Underground pipe gallery monitoring and warning method, system, equipment and medium
By constructing a twin model of underground pipeline corridors and a monitoring sensor network, and combining historical disaster records and multi-source sensing data, the pipeline corridor risk prediction is carried out, which solves the accuracy and effectiveness problems of underground pipeline corridor monitoring and alarms and improves the accuracy of monitoring. and effectiveness.
Patent Information
- Application Number
- CN202410838774.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
AI Technical Summary
Due to the complexity of monitoring objects and monitoring environments, the accuracy and effectiveness of monitoring alarms in underground pipeline corridor monitoring are poor.
By obtaining the basic structure data of the pipe gallery, a twin model of the underground pipe gallery is constructed, combined with historical disaster records, to identify key monitoring points and factors, lay out a monitoring sensor network, obtain multi-source sensing data, and train the risk prediction module to predict pipe gallery risks and disasters. Risk warning.
It improves the accuracy and effectiveness of underground pipe gallery monitoring and alarming, realizes risk warning for key monitoring points, and ensures the safe and stable operation of the pipe gallery.
Smart Images

Figure CN118736773A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent monitoring technology, and in particular to an underground pipe gallery monitoring and alarm method, system, equipment and medium. Background Art
[0002] As an important infrastructure of the city, the underground integrated pipeline corridor integrates various engineering pipelines such as electricity, communications, gas, heating, water supply and drainage, and plays an important role in meeting the basic needs of the people and improving the comprehensive carrying capacity of the city. However, there are problems such as abnormal structural deformation and water leakage in the construction and operation of underground pipeline corridors, which require comprehensive, real-time and accurate monitoring to ensure their safe and stable operation. However, due to the complexity of the monitoring objects and monitoring environment, the monitoring is difficult, and the accuracy and effectiveness of the early warning are poor. Summary of the invention
[0003] The present application provides an underground pipe gallery monitoring and alarm method, system, equipment and medium, which are used to solve the technical problem in the prior art that the accuracy and effectiveness of underground pipe gallery monitoring and alarm are poor due to the complexity of the monitoring object and the monitoring environment.
[0004] The first aspect of the present application provides an underground pipeline corridor monitoring and alarm method, the method comprising: obtaining pipeline corridor infrastructure data and constructing an underground pipeline corridor twin model; reading historical pipeline corridor disaster records, establishing a risk perception database, and performing data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors; based on the multiple key monitoring points and multiple key monitoring factors, in combination with the underground pipeline corridor twin model, deploying a monitoring sensor network; based on the monitoring sensor network, obtaining multi-source sensor monitoring data; based on the risk perception database, in combination with the underground pipeline corridor twin model, training a disaster situation prediction module and a risk level assessment module to be embedded in a risk prediction unit; through the risk prediction unit, performing pipeline corridor risk prediction based on the multi-source sensor monitoring data, obtaining pipeline corridor risk prediction results, and performing pipeline corridor disaster risk warning based on the pipeline corridor risk prediction results.
[0005] The second aspect of the present application provides an underground pipeline corridor monitoring and alarm system, the system comprising: an underground pipeline corridor twin model construction module, the underground pipeline corridor twin model construction module is used to obtain pipeline corridor infrastructure data and construct an underground pipeline corridor twin model; a key monitoring point identification module, the key monitoring point identification module is used to read historical pipeline corridor disaster records, establish a risk perception database, and perform data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors; a monitoring sensor network deployment module, the monitoring sensor network deployment module is used to, based on the multiple key monitoring points and multiple key monitoring factors, combine the underground pipeline corridor twin model type, deploying a monitoring sensor network; a multi-source sensor monitoring data acquisition module, the multi-source sensor monitoring data acquisition module is used to obtain multi-source sensor monitoring data according to the monitoring sensor network; a risk prediction unit construction module, the risk prediction unit construction module is used to train a disaster situation prediction module and a risk level assessment module based on the risk perception database and in combination with the underground pipeline corridor twin model, and embed them into the risk prediction unit; a disaster risk warning module, the disaster risk warning module is used to perform pipeline corridor risk prediction based on the multi-source sensor monitoring data through the risk prediction unit, obtain pipeline corridor risk prediction results, and perform pipeline corridor disaster risk warning according to the pipeline corridor risk prediction results.
[0006] In a third aspect, the present application provides an electronic device comprising: a processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the steps of any one of the methods described in the first aspect above.
[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0008] The present application provides an underground pipeline corridor monitoring and alarm method, which relates to the field of intelligent monitoring technology. The method obtains pipeline corridor infrastructure data, constructs an underground pipeline corridor twin model, combines historical pipeline corridor disaster records, identifies and obtains multiple key monitoring points and multiple key monitoring factors, deploys a monitoring sensor network, obtains multi-source sensor monitoring data, and uses a risk prediction unit to predict pipeline corridor risks based on multi-source sensor monitoring data. According to the pipeline corridor risk prediction results, a pipeline corridor disaster risk warning is issued, which solves the technical problem of poor accuracy and effectiveness of underground pipeline corridor monitoring and alarming due to the complexity of the monitoring objects and the monitoring environment in the prior art, and achieves the technical effect of improving the accuracy and effectiveness of underground pipeline corridor monitoring and alarming by identifying key monitoring points for risk monitoring and warning. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0010] Figure 1 A schematic diagram of a process flow of an underground pipe gallery monitoring and alarm method provided in an embodiment of the present application;
[0011] Figure 2 A schematic diagram of a process for identifying and obtaining multiple key monitoring points and multiple key monitoring factors in an underground pipe gallery monitoring and alarm method provided in an embodiment of the present application;
[0012] Figure 3 A schematic diagram of a process for obtaining the disaster situation prediction module in an underground pipe gallery monitoring and alarm method provided in an embodiment of the present application;
[0013] Figure 4 A schematic diagram of the structure of an underground pipe gallery monitoring and alarm system provided in an embodiment of the present application;
[0014] Figure 5 A structural schematic diagram of an electronic device is provided for the present application.
[0015] Explanation of the accompanying drawings: underground utility corridor twin model construction module 11, key monitoring point identification module 12, monitoring sensor network deployment module 13, multi-source sensor monitoring data acquisition module 14, risk prediction unit construction module 15, disaster risk warning module 16, electronic device 300, memory 301, processor 302, communication interface 303, bus architecture 304. DETAILED DESCRIPTION
[0016] The present application provides an underground pipe gallery monitoring and alarm method, which is used to solve the technical problem in the prior art that the accuracy and effectiveness of underground pipe gallery monitoring and alarm are poor due to the complexity of the monitoring object and the monitoring environment.
[0017] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0018] It should be noted that the terms "first", "second", etc. in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices.
[0019] Embodiment 1
[0020] like Figure 1 As shown, the present application provides an underground pipe gallery monitoring and alarm method, the method comprising:
[0021] P10: Obtain the infrastructure data of the tunnel and build a twin model of the underground tunnel;
[0022] Specifically, based on design drawings, construction drawings, on-site survey data, historical maintenance records, etc., basic structural data about the underground utility corridor is collected, including the size, material, layout, design parameters, geographic location information, surrounding environment, etc. of the utility corridor. Then, after verifying and cleaning the collected data, a twin model of the underground utility corridor is constructed using three-dimensional simulation software to provide a basic reference for subsequent risk identification, monitoring sensor network deployment, and data monitoring.
[0023] P20: Read historical pipeline corridor disaster records, establish a risk perception database, and conduct data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors;
[0024] Furthermore, step P20 of the embodiment of the present application also includes:
[0025] P21: Collect historical pipeline corridor disaster records, and cluster the historical pipeline corridor disaster records to obtain multiple disaster data sets corresponding to different disaster types;
[0026] P22: Based on the multiple disaster data sets, respectively perform disaster risk assessments to obtain multiple disaster risk data sets;
[0027] P23: Structuring the multiple disaster data sets and the multiple disaster risk data sets to obtain the risk perception database.
[0028] Optionally, collect historical tunnel disaster records, including detailed information about the disaster, such as the time, location, type, impact range, and loss of the disaster, and use cluster analysis or other data mining techniques to cluster the collected disaster records according to the disaster type. For example, cluster different types of disasters such as leakage, collapse, and fire to form different disaster data sets.
[0029] Furthermore, for each disaster data set, appropriate risk assessment methods, such as risk matrix method, fault tree analysis method, etc., are used to conduct risk assessment, including assessing the probability of disaster occurrence, possible losses, impact range, etc., to obtain multiple disaster risk data sets corresponding to different disaster types. Furthermore, multiple disaster data sets and disaster risk data sets are structured and organized to form a unified risk perception database. The risk perception database has a clear data structure and easy-to-query function, which can be used for subsequent analysis and application.
[0030] Further, such as Figure 2 As shown, step P20 of the embodiment of the present application also includes:
[0031] P24: Based on the risk perception database, multiple disaster risk data sets are read, and high-risk events are extracted based on the multiple disaster risk data sets to obtain multiple high-risk events;
[0032] P25: For the multiple high-risk events, statistics on disaster frequency, disaster location, and disaster time are performed, and based on the statistical results, multiple key monitoring points and multiple key monitoring factors are identified and obtained, and the multiple key monitoring points and multiple key monitoring factors are all weighted.
[0033] It should be understood that multiple disaster risk data sets are read from the risk perception database, and data analysis and mining techniques, such as machine learning algorithms, pattern recognition, etc., are used to extract high-risk events from the disaster risk data sets, that is, risk events with a higher probability of occurrence, greater potential losses or important geographical locations.
[0034] Furthermore, for the multiple high-risk events, by analyzing the number of occurrences of these events in history, the main locations and time periods, etc., statistics on disaster frequency, disaster location, and disaster time are performed, and by identifying areas with high disaster frequencies, key facility locations, or important intersections, etc., multiple key monitoring points closely related to high-risk events are obtained. At the same time, key monitoring factors closely related to high-risk events are determined. These factors may be physical parameters such as temperature, humidity, pressure, vibration, displacement, or operating parameters such as flow and voltage. Furthermore, corresponding weights are assigned to each key monitoring point and monitoring factor based on its importance, sensitivity, or degree of impact in high-risk events. By identifying key monitoring points and key monitoring factors, support is provided for the subsequent monitoring sensor network layout and pipeline corridor risk prediction.
[0035] P30: Based on the multiple key monitoring points and multiple key monitoring factors, combined with the underground pipeline gallery twin model, a monitoring sensor network is deployed;
[0036] Furthermore, step P30 of the embodiment of the present application further includes:
[0037] P31: Based on the underground utility corridor twin model, obtaining underground utility corridor space data;
[0038] P32: Matching the multiple key monitoring points with the multiple key monitoring factors to obtain multiple monitoring factor sets corresponding to the multiple key monitoring points;
[0039] P33: Based on the multiple monitoring factor sets and in combination with the underground pipe gallery space data, the sensor locations and quantities are determined to construct the monitoring sensor network.
[0040] Specifically, based on the multiple key monitoring points and multiple key monitoring factors, combined with the underground pipe gallery twin model, a monitoring sensor network is deployed. First, based on the underground pipe gallery twin model, the underground pipe gallery space data is obtained, including the size, structure, layout, material, specific location of pipelines and equipment, etc. of the pipe gallery, to provide accurate spatial location information for the subsequent deployment of the monitoring sensor network.
[0041] Furthermore, the multiple key monitoring points are matched with the multiple key monitoring factors. Each key monitoring point may correspond to one or more key monitoring factors, which together constitute the monitoring factor set of the monitoring point. Furthermore, according to the factor type in each monitoring factor set, a suitable sensor type is selected, and the specific installation location of each sensor is determined in combination with the spatial data of the underground pipe gallery and the location information of the key monitoring points, and the number of sensors required for each key monitoring point is determined according to the monitoring requirements. Finally, all selected sensors are connected according to a certain network topology to form a monitoring sensor network that can fully cover the key monitoring points and accurately monitor the key factors, providing real-time monitoring functions for the safe operation of the underground pipe gallery.
[0042] P40: Acquire multi-source sensor monitoring data according to the monitoring sensor network;
[0043] Optionally, based on the monitoring sensor network, real-time monitoring of the underground pipeline network is carried out, sensor data from different key monitoring points are obtained, data collection and monitoring of target objects and environments are realized, and multi-source sensor monitoring data, such as temperature, humidity, and pressure, are obtained.
[0044] P50: Based on the risk perception database and in combination with the underground utility gallery twin model, a disaster situation prediction module and a risk level assessment module are trained and embedded into a risk prediction unit;
[0045] Furthermore, step P50 of the embodiment of the present application also includes:
[0046] P51: Based on the risk perception database, multiple prior feature sequences of different disaster types are extracted, and supervised training is performed in combination with a deep learning network to obtain the disaster situation prediction module;
[0047] P52: Based on the risk perception database, extract multiple post-event feature sequences of different disaster types, as well as corresponding disaster causes and disaster impact levels, and train them in combination with a neural network model to obtain the risk level assessment module;
[0048] P53: Embed the disaster situation prediction module and the risk level assessment module into the risk prediction unit.
[0049] It should be understood that training data is extracted from the risk perception database, combined with the underground pipeline corridor twin model, and the training disaster situation prediction module and risk level assessment module are embedded in the risk prediction unit. Specifically, multiple prior feature sequences of different disaster types are extracted from the risk perception database. These feature sequences may include historical data of physical parameters such as temperature, humidity, pressure, vibration, or historical data of operating parameters such as flow and voltage. And the prior feature sequence is used as training data, combined with a deep learning network, such as a convolutional neural network, for supervised training. During the training process, it is necessary to define appropriate labels, such as normal, abnormal, specific disaster types, etc., and use these labels to train the deep learning network until the output converges to obtain the disaster situation prediction module.
[0050] Further, post-event feature sequences of different disaster types are extracted from the risk perception database, and at the same time, the disaster causes corresponding to these disaster events, such as leakage, collapse, fire, etc., and the disaster impact levels, such as minor, moderate, severe, etc., are extracted. Combined with the extracted post-event feature sequences, disaster causes and disaster impact levels, a neural network model, such as a multi-layer perceptron, a support vector machine, etc., is used for training until the model converges to obtain the risk level assessment module.
[0051] Finally, the trained disaster situation prediction module and risk level assessment module are integrated into the risk prediction unit. The risk prediction unit receives multi-source sensor monitoring data and calls the built-in disaster situation prediction module and risk level assessment module to predict the disaster situation and assess the risk level.
[0052] Further, such as Figure 3 As shown, step P51 of the embodiment of the present application also includes:
[0053] P51-1: The multiple prior feature sequences include pre-fault operating parameter sequences and pre-fault environmental data sequences of multiple key monitoring points;
[0054] P51-2: Perform correlation impact analysis on the multiple key monitoring points to generate multiple correlation impact factors;
[0055] P51-3: According to the pre-fault operating parameter sequence and the pre-fault environmental data sequence, supervised training is performed based on a deep learning network to obtain an initial disaster prediction module;
[0056] P51-4: Based on the multiple correlated influencing factors, the initial disaster prediction module is modified to obtain the disaster situation prediction module.
[0057] In a possible embodiment of the present application, the multiple pre-feature sequences include a pre-fault operating parameter sequence and a pre-fault environmental data sequence of multiple key monitoring points, wherein the pre-fault operating parameters include the flow, pressure, voltage, current, etc. of various equipment and pipelines in the tunnel, and the pre-fault environmental data include ambient temperature, humidity, vibration, etc., which can reflect the real-time status of the internal environment of the underground tunnel.
[0058] Furthermore, considering that there may be mutual influences between the key monitoring points in the underground tunnel, it is necessary to conduct an association impact analysis, including analyzing the physical connections, functional associations and possible fault propagation paths between different monitoring points, and generating multiple association impact factors based on the results of the association impact analysis.
[0059] Furthermore, the pre-fault operating parameter sequence and pre-fault environmental data sequence are used as training data, and supervised training is performed based on a deep learning network to obtain an initial disaster prediction module, and the initial disaster prediction module is corrected using the multiple associated influencing factors, such as by introducing additional weights in the model or adjusting the network structure to better reflect the association between monitoring points, thereby obtaining a final disaster situation prediction module. This module not only considers the data of a single monitoring point, but also the mutual influence between different monitoring points, so it can provide more accurate and comprehensive disaster prediction results.
[0060] P60: Through the risk prediction unit, a risk prediction of the pipeline corridor is performed based on the multi-source sensor monitoring data, a risk prediction result of the pipeline corridor is obtained, and a disaster risk warning of the pipeline corridor is performed according to the risk prediction result of the pipeline corridor.
[0061] Furthermore, step P60 of the embodiment of the present application also includes:
[0062] P61: Perform data cleaning and normalization processing on the multi-source sensor monitoring data to obtain a pipeline corridor monitoring data set;
[0063] P62: Input the pipeline corridor monitoring data set into the disaster situation prediction module of the risk prediction unit to perform disaster prediction and obtain a disaster prediction result;
[0064] P63: If the disaster prediction result meets the safety risk threshold, the operation safety push is performed;
[0065] P64: If the disaster prediction result does not meet the safety risk threshold, a risk assessment is performed through the risk level assessment module to obtain a pipeline corridor risk prediction result, and a pipeline corridor disaster risk warning is performed based on the pipeline corridor risk prediction result.
[0066] Specifically, the risk prediction unit performs risk prediction of the pipeline corridor based on the multi-source sensor monitoring data to obtain the risk prediction result of the pipeline corridor. First, the multi-source sensor monitoring data is cleaned to remove noise, outliers and duplicate data, and the cleaned data is normalized to be in the same order of magnitude and range, which is convenient for subsequent data analysis and model prediction.
[0067] Furthermore, the pipeline corridor monitoring data set is input into the disaster situation prediction module of the risk prediction unit for disaster situation prediction to obtain disaster situation prediction results. If the disaster situation prediction results meet the safety risk threshold, the operation safety information is pushed to the relevant personnel to show that the current operation status is in safe operation. If the disaster situation prediction results do not meet the safety risk threshold, indicating that there is a safety risk in the current pipeline corridor, the risk assessment is performed through the risk level assessment module to obtain the pipeline corridor risk prediction results, including the current risk level of the pipeline corridor, and according to the pipeline corridor risk prediction results, a disaster risk warning is issued to the relevant personnel to inform them of the current risk status of the pipeline corridor and recommend corresponding preventive measures to reduce potential risks.
[0068] Furthermore, the embodiment of the present application further includes step P70, and step P70 further includes:
[0069] P71: Based on the underground pipe gallery twin model and the multiple key monitoring points, multiple monitoring zones are divided, and regional location information and regional connectivity information of the multiple monitoring zones are obtained;
[0070] P72: Extract the zoning risk level assessment results based on the disaster prediction results, and sort the regional risk levels based on the zoning risk level assessment results to extract multiple high-risk areas;
[0071] P73: For the multiple monitoring zones and the multiple high-risk areas, determine the central impact area based on the zone contribution;
[0072] P74: Based on the central impact area, combined with the multiple high-risk areas, the regional location information and the regional connectivity information, the underground utility corridor twin model is used to perform disaster spread simulation analysis to obtain global disaster trend prediction results.
[0073] It should be understood that, based on the underground pipe gallery twin model and the multiple key monitoring points, the underground pipe gallery is divided into several monitoring zones according to its structure, function or geographical location, etc., taking into account the actual situation of the pipe gallery. Further, the regional location information and regional connectivity information of the multiple monitoring zones are obtained respectively, the regional location information includes the geographical coordinates and spatial distribution of each monitoring zone, and the regional connectivity information describes the connection relationship between each monitoring zone, such as pipeline connection, vents, etc., so as to simulate the diffusion path of disasters between zones.
[0074] Furthermore, based on the regional location information and regional connectivity information, combined with disaster prediction results, further, according to the disaster prediction results, combined with the functional characteristics of each monitoring zone, a quantitative calculation of safety risks is performed, the risk level of each monitoring zone is evaluated, and the risk levels of all monitoring zones are sorted. Areas with higher risk levels are extracted from the sorting results as the focus of attention, and multiple high-risk areas are obtained.
[0075] Furthermore, for the multiple monitoring zones, combined with the risk levels of the multiple high-risk areas, the corresponding zone contribution is generated, that is, the degree of influence of each monitoring zone on the overall corridor risk. Based on the zone contribution, the area with the greatest impact on the overall corridor risk is determined, that is, the central influence area. Furthermore, with the central influence area as the core, the risk weight of the central influence area during diffusion simulation is set to the highest, and after setting corresponding risk weights for the multiple high-risk areas, the underground corridor twin model is used, combined with analysis and simulation software (such as building ventilation simulation software), according to the regional location information and regional connectivity information, a global disaster diffusion simulation analysis is performed, and according to different risk weights, the disaster diffusion sensitivity of different areas is configured, so that the simulation effect is closer to the real disaster diffusion effect, and the accuracy and reliability of underground corridor monitoring and alarm are improved.
[0076] In summary, the embodiments of the present application have at least the following technical effects:
[0077] This application obtains the infrastructure data of the underground corridor, constructs a twin model of the underground corridor, combines historical corridor disaster records, identifies and obtains multiple key monitoring points and multiple key monitoring factors, deploys a monitoring sensor network, obtains multi-source sensor monitoring data, and uses a risk prediction unit to predict corridor risks based on multi-source sensor monitoring data, and issues corridor disaster risk warnings based on the corridor risk prediction results.
[0078] The technical effect of identifying key monitoring points for risk monitoring and early warning has been achieved, thereby improving the accuracy and effectiveness of underground pipeline corridor monitoring and alarm.
[0079] Embodiment 2
[0080] Based on the same inventive concept as the underground pipe gallery monitoring and alarm method in the aforementioned embodiment, Figure 4 As shown, the present application provides an underground pipe gallery monitoring and alarm system, and the system and method embodiments in the present application are based on the same inventive concept. The system includes:
[0081] An underground pipe gallery twin model construction module 11, wherein the underground pipe gallery twin model construction module 11 is used to obtain pipe gallery infrastructure data and construct an underground pipe gallery twin model;
[0082] A key monitoring point identification module 12, which is used to read historical pipeline corridor disaster records, establish a risk perception database, and perform data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors;
[0083] A monitoring sensor network deployment module 13, wherein the monitoring sensor network deployment module 13 is used to deploy a monitoring sensor network based on the multiple key monitoring points and multiple key monitoring factors in combination with the underground pipe gallery twin model;
[0084] A multi-source sensor monitoring data acquisition module 14, wherein the multi-source sensor monitoring data acquisition module 14 is used to acquire multi-source sensor monitoring data according to the monitoring sensor network;
[0085] A risk prediction unit construction module 15, wherein the risk prediction unit construction module 15 is used to train a disaster situation prediction module and a risk level assessment module based on the risk perception database and in combination with the underground pipeline gallery twin model, and embed them into the risk prediction unit;
[0086] The disaster risk warning module 16 is used to perform pipeline corridor risk prediction based on the multi-source sensor monitoring data through the risk prediction unit, obtain pipeline corridor risk prediction results, and perform pipeline corridor disaster risk warning according to the pipeline corridor risk prediction results.
[0087] Furthermore, the key monitoring point identification module 12 is also used to perform the following steps:
[0088] Collect historical pipeline corridor disaster records, and cluster the historical pipeline corridor disaster records to obtain multiple disaster data sets corresponding to different disaster types;
[0089] Based on the multiple disaster data sets, respectively perform disaster risk assessments to obtain multiple disaster risk data sets;
[0090] The multiple disaster data sets and the multiple disaster risk data sets are structured and sorted to obtain the risk perception database.
[0091] Furthermore, the key monitoring point identification module 12 is also used to perform the following steps:
[0092] Based on the risk perception database, multiple disaster risk data sets are read, and high-risk events are extracted based on the multiple disaster risk data sets to obtain multiple high-risk events;
[0093] For the multiple high-risk events, statistics on disaster frequency, disaster location, and disaster time are performed, and based on the statistical results, multiple key monitoring points and multiple key monitoring factors are identified and obtained, and the multiple key monitoring points and multiple key monitoring factors all have weights.
[0094] Furthermore, the monitoring sensor network deployment module 13 is also used to perform the following steps:
[0095] Based on the underground utility gallery twin model, obtaining underground utility gallery space data;
[0096] and matching the multiple key monitoring points with the multiple key monitoring factors to obtain multiple monitoring factor sets corresponding to the multiple key monitoring points;
[0097] According to the multiple monitoring factor sets and in combination with the underground pipe gallery space data, the sensor locations and quantities are determined to construct the monitoring sensor network.
[0098] Furthermore, the risk prediction unit construction module 15 is also used to perform the following steps:
[0099] Based on the risk perception database, multiple prior feature sequences of different disaster types are extracted, and supervised training is performed in combination with a deep learning network to obtain the disaster situation prediction module;
[0100] Based on the risk perception database, multiple post-event feature sequences of different disaster types, as well as corresponding disaster causes and disaster impact levels are extracted, and trained in conjunction with a neural network model to obtain the risk level assessment module;
[0101] The disaster situation prediction module and the risk level assessment module are embedded in the risk prediction unit.
[0102] Furthermore, the risk prediction unit construction module 15 is also used to perform the following steps:
[0103] The multiple prior feature sequences include pre-fault operating parameter sequences and pre-fault environmental data sequences of multiple key monitoring points;
[0104] Performing correlation impact analysis on the multiple key monitoring points to generate multiple correlation impact factors;
[0105] According to the pre-fault operating parameter sequence and the pre-fault environmental data sequence, supervised training is performed based on a deep learning network to obtain an initial disaster prediction module;
[0106] Based on the multiple associated influencing factors, the initial disaster situation prediction module is modified to obtain the disaster situation prediction module.
[0107] Furthermore, the disaster risk warning module 16 is further configured to perform the following steps:
[0108] Performing data cleaning and normalization processing on the multi-source sensor monitoring data to obtain a pipeline corridor monitoring data set;
[0109] Inputting the pipeline corridor monitoring data set into the disaster situation prediction module of the risk prediction unit to perform disaster prediction and obtain a disaster prediction result;
[0110] If the disaster prediction result meets the safety risk threshold, the operation safety push is performed;
[0111] If the disaster prediction result does not meet the safety risk threshold, a risk assessment is performed through the risk level assessment module to obtain a pipeline corridor risk prediction result, and a pipeline corridor disaster risk warning is performed based on the pipeline corridor risk prediction result.
[0112] Furthermore, the system also includes:
[0113] A monitoring partition division module, which is used to divide a plurality of monitoring partitions based on the underground pipe gallery twin model and the plurality of key monitoring points, and obtain regional location information and regional connectivity information of the plurality of monitoring partitions;
[0114] A high-risk area extraction module, the high-risk area extraction module is used to extract the sub-area risk level assessment results according to the disaster prediction results, and sort the regional risk levels based on the sub-area risk level assessment results to extract multiple high-risk areas;
[0115] A central impact area determination module, the central impact area determination module is used to determine the central impact area based on the partition contribution for the multiple monitoring partitions and the multiple high-risk areas;
[0116] A disaster spread simulation module is used to perform disaster spread simulation analysis based on the central impact area, in combination with the multiple high-risk areas, the area location information and the area connectivity information, using the underground utility gallery twin model to obtain a global disaster trend prediction result.
[0117] Embodiment 3
[0118] Based on the same inventive concept as the underground utility corridor monitoring and alarm method in the aforementioned embodiment, the present application also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the method in embodiment one is implemented.
[0119] Through the above detailed description of an underground pipe gallery monitoring and alarming method, those skilled in the art can clearly know an underground pipe gallery monitoring and alarming method and system in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.
[0120] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0121] Reference below Figure 5 To describe the electronic device of the embodiment of the present application:
[0122] The electronic device 300 includes: a processor 302, a communication interface 303, and a memory 301. Optionally, the electronic device 300 may also include a bus architecture 304. The communication interface 303, the processor 302, and the memory 301 may be interconnected via the bus architecture 304; the bus architecture 304 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus. The bus architecture 304 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0123] The processor 302 may be a CPU, a microprocessor, an ASIC, or one or more integrated circuits for controlling the execution of the program of the present application.
[0124] The communication interface 303 uses any transceiver-like device for communicating with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area networks (WLAN), wired access networks, etc.
[0125] The memory 301 may be a ROM or other types of static storage devices that can store static information and instructions, a RAM or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory may exist independently and be connected to the processor via a bus architecture 304. The memory may also be integrated with the processor, wherein the memory 301 is used to store computer-executable instructions for executing the solution of the present application, and the execution is controlled by the processor 302. The processor 302 is used to execute the computer-executable instructions stored in the memory 301.
[0126] Any step of the method described above can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor to implement any method in the embodiments of the present application, without any unnecessary restrictions.
[0127] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0128] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
[0129] This specification and the drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. An underground pipe gallery monitoring and alarm method, characterized in that: The method comprises: Obtain the infrastructure data of the pipeline corridor and build a twin model of the underground pipeline corridor; Read historical tunnel disaster records, establish a risk perception database, and conduct data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors; Based on the multiple key monitoring points and multiple key monitoring factors, combined with the underground pipeline gallery twin model, a monitoring sensor network is deployed; Acquiring multi-source sensor monitoring data according to the monitoring sensor network; Based on the risk perception database and in combination with the underground pipeline gallery twin model, a disaster situation prediction module and a risk level assessment module are trained and embedded into a risk prediction unit; Through the risk prediction unit, a pipeline corridor risk prediction is performed based on the multi-source sensor monitoring data, a pipeline corridor risk prediction result is obtained, and a pipeline corridor disaster risk warning is performed according to the pipeline corridor risk prediction result.
2. The method according to claim 1, reading historical pipeline corridor disaster records and establishing a risk perception database, comprises: Collect historical pipeline corridor disaster records, and cluster the historical pipeline corridor disaster records to obtain multiple disaster data sets corresponding to different disaster types; Based on the multiple disaster data sets, respectively perform disaster risk assessments to obtain multiple disaster risk data sets; The multiple disaster data sets and the multiple disaster risk data sets are structured and sorted to obtain the risk perception database.
3. The method according to claim 2, characterized in that Based on the risk perception database, data mining is performed to identify and obtain multiple key monitoring points and multiple key monitoring factors, including: Based on the risk perception database, multiple disaster risk data sets are read, and high-risk events are extracted based on the multiple disaster risk data sets to obtain multiple high-risk events; For the multiple high-risk events, statistics on disaster frequency, disaster location, and disaster time are performed, and based on the statistical results, multiple key monitoring points and multiple key monitoring factors are identified and obtained, and the multiple key monitoring points and multiple key monitoring factors all have weights.
4. The method according to claim 1, characterized in that Based on the multiple key monitoring points and multiple key monitoring factors, combined with the underground pipeline gallery twin model, a monitoring sensor network is deployed, including: Based on the underground utility gallery twin model, obtaining underground utility gallery space data; and matching the multiple key monitoring points with the multiple key monitoring factors to obtain multiple monitoring factor sets corresponding to the multiple key monitoring points; According to the multiple monitoring factor sets and in combination with the underground pipe gallery space data, the sensor locations and quantities are determined to construct the monitoring sensor network.
5. The method according to claim 1, characterized in that Based on the risk perception database and in combination with the underground utility gallery twin model, a disaster situation prediction module and a risk level assessment module are trained and embedded in a risk prediction unit, including: Based on the risk perception database, multiple prior feature sequences of different disaster types are extracted, and supervised training is performed in combination with a deep learning network to obtain the disaster situation prediction module; Based on the risk perception database, multiple post-event feature sequences of different disaster types, as well as corresponding disaster causes and disaster impact levels are extracted, and trained in conjunction with a neural network model to obtain the risk level assessment module; The disaster situation prediction module and the risk level assessment module are embedded in the risk prediction unit.
6. The method according to claim 5, characterized in that Based on the risk perception database, multiple prior feature sequences of different disaster types are extracted, and supervised training is performed in combination with a deep learning network to obtain the disaster situation prediction module, including: The multiple prior feature sequences include pre-fault operating parameter sequences and pre-fault environmental data sequences of multiple key monitoring points; Performing correlation impact analysis on the multiple key monitoring points to generate multiple correlation impact factors; According to the pre-fault operating parameter sequence and the pre-fault environmental data sequence, supervised training is performed based on a deep learning network to obtain an initial disaster prediction module; Based on the multiple associated influencing factors, the initial disaster situation prediction module is modified to obtain the disaster situation prediction module.
7. The method according to claim 1, characterized in that Through the risk prediction unit, a risk prediction of a pipeline corridor is performed based on the multi-source sensor monitoring data, a risk prediction result of the pipeline corridor is obtained, and a disaster risk warning of the pipeline corridor is performed according to the risk prediction result of the pipeline corridor, including: Performing data cleaning and normalization processing on the multi-source sensor monitoring data to obtain a pipeline corridor monitoring data set; Inputting the pipeline corridor monitoring data set into the disaster situation prediction module of the risk prediction unit to perform disaster prediction and obtain a disaster prediction result; If the disaster prediction result meets the safety risk threshold, the operation safety push is performed; If the disaster prediction result does not meet the safety risk threshold, a risk assessment is performed through the risk level assessment module to obtain a pipeline corridor risk prediction result, and a pipeline corridor disaster risk warning is performed based on the pipeline corridor risk prediction result.
8. The method according to claim 7, characterized in that The method further comprises: Based on the underground pipe gallery twin model and the multiple key monitoring points, multiple monitoring zones are divided, and regional location information and regional connectivity information of the multiple monitoring zones are obtained; According to the disaster prediction results, extract the zoning risk level assessment results, and sort the regional risk levels based on the zoning risk level assessment results to extract multiple high-risk areas; For the multiple monitoring zones and the multiple high-risk areas, based on the zone contribution, determine the central impact area; According to the central impact area, combined with the multiple high-risk areas, the regional location information and the regional connectivity information, the underground utility gallery twin model is used to perform disaster spread simulation analysis to obtain global disaster trend prediction results.
9. An underground pipe gallery monitoring and alarm system, characterized in that: The system comprises: An underground pipe gallery twin model construction module, wherein the underground pipe gallery twin model construction module is used to obtain pipe gallery infrastructure data and construct an underground pipe gallery twin model; A key monitoring point identification module, which is used to read historical pipeline corridor disaster records, establish a risk perception database, and perform data mining based on the risk perception database to identify and obtain multiple key monitoring points and multiple key monitoring factors; A monitoring sensor network deployment module, wherein the monitoring sensor network deployment module is used to deploy a monitoring sensor network based on the multiple key monitoring points and multiple key monitoring factors in combination with the underground pipeline gallery twin model; A multi-source sensor monitoring data acquisition module, the multi-source sensor monitoring data acquisition module is used to acquire multi-source sensor monitoring data according to the monitoring sensor network; A risk prediction unit construction module, wherein the risk prediction unit construction module is used to train a disaster situation prediction module and a risk level assessment module based on the risk perception database and in combination with the underground pipeline gallery twin model, and embed them into the risk prediction unit; A disaster risk warning module is used to perform corridor risk prediction based on the multi-source sensor monitoring data through the risk prediction unit, obtain corridor risk prediction results, and perform corridor disaster risk warning according to the corridor risk prediction results.
10. An electronic device, characterized in that: The electronic device comprises: At least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute an underground utility corridor monitoring and alarm method as described in any one of claims 1 to 8.
Citation Information
Cited By
Battery energy storage system monitoring resource configuration method, device, equipment, medium and program product
CN119647907A
Battery energy storage system monitoring resource configuration method, device, equipment, medium and program product
CN119647907B
Sky-ground integrated and conduction induction fused power system full-process risk situation awareness architecture
CN119651921A
Underground space safety monitoring method and device, electronic equipment and storage medium
CN119738103A
Underground space safety monitoring method, device, electronic equipment and storage medium
CN119738103B