Method for determining pre-tightening force of central pull rod-end tooth connecting structure

By analyzing the load changes and dynamic characteristics of the central tie rod-end tooth connection structure of the aeroengine, the preload range is determined, which solves the problem of insufficient preload in the existing technology and achieves stable operation and shafting in complex environments. reliability.

CN118734564APending Publication Date: 2024-10-01AECC SICHUAN GAS TURBINE RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410791530.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When determining the pre-tightening force of the central tie rod-end tooth connection structure of the aeroengine, the existing technology fails to accurately consider the influence of transition states and maneuvering loads, resulting in insufficient pre-tightening force, which may lead to end tooth separation and increased vibration, and even the turbine The disk is spinning.

Method used

By analyzing the axial load on the end teeth caused by external and internal forces, combined with analytical methods and finite element models, we determine the maximum relaxation force and maximum pressing force, determine whether there is a mode shape with a strain energy greater than 25%, and adjust the preload force range to ensure Maintain dynamic stability under various working conditions.

Benefits of technology

It achieves the precise determination of the preload force range in the complex environment of aero-engines, ensures the effective compression of the central tie rod-end tooth connection structure and the reliability of the shaft system, and ensures the stability of the engine under conditions of high temperature, high speed, high maneuverability and high torque. run.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118734564A_ABST
    Figure CN118734564A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of aero-engines, and discloses a central pull rod-end tooth connection structure pre-tightening force determination method, which comprises the following steps: S1, analyzing an end tooth axial load caused by external force and internal force to obtain the maximum relaxation force and the maximum pressing force of an end tooth; s2, analyzing the maximum tensile force which can be borne by the pull rod; and S3, based on the maximum relaxation force of the end teeth, the maximum pressing force of the end teeth and the maximum pulling force capable of being borne by the pull rod, the range of the pre-tightening force of the center pull rod-end tooth connecting structure is determined. According to the invention, the problems of inaccurate determined pre-tightening force and the like in the prior art are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of aeroengines, and in particular to a method for determining the preload force of a center tie rod-end tooth connection structure. Background Art

[0002] The center tie rod-arc end tooth connection structure has the advantages of simplicity, compactness, self-centering, strong load-bearing capacity and good assembly. It is widely used in modern small and medium-sized propeller shaft engines. The end tooth mating surface is an arc surface, and the concave teeth and convex teeth are engaged with each other to transmit torque circumferentially and center the end teeth. The concave teeth and convex teeth of the end teeth are pressed tightly with the center tie rod, which can ensure the torque transmission and centering of the aircraft engine under various working conditions.

[0003] The center tie rod-arc end tooth connection structure is more open than the short bolt connection end tooth structure. When the engine is working, in addition to the axial preload applied during the assembly process, the rotor must also withstand centrifugal force, aerodynamic force (including axial force and torque), thermal load and dynamic load, etc. Under the action of centrifugal force, the various parts of the rotor produce radial elongation, and due to the Poisson effect, it will cause axial contraction. Therefore, when the rotor rotates at high speed, the end teeth have a tendency to separate in the axial direction; when subjected to torque, because the end tooth connection surface is an inclined surface, axial separation force must be generated to transmit torque; under the action of thermal load, the axial force between the various components is relatively complex; the rotor bending caused by dynamic load causes the various parts of the rotor to move closer to each other on one side and separate from each other on the other side.

[0004] Obviously, in order to ensure the normal and safe operation of the rotor, it is necessary to apply appropriate axial preload during assembly. How to determine the size of the initial preload is a critical issue. When the preload is relaxed, the rotor's bending resistance at the end teeth is sharply lost. In extremely complex environments such as high temperature, high speed, high maneuverability, and high torque, the rotor may become unstable and vibrate more, or even cause the high-pressure turbine disc to spin rapidly, with disastrous consequences. On the contrary, if the preload is too large, the strength reserve of the tie rod and other parts will be insufficient. The design of the end tooth axial preload is extremely important to ensure engine safety.

[0005] In order to ensure the safe and reliable operation of the center tie rod-end gear connection, the following aspects must be considered when determining its axial preload in general:

[0006] (1) Ensure that the connection surfaces do not loosen when the rotor is working, that is, the preload force is required to be greater than the maximum relaxation force that may occur under various loads when the rotor is working;

[0007] (2) Ensure that all parts of the rotor are not damaged when it is working, that is, the preload and other loads during the operation of the rotor will not cause damage to any part;

[0008] (3) Ensure that the rotor has good dynamic characteristics, that is, it is required to consider the impact of the preload force on the rotor dynamic characteristics.

[0009] At present, when designing the end tooth preload in the industry, only (1) and (2) are considered. Moreover, for convenience, only the load in steady state is considered and then multiplied by an amplification factor. The preload obtained in this way is inaccurate. As the engine state requirements are diversified, the axial clamping force of the end tooth in the transition state is constantly changing, which may cause the preload to be less than the maximum relaxation force. In this case, the end tooth will separate, resulting in increased vibration and even turbine disc flying. Therefore, when designing the end tooth preload, the variable axial force in the transition state should be analyzed. In addition, the influence of the connection preload on the bending stiffness of the rotor should also be analyzed to ensure that the end tooth still maintains dynamic stability in the maximum relaxation state. Therefore, it is very necessary to study a preload determination method that simultaneously considers the transient load analysis and the influence of the end tooth preload on the rotor dynamic characteristics. Summary of the invention

[0010] In order to overcome the deficiencies of the prior art, the present invention provides a method for determining the preload force of a center tie rod-end tooth connection structure, which solves the problem of inaccurate preload force determination in the prior art.

[0011] The technical solution adopted by the present invention to solve the above problems is:

[0012] A method for determining the preload force of a center tie rod-end tooth connection structure comprises the following steps:

[0013] S1, analyze the axial load of the end teeth caused by external and internal forces, and obtain the maximum relaxation force and maximum clamping force of the end teeth;

[0014] S2, analyze the maximum tension that the pull rod can withstand;

[0015] S3, based on the maximum relaxation force of the end teeth, the maximum compression force of the end teeth, and the maximum tension that the tie rod can withstand, determine the range of the preload force of the center tie rod-end tooth connection structure.

[0016] As a preferred technical solution, in step S1, an analytical method is used to analyze the axial load of the end teeth caused by external force.

[0017] As a preferred technical solution, in step S1, the end tooth axial load caused by the external force includes the relaxation force caused by the torque, and the calculation formula is:

[0018]

[0019] Among them, P rT represents the relaxation force caused by torque, M T represents torque, r represents the average radius of the end tooth, tg represents the tangent operation, and α represents the half-angle of the end tooth top.

[0020] As a preferred technical solution, in step S1, the end tooth axial load caused by the external force includes the relaxation force or the compression force caused by the bending moment, and the calculation formula is:

[0021]

[0022] Among them, P rb Indicates the relaxation force or compression force caused by bending moment, M b represents the total bending moment, A represents the rotor cross-sectional area at the contact position, r represents the average radius of the end teeth, and I0 represents the geometric moment of inertia of the drum relative to the neutral axis.

[0023] As a preferred technical solution, M b The calculation formula is:

[0024]

[0025] Among them, M Ib Inertia bending moment, M gb It represents the bending moment caused by gyroscopic torque.

[0026] As a preferred technical solution, the calculation formula of A is:

[0027] A=2πrh

[0028] Where, represents the thickness of the teeth on the upper end of the drum.

[0029] As a preferred technical solution, in step S1, a finite element axisymmetric model is used to analyze the axial load of the end teeth caused by internal forces.

[0030] As a preferred technical solution, in step S1, the end tooth axial load caused by the internal force includes the aerodynamic axial force on the blade, the centrifugal force generated by the rotation of the rotor, and the thermal load caused by the temperature distribution.

[0031] As a preferred technical solution, in step S3, it is determined whether there is a vibration mode of the rotor end tooth position in which the strain energy is greater than N within the working speed range; if so, the critical point of the speed change is found, and the clamping force of the critical point is superimposed on the maximum relaxation force to determine the range of the preload force of the center tie rod-end tooth connection structure: maximum relaxation force + critical preload force < preload force < maximum tension - maximum compression force; if not, the range of the preload force of the center tie rod-end tooth connection structure is determined to be: maximum relaxation force < preload force < maximum tension - maximum compression force; wherein N is the strain energy threshold, 0 < N < 1, and the critical preload force refers to the compression force of the critical point.

[0032] As a preferred technical solution, N=25%.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] (1) The present invention comprehensively considers the influence of the superposition of various transition states and maneuvering load characteristics of the aircraft engine, adopts an analytical method combined with a two-dimensional simulation transition state method to obtain the change of the axial load of the rotor under various working states, and then supplemented by dynamic characteristic analysis, it can accurately obtain the preload range of the center tie rod-end tooth connection structure, and is suitable for different engine development stages;

[0035] (2) The present invention can effectively ensure the effective tightening of the screw center tie rod-end tooth connection structure, thereby ensuring the connection reliability of the shaft system. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a schematic flow chart of a method for determining the preload force of a center tie rod-end tooth connection structure according to the present invention;

[0037] Figure 2 It is a schematic diagram of the relaxation force caused by torque at the end tooth contact surface;

[0038] Figure 3 It is a schematic diagram of the distribution of inertia force bending moment;

[0039] Figure 4 Schematic diagram of the distribution of bending moment caused by gyroscopic torque;

[0040] Figure 5 It is a schematic diagram of the relationship between preload and overall normal stiffness;

[0041] Figure 6 Schematic diagram of the relationship between preload, critical speed and vibration amplitude. DETAILED DESCRIPTION

[0042] The present invention will be further described in detail below in conjunction with embodiments and drawings, but the embodiments of the present invention are not limited thereto.

[0043] Example 1

[0044] like Figures 1 to 6 As shown, in order to solve the problems in the background technology, the present invention provides a method for determining the preload force of a center tie rod-end tooth connection structure, which can accurately determine the appropriate preload force range and effectively ensure the reliability of the center tie rod-end tooth connection structure during engine operation.

[0045] The present invention provides a method for determining the preload of a center tie rod-end tooth connection structure, the method comprising: obtaining a working load according to the working state of the engine, mainly including: centrifugal force, aerodynamic force (including axial force and torque), thermal load and maneuvering load, etc. First, the maximum relaxation force and maximum compression force of the end teeth caused by aerodynamic torque and maneuvering bending moment are considered by an analytical method, and a two-dimensional axisymmetric model is used to consider the maximum relaxation force and maximum compression force of the end teeth caused by aerodynamic axial force, rotation speed and temperature load. Then, according to the structure and material characteristics of the center tie rod-end tooth connection structure, the maximum tension without damaging the weak parts is analyzed, and the influence of all working loads is comprehensively considered. According to the preload design criteria 1 and 2, the range of the preload design can be obtained as follows: maximum relaxation force < preload < maximum tension - maximum compression force.

[0046] By analyzing the rotor dynamics, if the rotor does not have a vibration mode with strain energy greater than 25% at the end tooth position within the operating speed range, the influence of the preload on the dynamic characteristics is not considered, and the preload design can be considered to be in the range of "maximum relaxation force < preload < maximum tension - maximum compression force". If the rotor has a vibration mode with strain energy greater than 25% at the end tooth position within the operating speed range, the influence of the preload on the dynamic characteristics must be considered, and the critical preload at which the critical speed changes sharply is obtained by analysis. According to the preload design criterion 3, the design range of the preload can be obtained as follows: maximum relaxation force + critical preload < preload < maximum tension - maximum compression.

[0047] The specific technical solutions are as follows:

[0048] 1. First, identify the load borne by the center tie rod-arc end tooth connection structure. In addition to the axial preload applied during assembly, the rotor also has to withstand centrifugal force, aerodynamic force (including axial force and torque), thermal load and maneuvering load, etc. The load borne by the end tooth position during operation causes changes in the axial load, which can be divided into axial loads caused by external forces and axial loads caused by internal forces.

[0049] a) Analysis of axial load caused by external force

[0050] The external forces here include the torque generated by aerodynamics and the bending moment caused by maneuvering loads. These loads are independent of axial deformation and can be analyzed using conventional methods.

[0051] (1) Relaxation force caused by torque

[0052] The torque is formed by the aerodynamic force acting on the rotor blades and can be determined by the thermal and aerodynamic calculations of the engine. In the end-toothed rotor, due to the mutual contact between the teeth of the adjacent end teeth, the transmitted torque will cause an axial force, which tends to separate the adjacent teeth axially at the contact surface (see Figure 2 ), which can be called the "relaxation force" caused by the torque.

[0053] The calculation formula for the axial relaxation force caused by torque is as follows:

[0054]

[0055] Where: r is the average radius of the end teeth;

[0056] α is the half angle of the end tooth top.

[0057] (2) Relaxation or compression force caused by bending moment

[0058] Inertia bending moment M Ib and the bending moment M caused by the gyroscopic torque gb mutually orthogonal, the rotor bending moment distribution is shown in Figure 3 , Figure 4 .

[0059] The total bending moment is calculated as follows:

[0060]

[0061] The calculation formula for the axial relaxation force or compression force (relaxation force and compression force are equal in magnitude and opposite in direction) caused by bending moment is as follows:

[0062]

[0063] Where: r is the average radius of the end teeth;

[0064] A is the cross-sectional area of ​​the rotor at the contact point, A = 2πrh, h is the thickness of the upper end teeth of the drum;

[0065] I0 is the geometric inertia moment of the drum relative to the neutral axis. For thin drums, I0≈πr 3 h.

[0066] According to the above formula, the axial force caused by the maximum torque and maximum bending moment under maneuvering load of a certain type of engine in each working state is calculated.

[0067] b) Analysis of axial load caused by internal force

[0068] The internal forces here include the aerodynamic axial force on the blades, the centrifugal force generated by the rotation of the rotor, and the thermal load caused by the temperature distribution. These are all loads caused by axial deformation and need to be analyzed using the calculation method of the finite element axisymmetric model. The most stringent load spectrum is selected, and the corresponding speed, temperature field and aerodynamic axial force loading on the load spectrum are analyzed to obtain the changes in the axial load of the lower end tooth connection section at each state point.

[0069] By combining the changes in axial load caused by external and internal forces, the maximum relaxation force and maximum clamping force of the end teeth under each state can be obtained.

[0070] 2. Secondly, the effect of the end tooth preload on the dynamic characteristics of the rotor is studied. If there is no vibration mode with large vibration strain energy at the end tooth position within the operating speed range of the engine, the sensitivity of the axial preload at the end tooth to the dynamic characteristics is low, and this work can be omitted. If there is a vibration mode with large vibration strain energy at the end tooth position within the operating speed range of the engine, the effect of the end tooth preload on the dynamic characteristics of the rotor must be considered. Jin Miao et al. established a dynamic model of the center tie rod-rotor-blade coupling system based on Timoshenko theory and Galerkin method, and based on this analytical model, studied the influence of different preloads on the critical speed and unbalanced response of the coupled rotor system. The trends are as follows: Figure 5 , Figure 6 ( Figure 6 In the figure, the curve corresponding to the whole rotor almost coincides with the curve corresponding to 60kN, so it is not Figure 6 The curve corresponding to 60kN is drawn in the figure). Studies have shown that when the preload is in a relaxed state, it will cause a loss of effective bending stiffness in the rotor system, which will lead to a significant reduction in the values ​​of each critical speed and reduce the robustness of the rotor. When designing the end tooth preload, consider increasing the preload margin at the critical point to ensure that the dynamic stability of the rotor can still be guaranteed under the rotor limit relaxation force state.

[0071] Example 2

[0072] like Figures 1 to 6 As shown, as a further optimization of Example 1, based on Example 1, this embodiment also includes the following technical features:

[0073] Taking the preload design of a central tie rod-end gear connection structure of an engine as an example, it mainly includes the following steps:

[0074] 1) Obtain the calculation results of aerodynamic load and maneuvering load to determine the working load of the center tie rod-end gear connection structure.

[0075] a) Based on the aerodynamic load results under typical working conditions, the maximum torque of the center tie rod-end gear connection structure is extracted. According to formula (1), the maximum axial relaxation force caused by torque can be obtained.

[0076] b) According to the results of the engine unit maneuvering load analysis and the engine overload requirements, the maximum bending moment of the end tooth connection section is determined. The maximum relaxation force and compression force caused by the bending moment can be obtained according to formula (3).

[0077] c) Select the most demanding load spectrum for the engine, and use the calculation method of the finite element axisymmetric model to analyze each state point of the load spectrum. According to the corresponding speed, temperature field and aerodynamic axial force loading on the load spectrum, the analysis can obtain the change of the axial load of the lower end tooth connection section at each state point. The maximum relaxation force and maximum compression force under the incoordination of centrifugal force and temperature during operation can be obtained.

[0078] d) Combining (a), (b) and (c) can obtain the maximum relaxation force and maximum compression force at the end teeth under various engine conditions.

[0079] e) Analyze the maximum tension that the tie rod can withstand (considering sufficient margin) and the maximum extrusion force that the end teeth can withstand (considering sufficient margin), and ensure that the strength of the tie rod and the end teeth can meet the design requirements after the preload force is superimposed on the maximum compression force. The maximum tension that ensures that the parts are not damaged minus the maximum compression force during the working process is used as the maximum preload force of the end teeth.

[0080] f) Analyze the rotor dynamics results. If the rotor does not have a vibration mode with strain energy greater than 25% at the end tooth position within the operating speed range, it can be considered that the preload force at the end tooth connection is determined according to steps (a) to (e), and the maximum relaxation force under the working state is used as the minimum preload force at the end tooth. If the rotor has a vibration mode with strain energy greater than 25% at the end tooth position within the operating speed range, the influence of the preload force on the bending stiffness of the end tooth connection structure must be considered, and the critical point of the critical speed change must be found. The compression force at the critical point is superimposed on the maximum relaxation force as the minimum preload force at the end tooth.

[0081] The present invention has the following advantages:

[0082] (1) The present invention comprehensively considers the influence of the superposition of various transition states and maneuvering load characteristics of the aircraft engine, adopts an analytical method combined with a two-dimensional simulation transition state method to obtain the change of the axial load of the rotor under various working states, and then supplemented by dynamic characteristic analysis, it can accurately obtain the preload range of the center tie rod-end tooth connection structure, and is suitable for different engine development stages;

[0083] (2) The present invention has been verified through a certain engine endurance test, acceptance test and field test flight, and has been shown to effectively ensure the effective tightening of the screw center tie rod-end tooth connection structure and ensure the connection reliability of the shaft system.

[0084] As described above, the present invention can be preferably implemented.

[0085] All features disclosed in all embodiments in this specification, or steps in all methods or processes implicitly disclosed, except for mutually exclusive features and / or steps, can be combined and / or expanded or replaced in any manner.

[0086] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. According to the technical essence of the present invention, within the spirit and principles of the present invention, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the present invention.

Claims

1. A method for determining the preload force of a center tie rod-end tooth connection structure, characterized in that: The following steps are involved: S1, analyze the axial load of the end teeth caused by external and internal forces, and obtain the maximum relaxation force and maximum clamping force of the end teeth; S2, analyze the maximum tension that the pull rod can withstand; S3, based on the maximum relaxation force of the end teeth, the maximum compression force of the end teeth, and the maximum tension that the tie rod can withstand, determine the range of the preload force of the center tie rod-end tooth connection structure.

2. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 1, characterized in that: In step S1, the axial load of the end teeth caused by the external force is analyzed by an analytical method.

3. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 2, characterized in that: In step S1, the end tooth axial load caused by external force includes the relaxation force caused by torque, and the calculation formula is: Among them, P rT represents the relaxation force caused by torque, M T represents torque, r represents the average radius of the end tooth, tg represents the tangent operation, and α represents the half-angle of the end tooth top.

4. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 2, characterized in that: In step S1, the end tooth axial load caused by external force includes the relaxation force or the compression force caused by the bending moment, and the calculation formula is: Among them, P rb Indicates the relaxation force or compression force caused by bending moment, M b represents the total bending moment, A represents the rotor cross-sectional area at the contact position, r represents the average radius of the end teeth, and I0 represents the geometric moment of inertia of the drum relative to the neutral axis.

5. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 4, characterized in that: M b The calculation formula is: Among them, M Ib Inertia bending moment, M gb It represents the bending moment caused by gyroscopic torque.

6. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 4, characterized in that: The calculation formula of A is: A=2πrh Where, represents the thickness of the teeth on the upper end of the drum.

7. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 1, characterized in that: In step S1, the axial load of the end teeth caused by the internal force is analyzed using a finite element axisymmetric model.

8. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 7, characterized in that: In step S1 , the end tooth axial load caused by the internal force includes the aerodynamic axial force on the blade, the centrifugal force generated by the rotation of the rotor, and the thermal load caused by the temperature distribution.

9. A method for determining the preload force of a center tie rod-end tooth connection structure according to any one of claims 1 to 8, characterized in that: In step S3, determine whether there is a vibration mode of the rotor end tooth position with strain energy greater than N within the working speed range; if so, find the critical point of the speed change, superimpose the clamping force of the critical point on the basis of the maximum relaxation force, and determine that the range of the preload force of the center tie rod-end tooth connection structure is: maximum relaxation force + critical preload force < preload force < maximum tension - maximum compression force; if not, determine that the range of the preload force of the center tie rod-end tooth connection structure is: maximum relaxation force < preload force < maximum tension - maximum compression force; wherein N is the strain energy threshold, 0 < N < 1, and the critical preload force refers to the compression force of the critical point.

10. A method for determining the preload force of a center tie rod-end tooth connection structure according to claim 9, characterized in that: N=25%。