Resource attribute parameter determination method and apparatus, and electronic device

By obtaining the first resource attribute parameters and historical resource attribute parameters of the target object, combining real-time data and historical data, and using the prediction model and sample weight strategy, the problem of being unable to meet real-time requirements in online scenarios is solved, and the target time is realized. Accurate estimation and real-time adjustment of resource attribute parameters within the cycle.

CN118735554APending Publication Date: 2024-10-01BEIJING YOUZHUJU NETWORK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310345278.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology cannot meet the real-time requirements of online scenarios and cannot effectively predict the resource attribute parameters of the target object in the future time period.

Method used

By obtaining the first resource attribute parameters of the target object in the target time period and the second resource attribute parameters in the historical time period, and combining real-time data and historical data, we can reasonably estimate the resource attribute parameters of the target object in the target time period, including Use prediction models and different sample weight strategies to adjust data processing strategies to meet real-time needs.

Benefits of technology

It realizes the timely confirmation of completed resource attribute parameters before the end of the target time period, and reasonably estimates the unfinished parts to meet the real-time needs of online scenarios, avoids the disadvantages of being unable to adjust in time during offline estimates, and improves transaction goals. achievement rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735554A_ABST
    Figure CN118735554A_ABST
Patent Text Reader

Abstract

Embodiments of the invention provide a resource attribute parameter determination method and apparatus, and an electronic device. The method comprises the steps of obtaining a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of the target time period; a second resource attribute parameter of the target object is obtained, the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; determining a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; and determining a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a method, device and electronic device for determining resource attribute parameters. Background Art

[0002] In the process of processing the target object, the resource attribute parameters of the target object within a certain time period can be estimated. Among them, the target object is the thing that is the target during processing, including a physical object or a virtual object. The target object can be exchanged with the resource corresponding to the target object. The resource is used to measure the value of the target object in the exchange process. The resource attribute parameter is a parameter used to represent at least one property of the resource. Optionally, it can be a parameter used to represent the quantity of the resource. The target object can be, for example, a commodity, and the resource can be, for example, the currency corresponding to the commodity during the exchange. The resource attribute parameter can be, for example, the total transaction amount (Gross Merchandise Volume, GMV) of the commodity corresponding to the currency quantity of the commodity. In the related scheme, the future resource attribute parameters are estimated by historical resource attribute parameters. The historical resource attribute parameters are the resource attribute parameters that occurred before the current time, for example, the daily average of GMV in the past month, and the future resource attribute parameters are the resource attribute parameters that have not occurred as of the current time, for example, the GMV of the next month. Specifically, the GMV of the next day can be estimated based on the daily average of GMV in the past month.

[0003] It can be seen that the relevant solutions cannot meet the real-time requirements of online scenarios. Summary of the invention

[0004] The purpose of the embodiments of the present application is to provide a method, device and electronic device for determining resource attribute parameters, which can meet the real-time requirements of online scenarios.

[0005] To solve the above technical problems, the embodiments of the present application are implemented through the following aspects.

[0006] In a first aspect, an embodiment of the present application provides a method for determining resource attribute parameters, including: obtaining a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time cycle; obtaining a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; determining a third resource attribute parameter of the target object based on the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time cycle; wherein the second time period is later than the first time period; determining a target resource attribute parameter of the target object based on the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0007] In a second aspect, an embodiment of the present application provides a device for determining resource attribute parameters, including: a first acquisition module, used to acquire a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; a second acquisition module, used to acquire a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; a first determination module, used to determine a third resource attribute parameter of the target object based on the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; a second determination module, used to determine a target resource attribute parameter of the target object based on the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0008] In a third aspect, an embodiment of the present application provides an electronic device, comprising: a memory, a processor, and computer executable instructions stored in the memory and executable on the processor, wherein the computer executable instructions, when executed by the processor, implement the method for determining resource attribute parameters described in the first aspect above.

[0009] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, which is used to store computer-executable instructions. When the computer-executable instructions are executed by a processor, the method for determining resource attribute parameters described in the first aspect above is implemented.

[0010] In an embodiment of the present application, a first resource attribute parameter of a target object is obtained; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; a second resource attribute parameter of the target object is obtained, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; a third resource attribute parameter of the target object is determined according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; according to the target The first resource attribute parameter and the third resource attribute parameter of the object are used to determine the target resource attribute parameter of the target object; wherein the target resource attribute parameter is the resource attribute parameter corresponding to the target object in the target time period, combined with the first resource attribute parameter of the target object that has been completed in the target time period acquired in real time, and the second resource attribute parameter achieved by the target object in the historical time period, to reasonably estimate the resource attribute parameters of the target object in the remaining time of the target time period, and then estimate the target resource attribute parameters of the target object in the entire target time period, that is, before the end of the target time period, the first resource attribute parameter that has actually been completed can be confirmed in time, and the target resource attribute parameters within the target time period can be reasonably estimated, which can meet the real-time requirements of online scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0012] Figure 1 A schematic diagram showing a flow chart of a method for determining resource attribute parameters provided in an embodiment of the present application;

[0013] Figure 2 Another flowchart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown;

[0014] Figure 3a Another flowchart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown;

[0015] Figure 3b A schematic diagram showing the first sample weight in the first model provided in an embodiment of the present application;

[0016] Figure 3c A schematic diagram showing the second sample weights of the second model provided in an embodiment of the present application;

[0017] Figure 4 Another flowchart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown;

[0018] Figure 5 Another flowchart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown;

[0019] Figure 6 A schematic diagram showing the structure of a device for determining resource attribute parameters provided in an embodiment of the present application;

[0020] Figure 7 A schematic diagram of the hardware structure of an electronic device for executing a method for determining resource attribute parameters provided in an embodiment of the present application. DETAILED DESCRIPTION

[0021] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.

[0022] Figure 1 A flow chart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown, and the method can be executed by an electronic device, such as a terminal device or a server device. In other words, the method can be executed by software or hardware installed in a terminal device or a server device. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc. As shown in the figure, the method may include the following steps:

[0023] Step S110: Acquire the first resource attribute parameter of the target object.

[0024] The first resource attribute parameter is a resource attribute parameter corresponding to the target object in the first time period of the target time period.

[0025] The target object is the object to be processed, which may include a physical object or a virtual object. The target object may be exchanged with the resource corresponding to the target object. The resource may be used to measure the value of the target object in the exchange process. The resource attribute parameter is a parameter used to represent at least one property of the resource. Optionally, it may be a parameter used to represent the quantity of the resource. The target object may be, for example, a commodity, the resource may be, for example, the currency corresponding to the commodity during the exchange, and the resource attribute parameter may be, for example, the GMV used to represent the amount of currency corresponding to the commodity.

[0026] The target time period is the time period for processing the target object. The first time period is the time period within the target time period. For example, if the target time period is January 10, 2020, the first time period is from 0:00 to 20:00 on that day. The first resource attribute parameter is the GMV corresponding to the product from 0:00 to 20:00 on January 10, 2020.

[0027] Optionally, the first resource attribute parameter is used to represent the parameters that have actually occurred in the target time period. That is, the first time period is the time period between the start time of the target time period and the current time. For example, if the start time of the target time period is 0:00 on January 10, 2020, and the current time is 20:00 on the same day, then the first time period is from 0:00 to 20:00 on January 10, 2020.

[0028] Step S120: Acquire a second resource attribute parameter of the target object.

[0029] The second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period.

[0030] The historical time period is used to represent a period of time before the first time period, and the length of the historical time period can be the same as or different from the length of the target time period. The second resource attribute parameter is the resource attribute parameter completed by the target object in the historical time period, such as the GMV of the target object in the historical time period.

[0031] Continue with the previous step and take an example. For example, the historical time period is the day before January 10, 2020, and the week before January 10, 2020. Taking the historical time period of the day before January 10, 2020 as an example, the second resource attribute parameter is used to represent the GMV of the product on January 9, 2020.

[0032] Step S130: Determine a third resource attribute parameter of the target object.

[0033] Determine a third resource attribute parameter of the target object based on the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period.

[0034] Optionally, the second time period is the time between the current time and the end time of the target time period; the third resource attribute parameter is used to indicate the resource attribute parameters that may be completed from the current time to the end time of the target time period, that is, to predict the resource attribute parameters that may be completed from the current time to the end time of the target time period. It is understandable that the third resource attribute parameter is used to indicate an estimated value. For example, the third resource attribute parameter is used to indicate the GMV of a product from 20:00 on January 10, 2020 to 24:00 on the same day.

[0035] In one implementation, this step may include: obtaining a target estimated value of the third resource attribute parameter according to the first resource attribute parameter and the second resource attribute parameter of the target object, wherein the target estimated value includes one of the following: a first estimated value, a second estimated value, a third estimated value, the first estimated value and the second estimated value, the first estimated value and the third estimated value. Determine the third resource attribute parameter of the target object according to the target estimated value of the third resource attribute parameter.

[0036] In other words, multiple estimated values ​​may be obtained in different ways, and the third resource attribute parameter of the target object may be determined based on the multiple estimated values.

[0037] Step S140: Determine the target resource attribute parameters of the target object.

[0038] Determine a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0039] The target resource attribute parameters are used to indicate the resource attribute parameters that can be completed within the target time period.

[0040] Optionally, the target resource attribute parameter is the sum of the first resource attribute parameter and the third resource attribute parameter.

[0041] Compared with the offline transaction task volume estimation method, this solution not only considers the third resource attribute parameter obtained based on historical data, but also considers the first resource attribute parameter that has actually occurred on the day, so that the data processing strategy can be adjusted based on the first resource attribute parameter in order to achieve the transaction target of the day. In addition, when the first resource attribute parameter exceeds the target of the day, it can avoid the situation where the target resource attribute parameter is less than the first resource attribute parameter.

[0042] For example, if the target resource attribute parameters calculated at 20:00 on the same day cannot reach the expected value for the day, the marketing strategy can be adjusted, such as increasing the supply of best-selling products, increasing discounts, or increasing the number of live broadcasts by anchors with strong sales capabilities. The current market responds quickly to these stimuli and can adjust resource attribute parameters in time to reach the expected value for the day. The expected value can be achieved every day, and ultimately the expected value for the whole year can be accurately controlled and achieved, avoiding the disadvantage of being unable to make timely adjustments during offline estimation.

[0043] An embodiment of the present invention provides a method for determining resource attribute parameters, which comprises obtaining a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time cycle; obtaining a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; determining a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time cycle; wherein the second time period is later than the first time period ; Determine the target resource attribute parameters of the target object according to the first resource attribute parameters and the third resource attribute parameters of the target object; wherein the target resource attribute parameters are the resource attribute parameters corresponding to the target object in the target time period, combined with the first resource attribute parameters of the target object that have been completed in the target time period acquired in real time, and the second resource attribute parameters achieved by the target object in the historical time period, to reasonably estimate the resource attribute parameters of the target object in the remaining time of the target time period, and then estimate the target resource attribute parameters of the target object in the entire target time period, that is, before the end of the target time period, the first resource attribute parameters that have actually been completed can be confirmed in time, and the target resource attribute parameters within the target time period can be reasonably estimated, which can meet the real-time requirements of online scenarios.

[0044] Figure 2Another flow chart of a method for determining a resource attribute parameter provided by an embodiment of the present application is shown. As shown in the figure, the method may include the following steps:

[0045] Step S210: Acquire the first resource attribute parameter of the target object.

[0046] Step S220: Acquire a second resource attribute parameter of the target object.

[0047] Step S210 and step S220 adopt Figure 1 The description of the corresponding steps of the embodiment will not be repeated here.

[0048] Step S231: Determine a fourth resource attribute parameter of the target object.

[0049] According to the second resource attribute parameter, determine the fourth resource attribute parameter of the target object, wherein the fourth resource attribute parameter is the resource attribute parameter corresponding to the target object in the third time period of the historical time period, and the position of the third time period in the historical time period is the same as the position of the first time period in the target time period. That is, the fourth resource attribute parameter is used to represent the resource attribute parameter of the target object in the time period corresponding to the first time period in the historical time period. Optionally, the time length of the time period is the same as the time length of the third time period, the start time of the third time period corresponds to the start time of the first time period, and the end time of the time period corresponds to the end time of the first time period. For example, the first time period is from 0:00 to 20:00 on January 10, 2020, the third time period of the historical time period can be from 0:00 to 20:00 on January 9, 2020, and the fourth resource attribute parameter can be the GMV from 0:00 to 20:00 on January 9, 2020.

[0050] Optionally, when there are multiple third time periods, the fourth resource attribute parameter is used to indicate the average value of the resource attribute parameters of the multiple third time periods. For example, the first time period is from 0:00 to 20:00 on January 10, 2020, and the third time period of the historical time period may include: from 0:00 to 20:00 every day from January 3 to January 9, 2020, and the fourth resource attribute parameter may be the average value of the GMV from 0:00 to 20:00 every day from January 3 to January 9, 2020.

[0051] Step S232: Determine the estimated proportion of the first resource attribute parameter in the target resource attribute parameter.

[0052] Optionally, the estimated proportion is the proportion of the fourth resource attribute parameter to the average value of the second resource attribute parameter.

[0053] Step S234: Determine a first estimated value of the third resource attribute parameter.

[0054] A first estimated value of the third resource attribute parameter is determined according to the first resource attribute parameter and the estimated proportion.

[0055] Optionally, GMV is used to represent the resource attribute parameter. The first resource attribute parameter can be represented as a first GMV, the second resource attribute parameter can be represented as a second GMV, and the first estimated value of the third GMV can be calculated according to formula (1).

[0056]

[0057] Referring to formula (1), a first estimated value of the third GMV can be obtained based on the determined first GMV and the estimated proportion.

[0058] For example, the average GMV from 0:00 to 20:00 in the first 7 days is 10,000 yuan, that is, the average GMV of the second GMV is 10,000 yuan. Correspondingly, the average daily GMV of the first 7 days is 20,000 yuan, that is, the average GMV of the second GMV is 20,000 yuan. The proportion of GMV from 0:00 to 20:00 every day to the whole day is 10,000 / 20,000 = 50%, which is also expected to be the estimated proportion of the first GMV in the estimated GMV of the day. If the first GMV achieved by 20:00 today is 15,000, then the estimated GMV for the whole day is 15,000 / 50% = 30,000. Thus, the first estimated value of the third GMV is calculated.

[0059] Step S240: Determine the target resource attribute parameters of the target object.

[0060] Determine a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0061] Optionally, the target resource attribute parameter is the sum of the first resource attribute parameter and a first estimated value of the third resource attribute parameter.

[0062] An embodiment of the present invention provides a method for determining resource attribute parameters. According to the estimated proportion of the first resource attribute parameter in the target resource attribute parameter and the first resource attribute parameter, a third resource attribute parameter is reasonably estimated, and then the target resource attribute parameter is reasonably estimated, so that the target resource attribute parameter within the target time period is closer to the actual value.

[0063] Figure 3a Another flow chart of a method for determining a resource attribute parameter provided by an embodiment of the present application is shown. As shown in the figure, the method may include the following steps:

[0064] Step S310: Acquire the first resource attribute parameter of the target object.

[0065] Step S320: Acquire a second resource attribute parameter of the target object.

[0066] Steps S310 and S320 adopt Figure 1 The description of the corresponding steps of the embodiment will not be repeated here.

[0067] Step S331: inputting the first time period and the first resource attribute parameter into an estimation model.

[0068] The estimation model is used to estimate the resource attribute parameters of the target object. The training sample data of the estimation model includes: a first sample time period of the historical time period, resource attribute parameters of the target object corresponding to the first sample time period, and reference resource attribute parameters of the target object corresponding to the second sample time period, wherein the second sample time period is a time period in the historical time period that is later than the first sample time period, wherein the reference resource attribute parameters of the target object corresponding to the second sample time period may be real resource attribute parameters of the target object corresponding to the second sample time period, and the real resource attribute parameters may be used as reference values ​​for adjusting the estimation model when training the estimation model as described below.

[0069] Prior to this step, a step of training an estimation model is also included, including: inputting the first sample time period of the historical time period and the resource attribute parameters of the target object corresponding to the first sample time period into the estimation model, the estimation model obtains the predicted resource attribute parameters of the target object corresponding to the second sample time period through the first sample time period and the resource attribute parameters of the target object corresponding to the first sample time period, for example, the first sample time period is from 0:00 to 20:00 on January 5, 2010, the GMV of the first sample time period is 10,000 yuan, the estimation model predicts that the predicted GMV of the second sample time period from 20:00 to 24:00 on January 5, 2010 is 18,000 yuan, then determining the loss value according to the reference resource attribute parameters of the target object corresponding to the second sample time period and the predicted resource attribute parameters of the target object corresponding to the second sample time period, and then adjusting the model parameters of the estimation model according to the loss value until the estimation model meets the preset conditions, wherein the preset conditions may be that the model parameters of the estimation model converge or the number of training times of the estimation model is greater than a preset threshold.

[0070] The estimated parameters are adjusted by the real resource attribute parameters of the target object corresponding to the second sample time period (i.e., the reference resource attribute parameters of the target object corresponding to the second sample time period). For example, the real GMV from 20:00 to 24:00 on January 5, 2010 in the second sample time period is 20,000 yuan. Based on this, the estimated model can be adjusted so that the output of the estimated model is 20,000 yuan or infinitely close to 20,000 yuan, that is, infinitely close to the real resource attribute parameters of the target object corresponding to the second sample time period. Thus, the estimated model used in this step is obtained through training.

[0071] Step S332: Outputting a second estimated value of the third resource attribute parameter through the estimation model.

[0072] Optionally, after determining the first estimated value of the third resource attribute parameter, an estimation model can be used to obtain a second estimated value of the third resource attribute parameter. The estimation model can adopt a light gradient boosting machine (light GBM) learning model. Compared with deep models, the light GBM model has a small data requirement and is more suitable for online trading scenarios where the industry structure changes frequently. Specifically, the time series features input into the estimation model may include time series, year-on-year and month-on-month trend items, mean variance, quantiles and other statistical values; date features may include years, months, days, holidays, etc.; scheduled user features may include the start of the live broadcast host's broadcast information, such as the number of user visits planned for the broadcast, the number of products selected by the host, the price level of the host's selected products, etc.; scheduled date features include information related to promotional activities, such as the level of promotional activities, promotional dates, etc.

[0073] Step S340: Determine the target resource attribute parameters of the target object.

[0074] Optionally, the target resource attribute parameter is equal to the sum of the first resource attribute parameter and the second estimated value of the third resource attribute parameter.

[0075] In a possible implementation, the estimation model includes a first model or a second model, and S331 may specifically include inputting the first time period and the first resource attribute parameter into the first model when the target time period is in a non-predetermined period, wherein the weight of the first sample used in the first model training is negatively correlated with the time of the first sample and the target time difference, wherein the target time difference is a negative correlation between the time of generating the first sample and the current time of the end time of the first time period. Alternatively, when the target time period is in a predetermined period and a predetermined date of a non-predetermined period, the first time period and the first resource attribute parameter are input into the second model, wherein the weight of the second sample used in the second model training is determined according to the weight corresponding to the second sample within the historical time range corresponding to the predetermined period.

[0076] Optionally, the first model is a weekday model, the scheduled period can be an activity period, and the non-scheduled period is a model for non-activity periods; the second model is a promotion model, that is, a model for activity periods. The weekday model and the promotion model can both be implemented using the lightGMB model in terms of algorithms, and the features can be basically the same. The difference lies in the use of different sample weight strategies. Figure 3b A schematic diagram of the weight of the first sample in the first model is shown. In the weekday model, recent samples are given higher weights. Taking the target time period of June 2022 as an example, there is no large-scale promotion in June 2022. At this time, the shorter the first time of the first sample is from the target time period, the higher the sample weight. Figure 3c A schematic diagram of the second sample weight in the second model shown, taking the target time period of November 2022 as an example, there is a large-scale promotion in November 2022, and the sample weight during the historical promotion is high. Therefore, on the one hand, a higher weight is given to recent samples; on the other hand, the sample weight during the historical promotion is increased, for example, the sample weight in November 2021 is increased. Before using the model, the time period to which the prediction task belongs can be determined. If it is during weekdays, the first sample weight of the first model is used; if it is during a promotion, the sample weight during the promotion is increased accordingly. To further optimize the model.

[0077] Using different models and assigning different weights to samples from different periods in the model can make more effective use of historical sample data and avoid using weekday data for training during promotional activities, which may lead to insufficient response during the promotion period.

[0078] In a possible implementation, in the case of obtaining authorization permission from a predetermined user, the training sample of the estimation model may further include a feature value of the predetermined user, where the feature value of the predetermined user is used to indicate an identifier of a processing object of the task.

[0079] Optionally, the scheduled user is a live streamer user whose number of fans or transaction volume reaches a predetermined threshold, and who has high sales and bargaining power. The characteristic value of the scheduled user may include the tradable objects that the live streamer is going to add to the product selection cart or the tradable objects with explanations. In scenarios such as online live broadcasting, excellent live streamers play a big role. Taking the tradable objects selected by these excellent live streamers as a factor in estimating GMV will improve the accuracy of the estimation.

[0080] In a possible implementation, after the second estimated value of the third resource attribute parameter is outputted through the estimation model, the method further includes: performing a weighted summation of the first estimated value and the second estimated value to determine the third resource attribute parameter.

[0081] Optionally, GMV may be used to represent resource attribute parameters, and the third resource attribute parameter may be calculated with reference to formula (2).

[0082] Third GMV = 0.5 * first estimated value + 0.5 * second estimated value (2)

[0083] When determining the third GMV, the first estimated value calculated based on the historical time period data and the second estimated value output by the model are used at the same time, and the obtained third GMV is closer to the actual value. Here, the respective weight values ​​of the first estimated value and the second estimated value can also adopt other reasonable values ​​within the predetermined range.

[0084] Figure 4 Another flow chart of a method for determining a resource attribute parameter provided by an embodiment of the present application is shown. As shown in the figure, the method may include the following steps:

[0085] Step S410: Acquire the first resource attribute parameter of the target object.

[0086] Step S420: Acquire a second resource attribute parameter of the target object.

[0087] Step S410 and step S420 adopt Figure 1 The description of the corresponding steps of the embodiment will not be repeated here.

[0088] Step S431: Determine the fifth resource attribute parameter of the target object.

[0089] When the target time period is a scheduled date, determine the fifth resource attribute parameter of the target object, wherein the fifth resource attribute parameter is the resource attribute parameter corresponding to the target object in the fourth time period of the historical scheduled date, and the historical scheduled date is the date corresponding to the scheduled date in the historical time period; the position of the fourth time period in the historical scheduled date is the same as the position of the second time period in the target time period. Optionally, the length of the fourth time period is the same as the length of the second time period, the start time of the fourth time period corresponds to the start time of the second time period, and the end time of the fourth time period corresponds to the end time of the second time period. Taking the target time period as November 11, 2022 and the second time period as 20:00 to 24:00 as an example, the fourth GMV can be the GMV from 20:00 to 24:00 on November 11, 2021.

[0090] Step S432: Acquire the sixth resource attribute parameter of the target object.

[0091] Among them, the sixth resource attribute parameter is the resource attribute parameter corresponding to the target object in the fifth time period within the time period associated with the historical scheduled date; the position of the fifth time period in the time period associated with the historical scheduled date is the same as the position of the first time period in the target time period. Continuing with the example in the previous step, the fifth GMV can be the GMV from 20:00 to 24:00 in the 7 days before November 11, 2021, and the average value of the fifth GMV is the average value of the GMV from 20:00 to 24:00 in the 7 days before.

[0092] Optionally, when the sixth resource attribute parameter has multiple values, the sixth resource attribute parameter is an average of the multiple values.

[0093] Step S433: Determine the target coefficient.

[0094] A target coefficient is determined according to an average value of the sixth resource parameter and the fifth resource attribute parameter.

[0095] The processing of some target objects will last for a long time. For example, the Double 11 promotion may last from late October to mid-November. The biggest discount may be given on November 11. Consumers tend to shop on November 11, and sellers will achieve higher transaction volume on this day than at other times during the promotion. For example, the sales volume on November 11 may be several times the average daily sales volume of the previous 7 days. By introducing the target coefficient, the transaction volume can be accurately estimated.

[0096] For details, see the following formula (3):

[0097]

[0098] Taking the target time period as November 11, 2022 and the second time period as 20:00 to 24:00 as an example, the fourth GMV may be the GMV from 20:00 to 24:00 on November 11, 2021. The fifth GMV may be the GMV from 20:00 to 24:00 in the first 7 days associated with November 11, 2021, and the average value of the fifth GMV is the average value of the GMV from 20:00 to 24:00 in the first 7 days. Optionally, the fifth GMV may indicate the GMV of multiple different associated time periods.

[0099] Optionally, in the case where the fifth GMV indicates a plurality of associated time periods, an average of the results of (average of fourth GMV / fifth GMV) may be used as the target coefficient.

[0100] Step S434: Determine a third estimated value of the third resource attribute parameter.

[0101] According to the seventh resource attribute parameter and the target coefficient, the third estimated value of the third resource attribute parameter is determined, the seventh resource attribute parameter is the resource attribute parameter corresponding to the target object in the sixth time period of the historical time period, and the position of the sixth time period in the historical time period is the same as the position of the second time period in the target time period. Taking the historical time period as the first seven days of November 11, 2021 and the second time period as 20:00 to 24:00 as an example, the seventh GMV can be the average value of the GMV from 20:00 to 24:00 in the first seven days of November 11, 2021.

[0102] Optionally, the second time period of the historical time period may be the remaining time in the historical time period except the first time period.

[0103] The third estimated value satisfies the following formula (4).

[0104] The third estimated value = the average GMV of the remaining time of the historical time period * target coefficient (4)

[0105] That is, based on the average value of the GMV of the remaining time of the historical time period and the target coefficient, the third estimated value can be calculated.

[0106] Step S440: Determine the target resource attribute parameters of the target object.

[0107] Optionally, the target resource attribute parameter may be the sum of the first resource attribute parameter and a third estimated value of the third resource attribute parameter.

[0108] In a possible implementation manner, after determining the third estimated value of the third resource attribute parameter, the method further includes: performing a weighted summation of the first estimated value and the third estimated value to determine the third resource attribute parameter.

[0109] Optionally, the third GMV may be calculated with reference to formula (5).

[0110] Third GMV = 0.5 * first estimated value + 0.5 * third estimated value (5)

[0111] When determining the third resource attribute parameter, the first estimated value calculated based on the historical time period data and the third estimated value calculated based on the target coefficient are used at the same time, and the obtained third resource attribute parameter is closer to the actual value. Here, the respective weight values ​​of the first estimated value and the third estimated value can also adopt other reasonable values ​​within the predetermined range.

[0112] Figure 5 Another flowchart of a method for determining resource attribute parameters provided in an embodiment of the present application is shown.

[0113] Step S510: upon receiving a query request, determine whether the current day is in a promotional activity phase, if not, jump to S520; if yes, jump to S530.

[0114] Step S520: call the first model to obtain a second estimated value of the third resource attribute parameter, and jump to S560.

[0115] Step S530: Determine whether the current day is a scheduled date during the promotion period, such as Double Eleven Day. If not, jump to step S540; if yes, jump to step S550.

[0116] Step S540: call the second model to obtain a second estimated value of the third resource attribute parameter, and jump to S560.

[0117] Step S550: Calculate a third estimated value of the third resource attribute parameter using the target coefficient, and jump to S560.

[0118] Step S560: Calculate a first estimated value of the third resource attribute parameter based on the data of the historical time period, and jump to S570.

[0119] Step S570: Calculate the estimated task volume based on the acquired first resource attribute parameter and the determined third resource attribute parameter, and return the result.

[0120] Based on the above real-time results, you can adjust various promotion strategies to achieve the sales target for the day or the scheduled sales. For example, adjust the anchor's broadcast time, adjust the product plan, increase marketing efforts, etc. The above solution combines multiple angles such as model selection, feature construction, and promotion identification, which can improve the estimation accuracy and retain the advantages of flexible rule calculation and adjustment. This solution is suitable for large-screen PC and mobile applications.

[0121] Figure 6A schematic diagram of the structure of a device for determining resource attribute parameters provided in an embodiment of the present application is shown. The device 600 includes: a first acquisition module 610, a second acquisition module 620, a first determination module 630 and a second determination module 640.

[0122] The first acquisition module 610 is used to acquire a first resource attribute parameter of a target object, wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time cycle; the second acquisition module 620 is used to acquire a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; the first determination module 630 is used to determine a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object, wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time cycle, wherein the second time period is later than the first time period; the second determination module 640 is used to determine a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object, wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0123] In one possible implementation, the first determination module 630 is used to obtain a target estimated value of the third resource attribute parameter based on the first resource attribute parameter and the second resource attribute parameter of the target object, wherein the target estimated value includes one of the following: a first estimated value, a second estimated value, a third estimated value, the first estimated value and the second estimated value, the first estimated value and the third estimated value; and determine the third resource attribute parameter of the target object based on the target estimated value of the third resource attribute parameter.

[0124] In one possible implementation, the first determination module 630 is specifically used to determine a fourth resource attribute parameter of the target object based on the second resource attribute parameter, wherein the fourth resource attribute parameter is a resource attribute parameter corresponding to the target object in a third time period of the historical time period, and the position of the third time period in the historical time period is the same as the position of the first time period in the target time period; determine an estimated proportion of the first resource attribute parameter in the target resource attribute parameter based on the fourth resource attribute parameter and the second resource attribute parameter; and determine the first estimated value of the third resource attribute parameter based on the first resource attribute parameter and the estimated proportion.

[0125] In one possible implementation, the first determination module 630 is used to input the first time period and the first resource attribute parameter into an estimation model, wherein the training sample data of the estimation model includes: a first sample time period of the historical time period, resource attribute parameters of the target object corresponding to the first sample time period, and reference resource attribute parameters of the target object corresponding to a second sample time period, wherein the second sample time period is a time period in the historical time period that is later than the first sample time period; and the second estimation value is output through the estimation model.

[0126] In one possible implementation, the estimation model includes a first model or a second model, and the first determination module 630 is used to input the first time period and the first resource attribute parameter into the first model when the target time period is not in a predetermined period, wherein the weight of the first sample used in the first model training is negatively correlated with the target time difference, wherein the target time difference is the time difference between the generation time of the first sample and the end time of the first time period; or, when the target time period is in a predetermined period and not a predetermined date of the predetermined period, the first time period and the first resource attribute parameter are input into the second model, wherein the weight of the second sample used in the second model training is determined according to the weight corresponding to the second sample within the historical time range corresponding to the predetermined period.

[0127] In a possible implementation, the first determination module 630 is used to determine a fifth resource attribute parameter of the target object when the target time period is a scheduled date, wherein the fifth resource attribute parameter is a resource attribute parameter corresponding to the target object in a fourth time period of a historical scheduled date, and the historical scheduled date is a date corresponding to the scheduled date in the historical time period; the position of the fourth time period in the historical scheduled date is the same as the position of the second time period in the target time period; obtain a sixth resource attribute parameter of the target object, wherein the sixth resource attribute parameter is a resource attribute parameter corresponding to the target object in a fifth time period within the time period associated with the historical scheduled date; the position of the fifth time period in the time period associated with the historical scheduled date is the same as the position of the second time period in the target time period; determine a target coefficient based on an average value of the sixth resource attribute parameter and the fifth resource attribute parameter; determine the third estimated value based on a seventh resource attribute parameter and the target coefficient, wherein the seventh resource attribute parameter is a resource attribute parameter corresponding to the target object in a sixth time period of the historical time period, and the position of the sixth time period in the historical time period is the same as the position of the second time period in the target time period.

[0128] In a possible implementation, the first determination module 630 is used to determine the third resource attribute parameter by weighted summing the first estimated value and the second estimated value; or to determine the third resource attribute parameter by weighted summing the first estimated value and the third estimated value. The device 600 provided in the embodiment of the present application can execute the methods described in the foregoing method embodiments, and realize the functions and beneficial effects of the methods described in the foregoing method embodiments, which will not be described in detail here.

[0129] Figure 7 A hardware structure diagram of an electronic device 700 for executing the data processing method provided in an embodiment of the present application is shown. Referring to the figure, at the hardware level, the electronic device includes a processor 710, and optionally, an internal bus 720, a network interface 730, and a memory. Among them, the memory may include a memory 740, such as a high-speed random access memory (Random-Access Memory, RAM), and may also include a non-volatile memory (non-volatile memory) 750, such as at least one disk storage, etc. Of course, the electronic device may also include hardware required for other services.

[0130] The processor 710, the network interface 730 and the memory may be connected to each other via an internal bus 720, which may be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one bidirectional arrow is used in the figure, but it does not mean that there is only one bus or one type of bus.

[0131] The memory is used to store programs. Specifically, the program may include program codes, and the program codes include computer operation instructions. The memory may include a memory 740 and a non-volatile memory 750, and provide instructions and data to the processor 710.

[0132] The processor 710 reads the corresponding computer program from the non-volatile memory 750 into the memory 740 and then runs it, forming a device for locating the target user at the logical level. The processor 710 executes the program stored in the memory and is specifically used to execute Figure 1-5 The method described in the embodiment achieves the same or corresponding technical effects.

[0133] The above application Figure 1-5 The method disclosed in the illustrated embodiment can be applied to a processor or implemented by a processor 710. The processor 710 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware or software instructions in the processor 710. The above processor 710 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application can be directly embodied as a hardware decoding processor for execution, or a combination of hardware and software modules in the decoding processor for execution. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor 710 reads the information in the memory and completes the steps of the above method in combination with its hardware.

[0134] The electronic device can also execute the methods described in the foregoing method embodiments, and realize the functions and beneficial effects of the methods described in the foregoing method embodiments, which will not be repeated here.

[0135] Of course, in addition to software implementation, the electronic device of the present application does not exclude other implementation methods, such as logic devices or a combination of software and hardware, etc. That is to say, the execution subject of the following processing flow is not limited to each logic unit, but can also be hardware or logic devices.

[0136] The embodiment of the present application also proposes a computer-readable storage medium, wherein the computer-readable medium stores one or more programs, and when the one or more programs are executed by an electronic device including multiple application programs, the electronic device performs the following operations: obtaining a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; obtaining a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; determining a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; determining a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period. .

[0137] The electronic device can also execute the methods described in the foregoing method embodiments, and realize the functions and beneficial effects of the methods described in the foregoing method embodiments, which will not be repeated here.

[0138] The computer-readable storage medium includes a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0139] Furthermore, an embodiment of the present application also provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the following process is implemented: obtaining a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; obtaining a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; determining a third resource attribute parameter of the target object based on the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; determining a target resource attribute parameter of the target object based on the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

[0140] In short, the above description is only a preferred embodiment of the present application and is not intended to limit the protection scope of the present application. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

[0141] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.

[0142] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0143] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0144] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

Claims

1. A method for determining resource attribute parameters, comprising: Acquire a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; Acquire a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; Determine a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; Determine a target resource attribute parameter of the target object according to the first resource attribute parameter and the third resource attribute parameter of the target object; wherein the target resource attribute parameter is a resource attribute parameter corresponding to the target object in the target time period.

2. The method according to claim 1, characterized in that The determining, according to the first resource attribute parameter and the second resource attribute parameter of the target object, a third resource attribute parameter of the target object includes: Acquire a target estimated value of the third resource attribute parameter according to the first resource attribute parameter and the second resource attribute parameter of the target object, wherein the target estimated value includes one of the following: a first estimated value, a second estimated value, a third estimated value, the first estimated value and the second estimated value, the first estimated value and the third estimated value; The third resource attribute parameter of the target object is determined according to the target estimated value of the third resource attribute parameter.

3. The method according to claim 2, wherein: Acquiring a target estimated value of the third resource attribute parameter according to the first resource attribute parameter and the second resource attribute parameter of the target object includes: Determine a fourth resource attribute parameter of the target object according to the second resource attribute parameter, wherein the fourth resource attribute parameter is a resource attribute parameter corresponding to the target object in a third time period of the historical time period, and a position of the third time period in the historical time period is the same as a position of the first time period in the target time period; Determining an estimated proportion of the first resource attribute parameter in the target resource attribute parameter according to the fourth resource attribute parameter and the second resource attribute parameter; The first estimated value of the third resource attribute parameter is determined according to the first resource attribute parameter and the estimated proportion.

4. The method according to claim 2, wherein: Acquiring a target estimated value of the third resource attribute parameter according to the first resource attribute parameter and the second resource attribute parameter of the target object includes: Inputting the first time period and the first resource attribute parameter into an estimation model, wherein the training sample data of the estimation model includes: a first sample time period of the historical time period, a resource attribute parameter of a target object corresponding to the first sample time period, and a reference resource attribute parameter of the target object corresponding to a second sample time period, wherein the second sample time period is a time period in the historical time period that is later than the first sample time period; The second estimated value is outputted through the estimation model.

5. The method according to claim 4, wherein: The estimation model includes a first model or a second model, and inputting the first time period and the first resource attribute parameter into the estimation model includes: In the case where the target time period is a non-predetermined period, the first time period and the first resource attribute parameter are input into a first model, wherein the weight of the first sample used in the first model training is negatively correlated with the target time difference, wherein the target time difference is the time difference between the generation time of the first sample and the end time of the first time period; or, When the target time period is within a predetermined period and is not a predetermined date of the predetermined period, the first time period and the first resource attribute parameter are input into a second model, wherein the weight of the second sample used for training the second model is determined based on the weight corresponding to the second sample within the historical time range corresponding to the predetermined period.

6. The method according to claim 2, wherein: Acquiring a target estimated value of the third resource attribute parameter according to the first resource attribute parameter and the second resource attribute parameter of the target object includes: In the case where the target time period is a scheduled date, determining a fifth resource attribute parameter of the target object, wherein the fifth resource attribute parameter is a resource attribute parameter corresponding to the target object in a fourth time period of a historical scheduled date, the historical scheduled date being a date corresponding to the scheduled date in the historical time period; and the position of the fourth time period in the historical scheduled date is the same as the position of the second time period in the target time period; Acquire a sixth resource attribute parameter of the target object, wherein the sixth resource attribute parameter is a resource attribute parameter corresponding to the target object in a fifth time period within the time period associated with the historical scheduled date; the position of the fifth time period in the time period associated with the historical scheduled date is the same as the position of the second time period in the target time period; determining a target coefficient according to an average value of the sixth resource attribute parameter and the fifth resource attribute parameter; The third estimated value is determined based on a seventh resource attribute parameter and the target coefficient, wherein the seventh resource attribute parameter is a resource attribute parameter corresponding to the target object in a sixth time period of a historical time period, and the position of the sixth time period in the historical time period is the same as the position of the second time period in the target time period.

7. The method according to claim 2, wherein: Determining the third resource attribute parameter of the target object according to the target estimated value of the third resource attribute parameter includes: Determine the third resource attribute parameter by taking a weighted sum of the first estimated value and the second estimated value; or The third resource attribute parameter is determined by performing a weighted summation on the first estimated value and the third estimated value.

8. A device for determining resource attribute parameters, comprising: A first acquisition module, used to acquire a first resource attribute parameter of a target object; wherein the first resource attribute parameter is a resource attribute parameter corresponding to the target object in a first time period of a target time period; A second acquisition module, configured to acquire a second resource attribute parameter of the target object, wherein the second resource attribute parameter is a resource attribute parameter corresponding to the target object in a historical time period, and the historical time period is earlier than the first time period; A first determination module, configured to determine a third resource attribute parameter of the target object according to the first resource attribute parameter and the second resource attribute parameter of the target object; wherein the third resource attribute parameter is a resource attribute parameter corresponding to the target object in a second time period of the target time period; wherein the second time period is later than the first time period; The second determination module is used to determine the target resource attribute parameters of the target object according to the first resource attribute parameters and the third resource attribute parameters of the target object; wherein the target resource attribute parameters are the resource attribute parameters corresponding to the target object in the target time period.

9. An electronic device, comprising: processor; as well as A memory arranged to store computer executable instructions, wherein when the executable instructions are executed, the processor is used to perform the method for determining resource attribute parameters according to any one of claims 1 to 7.

10. A computer-readable medium storing one or more programs, which, when executed by an electronic device including a plurality of application programs, enable the electronic device to execute the method for determining resource attribute parameters according to any one of claims 1 to 7.