Device and method for determining bubble point pressure of crude oil system in reservoir

By simulating the reservoir microstructure in the sand-filled pipe model and conducting continuous flow experiments of crude oil in porous media, the problem of failure to effectively consider porous media factors in the existing technology has been solved, and the bubble point pressure of the crude oil system has been accurately measured. , improving the accuracy and efficiency of reservoir development.

CN118730682APending Publication Date: 2024-10-01NORTHEAST GASOLINEEUM UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410740315.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology fails to effectively consider the porous medium factor when measuring the bubble point pressure of the crude oil system, resulting in a deviation between the measurement results and the bubble point pressure of the crude oil system in the actual reservoir.

Method used

A millimeter-scale sand-filling pipe model was used to obtain the particle size composition and distribution characteristics of reservoir minerals through a laser particle size analyzer. Quartz sand was selected for high-temperature activation and filled into the sand-filling pipe. The pore throat parameters were fitted using a constant-pressure mercury intrusion experiment to simulate storage. The device is used to conduct continuous flow experiments of crude oil in porous media and measure the pressure gradient in the sand-filled pipe to determine the bubble point pressure.

Benefits of technology

It achieves accurate simulation of reservoir pore throat size and distribution, accurately determines the bubble point pressure of the crude oil system, improves the accuracy of reservoir type judgment and recovery rate, and is simple to operate and low cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730682A_ABST
    Figure CN118730682A_ABST
Patent Text Reader

Abstract

The invention relates to a device and a method for determining bubble point pressure of a crude oil system in a reservoir. The device comprises a sand filling pipe model, a first ISCO pump, a high-pressure piston container, a first back-pressure valve, a first pressure gauge, a second pressure gauge, a second back-pressure valve, a produced liquid collector, a third ISCO pump, a second ISCO pump and a data collecting and processing system. The device is used for carrying out a stratum crude oil continuous flow experiment, the injection and extraction pressure of the sand filling pipe model is controlled through the first back-pressure valve and the second back-pressure valve, and the pressure of the extraction end is gradually reduced until the pressure is lower than the stratum pressure of a target reservoir; determining the oil reservoir type of a target reservoir according to the pressure gradient change interval in the sand-filled pipe model; if the target reservoir is the saturated reservoir, the in-situ crude oil bubble point pressure is the in-situ pressure Po; if the target reservoir is an unsaturated reservoir, a relation curve of the pressure gradient in the sand-filled pipe model and the outlet pressure of the sand-filled pipe is obtained; and determining the bubble point pressure of the in-situ crude oil under the target oil reservoir condition through the obtained relation curve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of oil and gas field development, and in particular to a device and method for quickly determining the type of oil reservoir and the bubble point pressure of a crude oil system in a reservoir. Background Art

[0002] The accurate determination of the bubble point pressure of the formation crude oil system is crucial for determining the reservoir type, calculating the reservoir reserves, formulating development plans and conducting reservoir engineering calculations. However, the relevant factors affecting the bubble point pressure are very complex, such as crude oil composition, formation temperature, etc. Recent studies have shown that the pore throat size and pore throat distribution of the reservoir porous medium will also have a significant impact on the bubble point pressure of the crude oil system. Taking all influencing factors into consideration, determining the bubble point pressure of the crude oil system is crucial for the actual reservoir development effect and the final recovery rate. In order to accurately determine the bubble point pressure of the crude oil system, a large number of scholars have conducted extensive research. For example, the Chinese patent application number CN202110326653.9, "A visual device for testing multi-component bubble point pressure and a method for testing bubble point pressure", uses a visual PVT device to capture the moment when the first bubble appears in the crude oil, thereby determining the bubble point of the crude oil. Pressure; Chinese patent application number 202310851543.3 "A method for predicting crude oil bubble point pressure based on PSO-LSSVM model" uses computer language to predict the bubble point pressure of formation crude oil; the above two methods both consider the influence of crude oil composition and temperature on the bubble point pressure, but fail to consider the porous medium factor; Chinese patent application number CN201910423179.4 "A device and method for measuring bubble point pressure in tight oil reservoirs" and Chinese patent application number CN201910185767.9 "A system and method for measuring bubble point pressure of crude oil in porous media" consider the influence of porous media in the process of measuring bubble point pressure, but these two methods expose the crude oil system to the outside of the porous medium during the measurement process, resulting in a deviation between the measurement results and the bubble point pressure of the crude oil system in the actual reservoir porous medium. Summary of the invention

[0003] In order to solve the technical problems existing in the background technology, the present disclosure proposes a new millimeter-scale sand-filled tube model, a device applying the model, and a method for determining the bubble point pressure of the crude oil system in the reservoir using the device. This method comprehensively considers the influence of the reservoir pore throat size and pore throat distribution, and the entire measurement process is carried out in porous media. Therefore, it is possible to accurately judge the reservoir type, and then accurately determine the bubble point pressure of the crude oil system in the actual target reservoir under the influence of pore throat microscopic parameters.

[0004] In a first aspect of the present disclosure, a sand-filled pipe model is provided, comprising a sand-filled pipe, wherein an injection end valve 1 and an outlet end valve 7 are respectively arranged at both ends of the sand-filled pipe; a first pressure measuring point 2 and a second pressure measuring point 6 are respectively arranged through the pipe wall of the sand-filled pipe, corresponding to the injection end valve and the outlet end valve; the sand-filled pipe is filled with activated quartz sand particles, and the quartz sand particles are pressed into the sand-filled pipe under a pore throat microstructure simulation pressure.

[0005] Furthermore, a second aspect of the present disclosure provides a method for determining the pore throat microstructure simulation pressure of the aforementioned sand filling pipe model, comprising the following steps:

[0006] The first step is to use a laser particle size analyzer to analyze the natural core of the target reservoir to obtain the particle size composition and distribution characteristics of the target reservoir minerals;

[0007] The second step is to select quartz sands of different mesh sizes and determine their proportions according to the obtained target reservoir mineral particle size composition and distribution characteristics, place the quartz sands in a square plate and stir them evenly, and then subject the quartz sands to high-temperature activation treatment to obtain activated quartz sands;

[0008] In the third step, the activated quartz sand obtained in the second step is filled into the sand filling tube, and the sand filling tube is pressurized at different pressures P. y Pressurizing the tube to obtain a series of sand-filled tube models; the number of the series of sand-filled tube models is not less than 100;

[0009] The fourth step is to use the constant pressure mercury injection experiment to analyze the different pressures P obtained in the third step. y The microscopic pore throat parameters of a series of sand filling pipe models obtained under the condition of pore filling are as follows: the microscopic pore throat parameters include the maximum pore throat radius, the minimum pore throat radius, the average pore throat radius and the pore throat distribution frequency; the microscopic pore throat parameters and the pressure P are fitted. y A quantitative relationship, wherein the relationship structure of the quantitative relationship is shown in Formula 1;

[0010]

[0011] Among them, P y is the pressure of the sand filling pipe, M is the weight coefficient of the microscopic pore throat parameters on the pressure, N is the weight coefficient of the particle size composition on the pressure, f(r a )、f(r b )、f(r c ) is the experimental fitting relationship, r a 、r b 、r c are the minimum, maximum and average pore throat radius of the target reservoir, μm; f a 、f b are the proportions of the smallest and largest pore throats in the target reservoir, respectively;

[0012] Among them, if the average pore throat radius r of the target reservoir c <10, then the value range of M is 0.9-1; if 10 <r c <50, then the value range of M is 0.7-0.9; if 50 <r c <100, then the value range of M is 0.6-0.7; if r c >100, then the value range of M is 0.4-0.6; N=1-M; f(r a )、f(r b )、f(r c ) in fitting the microscopic pore throat parameters and the pressure P y Obtained during the process; a 、r b 、r c 、f a 、f b Obtained by constant pressure mercury injection experiment;

[0013] The fourth step is to analyze the natural core drilled from the target reservoir by constant pressure mercury injection experiment to determine the microscopic pore throat parameters of the natural core, which include the maximum pore throat radius, the minimum pore throat radius, the average pore throat radius and the pore throat distribution frequency; the microscopic pore throat parameters of the natural core are substituted into formula 1, and the obtained sand filling pipe pressurization pressure P is y That is, the pore throat microstructure simulation pressure for making a sand-filled pipe model simulating the target reservoir, and the sand-filled pipe model pressurized under the pore throat microstructure simulation pressure can accurately simulate the pore throat microstructure of the porous medium of the reservoir.

[0014] The third aspect of the present disclosure provides a device for determining the bubble point pressure of a crude oil system in a reservoir, which applies the aforementioned sand-filled pipe model and further includes a first ISCO pump 8, a high-pressure piston container 9, a first back pressure valve 11, a first pressure gauge 11, a second pressure gauge 14, a second back pressure valve 15, a produced fluid collector 16, a third ISCO pump 17, a second ISCO pump 18 and a data collection and processing system 19.

[0015] The steel pipeline 10 is used to connect the various components in the device; the first ISCO pump is connected to the lower end valve of the high-pressure piston container, and the upper end valve of the high-pressure piston container is connected to the injection end of the first back-pressure valve; the second ISCO pump is connected to the pressure control valve of the first back-pressure valve; the liquid outlet valve of the first back-pressure valve is connected to the injection end valve of the sand-filled pipe model, and the production end valve of the sand-filled pipe model is connected to the injection end of the second back-pressure valve; the third ISCO pump is connected to the pressure control valve of the second back-pressure valve, and the liquid outlet valve of the second back-pressure valve is connected to the production liquid collector; the first pressure gauge and the second pressure gauge are respectively installed at the first pressure measuring point and the second pressure measuring point of the sand-filled pipe model; the data output ends of the first pressure gauge and the second pressure gauge are respectively connected to the data input ends of the data collection and processing system;

[0016] The first ISCO pump is used to provide driving power for the device;

[0017] The high-pressure piston container is built with a formation crude oil sample, and the formation crude oil sample flows out from the top by displacing the bottom of the piston container;

[0018] The steel pipeline is used to connect the components in the device to form a displacement passage;

[0019] The first back pressure valve is used to control the pressure at the injection end of the sand filling pipe model;

[0020] The first pressure gauge is used to measure the pressure near the injection end of the sand-filled pipe model;

[0021] The second pressure gauge is used to measure the pressure near the production end of the sand filling pipe model;

[0022] The second back pressure valve is used to control the pressure at the production end of the sand filling pipe;

[0023] The produced fluid collector is used to collect produced formation crude oil;

[0024] The third ISCO pump is used to control the pressure of the second back pressure valve;

[0025] The second ISCO pump is used to control the pressure of the first back pressure valve;

[0026] The data collection and processing system is used to collect the pressure data collected by the first pressure gauge and the second pressure gauge, and calculate the pressure gradient in the sand filling pipe model under the control of the built-in program.

[0027] In a fourth aspect of the present disclosure, a method for determining the bubble point pressure of a crude oil system in a reservoir using the aforementioned device is provided, comprising the following steps:

[0028] The first step is to obtain formation crude oil samples and determine the initial displacement pressure and initial displacement velocity to ensure that the crude oil flow is in a laminar state during the measurement process;

[0029] The second step is to use the device to carry out a continuous flow experiment of formation crude oil, and control the injection and production pressures of the sand-filled pipe model in the device through the first back pressure valve and the second back pressure valve, so that the pressure at the injection end is kept constant and the pressure at the production end is gradually reduced until it is lower than the formation pressure of the target reservoir;

[0030] The third step is to use the first pressure measuring point and the second pressure measuring point of the sand-filled tube model in the device to monitor the pressure gradient in the sand-filled tube model, and determine the target reservoir type according to the change range of the pressure gradient; if the target reservoir is a saturated reservoir, the bubble point pressure of the formation crude oil is the formation pressure P o ;

[0031] The fourth step is to continue to use the device to carry out continuous flow experiments on formation crude oil if the target reservoir is an unsaturated oil reservoir to obtain a relationship curve between the pressure gradient in the sand-filled tube model and the pressure at the sand-filled tube outlet; and determine the bubble point pressure of the formation crude oil under the target reservoir conditions through the obtained relationship curve.

[0032] Furthermore, the first step is performed according to the following path:

[0033] (1) Obtaining formation crude oil samples: First, use a closed sampler to obtain a target reservoir crude oil sample, and then transfer the crude oil sample to a high-pressure piston container under constant temperature and pressure conditions;

[0034] (2) Determine the initial displacement pressure P: To truly reflect the bubble point pressure of the target reservoir formation crude oil, determine the initial displacement pressure relative to the target reservoir formation pressure P o High 1-3MPa;

[0035] (3) Determine the displacement velocity V: To ensure that the crude oil in the sand-filled pipe is in a laminar flow state and that the crude oil does not undergo phase change due to excessive flow rate, the initial displacement velocity V is calculated using the following formula (2):

[0036]

[0037] Where a is the correction coefficient. If the flow is porous medium flow, the value range of a is between 0.001-0.01. If the flow is pipe flow, the value range of a is between 0.01-0.1. μ is the viscosity of the formation crude oil, mPa·s; d is the diameter of the sand filling pipe, mm; ρ is the density of the formation crude oil, Kg / m 3 ;

[0038] Furthermore, the second step is performed according to the following path:

[0039] (1) Connect valves at both ends of the sand-filled tube model and evacuate for 6-8 hours; after the evacuation is completed, connect the sand-filled tube model to the device;

[0040] (2) using the second ISCO pump and the third ISCO pump to set the pressure of the first back pressure valve and the second back pressure valve to the initial displacement pressure P determined in the first step;

[0041] (3) setting the first ISCO pump to a constant displacement mode to displace the crude oil in the high-pressure piston container into the sand-filled pipe at the initial displacement speed V determined in the first step;

[0042] (4) When the readings of the first pressure gauge and the second pressure gauge are stable, record the reading of the first pressure gauge P a1 and the reading of the second pressure gauge P b1 , P a1 With P b1 The difference is recorded as P d1 .

[0043] (5) Keep the pressure of the first back pressure valve unchanged, and use the third ISCO pump to reduce the pressure of the second back pressure valve by 0.5 MPa each time, denoted as P pi , then repeat steps (3)-(4) for 2*(PP o )+1 times.

[0044] Furthermore, the third step is performed according to the following path:

[0045] Using the difference P between the first pressure gauge and the second pressure gauge di Calculate the pressure gradient ΔP inside the sand-filled tube model i , ΔP i =P di / L, L is the length of the sand filling pipe; calculate ΔP i -ΔP i-1 ;

[0046] If ΔP i -ΔP i-1 All of them are less than 0.01, indicating that when the outlet pressure is lower than the bubble point pressure of the formation crude oil, the formation crude oil in the sand-filled pipe does not undergo phase change, indicating that the target reservoir is an unsaturated oil reservoir;

[0047] If ΔP i -ΔP i-1 When the value of is greater than 0.01, it means that when the outlet pressure is lower than the bubble point pressure of the formation crude oil, the formation crude oil in the sand filling pipe undergoes a phase change, indicating that the target reservoir is a saturated reservoir. The bubble point pressure of the formation crude oil is the formation pressure P o .

[0048] Furthermore, the fourth step is performed according to the following path:

[0049] If the target reservoir is judged to be an unsaturated reservoir, the pressure gradient ΔP in the sand filling pipe is obtained. i and the second back pressure valve pressure P pi The corresponding relationship is plotted in a plane rectangular coordinate system;

[0050] Keep the pressure of the first back pressure valve unchanged, and use the third ISCO pump to reduce the pressure of the second back pressure valve by 0.5MPa each time, recorded as P pi Then repeat steps (3)-(4) in the second step, repeat once, and calculate the pressure gradient ΔP in the sand filling tube i , adding the measured data points to the plane rectangular coordinate system, and fitting the relationship between the points using a linear curve;

[0051] If the absolute value of the slope of the fitting curve is greater than 0.001, the outlet pressure at this time is recorded as P f ; If the absolute value of the slope of the fitting curve is less than 0.01, repeat the previous step until the slope of the fitting curve is greater than 0.01. The outlet pressure corresponding to the absolute value of the slope of the fitting curve greater than 0.001 is recorded as P f ;

[0052] When the absolute value of the slope of the fitting curve is greater than 0.001, the pressure of the first back pressure valve is kept unchanged, and the pressure of the second back pressure valve is reduced by 0.5 MPa each time by using the third ISCO pump, which is recorded as P pi Then repeat steps (3)-(4) in the second step for 3-5 times. The readings of the first pressure gauge and the second pressure gauge are recorded as P ai and P bi , the difference is recorded as P di , adding the data points to the plane rectangular coordinate system;

[0053] The outlet pressure P in the plane rectangular coordinate system f The corresponding points are taken as the dividing points, and the corresponding relationships of the points before and after the dividing points are fitted using linear curves. The intersection of the two curves is the bubble point pressure of the target reservoir formation crude oil.

[0054] At least one of the above technical solutions adopted in one or more embodiments of this specification can achieve the following beneficial effects:

[0055] The millimeter-scale sand-filled tube model proposed in the present disclosure has a minimum diameter of 2 mm and an average pore diameter of less than 50 μm. By finding the pressurization pressure in the process of making the sand-filled tube model, the microscopic pore throat size and pore throat distribution of the reservoir are accurately simulated, so that the microscopic pore throat characteristics of the real reservoir porous medium can be simulated. The technical solution proposed in the present disclosure is a method for determining the type of reservoir and the bubble point pressure of the formation crude oil system that can be carried out in porous media throughout the process. By measuring the change of the internal pressure gradient of the sand-filled tube model with the pressure at the production end, the influence of factors such as pore throat size, pore throat distribution and temperature on the bubble point pressure is comprehensively considered, so that the results obtained can more accurately represent the bubble point pressure of crude oil in the actual reservoir.

[0056] In addition, the solution provided in the present disclosure also has the advantages of time saving, easy operation and low cost, and has certain guiding significance for the formulation of target reservoir development plan and subsequent production management.

[0057] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.

[0058] Further features and aspects of the present disclosure will become apparent from the following detailed description of exemplary embodiments with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] The drawings herein are incorporated into the specification and constitute a part of the specification. These drawings illustrate embodiments consistent with the present disclosure and are used to illustrate the technical solutions of the present disclosure together with the specification.

[0060] Figure 1 Fitting curve of pressurization pressure and maximum and minimum pore throat radius of sand filling pipe model.

[0061] Figure 2 Fitting curve of pressurization pressure and maximum and average pore throat radius of sand filling pipe model.

[0062] Figure 3 Fitting curve of pressurization pressure and minimum and minimum pore throat radius of sand filling pipe model.

[0063] Figure 4 is the pore throat radius distribution curve of the target reservoir.

[0064] Figure 5 Schematic diagram of the sand-filled tube model developed for the present invention.

[0065] Figure 6 This is the connection diagram of the experimental device of the present invention.

[0066] Figure 7 Schematic diagram of the critical point pressure determination process.

[0067] Figure 8 It is the curve of pressure gradient in the sand filling pipe changing with the pressure of back pressure valve 2.

[0068] In the figure: 1-injection end valve; 2-first pressure measuring point; 3-quartz sand particles; 4-outer wall of sand filling tube; 5-inner wall of sand filling tube; 6-second pressure measuring point; 7-outlet end valve; 8-first ISCO pump, 9-high pressure piston container, 10-high pressure resistant pipeline, 11-first back pressure valve, 12-first pressure gauge, 13-sand filling tube model, 14-second pressure gauge, 7-production end valve, 15-second back pressure valve, 16-produced liquid collector, 17-third ISCO pump, 18-second ISCO pump, 19-data collection and processing system. DETAILED DESCRIPTION

[0069] Various exemplary embodiments, features and aspects of the present disclosure will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.

[0070] In addition, in order to better illustrate the present disclosure, numerous specific details are given in the following specific embodiments. It should be understood by those skilled in the art that the present disclosure can also be implemented without certain specific details. In some examples, methods and means well known to those skilled in the art are not described in detail in order to highlight the main purpose of the present disclosure.

[0071] The following is an experimental example using the A reservoir of Daqing Oilfield as the target reservoir. The average permeability of the A reservoir is 950×10 -3 μm 2 , the average porosity is 25.62%.

[0072] Step 1: Use a laser particle size analyzer to determine the mineral particle size composition of the target reservoir, use quartz sand with the same particle size composition to press the sand-filled tube model at different pressurization pressures, and use a constant-pressure mercury injection experiment to determine the pore throat microscopic parameters (maximum pore throat radius, minimum pore throat radius, average pore throat radius and pore throat distribution frequency) of the sand-filled tube model under different pressurization pressures to obtain the quantitative relationship between the pressurization pressure and the microscopic parameters of the sand-filled tube model; then, the pore throat microscopic parameters (maximum pore throat radius, minimum pore throat radius, average pore throat radius and pore throat distribution frequency) of the natural core of the target reservoir are determined by constant-pressure mercury injection experiment, and the pressurization pressure of the sand-filled tube model that can simulate the pore throat microscopic parameters of the target reservoir is determined in combination with the quantitative relationship between the pressurization pressure and the microscopic parameters of the sand-filled tube model.

[0073] The following specific steps are included:

[0074] (1) The natural core of the target reservoir was analyzed using a laser particle size analyzer to obtain the particle size composition and distribution of the target reservoir minerals. The results are shown in Table 1.

[0075] (2) Table 1 shows that the target reservoir mineral particle diameter range is 64-430 μm, corresponding to a mesh size of 40-270 mesh; combined with the common quartz sand mesh size classification on the market, four specifications of quartz sand, 40-70 mesh, 70-140 mesh, 160-200 mesh and 230-270 mesh, are selected to make the sand filling tube model. According to the proportion of quartz sand with different mesh sizes, the mass ratio of quartz sand with different specifications is determined to be 40-70 mesh: 70-140 mesh: 160-200 mesh: 230-270 mesh = 2299: 2775: 1910: 170; quartz sand with different mesh sizes is placed in a tray and stirred evenly, and activated at high temperature at 120°C for 6 h;

[0076] (3) Activated quartz sand was filled into the sand-filled tube and pressurized at 4, 8, 12, 16, 20, and 24 MP, respectively, to obtain 6 sand-filled tube models under different pressurization pressures. Twenty sand-filled tube models were made under each pressure, and a total of 120 sand-filled tube models were made. The maximum pore throat radius, minimum pore throat radius, average pore throat radius, and pore throat distribution frequency of the sand-filled tube models obtained under 6 different pressurization pressures were analyzed by constant pressure mercury injection experiment. The quantitative relationship curves between each parameter and pressurization pressure are shown in Figure 2. Figure 1 , 2 , 3; the quantitative relationship between the microscopic parameters of the sand filling tube (maximum pore throat radius, minimum pore throat radius, average pore throat radius, pore throat distribution frequency) and the pressurization pressure was fitted by the multivariate linear regression method, and the fitting relationship was obtained after fitting The final fitting result is shown in formula 3;

[0077]

[0078] (4) The natural cores drilled from the A reservoir of Daqing Oilfield were analyzed by constant pressure mercury injection experiment to determine the microscopic pore throat parameters (maximum pore throat radius, minimum pore throat radius, average pore throat radius and pore throat distribution frequency) of the natural cores. The results are as follows: Figure 4 As shown by Figure 4 It can be seen that the minimum pore throat radius r of the natural core of reservoir A is a =0.001μm, maximum pore throat radius r b =638.2μm, average pore throat radius r c =16.95μm, the minimum pore throat radius accounts for f a =0.58%, the maximum pore throat radius accounts for f b=0.97%; the average pore throat radius of reservoir A is 16.95, based on which M=0.8 and N=0.2 are determined; the above parameters are substituted into formula 3, and the pressurization pressure for making the sand-filled tube model simulating the target reservoir is determined to be 13.23 MPa, that is, the sand-filled tube model obtained under this pressurization pressure can accurately simulate the pore throat microstructure of the porous medium of reservoir A;

[0079] (5) The activated quartz sand was filled into a sand-filling tube with an inner diameter of 0.5 mm, an outer diameter of 8 mm, and a length of 12 m. After filling, the tube was pressurized at 13.23 MPa for 10 min. After the pressurization was completed, valves were installed at both ends of the sand-filling tube, and pressure measuring points were arranged at 5 cm from the valves at both ends. A sand-filling tube model simulating the pore throat microstructure of reservoir A was obtained. The schematic diagram of the sand-filling tube model is shown in FIG. Figure 5 shown.

[0080] Step 2: Obtain formation crude oil samples and determine the initial experimental pressure and experimental displacement rate

[0081] It is known that the formation pressure of the A reservoir in Daqing Oilfield is 11.9 MPa, the formation temperature is 45°C, the crude oil viscosity is 8.6 mPa·s, and the density is 850 Kg / m 3 ;

[0082] (1) Obtaining formation crude oil samples: lowering a high-temperature, high-pressure, sealed sampler to the depth of reservoir A and obtaining a reservoir crude oil sample; then connecting the high-temperature, high-pressure, sealed sampler to the top of a piston container, and transferring the formation crude oil sample to the piston container at a constant temperature of 45°C and a constant pressure of 12 MPa;

[0083] (2) Determine the initial pressure P of the experiment: In this embodiment, the initial pressure P of the experiment = 11.9 + 3 = 14.9 MPa;

[0084] (3) Determine the experimental displacement velocity V: In this embodiment, the flow is porous medium flow, a=0.07, crude oil viscosity μ=8.6 mPa·s, crude oil density ρ=850 kg / m 3 , the inner diameter of the sand filling tube d = 0.5 mm, then the experimental displacement velocity V of this embodiment = 0.007 × 8.6 × 2000 / (0.5 × 850) = 0.28 m / s, which is converted into a volume flow rate of 3 mL / min;

[0085] Step 3: Use the developed millimeter-scale sand-filled pipe model to carry out continuous flow experiments of formation crude oil. Use the back pressure valve to control the injection and production pressures of the model, keep the injection pressure constant, and gradually reduce the production pressure until it is lower than the target reservoir formation pressure. Use the pressure measuring points at the injection and production ends to monitor the pressure gradient in the sand-filled pipe, and determine the target reservoir type based on the pressure gradient change range in the sand-filled pipe.

[0086] The step three comprises the following specific steps:

[0087] (1) Vacuum the sand filling pipe prepared in step 1 for 8 hours; after vacuuming, close the valves at both ends of the sand filling pipe and connect it to the Figure 6 In the device diagram shown;

[0088] (2) Using ISCO pump 2 and ISCO pump 3, set the pressure of back pressure valve 1 and back pressure valve 2 to 14.9 MPa respectively;

[0089] (3) ISCO pump 1 is set to constant displacement mode, and then the formation crude oil in the piston container is displaced into the sand filling pipe at a displacement rate of V = 3 mL / min;

[0090] (4) Using the pressure monitoring system, record the readings of pressure gauge 1 and pressure gauge 2 every 30 seconds. When the readings of pressure gauge 1 and pressure gauge 2 are stable, record the reading of pressure gauge 1. a1 and the reading of pressure gauge 2 P b1 , and calculate P a1 and P b1 The difference P d1 , as shown in Table 2;

[0091] (5) Keep the pressure of back pressure valve 1 at 14.9 MPa, use ISCO pump 3 to reduce the pressure of back pressure valve 2 to 14.4 MPa, then repeat steps (3)-(4), and record the readings of pressure gauge 1 and pressure gauge 2 as P a2 and P b2 , the difference is recorded as P d2 ; After that, the pressure of the back pressure valve 1 was kept unchanged, and the pressure of the back pressure valve 2 was further reduced by using the ISCO pump 3, and the cycle was continued for 6 times at 13.9, 13.4, 12.9, 12.4, 11.9, and 11.4 MPa, respectively. The experimental data are recorded in Table 2;

[0092] (6) In this embodiment, the length of the sand filling pipe is 12 m. According to the difference P between the readings of pressure gauge 1 and pressure gauge 2 in Table 2, di Calculate the pressure gradient ΔP in the sand-filled tube i , the results are recorded in Table 2; using the pressure gradient ΔP of each group i Subtract the pressure gradient of the previous group from the pressure gradient ΔP i-1 , the calculation results are shown in Table 2; it can be found that (ΔP i -ΔP i-1 ) are all less than 0.01, which means that the target reservoir is an unsaturated reservoir;

[0093] like Figure 6As shown, the relevant components in the device are connected by a steel pipeline 10, wherein an ISCO pump 1 is connected to the valve at the lower end of the piston container, the valve at the upper end of the piston container is connected to the injection end of the back pressure valve 1, an ISCO pump 2 is connected to the pressure control valve of the back pressure valve 1, the liquid outlet valve of the back pressure valve 1 is connected to the injection end valve of the sand filling pipe, the production end valve of the sand filling pipe is connected to the injection end of the back pressure valve 2, an ISCO pump 3 is connected to the pressure control valve of the back pressure valve 2, and the liquid outlet valve of the back pressure valve 2 is connected to the output liquid collection device; a pressure gauge 1 is installed at a pressure measuring point near the valve at the injection end of the sand filling pipe, and a pressure gauge 2 is installed at a pressure measuring point near the valve at the production end of the sand filling pipe; pressure gauges 1 and 2 are connected to a data collection and processing system.

[0094] The ISCO pump 1 provides driving power for the system;

[0095] The piston container contains a formation crude oil sample, and the formation crude oil flows out from the top by displacing the bottom of the piston container;

[0096] The steel pipeline is used to connect various devices in the experiment and provide a displacement path;

[0097] The back pressure valve 1 is used to control the pressure at the injection end of the sand filling pipe;

[0098] The valve at the injection end of the sand filling pipe is used to connect the injection end of the sand filling pipe with the experimental device;

[0099] The pressure gauge 1 is used to measure the pressure near the injection end of the sand filling pipe;

[0100] The sand-filled pipe is used to carry out formation crude oil flow experiments;

[0101] The pressure gauge 2 is used to measure the pressure near the production end of the sand filling pipe;

[0102] The valve at the sand filling pipe production end is used to connect the sand filling pipe production end with the experimental device;

[0103] The back pressure valve 2 is used to control the pressure at the output end of the sand filling pipe;

[0104] The produced fluid collection system is used to collect produced formation crude oil;

[0105] The ISCO pump 3 is used to control the pressure of the back pressure valve 2;

[0106] The ISCO pump 2 is used to control the pressure of the back pressure valve 1;

[0107] The data collection and processing system is used to collect the pressures of the pressure gauge 1 and the pressure gauge 2 and calculate the pressure gradient in the sand filling pipe.

[0108] Step 4: Continue to use the developed millimeter-scale sand-filled pipe model to carry out continuous flow experiments on formation crude oil, and determine the bubble point pressure of the formation crude oil under the target reservoir conditions based on the relationship curve between the pressure gradient in the sand-filled pipe model and the pressure at the sand-filled pipe outlet;

[0109] (1) From step 3, it can be seen that the target reservoir is an unsaturated reservoir, and further experiments need to be carried out to determine the bubble point pressure of the crude oil in reservoir A. First, the pressure gradient ΔP in the sand filling tube obtained in step 3 is i With back pressure valve 2 pressure P pi The corresponding relationship is drawn in the plane rectangular coordinate system, such as Figure 7 (a)

[0110] (2) Continue with step 3 (5), reduce the pressure of back pressure valve 2 to 10.9 MPa, and calculate the pressure gradient ΔP in the sand filling pipe i , add the measured data points to the plane rectangular coordinate system described in step 4 (1), such as Figure 7 As shown in (b), a linear curve is used to fit the relationship between each point, and the slope of the fitting curve is 0.0001;

[0111] (3) Repeat step 4 (2) to continue reducing the pressure of back pressure valve 2, add the data points to the plane rectangular coordinate system and use a linear curve to fit the relationship between the points. The result is as follows: Figure 7 (c)-(e); when the pressure of the back pressure valve 2 is 10.4, 9.9, 9.4 MPa, the slope of the fitting curve is less than 0.001. When the pressure of the back pressure valve 2 drops to 8.9 MPa, the slope of the fitting curve is 0.0026, which is greater than 0.001. Therefore, in this embodiment, the dividing point P f =8.9MPa;

[0112] (4) Continue with step 3 (5). To ensure the stability of the subsequent fitting curve, set the number of repetitions to 3, that is, the pressures of the back pressure valve 2 are 8.4, 7.9, and 7.4 MPa, respectively, and add the data points to the plane rectangular coordinate system, such as Figure 8 As shown;

[0113] (5) Taking the data point corresponding to 8.9 MPa as the demarcation point, linearly fit the relationship curves of the data points before and after the demarcation point, as shown in Figure 2. Figure 8 As shown in the figure, it can be seen that the intersection of the two curves corresponds to a pressure of 9.2MPa, that is, the bubble point pressure of the crude oil in the A reservoir of Daqing Oilfield is 9.2MPa.

[0114] Table 1 Statistics of rock grain size distribution in reservoir A of Daqing Oilfield

[0115]

[0116]

[0117] Table 2 Step 3 Experimental Data Collection Table

[0118]

Claims

1. A sand-filled tube model, comprising a sand-filled tube, characterized in that: An injection end valve (1) and an outlet end valve (7) are respectively arranged at both ends of the sand filling pipe; a first pressure measuring point (2) and a second pressure measuring point (6) are respectively arranged through the pipe wall of the sand filling pipe and corresponding to the injection end valve and the outlet end valve; the sand filling pipe contains activated quartz sand particles, and the quartz sand particles are pressed into the sand filling pipe under a pore throat microstructure simulation pressure.

2. A method for determining the pore throat microstructure simulation pressure of the sand filling pipe model according to claim 1, characterized in that The steps include: The first step is to use a laser particle size analyzer to analyze the natural core of the target reservoir to obtain the particle size composition and distribution characteristics of the target reservoir minerals; The second step is to select quartz sands of different mesh sizes and determine their proportions according to the obtained target reservoir mineral particle size composition and distribution characteristics, place the quartz sands in a square plate and stir them evenly, and then subject the quartz sands to high-temperature activation treatment to obtain activated quartz sands; In the third step, the activated quartz sand obtained in the second step is filled into the sand filling tube, and the sand filling tube is pressurized at different pressures P. y Pressurizing the tube to obtain a series of sand-filled tube models; the number of the series of sand-filled tube models is not less than 100; The fourth step is to use the constant pressure mercury injection experiment to analyze the different pressures P obtained in the third step. y The microscopic pore throat parameters of a series of sand filling pipe models obtained under the condition of pore filling are as follows: the microscopic pore throat parameters include the maximum pore throat radius, the minimum pore throat radius, the average pore throat radius and the pore throat distribution frequency; the microscopic pore throat parameters and the pressure P are fitted. y A quantitative relationship, wherein the relationship structure of the quantitative relationship is shown in Formula 1; Among them, P y is the pressure of the sand filling pipe, M is the weight coefficient of the microscopic pore throat parameters on the pressure, N is the weight coefficient of the particle size composition on the pressure, f(r a )、f(r b )、f(r c ) is the experimental fitting relationship, r a 、r b 、r c are the minimum, maximum and average pore throat radius of the target reservoir, μm; f a 、f b are the proportions of the smallest and largest pore throats in the target reservoir, respectively; Among them, if the average pore throat radius r of the target reservoir c <10, then the value range of M is 0.9-1; if 10 <r c <50, then the value range of M is 0.7-0.9; if 50 <r c <100, then the value range of M is 0.6-0.7; if r c >100, then the value range of M is 0.4-0.6; N=1-M; f(r a )、f(r b )、f(r c ) in fitting the microscopic pore throat parameters and the pressure P y Obtained during the process; a 、r b 、r c 、f a 、f b Obtained by constant pressure mercury injection experiment; The fifth step is to analyze the natural core drilled from the target reservoir by constant pressure mercury injection experiment to determine the microscopic pore throat parameters of the natural core, which include the maximum pore throat radius, the minimum pore throat radius, the average pore throat radius and the pore throat distribution frequency; the microscopic pore throat parameters of the natural core are substituted into formula 1, and the obtained sand filling pipe pressurization pressure P is y That is, the pore throat microstructure simulation pressure for making a sand-filled pipe model simulating the target reservoir, and the sand-filled pipe model pressurized under the pore throat microstructure simulation pressure can accurately simulate the pore throat microstructure of the porous medium of the reservoir.

3. A device for determining the bubble point pressure of a crude oil system in a reservoir, using the sand-filled tube model of claim 1, characterized in that It includes a first ISCO pump (8), a high-pressure piston container (9), a first back-pressure valve (11), a first pressure gauge (11), a second pressure gauge (14), a second back-pressure valve (15), a produced liquid collector (16), a third ISCO pump (17), a second ISCO pump (18) and a data collection and processing system (19); The device uses a steel pipeline (10) to connect various components; the first ISCO pump is connected to the lower end valve of the high-pressure piston container, and the upper end valve of the high-pressure piston container is connected to the injection end of the first back-pressure valve; the second ISCO pump is connected to the pressure control valve of the first back-pressure valve; the liquid outlet valve of the first back-pressure valve is connected to the injection end valve of the sand-filled pipe model, and the production end valve of the sand-filled pipe model is connected to the injection end of the second back-pressure valve; the third ISCO pump is connected to the pressure control valve of the second back-pressure valve, and the liquid outlet valve of the second back-pressure valve is connected to a production liquid collector; a first pressure gauge and a second pressure gauge are respectively installed at the first pressure measuring point and the second pressure measuring point of the sand-filled pipe model; the data output ends of the first pressure gauge and the second pressure gauge are respectively connected to the data input end of the data collection and processing system; The first ISCO pump is used to provide driving power for the device; The high-pressure piston container is built with a formation crude oil sample, and the formation crude oil sample flows out from the top by displacing the bottom of the piston container; The steel pipeline is used to connect the components in the device to form a displacement passage; The first back pressure valve is used to control the pressure at the injection end of the sand filling pipe model; The first pressure gauge is used to measure the pressure near the injection end of the sand-filled pipe model; The second pressure gauge is used to measure the pressure near the production end of the sand filling pipe model; The second back pressure valve is used to control the pressure at the production end of the sand filling pipe; The produced fluid collector is used to collect produced formation crude oil; The third ISCO pump is used to control the pressure of the second back pressure valve; The second ISCO pump is used to control the pressure of the first back pressure valve; The data collection and processing system is used to collect the pressure data collected by the first pressure gauge and the second pressure gauge, and calculate the pressure gradient in the sand filling pipe model under the control of the built-in program.

4. A method for determining the bubble point pressure of a crude oil system in a reservoir, characterized in that Using the device described in claim 3, comprising the following steps: The first step is to obtain formation crude oil samples and determine the initial displacement pressure and initial displacement velocity to ensure that the crude oil flow is in a laminar state during the measurement process; The second step is to use the device to carry out a continuous flow experiment of formation crude oil, and control the injection and production pressures of the sand-filled pipe model in the device through the first back pressure valve and the second back pressure valve, so that the pressure at the injection end is kept constant and the pressure at the production end is gradually reduced until it is lower than the formation pressure of the target reservoir; The third step is to use the first pressure measuring point and the second pressure measuring point of the sand-filled tube model in the device to monitor the pressure gradient in the sand-filled tube model, and determine the target reservoir type according to the change range of the pressure gradient; if the target reservoir is a saturated reservoir, the bubble point pressure of the formation crude oil is the formation pressure P o ; The fourth step is to continue to use the device to carry out continuous flow experiments on formation crude oil if the target reservoir is an unsaturated oil reservoir to obtain a relationship curve between the pressure gradient in the sand-filled tube model and the pressure at the sand-filled tube outlet; and determine the bubble point pressure of the formation crude oil under the target reservoir conditions through the obtained relationship curve.

5. A method for determining the bubble point pressure of a crude oil system in a reservoir according to claim 4, characterized in that The first step is performed according to the following path: (1) Obtaining formation crude oil samples: First, use a closed sampler to obtain a target reservoir crude oil sample, and then transfer the crude oil sample to a high-pressure piston container under constant temperature and pressure conditions; (2) Determine the initial displacement pressure P: The initial displacement pressure P is higher than the target reservoir formation pressure P o High 1-3MPa; (3) Determine the displacement velocity V: To ensure that the crude oil in the sand-filled pipe is in a laminar flow state and that the crude oil does not undergo phase change due to excessive flow rate, the initial displacement velocity V is calculated using the following formula (2): Where a is the correction coefficient. If the flow is porous medium flow, the value range of a is between 0.001-0.

01. If the flow is pipe flow, the value range of a is between 0.01-0.

1. μ is the viscosity of the formation crude oil, mPa·s; d is the diameter of the sand filling pipe, mm; ρ is the density of the formation crude oil, Kg / m 3 .

6. A method for determining the bubble point pressure of a crude oil system in a reservoir according to claim 5, characterized in that The second step is performed according to the following path: (1) Connect valves at both ends of the sand-filled tube model and evacuate for 6-8 hours; after the evacuation is completed, connect the sand-filled tube model to the device; (2) using the second ISCO pump and the third ISCO pump to set the pressure of the first back pressure valve and the second back pressure valve to the initial displacement pressure P determined in the first step; (3) setting the first ISCO pump to a constant displacement mode to displace the crude oil in the high-pressure piston container into the sand-filled pipe at the initial displacement speed V determined in the first step; (4) When the readings of the first pressure gauge and the second pressure gauge are stable, record the reading of the first pressure gauge P a1 and the reading of the second pressure gauge P b1 , P a1 With P b1 The difference is recorded as P d1 ; (5) Keep the pressure of the first back pressure valve unchanged, and use the third ISCO pump to reduce the pressure of the second back pressure valve by 0.5 MPa each time, denoted as P pi , then repeat steps (3)-(4) for 2*(PP o )+1 times.

7. A method for determining the bubble point pressure of a crude oil system in a reservoir according to claim 6, characterized in that The third step is performed according to the following path: Using the difference P between the first pressure gauge and the second pressure gauge di Calculate the pressure gradient ΔP inside the sand-filled tube model i , ΔP i =P di / L, L is the length of the sand filling pipe; calculate ΔP i -ΔP i-1 ; If ΔP i -ΔP i-1 All of them are less than 0.01, indicating that when the outlet pressure is lower than the bubble point pressure of the formation crude oil, the formation crude oil in the sand-filled pipe does not undergo phase change, indicating that the target reservoir is an unsaturated oil reservoir; If ΔP i -ΔP i-1 When the value of is greater than 0.01, it means that when the outlet pressure is lower than the bubble point pressure of the formation crude oil, the formation crude oil in the sand filling pipe undergoes a phase change, indicating that the target reservoir is a saturated reservoir. The bubble point pressure of the formation crude oil is the formation pressure P o .

8. A method for determining the bubble point pressure of a crude oil system in a reservoir according to claim 7, characterized in that The fourth step is performed according to the following path: If the target reservoir is judged to be an unsaturated reservoir, the pressure gradient ΔP in the sand filling pipe is obtained. i and the second back pressure valve pressure P pi The corresponding relationship is plotted in a plane rectangular coordinate system; Keep the pressure of the first back pressure valve unchanged, and use the third ISCO pump to reduce the pressure of the second back pressure valve by 0.5MPa each time, recorded as P pi Then repeat steps (3)-(4) in the second step, repeat once, and calculate the pressure gradient ΔP in the sand filling tube i , adding the measured data points to the plane rectangular coordinate system, and fitting the relationship between the points using a linear curve; If the absolute value of the slope of the fitting curve is greater than 0.001, the outlet pressure at this time is recorded as P f ; If the absolute value of the slope of the fitting curve is less than 0.01, repeat the previous step until the slope of the fitting curve is greater than 0.

01. The outlet pressure corresponding to the absolute value of the slope of the fitting curve greater than 0.001 is recorded as P f ; When the absolute value of the slope of the fitting curve is greater than 0.001, the pressure of the first back pressure valve is kept unchanged, and the pressure of the second back pressure valve is reduced by 0.5 MPa each time by using the third ISCO pump, which is recorded as P pi Then repeat steps (3)-(4) in the second step for 3-5 times. The readings of the first pressure gauge and the second pressure gauge are recorded as P ai and P bi , the difference is recorded as P di , adding the data points to the plane rectangular coordinate system; The outlet pressure P in the plane rectangular coordinate system is f The corresponding points are taken as the dividing points, and the corresponding relationships of the points before and after the dividing points are fitted using linear curves. The intersection of the two curves is the bubble point pressure of the target reservoir formation crude oil.