Irrigation load double-layer optimization scheduling method and device
Through the CNN-LSTM neural network and the two-layer interactive coordination optimization dispatch model, the problems of rural irrigation load prediction and grid power shortage are solved, achieving more accurate load forecasting and grid coordination, satisfying user satisfaction and grid stability.
Patent Information
- Application Number
- CN202410902009.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technology is difficult to accurately capture different power consumption patterns within user clusters in rural irrigation load prediction and optimal dispatch, leading to the risk of insufficient power supply from the grid. Moreover, the traditional model ignores the non-linear adjustment of irrigation pump power, reducing prediction accuracy and practicality. sex.
A multi-feature time series model based on CNN-LSTM neural network is used to predict irrigation load, combined with meteorological data for preprocessing and feature analysis, to extract user behavior characteristics, and coordinate and optimize the dispatch model through two-layer interaction between the power grid side and the agricultural irrigation user side. Use gurobi solver and improved particle swarm algorithm to perform iterative optimization to optimize irrigation load scheduling.
It improves the accuracy of irrigation load prediction, ensures orderly irrigation for agricultural irrigation users and meets user satisfaction. It also relieves the pressure on power supply on the power grid, improves the utilization rate of power grid assets and the safety and stability of the power system.
Smart Images

Figure CN118735010A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of agricultural irrigation, and in particular relates to a double-layer optimization scheduling method and device for irrigation load. Background Art
[0002] Traditional agricultural irrigation is generally powered by rural low-voltage distribution networks. However, rural power grid equipment and technology are relatively backward, there are fewer power supply support points, and the reliability of power supply is low. During each agricultural irrigation cycle, the concentrated power consumption of agricultural water pumps and other facilities will bring the risk of insufficient power supply capacity and over-limit capacity of distribution station area transformers to the distribution network. In addition to bringing operational safety risks to the distribution network, the disorder of agricultural irrigation power consumption will also increase the cost of water and electricity for farmers. In this context, the interactive coordination optimization method of distribution network-agricultural irrigation park based on CNN-LSTM neural network prediction is studied. The CNN-LSTM neural network is used to better analyze historical load data and extract related feature data, so that the load data prediction required for day-ahead scheduling is more accurate, and the interactive coordination between the distribution network and agricultural irrigation users is carried out to ensure orderly irrigation for agricultural irrigation users and relieve the power supply pressure of the distribution network.
[0003] Load forecasting for rural irrigation user clusters can promote demand-side management, assist power grid companies in achieving peak load shaving and valley filling, and improve the utilization rate of power grid assets. In the user forecasting scenario, common artificial intelligence forecasting methods can be roughly divided into bottom-up forecasting and top-down forecasting. The bottom-up forecasting method refers to first aggregating each single load in the user cluster, and then modeling and forecasting the overall load. The top-down forecasting method refers to first grouping user clusters, then predicting the load of each group of users separately, and finally fusing the load forecast results of each group of users. Existing studies usually use different clustering strategies to group user clusters, and then build corresponding forecasting models. In comparison, the top-down user group load forecasting method aggregates users with similar electricity consumption behaviors through clustering strategies and models and predicts them separately, which can make the aggregated load curve more stable, thereby optimizing the forecasting effect, and at the same time avoid the problems of low accuracy and low efficiency caused by modeling and forecasting for each single user.
[0004] In 2020, Ji Li and others studied the electricity consumption characteristics of agricultural electric irrigation and drainage, as well as the adverse effects of traditional centralized electric irrigation and drainage on the distribution network, transformed the optimization problem of agricultural pumping stations into a linear optimization problem, and proposed a time-of-use electricity price optimization model with the economic security of the grid side as the goal; in 2021, Wang Yuchen and others analyzed that the electricity load of agricultural irrigation pumps has adjustable characteristics in the time dimension, and proposed a control model for agricultural irrigation load agent aggregators to participate in the operation and reserve of the power system. They also modeled and analyzed the energy boundary of agricultural irrigation load as a reserve resource for the operation of the power system, and derived and verified the feasibility of this reserve resource. and economy; in 2023, Yang Sen et al. proposed a robust optimization scheduling model that combines an isolated agricultural microgrid with a pumped-storage power station and an irrigation system, taking advantage of the abundant water resources and wind and solar resources in rural areas, while minimizing the total cost of the power system and improving the grid's absorption of renewable energy; Wang Wenqin et al. proposed a distribution network-agricultural irrigation park optimization model based on master-slave game, and for the first time proposed an agricultural irrigation user satisfaction index. Through the time-of-use electricity price information released by the upper distribution network, the lower-level agricultural irrigation users are guided to ensure their own satisfaction while making irrigation water decisions, providing new ideas for the optimal scheduling of the distribution network.
[0005] A large number of experiments and studies have been conducted on the optimal dispatching of distribution networks under the background of concentrated and disorderly access of agricultural irrigation loads, which provides a certain basis for the safe and stable operation strategy of the power system. However, in the scenario of user cluster load forecasting, since each single user has different electricity consumption habits, there are often multiple different electricity consumption patterns within the user group. Therefore, it is difficult to accurately mine and model different load laws for the overall forecasting method of the user cluster, which limits the improvement of its forecasting accuracy. At present, the distribution network optimization dispatching model studied by most researchers has failed to take into account the characteristics of small and scattered single loads of agricultural irrigation users, such as the inability to sign a contract with them in the form of day-ahead invitation-type demand response. Only by guiding the electricity consumption behavior of users through time-of-use electricity prices, there is still a risk of insufficient power supply in the power grid during peak electricity consumption. In addition, the decision variables set in the optimization dispatching models proposed by most researchers are the power of irrigation pumps at various time sections, ignoring the characteristics that the power of most irrigation pumps on the market cannot be linearly adjusted, and the practicality is relatively low. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a two-layer optimization scheduling method and device for irrigation load based on CNN-LSTM neural network prediction.
[0007] To achieve the above object, the present invention adopts the following technical solution:
[0008] A two-layer optimization scheduling method for irrigation load, comprising:
[0009] Step S1, obtaining historical agricultural irrigation load data and meteorological data;
[0010] Step S2: According to the historical agricultural irrigation load data and its meteorological data, the predicted irrigation load of future users is obtained through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model;
[0011] Step S3: perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
[0012] Preferably, step S2 comprises:
[0013] Preprocess the historical agricultural irrigation load data and its meteorological data, where the preprocessing includes: data supplementation, normalization processing and data correlation analysis;
[0014] The preprocessed historical agricultural irrigation load data and its meteorological data are input into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
[0015] Preferably, the historical agricultural irrigation load data and its meteorological data are the irrigation load and the temperature, humidity, precipitation, ground wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period.
[0016] Preferably, step S3 comprises:
[0017] Conduct user behavior analysis on the predicted future user irrigation load; extract user behavior characteristics as the initial time-sharing switch plan for agricultural irrigation users;
[0018] Taking the time-of-use electricity price on the grid side and the time-of-use initial switching plan on the agricultural irrigation user side as decision variables, a two-layer interactive coordinated optimization scheduling model of the grid and agricultural irrigation users is obtained.
[0019] The gurobi solver combined with the improved particle swarm algorithm is used to iteratively optimize the grid-agricultural irrigation user two-layer interactive coordinated optimization scheduling model.
[0020] The present invention also provides a double-layer optimization scheduling device for irrigation load, comprising:
[0021] An acquisition module is used to obtain historical agricultural irrigation load data and its meteorological data;
[0022] The prediction module is used to obtain the predicted irrigation load of future users based on the historical agricultural irrigation load data and its meteorological data through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model;
[0023] The scheduling module is used to perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
[0024] Preferably, the prediction module comprises:
[0025] A preprocessing unit is used to preprocess the historical agricultural irrigation load data and its meteorological data, wherein the preprocessing includes: data supplementation, normalization processing and data correlation analysis;
[0026] The prediction unit is used to input the preprocessed historical agricultural irrigation load data and its meteorological data into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
[0027] Preferably, the historical agricultural irrigation load data and its meteorological data are the irrigation load and the temperature, humidity, precipitation, ground wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period.
[0028] Preferably, the scheduling module includes:
[0029] An extraction unit is used to perform user behavior analysis on the predicted future user's irrigation load and extract user behavior characteristics as an initial time-sharing switch plan at the agricultural irrigation user side;
[0030] A processing unit is used to obtain a two-layer interactive coordination optimization scheduling model of power grid and agricultural irrigation users by taking the time-of-use electricity price on the power grid side and the time-of-use initial switching plan on the agricultural irrigation user side as decision variables;
[0031] The computing unit is used to iteratively search and solve the two-layer interactive coordinated optimization scheduling model of power grid and agricultural irrigation users by using the gurobi solver combined with the improved particle swarm algorithm.
[0032] The present invention uses the CNN-LSTM neural network to better analyze historical load data and extract related feature data, so as to make the load data prediction required for day-ahead scheduling more accurate; and based on the above-mentioned prediction data, the distribution network and agricultural irrigation users are interactively coordinated to ensure orderly irrigation of agricultural irrigation users, thereby alleviating the power supply pressure of the distribution network while meeting the optimal satisfaction of agricultural irrigation users. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0034] Figure 1It is a flow chart of the double-layer optimization scheduling method of irrigation load according to an embodiment of the present invention;
[0035] Figure 2 It is a CNN-LSTM network model;
[0036] Figure 3 This is the basic topology diagram of the low-voltage power supply area. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0039] Embodiment 1:
[0040] like Figure 1 As shown, an embodiment of the present invention provides a two-layer optimization scheduling method for irrigation load, comprising:
[0041] Step S1, obtaining historical agricultural irrigation load data and meteorological data; wherein the historical agricultural irrigation load data and meteorological data are irrigation load and temperature, humidity, precipitation, ground wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period;
[0042] Step S2: According to the historical agricultural irrigation load data and its meteorological data, the predicted irrigation load of future users is obtained through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model;
[0043] Step S3: perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
[0044] As an implementation of the embodiment of the present invention, step S2 includes:
[0045] Preprocess the historical agricultural irrigation load data and its meteorological data, where the preprocessing includes: data supplementation, normalization processing and data correlation analysis;
[0046] The preprocessed historical agricultural irrigation load data and its meteorological data are input into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
[0047] Furthermore, the meteorological data collected in hours are supplemented by linear interpolation and processed into 96-point data with the same length as the power load sampling, and the missing load data are supplemented by interpolation. After that, normalization is performed to eliminate the dimensional difference between the data and avoid gradient problems in the training model. The normalization formula is as follows: * = x-x min , where x is the sequence data before normalization; x* is the sequence data after normalization;
[0048] x max -x min x min is the minimum value of the sequence; x max is the maximum value of the sequence.
[0049] Furthermore, the grey correlation degree is used to perform data correlation analysis. Grey correlation degree is an important method based on grey system theory. Its essence is to express the sequence correlation degree by analyzing the similarity of the shape of discrete sequence data curves, so as to perform correlation analysis and prediction on sequence data. Assume that the historical load sequence is X0 = [x0(1), x0(2), …, x0(t)], and the sequence of the i-th load influencing factor is X i =[x i (1),x i (2),…,x i (t)]. Then the grey relational degree calculation process is as follows:
[0050] 1) De-dimensionalization
[0051]
[0052] in, is the jth data after dimensionalization of the i-th feature sequence, x i (j) is the jth data before dimensionalization.
[0053] 2) Calculate the grey correlation coefficient
[0054] The grey correlation coefficient refers to the correlation coefficient between various influencing factors and the load sequence at each moment. The specific calculation is as follows:
[0055]
[0056] in, for and Grey correlation coefficient; a, b are the minimum difference and maximum difference between the load data and various influencing factors; ρ is the coefficient, which is generally taken as 0.5.
[0057] 3) Calculate the grey correlation degree
[0058]
[0059] Among them, γ(x0,x i ) is the grey correlation degree between the load sequence and the i-th type load influencing factor sequence.
[0060] Furthermore, the multi-feature time series CNN-LSTM model structure is as follows Figure 2 As shown in the figure, it consists of a signal input layer, a CNN convolution layer, a pooling layer, a LSTM layer, and a classification output layer. The prediction process based on CNN-LSTM is as follows:
[0061] (1) The preprocessed historical agricultural irrigation load data and its meteorological data are standardized and input into the CNN convolution layer, and the convolution kernel is used to adaptively extract features;
[0062] (2) The extracted features are pooled through the maximum pooling layer to reduce the data dimension and retain the main feature information;
[0063] (3) The reduced feature data is then used as the feature input of the LSTM layer to train the neural network and automatically learn the sequence features;
[0064] (4) The Dropout regularization layer randomly ignores some neurons during learning to improve the robustness and computing speed of the network;
[0065] (5) Use the Adam algorithm to back-propagate the training error and gradually update the model parameters layer by layer;
[0066] (6) Using the Softmax activation function, the signal features are classified to obtain the predicted irrigation load of future users.
[0067] As an implementation of the embodiment of the present invention, step S3 includes:
[0068] Step S31, performing user behavior analysis on the predicted future user's irrigation load; extracting user behavior characteristics as the initial time-sharing switch plan at the agricultural irrigation user side;
[0069] Step S32: Taking the time-of-use electricity price on the grid side and the time-of-use initial switch plan on the agricultural irrigation user side as decision variables, a two-layer interactive coordination optimization scheduling model of the grid and the agricultural irrigation user is obtained;
[0070] Step S33: The two-layer interactive coordinated optimization scheduling model of power grid and agricultural irrigation users is solved iteratively by using the gurobi solver combined with the improved particle swarm algorithm.
[0071] Furthermore, in step S31, by analyzing and predicting the user behavior under the dedicated transformer for irrigation load, the rules of user irrigation of farmland can be summarized. Users usually concentrate on irrigation in the morning and afternoon for two or three times, and the start and stop state of the water pump can be predicted by predicting the power demand. The user's irrigation behavior is negatively correlated with the precipitation. In rainy seasons, crops can meet the water demand requirements by relying on precipitation, and no additional irrigation is required. The irrigation load is greatly reduced, resulting in load shortages, which is easy to affect the distribution network and cause imbalance in the power of the power grid. At the same time, the irrigation behavior of irrigation load users also has spatial distribution characteristics. Users close to the river do not frequently start and stop the water pump during irrigation, and only generate irrigation loads briefly during the growth period when crops require a lot of water. According to the above user characteristics, the user's irrigation behavior is modeled to achieve accurate scheduling.
[0072] Further, in step S32, the grid-agricultural irrigation user two-layer interactive coordination optimization scheduling model is an irrigation load operation scheduling model based on a demand response mechanism, and the irrigation load operation scheduling model includes: a grid side model and an irrigation load aggregator model.
[0073] The distribution network has natural stratification and radial characteristics. The power wiring mode of the irrigation area usually takes 66kV high-voltage main network as the incoming line, and lays a large-scale 10kV voltage distribution network after 66 / 10kV transformation, and then covers the 380V rural low-voltage power supply area by 10 / 0.4kV transformation. The low-voltage power supply area is connected to the irrigation well load in the area in a radial manner. The irrigation well of each farmland corresponds to a pump running at rated power. These pump switch groups are contracted and controlled by the agricultural irrigation load agent aggregator. The contracted farmers need to respond to irrigation according to the day-ahead switch operation plan provided by the agricultural irrigation load agent aggregator. Among them, the irrigation well load that has not signed a contract with the agricultural irrigation load agent aggregator is defined as an uncontrollable load, that is, the uncontrollable well load mentioned.
[0074] The irrigation load operation and scheduling model is divided into two layers, namely the upper power grid side and the lower agricultural irrigation load aggregator side. The two stakeholders interact and coordinate through the irrigation load operation and scheduling model to maximize their goals. The upper distribution network provides electricity to agricultural irrigation users and charges relevant fees. According to the time-of-use electricity consumption information transmitted by the lower agricultural irrigation users, it decides the time-of-use electricity price information it publishes to agricultural irrigation users, thereby improving its own safety and economic benefits. Based on the time-of-use electricity price information transmitted by the upper power grid side and their own electricity consumption willingness, the lower agricultural irrigation users decide their own time-of-use electricity consumption information and transmit it to the upper layer on the premise of meeting their own satisfaction and other related indicators, thereby improving their own satisfaction and economic goals. The basic topology diagram of the agricultural irrigation low-voltage power supply area mentioned in the irrigation load operation and scheduling model is shown in the figure below. Figure 3 shown.
[0075] The grid side model is as follows:
[0076] (1) Safety objectives
[0077] The disorderly centralized access of irrigation wells leads to sharp fluctuations in the load of the distribution network, resulting in a large peak-to-valley difference, which brings great losses and risks to the power grid. In order to reduce the abnormal fluctuations in the load of the power grid caused by the disorderly centralized access of the load, the goal of the power grid planning is to minimize the daily mean square error of the substation area interconnection line, which can be expressed as:
[0078]
[0079] Among them, P t trans is the transformer interconnection line power during period t, P t trans,av is the average power of the transformer tie line.
[0080] (2) Economic goals
[0081] Including the upper power sales cost and network loss cost, the comprehensive operating cost of the distribution area is minimized. The objective function 2 is:
[0082] minF2=-C sell +C loss
[0083]
[0084] in, ω load ,ω loss is the electricity price for irrigation load, electricity price for common load and unit network loss cost in period t, is the active power of the common load in period t. The decision variable is the decision electricity price of the irrigation load in period t.
[0085] (3) Constraints
[0086] 1) Power flow constraints
[0087] For the radial AC distribution network area, assuming that the three-phase AC distribution system is balanced, the DistFlow branch power flow model after the second-order cone relaxation is:
[0088]
[0089] v i,t =v j,t +2(r ij P ij,t +x ij Q ij,t )-[(r ij ) 2 +(x ij )2 ]l ij,t
[0090]
[0091] Among them, x ij is the three-phase reactance of branch ij; v i,t is the square of the three-phase voltage amplitude at node i; P ij,t , Q ij,t is the active and reactive power flowing from node i to node j; all distribution network branches satisfy P j,t , Q j,t is the active and reactive power of the load at node j; u(j) is the set of branch head nodes with j as the terminal node; v(j) is the set of branch terminal nodes with j as the head node. The subscript t in the formula represents the time. are the irrigation load power and common load power of node j in period t respectively;
[0092] 2) Security constraints
[0093]
[0094] Among them, S ij , They are the upper limit of the line capacity of branch ij and the upper limit of the voltage square of node j respectively.
[0095] 3) Time-of-use electricity price constraints for irrigation loads
[0096]
[0097] in, They are the lower and upper limits of the time-of-use electricity price for irrigation load respectively.
[0098] 4) Irrigation load constraints, water pump switch constraints
[0099]
[0100] in, is the rated active power of the water pump corresponding to node j, w ij,t is the switch state of branch ij in period t, and is a decision variable. If it is 1, it means that the switch of branch ij is closed; and are binary variables representing the operating state changes of the switch branch ij in period t, 1 means it changes from open state to closed state. A value of 1 indicates a change from a closed state to an open state.
[0101] Irrigation Load Aggregator Model
[0102] (1) Satisfaction index
[0103] The aggregator-agricultural irrigation user satisfaction index mainly includes two parts, namely the user's electricity cost and the continuity of irrigation work. Because the aggregator and the agricultural irrigation user belong to the same economic interest group, the cost saved by the user's demand response is shared by the two, so this indicator represents the common satisfaction of the two. In addition, the irrigation work continuity index superficially represents the satisfaction of the farmer side, but from a side point of view, it reduces the probability of agricultural irrigation users defaulting and not responding. It is expressed as follows:
[0104] minF3=λ1C irr -λ2S irr
[0105] Among them, C irr is the user's electricity cost, S irr is the irrigation continuity of the user, which is expressed as the number of changes in the water pump switch during the scheduling period. λ1 and λ2 are the normalized coefficients of the two indicators. The decision variable is the switch state of the irrigation load in period t. It is expressed as follows:
[0106]
[0107] (2) Constraints
[0108] 1) Irrigation power constraints
[0109] The total amount of irrigation electricity consumed by the responding irrigation users during the day remains unchanged, as shown below:
[0110]
[0111] 2) User electricity cost constraints
[0112] After the dispatch cycle ends, the user's electricity cost should not be higher than the electricity cost without dispatch, as shown below:
[0113]
[0114] in, The conventional electricity price for irrigation load is Day-ahead power forecast for irrigation loads.
[0115] Further, step S33 specifically includes:
[0116] Step S331: Set the maximum number of iterations ger and the maximum allowable convergence error σ, and randomly initialize the kth electricity price particle position X k,h , speed V k,h , iteration number h=1, start iteration.
[0117] Step S332: Based on the objective function and constraints of the lower model, the gurobi solver is called to solve the optimization program on the agricultural irrigation user side. The agricultural irrigation user makes an optimal time-sharing switch plan decision based on the initial electricity price particles and transmits the decision result to the distribution network.
[0118] Step S333: Based on the upper-level grid-side objective function and constraints, the gurobi solver is called to solve the grid-side power flow network loss and other programs, and the grid-side objective function value is calculated and saved.
[0119] Step S334: Update the particle speed and position based on the following formula, update the time-sharing electricity price parameters, and pass them to the agricultural irrigation user side, and calculate the local optimal value of each time-sharing electricity price particle and the optimal particle swarm
[0120]
[0121] Among them, r 1 、r 2 is a random number between 0 and 1; c 1 、c 2 is the learning factor; ω max ,ω min are the maximum and minimum values of inertia weight.
[0122] Step S335: Determine whether the number of iterations is greater than the maximum number of iterations, and whether the difference between the last two coordinated optimization results is less than the iteration accuracy. If the limit is not reached, set h = h + 1 and repeat the iteration process from step 6 to step 9 until the conditions are met, and output the optimal time-of-use electricity price and time-of-use switch scheme parameters.
[0123] Embodiment 2:
[0124] The embodiment of the present invention further provides a dual-layer optimization scheduling device for irrigation load, comprising:
[0125] An acquisition module is used to obtain historical agricultural irrigation load data and its meteorological data;
[0126] The prediction module is used to obtain the predicted irrigation load of future users based on the historical agricultural irrigation load data and its meteorological data through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model;
[0127] The scheduling module is used to perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
[0128] As an implementation of an embodiment of the present invention, the prediction module includes:
[0129] A preprocessing unit is used to preprocess the historical agricultural irrigation load data and its meteorological data, wherein the preprocessing includes: data supplementation, normalization processing and data correlation analysis;
[0130] The prediction unit is used to input the preprocessed historical agricultural irrigation load data and its meteorological data into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
[0131] As an implementation method of an embodiment of the present invention, the historical agricultural irrigation load data and its meteorological data are irrigation load and temperature, humidity, precipitation, ground wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period.
[0132] As an implementation method of the embodiment of the present invention, the scheduling module includes:
[0133] An extraction unit is used to perform user behavior analysis on the predicted future user's irrigation load and extract user behavior characteristics as an initial time-sharing switch plan at the agricultural irrigation user side;
[0134] A processing unit is used to obtain a two-layer interactive coordination optimization scheduling model of power grid and agricultural irrigation users by taking the time-of-use electricity price on the power grid side and the time-of-use initial switching plan on the agricultural irrigation user side as decision variables;
[0135] The computing unit is used to iteratively search and solve the two-layer interactive coordinated optimization scheduling model of power grid and agricultural irrigation users by using the gurobi solver combined with the improved particle swarm algorithm.
[0136] The embodiments described above are only descriptions of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A two-layer optimization scheduling method for irrigation load, characterized in that: include: Step S1, obtaining historical agricultural irrigation load data and meteorological data; Step S2: According to the historical agricultural irrigation load data and its meteorological data, the predicted irrigation load of future users is obtained through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model; Step S3: perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
2. The double-layer optimization scheduling method for irrigation load according to claim 1, characterized in that: Step S2 includes: Preprocess the historical agricultural irrigation load data and its meteorological data, where the preprocessing includes: data supplementation, normalization processing and data correlation analysis; The preprocessed historical agricultural irrigation load data and its meteorological data are input into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
3. The double-layer optimization scheduling method for irrigation load according to claim 2, characterized in that: The historical agricultural irrigation load data and its meteorological data are irrigation load and temperature, humidity, precipitation, surface wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period.
4. The double-layer optimization scheduling method for irrigation load according to claim 3, characterized in that: Step S3 includes: Conduct user behavior analysis on the predicted future user irrigation load; extract user behavior characteristics as the initial time-sharing switch plan for agricultural irrigation users; Taking the time-of-use electricity price on the grid side and the time-of-use initial switching plan on the agricultural irrigation user side as decision variables, a two-layer interactive coordinated optimization scheduling model of the grid and agricultural irrigation users is obtained. The gurobi solver combined with the improved particle swarm algorithm is used to iteratively optimize the grid-agricultural irrigation user two-layer interactive coordinated optimization scheduling model.
5. A double-layer optimization scheduling device for irrigation load, characterized in that: include: An acquisition module is used to obtain historical agricultural irrigation load data and its meteorological data; The prediction module is used to obtain the predicted irrigation load of future users based on the historical agricultural irrigation load data and its meteorological data through a multi-feature prediction irrigation load model; wherein the multi-feature prediction irrigation load model is a multi-feature time series CNN-LSTM model; The scheduling module is used to perform double-layer optimization scheduling of irrigation load according to the predicted future user's irrigation load.
6. The double-layer optimization scheduling device for irrigation load according to claim 5, characterized in that: The prediction module includes: A preprocessing unit is used to preprocess the historical agricultural irrigation load data and its meteorological data, wherein the preprocessing includes: data supplementation, normalization processing and data correlation analysis; The prediction unit is used to input the preprocessed historical agricultural irrigation load data and its meteorological data into the CNN-LSTM neural network to obtain the predicted irrigation load of future users.
7. The double-layer optimization scheduling device for irrigation load according to claim 6, characterized in that: The historical agricultural irrigation load data and its meteorological data are irrigation load and temperature, humidity, precipitation, surface wind speed, surface radiation, soil moisture content, surface temperature, evaporation, runoff and soil temperature during the same period.
8. The double-layer optimization scheduling device for irrigation load according to claim 7, characterized in that: The scheduling module includes: An extraction unit is used to perform user behavior analysis on the predicted future user's irrigation load and extract user behavior characteristics as an initial time-sharing switch plan at the agricultural irrigation user side; A processing unit is used to obtain a two-layer interactive coordination optimization scheduling model of power grid and agricultural irrigation users by taking the time-of-use electricity price on the power grid side and the time-of-use initial switching plan on the agricultural irrigation user side as decision variables; The computing unit is used to iteratively search and solve the two-layer interactive coordinated optimization scheduling model of power grid and agricultural irrigation users by using the gurobi solver combined with the improved particle swarm algorithm.
Citation Information
Patent Citations
Electric heating load double-layer optimization scheduling method under multiple time scales
CN112488372A
Power distribution network-agricultural irrigation park electricity-water interaction coordination method considering photovoltaic access
CN115587486A
Electric vehicle charging station multi-time scale load prediction method based on improved LSTM network and error correction
CN117474039A
Cited By
Power load prediction system and method based on power data
CN119228079A
Distributed power supply coordinated regulation and control method considering load characteristics of rural power distribution area
CN120222488A
Flexible load multi-target collaborative scheduling system and method
CN120851410A