A resource collaborative optimization decision-making method and system
By dividing regions, assigning parameters and filtering the optimal combination in resource allocation, and establishing an information database in combination with cloud services, the problem of bias in resource allocation algorithms in the existing technology is solved, and the balanced and efficient utilization of resource allocation is achieved.
Patent Information
- Application Number
- CN202411231276.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-04
AI Technical Summary
The existing resource provisioning algorithms mainly rely on weights, neural networks, decision trees and other methods. They are affected by artificial tendencies and small sample data, which leads to difficulty in establishing mathematical models and biased training results.
By obtaining resource distribution, dividing regions, based on cloud database assignment parameters, filtering the optimal area combination, setting up resource information collection points, establishing resource mobilization information sheets, and using cloud services to statistics and integrate data, building resource mobilization information databases, and optimizing resource allocation .
Ensure balanced resource allocation, improve the utilization rate of callable resources, reduce resource waste and intersection, effectively improve the efficiency of resource promotion work, and achieve the expected goals.
Smart Images

Figure CN118735236B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of resource collaborative optimization, and in particular to a resource collaborative optimization decision-making method and system. Background Art
[0002] Faced with a huge number of resources and a wide distribution area, resource allocation will be a very complex process. Reasonable allocation of regional resources will play a very important and positive role in improving resource utilization, promoting the efficient and orderly completion of various tasks, reducing the cross-use of resources within the region, releasing deployable resources, and achieving optimal resource utilization. The goal of studying the resource allocation problem is to find an optimal or most reasonable allocation method. This method makes the resource allocation process scientific, rational, economical and stable, so that resources can more efficiently and stably advance tasks and achieve the expected goals.
[0003] The main calculation methods of existing resource allocation algorithms are concentrated on weights, neural networks, and decision trees. They predict future resource allocation methods based on past data. However, in the process of establishing weight ratios and training sets, they are affected by human tendencies and the small amount of sample training set data, which makes it difficult to establish mathematical models and leads to deviations in training results. Summary of the invention
[0004] In order to solve the above technical problems, a resource collaborative optimization decision-making method and system are provided. This technical solution solves the problem that the main calculation methods of the existing resource allocation algorithms proposed in the above background technology are concentrated in weights, neural networks, decision trees, etc., and the future resource allocation methods are predicted based on past data. However, in the process of establishing weight ratios and establishing training sets, it will be affected by human tendencies and the small amount of sample training set data, which makes it difficult to establish mathematical models and causes deviations in training results.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A resource collaborative optimization decision-making method, comprising:
[0007] Obtain the distribution of all resources and divide them into several areas according to their distribution characteristics;
[0008] Based on the data information in the cloud database, assign values to the parameters involved;
[0009] Based on the data information in the cloud database, obtain the resource information and task constraints of each area;
[0010] According to the efficiency formula, the optimal regional combination that meets the conditions is screened out;
[0011] Set up resource information collection points in each area and establish resource mobilization information sheets;
[0012] Cloud services are used to compile statistics on the information in the resource mobilization information sheet and establish a resource mobilization information database.
[0013] Preferably, the obtaining of the distribution of all resources and dividing them into several regions according to the resource distribution characteristics specifically includes:
[0014] According to the distribution of all resources, regions with the same resource distribution characteristics are classified as the same resource region, where the resource distribution characteristics include the same tasks and resource concentration, and form a regional aggregate , ,in, Refers to the Regions, is the total number of regions.
[0015] Preferably, assigning values to the parameters involved based on the cloud database data information specifically includes:
[0016] The average speed of resources in the scheduling process is ;
[0017] The working efficiency of resources is the same and the working efficiency of a single resource is η;
[0018] The time error generated during the scheduling process is ;
[0019] The rated compensation amount reserved by the resource during the work process is Among them, the rated compensation amount refers to the amount used to make up for the lack of resources when a small amount of resources have problems, ensuring the stable completion of the task.
[0020] Preferably, the acquisition of resource information and task constraints of each region based on cloud database data information specifically includes:
[0021] The amount of unused resources and the amount of resources in use in each region;
[0022] The amount of tasks and completed tasks of resources in use, constraint time and time worked;
[0023] The workload and time constraints of the new goals;
[0024] The shortest distance from the center point of each area to the new target.
[0025] Preferably, the screening out the optimal region combination that meets the conditions according to the efficiency formula specifically includes:
[0026] The shortest distance from each area center to the new target is combined into a collection , ,in, Refers to the The shortest distance from the center of each region to the new target, is the total number of regions;
[0027] According to the distance formula, calculate the dispatch time of each area in the dispatch process;
[0028] According to the time formula, calculate the working time of each regional resource participating in the new target work;
[0029] According to the efficiency formula, calculate the maximum amount of resources that can be used in each area;
[0030] According to the efficiency formula, the amount of tasks that can be completed by the available resources in each area within the constraint time of the new target is calculated, where the available resources include the maximum resources of the unused resources and the available resources in use;
[0031] Compare the task volume calculated above with the task volume given by the new target, and select the optimal area combination that meets the conditions;
[0032] The distance formula is:
[0033] in, is the collection of the shortest distances from the center of each region to the new target. is the average speed of resources in the scheduling process, It is the aggregate of the scheduling time of each area during the scheduling process;
[0034] The time formula is:
[0035] in, For the The time that resources can be mobilized in each region to participate in the new target work, is the constraint time of the new target, For the The scheduling time of each area in the scheduling process, is the time error generated during the scheduling process, wherein the time formula is valid on the premise that each area is scheduled at the same time, and the sum of the working time of each area and the scheduling time is always equal to the constraint time;
[0036] The expression for calculating the maximum amount of resources that can be used in each area according to the efficiency formula is:
[0037]
[0038] in, The maximum amount of resources that can be used in each area. is the amount of resources in use in each region, Given the initial workload for ongoing tasks in each region, The amount of tasks that have been completed for the ongoing tasks in each area, The initial constraint time given to the ongoing tasks in each region, Time worked on ongoing tasks for each area, is the rated compensation amount reserved for resources during the work process, and η is the work efficiency of a single resource;
[0039] The expression for calculating the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula is:
[0040]
[0041] in, is the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target, η is the work efficiency of a single resource, is the constraint time of the new target, is the time error generated in the scheduling process, For the The maximum amount of resources that can be used in a region. For the The amount of unused resources in the region, is the average speed of resources in the scheduling process, For the The shortest distance from the center point of a region to the new target.
[0042] Preferably, the steps of setting up resource information collection points in various areas and establishing resource mobilization information sheets specifically include:
[0043] Resource information collection points are set up in each area and a resource mobilization information sheet is established. Relevant resource information is filled in manually in real time based on the actual situation on site, and the use of resources is tracked and fed back to ensure the accuracy and real-time nature of various resource data. The resource mobilization information sheet includes: the amount of unused resources in the area, the amount of resources in use, the amount of tasks, task constraints, the working time of resources in use, the amount of resources completed in use, location information, abnormal conditions of resources, writing date, writer, and resource mobilization time and quantity. Among them, abnormal conditions of resources include damage, loss and reduced work efficiency of resources.
[0044] Preferably, the adopting of cloud services to collect statistics on the information of the resource mobilization information sheet and establishing a resource mobilization information database specifically includes:
[0045] Cloud technology is used to count and integrate the resource information fed back from the resource mobilization information sheet. By analyzing the data, the parameter values involved in the resource mobilization process are determined, and a resource mobilization information database is established to provide data support for subsequent decision-making on resource collaborative optimization.
[0046] Furthermore, a resource collaborative optimization decision system is proposed, which is used to implement a resource collaborative optimization decision method as described above, including: a screening optimal regional combination method module, wherein the screening optimal regional combination method module is used to obtain the distribution of all resources and divide them into several regions according to resource distribution characteristics; assign values to the parameters involved based on cloud database data information; obtain resource information and task constraints of each region based on cloud database data information; and screen out the optimal regional combination that meets the conditions according to the efficiency formula;
[0047] The system operation module is used to set resource information collection points in various areas and establish a resource mobilization information sheet; use cloud services to count the information on the resource mobilization information sheet and establish a resource mobilization information database.
[0048] Optionally, the optimal region combination screening method module specifically includes:
[0049] A region division unit, which is used to obtain the distribution of all resources and divide them into several regions according to the resource distribution characteristics;
[0050] A parameter assignment unit, which is used to assign values to the parameters involved based on the cloud database data information;
[0051] An information collection unit, which is used to obtain resource information and task constraints of each area based on cloud database data information;
[0052] A scheduling time calculation unit, the scheduling time calculation unit is used to calculate the scheduling time of each area in the scheduling process according to the distance formula;
[0053] A working time calculation unit, which is used to calculate the working time of resources that can be called upon in each area to participate in the new target work according to a time formula. The premise for the establishment of the time formula is that each area is scheduled at the same time, and then the sum of the working time of each area and the scheduling time is always equal to the constraint time;
[0054] A maximum resource amount calculation unit for resources that can be called in use, wherein the maximum resource amount calculation unit for resources that can be called in use is used to calculate the maximum resource amount of resources that can be called in use in each area according to an efficiency formula;
[0055] A task volume calculation unit, the task volume calculation unit is used to calculate the task volume of each area that can be called upon to complete within the constraint time of the new target according to the efficiency formula, wherein the callable resources include the maximum resources of unused resources and callable resources in use;
[0056] The optimal regional combination screening unit is used to calculate the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula, and screen out the optimal regional combination that meets the conditions by comparing with the task amount given by the new target.
[0057] Optionally, the system operation module specifically includes:
[0058] A resource mobilization information sheet establishment unit, which is used to set resource information collection points in various areas and establish resource mobilization information sheets, manually fill in relevant resource information in real time according to the actual situation on site, track and feedback the use of resources, and ensure the accuracy and real-time nature of various resource data. The resource mobilization information sheet includes: the amount of unused resources in the area, the amount of resources in use, the amount of tasks, task constraints, the working time of the resources in use, the amount of resources completed in use, location information, abnormal conditions of resources, writing date, writer, and resource mobilization time and quantity, wherein abnormal conditions of resources include damage, loss and reduced work efficiency of resources;
[0059] A cloud information database establishment unit is used to use cloud technology to count and integrate the resource mobilization information fed back by the resource mobilization information sheet, determine the parameter values involved in the resource mobilization process by analyzing the data, and establish a resource mobilization information database to provide data support for subsequent decision-making on resource collaborative optimization.
[0060] Compared with the prior art, the present invention has the following beneficial effects:
[0061] By setting up the optimal regional combination screening method module and the system operation module, the balance of resource allocation in each region is ensured, which greatly guarantees the utilization rate of available resources, reduces resource waste and resource overlap, and effectively improves the efficiency of existing resources to advance work in an orderly manner and achieve the expected goals. A screening method for confirming the optimal regional combination is proposed, and resource data is fed back and coordinated through resource mobilization information sheets and cloud databases, thereby improving the utilization rate of resources in each region. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 This is a flow chart of the resource collaborative optimization decision-making method of the present invention;
[0063] Figure 2The present invention selects the optimal regional combination flow chart that meets the conditions according to the efficiency formula. DETAILED DESCRIPTION
[0064] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0065] Reference Figure 1 As shown, a resource collaborative optimization decision-making method includes:
[0066] Obtain the distribution of all resources and divide them into several areas according to their distribution characteristics;
[0067] Based on the data information in the cloud database, assign values to the parameters involved;
[0068] Based on the data information in the cloud database, obtain the resource information and task constraints of each area;
[0069] According to the efficiency formula, the optimal regional combination that meets the conditions is screened out;
[0070] Set up resource information collection points in each area and establish resource mobilization information sheets;
[0071] Cloud services are used to compile statistics on the information in the resource mobilization information sheet and establish a resource mobilization information database.
[0072] This system reads and assigns data to the cloud database, uses efficiency formulas to build mathematical models, and screens out the optimal regional combination by comparing the calculated task volume with the task volume set for the new target. It also sets up resource information collection points, establishes resource mobilization information sheets, and feeds back resource call information to the cloud database in real time, thus forming a complete resource collaborative optimization decision-making method.
[0073] Reference Figure 2 As shown in the figure, according to the efficiency formula, the optimal regional combination that meets the conditions is selected, including:
[0074] The shortest distance from each area center to the new target is combined into a collection , ,in, Refers to the The shortest distance from the center of each region to the new target, is the total number of regions;
[0075] According to the distance formula, calculate the dispatch time of each area in the dispatch process;
[0076] According to the time formula, calculate the working time of each regional resource participating in the new target work;
[0077] According to the efficiency formula, calculate the maximum amount of resources that can be used in each area;
[0078] According to the efficiency formula, the amount of tasks that can be completed by the available resources in each area within the constraint time of the new target is calculated, where the available resources include the maximum resources of the unused resources and the available resources in use;
[0079] Compare the task volume calculated above with the task volume given by the new target, and select the optimal area combination that meets the conditions;
[0080] The distance formula is:
[0081] in, is the collection of the shortest distances from the center of each region to the new target. is the average speed of resources in the scheduling process, It is the aggregate of the scheduling time of each area during the scheduling process;
[0082] The time formula is:
[0083] in, For the The time that resources can be mobilized in each region to participate in the new target work, is the constraint time of the new target, For the The scheduling time of each area in the scheduling process, is the time error generated during the scheduling process, wherein the time formula is valid on the premise that each area is scheduled at the same time, and the sum of the working time of each area and the scheduling time is always equal to the constraint time;
[0084] The expression for calculating the maximum amount of resources that can be used in each area according to the efficiency formula is:
[0085]
[0086] in, The maximum amount of resources that can be used in each area. is the amount of resources in use in each region, Given the initial workload for ongoing tasks in each region, The amount of tasks that have been completed for the ongoing tasks in each area, The initial constraint time given to the ongoing tasks in each region, Time worked on ongoing tasks for each area, is the rated compensation amount reserved for resources during the work process, and η is the work efficiency of a single resource;
[0087] The expression for calculating the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula is:
[0088]
[0089] in, is the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target, η is the work efficiency of a single resource, is the constraint time of the new target, is the time error generated in the scheduling process, For the The maximum amount of resources that can be used in a region. For the The amount of unused resources in the region, is the average speed of resources in the scheduling process, For the The shortest distance from the center point of a region to the new target.
[0090] Based on the efficiency formula, the other parameters required by the efficiency formula are obtained through the distance formula and the time formula respectively, and a mathematical expression of the amount of tasks that can be completed by the available resources in each area within the constraint time of the new target is constructed. By comparing the calculated amount of tasks with the amount of tasks set for the new target, three results can be obtained, and the results are as follows: when the amount of tasks set for the new target is greater than the calculated amount of tasks, it means that the existing available resources cannot meet the tasks of the target under the constraint time; when the amount of tasks set for the new target is equal to the calculated amount of tasks, it means that all available resources need to be called to the target area; when the amount of tasks set for the new target is less than the calculated amount of tasks, it means that there is only one optimal regional combination that can complete the task, among which the basis for determining the only optimal regional combination is: According to the expression of the amount of tasks that can be completed by the available resources in each area within the constraint time of the new target, it can be seen is a fixed value, which stipulates that when the distance between the area and the target is less than one meter, the resource still belongs to the area, that is, is a number greater than 1, so the expression is less than The value of increase, and The greater the gap, the more tasks that can be completed by resources in each region within the constraint time of the new target conforms to the property of discrete monotonically decreasing, so there is only one optimal region whose calculated task volume is closest to the new target task volume.
[0091] Furthermore, based on the same inventive concept as the above-mentioned resource collaborative optimization decision-making method, the present solution also proposes a resource collaborative optimization decision-making system, including:
[0092] The optimal regional combination screening method module is used to obtain the distribution of all resources and divide them into several regions according to the resource distribution characteristics; assign values to the parameters involved based on the cloud database data information; obtain the resource information and task constraints of each region based on the cloud database data information; and screen out the optimal regional combination that meets the conditions according to the efficiency formula;
[0093] The system operation module is used to set resource information collection points in various areas and establish a resource mobilization information sheet; use cloud services to count the information on the resource mobilization information sheet and establish a resource mobilization information database.
[0094] The optimal regional combination screening method module specifically includes:
[0095] A region division unit, which is used to obtain the distribution of all resources and divide them into several regions according to the resource distribution characteristics;
[0096] A parameter assignment unit, which is used to assign values to the parameters involved based on the cloud database data information;
[0097] An information collection unit, which is used to obtain resource information and task constraints of each area based on cloud database data information;
[0098] A scheduling time calculation unit, the scheduling time calculation unit is used to calculate the scheduling time of each area in the scheduling process according to the distance formula;
[0099] A working time calculation unit, which is used to calculate the working time of resources that can be called upon in each area to participate in the new target work according to a time formula. The premise for the establishment of the time formula is that each area is scheduled at the same time, and then the sum of the working time of each area and the scheduling time is always equal to the constraint time;
[0100] A maximum resource amount calculation unit for resources that can be called in use, wherein the maximum resource amount calculation unit for resources that can be called in use is used to calculate the maximum resource amount of resources that can be called in use in each area according to an efficiency formula;
[0101] A task volume calculation unit, the task volume calculation unit is used to calculate the task volume of each area that can be called upon to complete within the constraint time of the new target according to the efficiency formula, wherein the callable resources include the maximum resources of unused resources and callable resources in use;
[0102] The optimal regional combination screening unit is used to calculate the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula, and screen out the optimal regional combination that meets the conditions by comparing with the task amount given by the new target.
[0103] The system operation modules specifically include:
[0104] A resource mobilization information sheet establishment unit, which is used to set resource information collection points in various areas and establish resource mobilization information sheets, manually fill in relevant resource information in real time according to the actual situation on site, track and feedback the use of resources, and ensure the accuracy and real-time nature of various resource data. The resource mobilization information sheet includes: the amount of unused resources in the area, the amount of resources in use, the amount of tasks, task constraints, the working time of the resources in use, the amount of resources completed in use, location information, abnormal conditions of resources, writing date, writer, and resource mobilization time and quantity, wherein abnormal conditions of resources include damage, loss and reduced work efficiency of resources;
[0105] A cloud information database establishment unit is used to use cloud technology to count and integrate the resource mobilization information fed back by the resource mobilization information sheet, determine the parameter values involved in the resource mobilization process by analyzing the data, and establish a resource mobilization information database to provide data support for subsequent decision-making on resource collaborative optimization.
[0106] To sum up, the advantages of the present invention are: by setting up a screening optimal regional combination method module and a system operation module, the balance of resource allocation in each region is ensured, the utilization rate of available resources is greatly guaranteed, resource waste and resource overlap are reduced, thereby effectively improving the efficiency of existing resources to advance work in an orderly manner and achieving the expected goals. A screening method for confirming the optimal regional combination is proposed, and resource data is fed back and coordinated through a resource mobilization information sheet and a cloud database, thereby improving the utilization rate of resources in each region.
[0107] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A resource collaborative optimization decision-making method, It is characterized in that include: Obtain the distribution of all resources and divide them into several areas according to their distribution characteristics; Based on the data information in the cloud database, assign values to the parameters involved; Based on the data information in the cloud database, obtain the resource information and task constraints of each area; According to the efficiency formula, the optimal regional combination that meets the conditions is screened out; Set up resource information collection points in each area and establish resource mobilization information sheets; Use cloud services to compile statistics on resource mobilization information sheets and establish a resource mobilization information database; The distribution of all resources is obtained and divided into several areas according to the resource distribution characteristics, including: According to the distribution of all resources, the regions with the same resource distribution characteristics are classified as the same resource region, where the resource distribution characteristics include the same tasks and resource concentration, and form a regional aggregate D, D = {d 1 d 2 d 3 ···d n ···d N }, where d n refers to the nth region, N is the total number of regions; The assigning of values to the parameters involved based on the cloud database data information specifically includes: The average speed of resources in the scheduling process is v; The working efficiency of resources is the same and the working efficiency of a single resource is η; The time error generated in the scheduling process is T e ; The rated compensation amount reserved by the resource during the work process is M e , where the rated compensation amount refers to the amount used to make up for the lack of resources when a small amount of resources have problems, ensuring the stable completion of the task; The acquisition of resource information and task constraints of each region based on the cloud database data information specifically includes: The amount of unused resources and the amount of resources in use in each area; The amount of tasks and completed tasks of resources in use, constraint time and time worked; The workload and time constraints of the new goals; The shortest distance from the center point of each area to the new target; The above-mentioned method of selecting the optimal regional combination that meets the conditions according to the efficiency formula specifically includes: The shortest distances from the center of each region to the new target are grouped into a set H, H = {h 1 h 2 h 3 ···h n ···h N }, where h n It refers to the shortest distance from the center point of the nth region to the new target, where N is the total number of regions; According to the distance formula, calculate the dispatch time of each area in the dispatch process; According to the time formula, calculate the working time of each regional resource participating in the new target work; According to the efficiency formula, calculate the maximum amount of resources that can be used in each area; According to the efficiency formula, the amount of tasks that can be completed by the available resources in each area within the constraint time of the new target is calculated, where the available resources include the maximum resources of the unused resources and the available resources in use; Compare the task volume calculated above with the task volume given by the new target, and select the optimal area combination that meets the conditions; The distance formula is: Among them, H is the collection of the shortest distances from the center of each area to the new target, v is the average speed of resources in the scheduling process, T s It is the aggregate of the scheduling time of each area during the scheduling process; The time formula is: T zi =T-T si -T e Among them, T zi is the working time of the resources available in the ith region to participate in the new target work, T is the constraint time of the new target, and T si is the scheduling time of the ith area in the scheduling process, T e is the time error generated during the scheduling process, wherein the time formula is valid on the premise that each area is scheduled at the same time, and the sum of the working time of each area and the scheduling time is always equal to the constraint time; The expression for calculating the maximum amount of resources that can be used in each area according to the efficiency formula is: Among them, M max is the maximum amount of resources that can be used in each area, M is the amount of resources in use in each area, and M m The initial task volume M is given for the ongoing tasks in each area. n is the amount of tasks that have been completed in each area, T m The initial constraint time given for the ongoing tasks in each region, T n The time worked on the ongoing tasks in each area, M e is the rated compensation amount reserved for resources during the work process, and η is the work efficiency of a single resource; The expression for calculating the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula is: Among them, Y is the amount of tasks that can be completed by the available resources in each area within the constraint time of the new goal, η is the work efficiency of a single resource, T is the constraint time of the new goal, and T e is the time error generated in the scheduling process, M max(i) is the maximum amount of resources that can be used in the i-th region, M w(i) is the amount of unused resources in the ith region, v is the average speed of resources in the scheduling process, and h i is the shortest distance from the center point of the i-th region to the new target.
2. A resource collaborative optimization decision-making method according to claim 1, It is characterized in that The setting of resource information collection points in each area and establishing resource mobilization information sheets specifically include: Resource information collection points are set up in each area and a resource mobilization information sheet is established. Relevant resource information is filled in manually in real time based on the actual situation on site, and the use of resources is tracked and fed back to ensure the accuracy and real-time nature of various resource data. The resource mobilization information sheet includes: the amount of unused resources in the area, the amount of resources in use, the amount of tasks, task constraints, the working time of resources in use, the amount of resources completed in use, location information, abnormal conditions of resources, writing date, writer, and resource mobilization time and quantity. Among them, abnormal conditions of resources include damage, loss and reduced work efficiency of resources.
3. A resource collaborative optimization decision-making method according to claim 2, It is characterized in that The method of using cloud services to collect information on resource mobilization information sheets and establish a resource mobilization information database specifically includes: Cloud technology is used to count and integrate the resource information fed back from the resource mobilization information sheet. By analyzing the data, the parameter values involved in the resource mobilization process are determined, and a resource mobilization information database is established to provide data support for subsequent decision-making on resource collaborative optimization.
4. A resource collaborative optimization decision system, used to implement the resource collaborative optimization decision method according to any one of claims 1 to 3, It is characterized in that include: The optimal regional combination method screening module is used to obtain the distribution of all resources and divide them into several regions according to the resource distribution characteristics; assign values to the parameters involved based on the cloud database data information; and obtain the resource information and task constraints of each region based on the cloud database data information; According to the efficiency formula, the optimal regional combination that meets the conditions is screened out; The system operation module is used to set resource information collection points in various areas and establish resource mobilization information sheets; use cloud services to count the information on the resource mobilization information sheets and establish a resource mobilization information database.
5. A resource collaborative optimization decision-making system according to claim 4, It is characterized in that The optimal regional combination screening method module includes: A region division unit, which is used to obtain the distribution of all resources and divide them into several regions according to the resource distribution characteristics; A parameter assignment unit, which is used to assign values to the parameters involved based on the cloud database data information; An information collection unit, which is used to obtain resource information and task constraints of each area based on cloud database data information; A scheduling time calculation unit, the scheduling time calculation unit is used to calculate the scheduling time of each area in the scheduling process according to the distance formula; A working time calculation unit, which is used to calculate the working time of resources that can be called upon in each area to participate in the new target work according to a time formula. The premise for the establishment of the time formula is that each area is scheduled at the same time, and then the sum of the working time of each area and the scheduling time is always equal to the constraint time; A maximum resource amount calculation unit for resources that can be called in use, wherein the maximum resource amount calculation unit for resources that can be called in use is used to calculate the maximum resource amount of resources that can be called in use in each area according to an efficiency formula; A task volume calculation unit, the task volume calculation unit is used to calculate the task volume of each area that can be called upon to complete within the constraint time of the new target according to the efficiency formula, wherein the callable resources include the maximum resources of unused resources and callable resources in use; The optimal regional combination screening unit is used to calculate the amount of tasks that can be completed by the available resources in each region within the constraint time of the new target according to the efficiency formula, and screen out the optimal regional combination that meets the conditions by comparing with the task amount given by the new target.
6. A resource collaborative optimization decision-making system according to claim 5, It is characterized in that The system operation module includes: A resource mobilization information sheet establishment unit, which is used to set resource information collection points in various areas and establish resource mobilization information sheets, manually fill in relevant resource information in real time according to the actual situation on site, track and feedback the use of resources, and ensure the accuracy and real-time nature of various resource data. The resource mobilization information sheet includes: the amount of unused resources in the area, the amount of resources in use, the amount of tasks, task constraints, the working time of the resources in use, the amount of resources completed in use, location information, abnormal conditions of resources, writing date, writer, and resource mobilization time and quantity, wherein abnormal conditions of resources include damage, loss and reduced work efficiency of resources; A cloud information database establishment unit is used to use cloud technology to count and integrate the resource mobilization information fed back by the resource mobilization information sheet, determine the parameter values involved in the resource mobilization process by analyzing the data, and establish a resource mobilization information database to provide data support for subsequent decision-making on resource collaborative optimization.
Citation Information
Patent Citations
Distribution resource scheduling method, device and equipment
CN114331342A
Resource scheduling model construction method and system based on dynamic multi-objective optimization
CN114997659A
Cited By
Real-time dynamic perception collaborative intelligent service decision-making method and system based on multi-modal heterogeneous data fusion
CN122087695A