device capable of protecting edges and corners and mounting method of tunnel lining spiral supporting rod force transmission device
By designing a tunnel lining spiral strut force transmission device that protects edges and corners, and using components such as threaded sleeves, bolts, and rubber pads, the problem of damage to concrete caused by the force transmission method and the floating of the trolley is solved, and force sharing and edge protection are achieved. Ensure the stability and construction quality of tunnel lining.
Patent Information
- Application Number
- CN202410701883.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-05-31
AI Technical Summary
In the existing tunnel lining construction, the force transmission method has the problem that the implantation of steel bars destroys the integrity of the filling surface and causes the trolley to float, which affects the stability and quality of the construction.
A force transmission device for tunnel lining spiral struts that protects edges and corners is designed, including a protection mechanism, a fastening mechanism and a support mechanism. Through threaded sleeves, bolts, rubber pads and limiting cavities, the protection and protection of concrete edges and corners are achieved. Support to prevent the trolley from floating due to excessive angle.
Effectively share the force, reduce concrete pressure, protect edges and corners, ensure appropriate support rod angles, avoid trolley floating, and ensure the long-term stability and construction accuracy of the tunnel lining.
Smart Images

Figure CN118728441A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of infrastructure, in particular to a tunnel lining spiral strut force transmission device for protecting corners and an installation method. Background Art
[0002] The tunnel lining trolley is one of the important equipment in tunnel construction. It is used to support the construction of tunnel lining and ensure the smooth progress of construction and the stability of tunnel structure. In the design and use of the tunnel lining trolley, the force transmission method of the outrigger strut has an important impact on the safety and construction quality of tunnel lining construction.
[0003] There are usually two ways at present. The first is to implant steel bars on the filling surface to transmit force. This method is to implant steel bars into the filling surface of the tunnel, and then the leg braces are directly supported on these steel bars. The advantage of this is that the weight of the trolley and the construction load can be supported vertically while providing a horizontal constraint to the trolley, thereby ensuring the lateral position of the trolley and its stability to avoid the misalignment of the low side walls. However, this method also has disadvantages. The implantation of steel bars may damage the integrity of the filling surface, and repair treatment will be required later, affecting subsequent construction. In addition, the implantation of steel bars requires additional construction time and cost.
[0004] The second is to support the force transmission method at the corner of the filling at the bottom of the temporary ditch. This method is to support the outrigger support rod at the bottom of the temporary ditch, usually at the corner of the filling surface. The advantage of this is that it will not directly damage the filling surface and maintain the integrity of the filling surface. However, this method has some potential problems. Due to the large angle between the outrigger support rod and the filling surface, the trolley may be subjected to a large upward thrust. This thrust may cause the trolley to float up, affecting the thickness of the vault concrete of the tunnel lining or the side wall intrusion limit. In addition, if the trolley floats up, it may cause the longitudinal construction joint to be misaligned, which will affect the overall quality of the tunnel lining. Summary of the invention
[0005] In view of the above problems in the prior art, the present invention is proposed.
[0006] Therefore, the object of the present invention is to provide a tunnel lining spiral strut force transmission device for protecting corners.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a tunnel lining spiral strut force transmission device for protecting corners, comprising:
[0008] The protection mechanism comprises a first protection plate, a second protection plate fixedly connected to one end of the first protection plate, and a limiting cavity opened on the outer side of the second protection plate, and a mounting component is adapted to be mounted inside the concrete;
[0009] Wherein, the first protective plate and the second protective plate are designed to be L-shaped.
[0010] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, the limiting cavity is composed of an inclined surface and a plane, the inclined surface is designed to be inclined from top to bottom from the outer side of the second protective plate to the inner side of the second protective plate, and the plane is connected to the bottom end of the inclined surface.
[0011] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, the installation component includes a threaded sleeve fixedly connected to the inside of the concrete, and a bolt threadedly connected to the inside of the threaded sleeve.
[0012] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, it also includes:
[0013] The fastening mechanism comprises a pad installed on the outside of the concrete through the bolts, a through hole opened on the outside of the pad, and a rubber pad adapted to be installed inside the pad, wherein a limiting component is arranged inside the pad.
[0014] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, the limiting component includes a fixed block slidably connected to the inside of the pad, a ratchet fixedly connected to one end of the fixed block, and a clamping block fixedly connected to the other end of the fixed block, and the upper and lower sides of the fixed block are fixedly connected to the inner plate;
[0015] Wherein, the inner plate is slidably connected to the inside of the pad, and one side of the inner plate is fixedly connected to one side of the rubber pad.
[0016] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, it also includes:
[0017] A supporting mechanism, comprising a top plate adapted to be mounted on the outside of the first protective plate, a side plate fixedly connected to one end of the top plate, and a slot provided on the inner side of the side plate;
[0018] The top plate and the side plate are designed to be L-shaped, and a support shaft is fixedly connected to the connection between the top plate and the side plate.
[0019] As a preferred solution of the tunnel lining spiral strut force transmission device for protecting corners of the present invention, it also includes:
[0020] The connecting mechanism comprises a supporting rod connected to the trolley, a connecting sleeve fixedly connected to one end of the supporting rod, and a reinforcing rib fixedly connected to the outside of the connecting sleeve, and one side of the connecting sleeve is designed to be open.
[0021] The present invention also provides an installation method.
[0022] In order to solve the above technical problems, the present invention also provides the following technical solutions: an installation method, comprising the tunnel lining spiral strut force transmission device for protecting corners, and an installation method, the installation method comprising the following steps:
[0023] S1. Preparatory work;
[0024] S2. Installation work;
[0025] S3, connection work;
[0026] The preparatory work includes the following steps:
[0027] Before closing the formwork and pouring the concrete for the invert filling in the tunnel;
[0028] Make holes in the concrete side formwork for the invert filling;
[0029] The threaded sleeve is embedded in the concrete using bolts until the filled concrete solidifies.
[0030] As a preferred solution of the installation method of the present invention, the installation work includes the following steps:
[0031] placing the guard mechanism on the surface of the invert;
[0032] Install the backing plate through bolts and threaded sleeves, and fasten the protective mechanism through the backing plate;
[0033] Install the support mechanism on the outside of the pad.
[0034] As a preferred solution of the installation method of the present invention, the connection work includes the following steps:
[0035] Install the connecting component and the supporting shaft through the connecting sleeve;
[0036] Tighten the spiral of the support rod until it meets the construction requirements.
[0037] Beneficial effects of the present invention: Compared with the transmission force transmission mode, the present equipment can not only effectively distribute the force to the concrete surface and side, reduce the pressure of the concrete, but also effectively protect the edges and corners of the concrete without damaging the concrete surface; at the same time, it ensures that the support rod is at an appropriate angle to avoid the angle being too large, and the trolley is subjected to a large upward thrust, causing the trolley to float, thereby ensuring the long-term stability of the tunnel lining, the stability of the construction and the accuracy of the tunnel lining, and providing support for the pouring of the second lining. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0039] Figure 1 It is an overall schematic diagram of the present invention.
[0040] Figure 2 It is the overall connection schematic diagram of the present invention.
[0041] Figure 3 It is a partial schematic diagram of the present invention.
[0042] Figure 4 It is a partial cross-sectional schematic diagram of the present invention.
[0043] Figure 5 It is an overall schematic diagram of the protection mechanism of the present invention.
[0044] Figure 6 It is an overall schematic diagram of the fastening mechanism of the present invention.
[0045] Figure 7 It is a cross-sectional schematic diagram of the present invention.
[0046] Figure 8 It is an overall schematic diagram of the support mechanism of the present invention.
[0047] Fig. 9 It is an overall schematic diagram of the connecting mechanism of the present invention. DETAILED DESCRIPTION
[0048] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0049] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0050] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0051] Example 1
[0052] Reference Figures 1 to 9 , which is the first embodiment of the present invention, provides a tunnel lining spiral strut force transmission device for protecting corners, comprising:
[0053] The protection mechanism 100 includes a first protection plate 101, a second protection plate 102 fixedly connected to one end of the first protection plate 101, and a limiting cavity 103 opened outside the second protection plate 102, and a mounting component 104 is adapted to be mounted inside the concrete 2;
[0054] The first protection plate 101 and the first protection plate 101 are designed to be L-shaped.
[0055] Specifically, the limiting cavity 103 is composed of an inclined surface 103a and a plane 103b. The inclined surface 103a is designed to be inclined from the outside of the second protective plate 102 to the inside of the second protective plate 102 from top to bottom, and the plane 103b is connected to the bottom end of the inclined surface 103a.
[0056] Furthermore, the installation component 104 includes a threaded sleeve 104a fixedly connected to the interior of the concrete 2, and a bolt 104b threadably connected to the interior of the threaded sleeve 104a.
[0057] Furthermore, it also includes,
[0058] The fastening mechanism 200 includes a pad 201 installed on the outside of the concrete 2 through bolts 104b, a through hole 202 opened on the outside of the pad 201, and a rubber pad 203 adapted to be installed inside the pad 201. A limiting component 204 is arranged inside the pad 201.
[0059] Preferably, the limiting component 204 includes a fixed block 204a slidably connected to the inside of the pad 201, a ratchet 204b fixedly connected to one end of the fixed block 204a, and a clamping block 204c fixedly connected to the other end of the fixed block 204a, and the upper and lower sides of the fixed block 204a are fixedly connected to the inner plate 204d;
[0060] The inner plate 204 d is slidably connected to the inside of the pad 201 , and one side of the inner plate 204 d is fixedly connected to one side of the rubber pad 203 .
[0061] It should be noted that it also includes:
[0062] The supporting mechanism 300 includes a top plate 301 adapted to be installed on the outside of the first protective plate 101, a side plate 302 fixedly connected to one end of the top plate 301, and a slot 303 provided on the inner side of the side plate 302;
[0063] The top plate 301 and the side plate 302 are designed to be L-shaped, and a support shaft 304 is fixedly connected to the connection between the top plate 301 and the side plate 302 .
[0064] Preferably, it also includes,
[0065] The connecting mechanism 400 includes a supporting rod 401 connected to the trolley, a connecting sleeve 402 fixedly connected to one end of the supporting rod 401, and a reinforcing rib 403 fixedly connected to the outside of the connecting sleeve 402. One side of the connecting sleeve 402 is designed to be open.
[0066] First, before closing the mold and pouring the concrete 2 filled in the invert in the tunnel 1, a hole is opened on the side template of the concrete 2 filled in the invert, and the threaded sleeve 104a is embedded in the concrete 2 using the bolt 104a until the filled concrete 2 solidifies.
[0067] Then, the bolt 104a is taken out from the threaded sleeve 104a, and the first protective plate 101 is placed on the surface of the concrete 2, so that the second protective plate 102 is located on one side of the concrete 2. Then, the bolt 104b is inserted into the through hole 202, and the bolt 104b and the threaded sleeve 104a are connected in sequence until the backing plate 201 squeezes and fixes the second protective plate 102.
[0068] When the pad 201 is squeezed by the bolt 104b and gradually tightens the second protective plate 102, the ratchet 204b at one end of the fixing block 204a will be preferentially inserted into the interior of the limiting cavity 103, so as to ensure the overall stability of the second protective plate 102 when the pad 201 squeezes and fixes the second protective plate 102, and does not slide upward, thereby improving the installation efficiency; at the same time, it can also ensure the fit of the first protective plate 101 when it is placed on the surface of the concrete 2. If there are foreign particles between the first protective plate 101 and the concrete 2, it cannot be ensured that the ratchet 204b can be inserted into the limiting cavity 103 in an adaptable manner. The staff can directly judge the fit of the first protective plate 101 placed on the surface of the concrete 2, thereby avoiding rework caused by non-fitting after the equipment is installed, thereby once again improving the overall practicality of the equipment.
[0069] After the ratchet 204b is engaged in the limiting cavity 103, continuing to tighten the bolt 104b will drive the pad 201 to gradually press against the second protective plate 102, and at this time, the inner plate 204d will squeeze the rubber pad 203 until the pad 201 and the second protective plate 102 are completely fitted together, thereby achieving the fastening of the pad 201 to the second protective plate 102.
[0070] In summary, during the installation process, the ratchet 204b is preferentially engaged in the limiting cavity 103, which can avoid the second protective plate 102 from sliding upward and deviating during the installation process, and further facilitates the installation by personnel; after the installation is completed, the pad 201 can effectively fasten the second protective plate 102, and cooperate with the ratchet 204b to engage in the limiting cavity 103, which can ensure that the second protective plate 102 cannot move during use, ensuring effective protection of the edges and corners of the concrete 2.
[0071] Example 2
[0072] Reference Figures 1 to 9 , which is the second embodiment of the present invention, and is based on the previous embodiment:
[0073] After the pad 201 is installed, the inner plate 204d will completely squeeze the rubber pad 203, causing the fixed block 204a to drive the clamping block 204c at one end to completely leak out;
[0074] Then, by connecting the card slot 303 on the inner side of the side panel 302 with the card block 204c, the installation of the top panel 301 and the side panel 302 can be completed. If the card slot 303 cannot be used to install the card block 204c, it can be determined that the card block 204c has not completely leaked out, and the pad 201 at this time is not completely fastened and fitted with the second protective plate 102. Therefore, on the premise of installing the side panel 302, the tightness of the pad 201 after installation can be verified for the second time to ensure that the pad 201 has been fastened and installed.
[0075] When the side panel 302 is installed on the outer side of the pad 201 through the clamping connection between the clamping groove 303 and the clamping block 204c, not only can the installation of the side panel 302 be ensured by the clamping connection, but also the thrust of the rubber pad 203 on the inner panel 204d can be converted into the pulling force of the clamping block 204c on the clamping groove 303, thereby improving the stability of the side panel 302 after installation; at the same time, the thrust of the rubber pad 203 on the inner panel 204d can be cancelled through the force conversion, resulting in the reverse force caused by the ratchet 204b squeezing the limiting cavity 103, thereby avoiding the situation where the bolt 104b is loosened due to the reaction force and reducing the life of the bolt 104b, thereby ensuring the overall installation stability and improving the service life of the equipment.
[0076] Finally, the connecting sleeve 402 at one end of the support rod 401 is engaged with the outer side of the support shaft 304, and the spiral of the support rod 401 is tightened until the construction requirements are met.
[0077] Through the support and force transmission method of the equipment, the force can be effectively distributed to the surface and side of the concrete 2, reducing the pressure of the concrete 2, and at the same time, the edges and corners of the concrete 2 can be effectively protected. Compared with the traditional method of implanting steel bars, the surface of the concrete 2 does not need to be damaged, ensuring the long-term stability of the lining of the tunnel 1;
[0078] Compared with the method of supporting the transmission at the filling corner at the bottom of the temporary ditch, the angle can be reduced to prevent the trolley from being subjected to a large upward thrust, causing the trolley to float, thereby ensuring the stability of the construction and the accuracy of the tunnel lining.
[0079] In summary, compared with the transmission force transmission method, this equipment can not only effectively distribute the force to the surface and side of concrete 2, reduce the pressure of concrete 2, but also effectively protect the edges and corners of concrete 2 without damaging the surface of concrete 2; at the same time, it ensures that the support rod 401 is at an appropriate angle, avoiding the angle being too large, and the trolley being subjected to a large upward thrust, causing the trolley to float, thereby ensuring the long-term stability of the lining of tunnel 1, the stability of the construction and the accuracy of the tunnel lining, and providing support during the pouring of the second lining.
[0080] Example 3
[0081] Reference Figures 1 to 9 , which is the third embodiment of the present invention, is different from the previous embodiment in that this embodiment provides an installation method, including a tunnel lining spiral brace force transmission device for protecting corners, and an installation method, the installation method comprising the following steps:
[0082] S1. Preparatory work;
[0083] S2. Installation work;
[0084] S3, connection work;
[0085] The preparatory work includes the following steps:
[0086] Before closing the formwork and pouring the concrete for the invert filling in the tunnel;
[0087] Make holes in the concrete side formwork for the invert filling;
[0088] The threaded sleeve is embedded in the concrete using bolts until the filled concrete solidifies.
[0089] Specifically, the installation work includes the following steps:
[0090] placing the guard mechanism on the surface of the invert;
[0091] Install the backing plate through bolts and threaded sleeves, and fasten the protective mechanism through the backing plate;
[0092] Install the support mechanism on the outside of the pad.
[0093] Furthermore, the connection work includes the following steps:
[0094] Install the connecting component and the support shaft 304 through the connecting sleeve;
[0095] Tighten the spiral of the support rod until it meets the construction requirements.
[0096] In summary, through the above-mentioned overall installation steps, not only is the operation convenient and reduces the overall construction time and cost of the staff, but it can also avoid unnecessary problems and rework.
Claims
1. A tunnel lining spiral strut force transmission device for protecting corners, characterized in that: include, The protection mechanism (100) comprises a first protection plate (101), a second protection plate (102) fixedly connected to one end of the first protection plate (101), and a limiting cavity (103) opened outside the second protection plate (102); and a mounting component (104) is adapted to be mounted inside the concrete (2); Wherein, the first protective plate (101) and the first protective plate (101) are designed to be L-shaped.
2. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 1, characterized in that: The limiting cavity (103) is composed of an inclined surface (103a) and a plane (103b); the inclined surface (103a) is designed to be inclined from the outside of the second protective plate (102) to the inside of the second protective plate (102) from top to bottom; and the plane (103b) is connected to the bottom end of the inclined surface (103a).
3. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 1 or 2, characterized in that: The installation component (104) comprises a threaded sleeve (104a) fixedly connected to the interior of the concrete (2), and a bolt (104b) threadedly connected to the interior of the threaded sleeve (104a).
4. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 3, characterized in that: Also includes, The fastening mechanism (200) comprises a pad (201) installed on the outside of the concrete (2) via the bolts (104b), a through hole (202) provided on the outside of the pad (201), and a rubber pad (203) adapted to be installed inside the pad (201), wherein a limiting component (204) is provided inside the pad (201).
5. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 4, characterized in that: The limiting component (204) comprises a fixed block (204a) slidably connected to the interior of the pad (201), a ratchet (204b) fixedly connected to one end of the fixed block (204a), and a clamping block (204c) fixedly connected to the other end of the fixed block (204a); the upper and lower sides of the fixed block (204a) are fixedly connected to inner plates (204d); The inner plate (204d) is slidably connected inside the pad (201), and one side of the inner plate (204d) is fixedly connected to one side of the rubber pad (203).
6. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 5, characterized in that: Also includes, A supporting mechanism (300) comprising a top plate (301) adapted to be mounted on the outside of the first protective plate (101), a side plate (302) fixedly connected to one end of the top plate (301), and a slot (303) provided on the inside of the side plate (302); The top plate (301) and the side plate (302) are designed to be L-shaped, and a support shaft (304) is fixedly connected to the connection between the top plate (301) and the side plate (302).
7. The tunnel lining spiral strut force transmission device for protecting corners as claimed in claim 6, characterized in that: Also includes, The connecting mechanism (400) comprises a supporting rod (401) connected to the trolley, a connecting sleeve (402) fixedly connected to one end of the supporting rod (401), and a reinforcing rib (403) fixedly connected to the outside of the connecting sleeve (402), wherein one side of the connecting sleeve (402) is designed to be open.
8. An installation method, characterized in that: A tunnel lining spiral brace force transmission device for protecting corners according to any one of claims 1 to 7, and an installation method, the installation method comprising the following steps: S1. Preparatory work; S2. Installation work; S3, connection work; The preparatory work includes the following steps: Before closing the formwork and pouring the concrete for the invert filling in the tunnel; Make holes in the concrete side formwork for the invert filling; The threaded sleeve is embedded in the concrete using bolts until the filled concrete solidifies.
9. The installation method according to claim 8, characterized in that: The installation process includes the following steps: placing the guard mechanism on the surface of the invert; Install the backing plate through bolts and threaded sleeves, and fasten the protective mechanism through the backing plate; Install the support mechanism on the outside of the pad.
10. The installation method according to claim 9, characterized in that: The connection process includes the following steps: Installing the connecting component and the supporting shaft (304) via a connecting sleeve; Tighten the spiral of the support rod until it meets the construction requirements.
Citation Information
Patent Citations
Large reverse slop and small cross-section tunnel double chassis direct connection lining construction method
CN105673045A
Tunnel construction method adopting prefabricated inverted arch module
CN111794766A
Subway tunnel lining construction method and device
CN114263477A
Longitudinal soft lap joint structure of lining trolley
CN116291583A
Once-forming tunnel secondary-lining trolley for ditch side walls and arch walls
CN202181904U