Method for rapidly detecting silt content of sand
By injecting water into the sand to separate the sediment and observing the settlement type, the volume ratio is used to infer the sand mud content, which solves the problem of long detection time in the existing technology, achieves fast and accurate sand mud content detection, and ensures Timeliness and quality of sand production.
Patent Information
- Application Number
- CN202410932618.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-01
AI Technical Summary
The existing sand mud content detection method takes a long time and cannot guide sand production and acceptance in a timely manner, resulting in increased production costs and reduced output.
By injecting water into the sand to separate the sediment, observe the settlement type, record the volume ratio of the sand layer and the mud layer, use the black box principle and mathematical formulas to infer the mud content of the sand, and use a simple measuring cylinder and timing method for detection.
It realizes rapid detection of sand mud content, can timely guide sand production and acceptance, prevents unqualified sand from entering the production process, reduces production costs and increases output.
Smart Images

Figure CN118730833A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of test detection, and in particular relates to a method for quickly detecting mud content in sand. Background Art
[0002] As an important building material, sand is an important raw material for concrete and mortar. The quality of sand has a great impact on concrete and mortar. The mud content of sand has a great impact on the workability and durability of concrete and mortar. Therefore, the mud content detection of sand is the focus of sand quality detection. At present, according to the national standard and industry standard, it takes about 7 hours to detect the mud content of sand under normal circumstances. Therefore, it is impossible to guide the production and acceptance of sand in time. If the mud content exceeds the standard after batch production of sand, it is necessary to remove the mud again, which increases costs and reduces production. If the sand with unqualified mud content is put into the warehouse, it will be cleared after detection, which affects the use of sand. Summary of the invention
[0003] Aiming at the problem that the existing sand mud content detection method takes a long time, the present invention provides a method for quickly detecting the sand mud content.
[0004] A certain amount of water is injected into the sand and the sand is shaken so that the mud on the surface of the sand is brought out by the water and floats in the water. After shaking, the sand is allowed to stand. During the sedimentation process, there are several different sedimentation types according to the different properties of the particles, including free sedimentation, flocculation sedimentation, crowded sedimentation, compression sedimentation, etc. After the characteristics, a visible soil layer is formed. The volume of the sand layer and the volume of the soil layer are recorded within the specified time. The ratio of these two volumes has a certain relationship with the mud content of the sand. By avoiding the complex movement law of mud and sand sedimentation, the black box principle is used to determine the mathematical formula of this relationship. After determining the relationship between the sediment volume ratio and the mud content, the mud content of the sand can be inferred by directly measuring the sediment volume ratio.
[0005] The present invention adopts the following technical solution: A method for quickly detecting the mud content of sand comprises the following steps: The first step is to separate the sand to be tested into mud and sand using the standard method, dry it, and use the separated mud and sand to prepare sand with different mud contents; The second step is to pour the sand with different mud contents prepared in the first step into the measuring cylinder respectively, slowly inject clean water into the measuring cylinder to the bottle mouth, plug it with a stopper, put it flat, and swing it back and forth several times. After swinging, quickly put it on the table, start timing, and read the volume of sand and mud layer at certain intervals until all tests are completed; The third step is to list the data recorded in the second step in an Excel table. By calculation, the ratio of mud layer volume to sand layer volume is used as the horizontal axis, the mud content is used as the vertical axis, and a smooth line scatter plot is made. A trend line regression analysis is added to obtain the regression equation and similarity coefficient. The column with the highest similarity coefficient is selected. The time in this column is the optimal settlement time, and this equation is used to infer the mud content equation. The fourth step is verification. Take the same batch of sand and compare the mud content using the standard method with the sand tested using the above steps.
[0006] Furthermore, the mud contents of the sands with different mud contents in the first step are 0.5%, 1.0%, 1.5%, 2.0%, 2.5%, 3.0%, 3.5%, 4.0%, 4.5%, and 5.0%, respectively.
[0007] Furthermore, the certain time interval in the second step is an interval of 2 minutes.
[0008] Furthermore, in the fourth step of verification, the absolute value of the difference in mud content between the sand detected by the standard method and the sand detected by the present invention is defined as a, and a≤0.2% is determined to be in compliance and used for mud content inspection in construction production; 0.2%≤a≤0.5% is determined to be basically in compliance and used for preliminary judgment of finding sand sources, judging the mud and sand content in river water, judging whether the sand has been washed to meet the requirements of the mud content standard, and judging the uniformity of the mud content of the sand; a>0.5% is determined to be non-compliant and shall not be adopted, and the test shall be carried out again.
[0009] The beneficial effects of the present invention are as follows: The detection method of the present invention uses simple instruments during detection and only requires a measuring cylinder for detection. The mud content in the sand can be quickly detected, and the sand production can be timely guided during sand production to avoid producing unqualified sand. The mud content of the sand can be timely inspected and accepted to avoid unqualified sand from entering the warehouse. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a linear regression curve diagram of an embodiment of the present invention. DETAILED DESCRIPTION
[0011] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0012] A method for quickly detecting the mud content of sand comprises the following steps: The first step is to separate the sand to be tested into mud and sand using the standard method, dry it, and use the separated mud and sand to prepare sand with different mud contents; When preparing sand with different mud contents, determine the mud content preparation interval and the maximum preparation value. First determine the maximum value, and then determine the preparation interval. The quality requirements for fine aggregate in the "Specifications for Construction of Hydraulic Concrete" stipulate: for concrete with design age strength grade <30MPa, mud content ≤5%; for concrete with design age strength grade ≥30MPa and frost resistance requirements, mud content ≤3%. During preparation, if the maximum preparation mud content exceeds 5%, the interval is 0.5%.
[0013] The second step is to pour the sand with different mud contents prepared in the first step into the measuring cylinder respectively, slowly inject clean water into the measuring cylinder to the bottle mouth, plug it with a stopper, put it flat, and swing it back and forth several times. After swinging, quickly put it on the table, start timing, and read the volume of sand and mud layer at certain intervals until all tests are completed; The third step is to list the data recorded in the second step in an Excel table. By calculation, the ratio of mud layer volume to sand layer volume is used as the horizontal axis, the mud content is used as the vertical axis, and a smooth line scatter plot is made. A trend line regression analysis is added to obtain the regression equation and similarity coefficient. The column with the highest similarity coefficient is selected. The time in this column is the optimal settlement time, and this equation is used to infer the mud content equation. The fourth step is verification. Take the same batch of sand and compare the mud content using the standard method with the sand tested using the above steps.
[0014] Example 1. For a water conservancy project, the "Specifications for Construction of Hydraulic Concrete" stipulates that the maximum mud content is 5%. The maximum mud content is 5% with an interval of 0.5%. The standard method for sand mud content is to adopt the mud content detection method of the "Test Procedure for Hydraulic Concrete". At room temperature, take 25kg of sand, wash the sand with water and pass it through a 0.075mm sieve. The sand and mud are separated and then dried. 200g of sand is used each time. The sand is prepared according to the mud content of 0.5%, 1.0%, 1.5%, 2.0%, 2.5%, 3.0%, 3.5%, 4.0%, 4.5%, and 5.0%. The mud content is configured with sand and mud content as shown in Table 1.
[0015] Table 1 Amount of sand and mud for preparing mud content (2) Place the prepared mud and sand into a 250 ml measuring cylinder with a graduation value of 2 ml. Add water until the bottleneck is reached and shake it 20 times.
[0016] (3) The volume of the mud layer was recorded every 2 minutes during each test, from 2 minutes to 20 minutes. The statistics of the sedimentation time and sedimentation volume of the sand and mud layers are shown in Table 2.
[0017] Table 2 Statistics of sedimentation time and sedimentation volume of sand and mud layers Note: 1. The volume of mud layer is rounded up; 2. Mud content below 0.5% cannot be measured; 3. The highest correlation coefficient is after 16 minutes, so 16 minutes is selected as the time to record mud layer thickness and sand layer thickness.
[0018] (4) When the method of the present invention is used for 16 minutes, the relationship between the volume of the sand layer and the volume of the mud layer is as follows: Figure 1 shown.
[0019] (5) The linear regression formula is: y = 63.367x + 0.19, where the intercept is the mud contained in the sand during sedimentation, and the slope is the relationship between the mud content of the sand and the volume ratio of the mud layer to the sand layer.
[0020] (6) Verification: The same batch of sand was used for testing. When using the rapid method, the water content of the sand was not considered. The amount of sand taken was controlled by volume. For 200 g of sand, the bulk density of the sand was assumed to be 1.5 g / cm 3 The volume of the sand container is 133.3 cm 3 , round up, use 135cm 3 Sand was taken from the container, and the results are shown in Table 3. The test results of the standard method are shown in Table 4. The difference between the rapid method and the standard method was 0.1%. The conclusion of this scheme was compliance.
[0021] Table 3 Test results Table 4 Test results of standard method (7) The results are shown in Table 5.
[0022] Table 5 Statistics of conclusions of the rapid method for testing sand mud content (8) Rapid detection of sand mud content, which can be used for the following tests: ① Check the uniformity of mud content in the sand silo of the concrete mixing station to ensure the quality of concrete. It is especially important to ensure the uniformity of mud content when the amount of concrete is large and the mud content has a great impact on the working performance of concrete.
[0023] ② Testing the mud content of sand before it is transported from the sand plant to the concrete mixing station can reduce the costs of cleaning up the site and freight due to unqualified sand quality, as well as the costs of lost work time due to the inability to produce concrete normally due to lack of sand.
[0024] ③ During the sand cleaning process, rapid testing of the mud content will help to promptly detect sand with excessive mud content and clean it in a timely manner.
[0025] ④ When looking for sand sources, you can determine the mud content of the sand and judge the quality of the sand source.
[0026] ⑤ Determine the mud and sand content in the river, the changes in river sediment, and infer the source and sedimentation of sediment.
[0027] (9) When the properties of sand are different, different volume ratio and mud content relationship curves should be produced.
[0028] (10) Precautions for rapid detection of sand mud content ① The relationship between the production volume ratio and the mud content is reproducible with the rapid detection method.
[0029] ② In case of dispute, the standard method shall be adopted.
[0030] ③ The present invention does not consider the impact of factors such as ambient temperature, water quality, sediment concentration, and changes in the diameter of the measuring cylinder on the test. It is possible that the customized solution may require several modifications to achieve the appropriate effect.
Claims
1. A method for quickly detecting the mud content of sand. Features: The steps include: The first step is to separate the sand to be tested into mud and sand using the standard method, dry it, and use the separated mud and sand to prepare sand with different mud contents; The second step is to pour the sand with different mud contents prepared in the first step into the measuring cylinder respectively, slowly inject clean water into the measuring cylinder to the bottle mouth, plug it with a stopper, put it flat, and swing it back and forth several times. After swinging, quickly put it on the table, start timing, and read the volume of sand and mud layer at certain intervals until all tests are completed; The third step is to list the data recorded in the second step in an Excel table. By calculation, the ratio of mud layer volume to sand layer volume is used as the horizontal axis, the mud content is used as the vertical axis, and a smooth line scatter plot is made. A trend line regression analysis is added to obtain the regression equation and similarity coefficient. The column with the highest similarity coefficient is selected. The time in this column is the optimal settlement time, and this equation is used to infer the mud content equation. The fourth step is verification. Take the same batch of sand and compare the mud content using the standard method with the sand tested using the above steps.
2. A method for quickly detecting the mud content of sand according to claim 1, Features: The mud contents of the sands with different mud contents described in the first step are 0.5%, 1.0%, 1.5%, 2.0%, 2.5%, 3.0%, 3.5%, 4.0%, 4.5%, and 5.0%, respectively.
3. A method for quickly detecting the mud content of sand according to claim 1, Features: The certain time interval in the second step is 2 minutes.
4. A method for quickly detecting the mud content of sand according to claim 1, Features: In the fourth step of verification, the absolute value of the difference between the mud content of the sand detected by the standard method and the sand detected by the present invention is defined as a, and a≤0.2% is determined to be in compliance and used for mud content inspection in construction production; 0.2%≤a≤0.5% is determined to be basically in compliance and used for preliminary judgment of finding sand sources, judging the mud and sand content in river water, judging whether the sand has been washed to meet the requirements of the mud content standard, and judging the uniformity of the mud content of the sand; a>0.5% is determined to be non-compliant and shall not be adopted and shall be re-tested.