Building engineering operation management method and system based on BIM technology

CN118735443APending Publication Date: 2024-10-01CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410801962.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

但在实际的运用过程中,由于部分单位对信息化监控手段存在抵触情绪,BIM技术并没有能够得到全方位的应用,参建单位在沟通协作方面更多采用的是QQ、微信、腾讯会议等手段,此种方式虽然方便,但是后期信息追溯效果较差,信息保存不够完整

Benefits of technology

[0023] The construction project operation management method and system based on BIM technology of the present invention automatically inputs construction data information based on the BIM model and Dynamo programming, avoiding the possibility of data errors and omissions due to human negligence, and improving the accuracy of the data; through detailed data updates, Use the Dynamo program driver to identify and update construction data, reducing the cost increase caused by untimely input or data modification during the process; through the BIM warranty period operation management method, combined with BIM model analysis, the optimal construction plan within the warranty period is selected to reduce the number of projects cost, providing strong data support for construction progress, not only shortening management time, but also reducing labor costs and construction delay costs. This approach not only meets the project cost control requirements, but also meets the needs of on-site construction during the warranty period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735443A_ABST
    Figure CN118735443A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM technology-based construction engineering operation management method and system, and the method comprises the steps: obtaining engineering related information, and importing the engineering related information based on a revit platform; a volume family is newly built, and a three-dimensional model is built on the volume family according to the engineering related information; acquiring site working condition data and construction data of each process, and integrating the construction detail integration data; integrating the construction detail integration data, establishing a corresponding relationship between each construction process and a professional subpackage manager of the corresponding professional subpackage construction data, binding each professional subpackage manager with a corresponding three-dimensional model through a revit platform, then performing correction, and exporting target detail data; and Dynamo software is adopted to automatically identify the target detail data and record the target detail data into the system, and information in the construction process is bound with the corresponding three-dimensional model, so that construction progress related information is inquired according to the three-dimensional model. According to the invention, the accuracy of data entry in the construction process is improved, and the construction efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of construction industry, and in particular to a construction engineering operation management method and system based on BIM technology. Background Art

[0002] The greater the investment in the construction process of an engineering project, the greater the complexity and scale of the project. The pressure on project construction management also increases, and the pressure on project management to supervise and manage information such as project progress, quality, and safety also increases, which can easily lead to rework, delays in construction, and even safety accidents. In addition, there are too many parties involved in the construction of engineering projects, involving multiple parties such as design, construction, and supervision, and the amount of engineering data information is large. If communication and coordination cannot be timely and accurate, there will be errors in information transmission, resulting in inaccurate management, waste of resources, and increased construction costs. Therefore, it is urgent to take project management as the core, face design, construction, establish warranty period operation management, and establish a unified platform for digital management, command, and decision-making for all parties to improve the level and efficiency of project management.

[0003] BIM technology is a new and rapidly developing technology that can integrate engineering three-dimensional models and information data throughout the entire life cycle of the project, and can realize unified and efficient management of all parties involved in the project based on the BIM model. It is an important support for the construction and management of smart projects. However, in the actual application process, due to the resistance of some units to information-based monitoring methods, BIM technology has not been fully applied. Participating units use QQ, WeChat, Tencent Conference and other means for communication and collaboration. Although this method is convenient, the later information tracing effect is poor and the information preservation is not complete. According to the information, the current domestic construction and management platform using BIM technology mainly focuses on the management of the construction party, and rarely involves the business information of the design and supervision party. There are information barriers between participating units, data cannot be shared, and it is easy to form information islands, which cannot achieve the role of efficient construction management. Summary of the invention

[0004] The purpose of the present invention is to provide a construction project operation management method and system based on BIM technology, so as to ensure the traceability of data in the construction process, improve the accuracy of data entry in the construction process, and effectively improve the construction efficiency.

[0005] The present invention is implemented as follows: a construction project operation management method based on BIM technology, comprising the following steps:

[0006] Obtain project-related information, and import the project-related information based on the Revit platform;

[0007] Create a new massing family, and build a 3D model on the massing family according to the project related information;

[0008] Acquire site condition data and construction data of each process, and integrate the site condition data and the construction data of each process into construction detail integrated data based on the revit platform;

[0009] Integrate the construction detail integration data, and establish a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, and bind each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform to perform deviation correction, and export the target detail data;

[0010] The target detailed data is automatically identified and entered into the system using Dynamo software, and the information in the construction process is bound to the corresponding three-dimensional model, so as to query the information related to the construction progress according to the three-dimensional model.

[0011] Optionally, the project-related information includes construction plans, stereograms, cross-sections, node details, system diagrams and design specifications.

[0012] Optionally, the three-dimensional model includes a structural model, an architectural model, an electromechanical model and a decoration model.

[0013] Optionally, each of the three-dimensional models corresponds to a construction progress one by one, and the three-dimensional models contain information related to the name, material, model, etc. of the application object.

[0014] Optionally, the three-dimensional models are constructed according to actual starting and ending elevations, and the positions and coordinates of the main horizontal points and starting and ending points of major components such as beams and walls are accurately set according to actual needs in actual construction engineering design.

[0015] Optionally, the three-dimensional model satisfies the parameter model of LOD400.

[0016] Optionally, the construction progress related information queried by the three-dimensional model includes at least one of the construction unit, construction manager, construction or installation time, materials, technical parameters, manufacturer, factory number, and equipment number.

[0017] The present invention also provides a construction engineering operation management system based on BIM technology, comprising:

[0018] An information acquisition module is used to acquire project-related information and import the project-related information based on the Revit platform;

[0019] A modeling module, used for creating a new volume family and establishing a three-dimensional model on the volume family according to the project related information;

[0020] A data integration module, used to obtain site condition data and construction data of each process, and integrate the site condition data and the construction data of each process into construction detailed integrated data based on the revit platform;

[0021] An export module is used to integrate the construction detail integration data, establish a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, bind each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform, perform deviation correction, and export the target detail data;

[0022] The integrated module is used to automatically identify and enter the target detailed data into the system using Dynamo software, bind the information in the construction process with the corresponding three-dimensional model, and query the construction progress related information according to the three-dimensional model.

[0023] The construction engineering operation management method and system based on BIM technology of the present invention automatically inputs construction data information based on BIM model and Dynamo programming, avoiding the possibility of data errors and omissions due to human negligence, and improving the accuracy of data; by updating detailed data, using Dynamo program to drive identification and update of construction data, reducing the cost increase caused by untimely input or data modification during the process; through the BIM warranty period operation management method, combined with BIM model analysis, the optimal construction plan within the warranty period is selected to reduce engineering costs, and provide data support for the construction progress, which can not only shorten management time, but also reduce labor costs and construction delay costs. The approach not only meets the project cost control requirements, but also meets the needs of on-site construction within the warranty period. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a front structural schematic diagram of the construction engineering operation management method based on BIM technology of the present invention;

[0025] Figure 2 It is a side structural schematic diagram of the construction project operation management method based on BIM technology of the present invention. DETAILED DESCRIPTION

[0026] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0027] See also Figure 1 and Figure 2 The present invention provides a construction engineering operation management method based on BIM technology, comprising the following steps:

[0028] S101, obtaining project related information, and importing the project related information based on the Revit platform.

[0029] In some embodiments, the project-related information includes construction plans, stereograms, cross-sections, node details, system diagrams, and design instructions. Importing the project-related information into the Revit platform facilitates the subsequent establishment of a three-dimensional model.

[0030] S102, creating a new volume family, and establishing a three-dimensional model on the volume family according to the project related information.

[0031] In some embodiments, the three-dimensional model includes a structural model, an architectural model, an electromechanical model, and a decorative model.

[0032] It should be noted that each of the three-dimensional models corresponds to the construction progress one by one, and the three-dimensional models contain relevant information such as the name, material, model, etc. of the application object. The three-dimensional models are constructed according to the actual starting and ending elevations, and the positions and coordinates of the main horizontal points and starting and ending points of the main components such as beams and walls are accurately set according to the actual needs in the actual construction engineering design.

[0033] Specifically, the 3D model needs to be closely followed for in-depth design and updating in all links and stages of the project. The 3D model must reflect the name, material, model and other relevant information of the application object; and the construction of the 3D model should be in line with reality. The hierarchical structure model should be established according to the elevation. It is strictly forbidden to have a supporting column extending from the bottom of the foundation to the top of the foundation. It should be constructed according to the actual starting and ending elevations; the position and coordinates of the main horizontal points and starting and ending points of the main components such as beams and walls must be accurately set according to the actual needs of the actual construction engineering design to avoid the abnormal situation where the main components such as beams and walls and columns overlap with each other. The automatic overlap modeling system between plates, columns and beams should be overlapped in time according to the actual use.

[0034] Furthermore, the three-dimensional model satisfies the parameter model of LOD400.

[0035] S103, obtaining site condition data and construction data of each process, and integrating the site condition data and the construction data of each process into detailed construction integrated data based on the revit platform.

[0036] S104, integrating the construction detail integration data, and establishing a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, and binding each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform for correction, and exporting the target detail data.

[0037] On the basis of making full use of the existing design drawings and construction plans, according to the complex working conditions of the site and the construction conditions of each process, the data is integrated based on the BIM platform, and the construction data of each professional subcontract is integrated through the smart construction site system, and the responsibility of each process is assigned to a person. At the same time, the management personnel of each professional subcontract are required to bind the model of each process through the platform, and the project management personnel correct the problems in the process to ensure the accuracy of the data. Then the details are exported through the smart construction site platform.

[0038] S105, using Dynamo software to automatically identify the target detailed data and enter it into the system, binding the information in the construction process with the corresponding three-dimensional model, so as to query the information related to the construction progress according to the three-dimensional model.

[0039] By automatically entering the target detailed data into the system, the information in the construction process can be bound to the corresponding 3D model, making it convenient to query the construction progress-related information based on the 3D model, thereby realizing automated management of the construction progress.

[0040] In some other embodiments, the construction progress related information queried by the three-dimensional model includes at least one of the construction unit, construction manager, construction or installation time, materials, technical parameters, manufacturer, factory number, and equipment number.

[0041] Automatically inputting construction data information based on BIM model and Dynamo programming avoids the possibility of data errors caused by human negligence and improves data accuracy. By updating detailed data and using Dynamo program to drive the identification and update of construction data, the cost increase caused by untimely data input or data modification during the process is reduced. Through the BIM warranty period operation management method, combined with BIM model analysis, the optimal construction plan within the warranty period is selected to reduce project costs and provide strong data support for the construction progress.

[0042] The solution of the present invention integrates the BIM model with the construction data, and the construction data is automatically entered into the binding model, and each process is accurately identified and bound. At the same time, the requirements of the operation management application during the warranty period are met, and the process management is traceable, which guides the construction of engineers during the warranty period and improves the construction efficiency. The data software is entered in batches, which is accurate and efficient: using Dynamo programming, thousands of data can be entered in batches and imported into the model at one time, which is accurate and efficient. It can shorten the management time and reduce labor costs and construction delay costs. The approach not only meets the project cost control requirements, but also meets the needs of on-site construction during the warranty period.

[0043] The present invention discloses a construction engineering operation management system based on BIM technology, comprising:

[0044] The information acquisition module 201 is used to acquire project related information and import the project related information based on the Revit platform;

[0045] Modeling module 202, used to create a new volume family, and to build a three-dimensional model on the volume family according to the project related information;

[0046] The data integration module 203 is used to obtain site condition data and construction data of each process, and integrate the site condition data and the construction data of each process into construction detailed integrated data based on the revit platform;

[0047] The export module 20 is used to integrate the construction detail integration data, establish a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, bind each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform, perform deviation correction, and export the target detail data;

[0048] The query module 205 is used to automatically identify the target detailed data and enter it into the system using Dynamo software, bind the information in the construction process with the corresponding three-dimensional model, and query the construction progress related information according to the three-dimensional model.

[0049] Since the structure and principles of the above-mentioned construction project operation management system based on BIM technology correspond one to one with the steps in the above-mentioned construction project operation management method based on BIM technology, they will not be repeated here.

[0050] It should be noted that it should be understood that the division of the various modules of the above system is only a division of logical functions. In actual implementation, they can be fully or partially integrated into one physical entity, or they can be physically separated. And these modules can all be implemented in the form of software calling through processing elements; they can also be all implemented in the form of hardware; some modules can also be implemented in the form of software calling through processing elements, and some modules can be implemented in the form of hardware. For example, the x module can be a separately established processing element, or it can be integrated in a certain chip of the above system for implementation. In addition, it can also be stored in the memory of the above system in the form of program code, and called and executed by a certain processing element of the above system. The implementation of other modules is similar. In addition, these modules can be fully or partially integrated together, or they can be implemented independently. The processing element described here can be an integrated circuit with signal processing capabilities. In the implementation process, each step of the above method or each module above can be completed by an integrated logic circuit of hardware in the processor element or instructions in the form of software.

[0051] For example, the above modules may be one or more integrated circuits configured to implement the above methods, such as one or more application specific integrated circuits (ASIC), or one or more digital signal processors (DSP), or one or more field programmable gate arrays (FPGA). For another example, when a module above is implemented in the form of a processing element scheduling program code, the processing element may be a general-purpose processor, such as a central processing unit (CPU) or other processor that can call program code. For another example, these modules may be integrated together and implemented in the form of a system-on-a-chip (SOC).

[0052] It should be noted that the construction project operation and management system based on BIM technology of the present invention can implement the construction project operation and management method based on BIM technology of the present invention, but the implementation device of the construction project operation and management method based on BIM technology of the present invention includes but is not limited to the structure of the system listed in this embodiment, and all structural deformations and replacements of the prior art made according to the principles of the present invention are included in the protection scope of the present invention.

[0053] The construction engineering operation management method and system based on BIM technology of the present invention automatically inputs construction data information based on BIM model and Dynamo programming, avoiding the possibility of data errors and omissions due to human negligence, and improving the accuracy of data; by updating detailed data, using Dynamo program to drive identification and update of construction data, reducing the cost increase caused by untimely input or data modification during the process; through the BIM warranty period operation management method, combined with BIM model analysis, the optimal construction plan within the warranty period is selected to reduce engineering costs, and provide data support for the construction progress, which can not only shorten management time, but also reduce labor costs and construction delay costs. The approach not only meets the project cost control requirements, but also meets the needs of on-site construction within the warranty period.

[0054] The above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction project operation management method based on BIM technology, characterized in that: The steps include: Obtain project-related information, and import the project-related information based on the Revit platform; Create a new massing family, and build a 3D model on the massing family according to the project related information; Acquire site condition data and construction data of each process, and integrate the site condition data and the construction data of each process into construction detail integrated data based on the revit platform; Integrate the construction detail integration data, and establish a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, and bind each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform to perform deviation correction, and export the target detail data; The target detailed data is automatically identified and entered into the system using Dynamo software, and the information in the construction process is bound to the corresponding three-dimensional model, so as to query the information related to the construction progress according to the three-dimensional model.

2. The construction engineering operation management method based on BIM technology according to claim 1 is characterized in that: The project-related information includes construction plans, stereoscopic drawings, cross-sectional drawings, node details, system diagrams and design instructions.

3. The construction engineering operation management method based on BIM technology according to claim 1 is characterized in that: The three-dimensional model includes a structural model, an architectural model, an electromechanical model and a decorative model.

4. The construction engineering operation management method based on BIM technology according to claim 3 is characterized in that: Each of the three-dimensional models corresponds to a construction progress one by one, and the three-dimensional models contain information related to the name, material, model, etc. of the application object.

5. The construction engineering operation management method based on BIM technology according to claim 1 is characterized in that: The three-dimensional models are constructed according to the actual starting and ending elevations, and the positions and coordinates of the main horizontal points and starting and ending points of the main components such as beams and walls are accurately set according to the actual needs in the actual construction engineering design.

6. The construction engineering operation management method based on BIM technology according to claim 1 is characterized in that: The three-dimensional model satisfies the parameter model of LOD400.

7. The construction engineering operation management method based on BIM technology according to claim 1 is characterized in that: The construction progress related information queried by the three-dimensional model includes at least one of the construction unit, construction manager, construction or installation time, materials, technical parameters, manufacturer, factory number, and equipment number.

8. A construction project operation management system based on BIM technology, characterized in that: include: An information acquisition module is used to acquire project-related information and import the project-related information based on the Revit platform; A modeling module, used for creating a new volume family and establishing a three-dimensional model on the volume family according to the project related information; A data integration module, used to obtain site condition data and construction data of each process, and integrate the site condition data and the construction data of each process into construction detailed integrated data based on the revit platform; An export module is used to integrate the construction detail integration data, establish a corresponding relationship between each construction process and the professional subcontract management personnel of the corresponding professional subcontract construction data, bind each of the professional subcontract management personnel with the corresponding three-dimensional model through the revit platform, perform deviation correction, and export the target detail data; The integrated module is used to automatically identify and enter the target detailed data into the system using Dynamo software, bind the information in the construction process with the corresponding three-dimensional model, and query the construction progress related information according to the three-dimensional model.