Plug loading and unloading lead filling device and method
By designing the lead filling device for loading and unloading plugs, and using water tank, electronic scale and heating belt technology, the problems of poor lead layer density and metal shrinkage and deformation were solved, achieving efficient lead pouring and radiation shielding effects, ensuring the safety of workers and assembly Accuracy.
Patent Information
- Application Number
- CN202410297674.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-03-15
AI Technical Summary
The existing loading and unloading plugs have poor tightness in the lead layer and shrinkage of the metal, resulting in deformation, which affects the shielding effect and assembly accuracy. Moreover, the difficulty in removing compressed air affects radiation shielding.
A loading and unloading plug lead filling device is designed, including a water tank, an electronic scale, a heating belt, a lead filling funnel and a boiler. Through evenly distributed pouring holes and heating belt tilting technology, the lead liquid is ensured to be degassed and densely filled, combined with infrared heating and Electronic scales monitor weight to achieve high-density lead layer pouring.
It effectively improves the radiation shielding effect and installation accuracy of the loading and unloading plug, ensuring the safety of workers. The density of the lead layer meets the requirements, avoiding metal shrinkage and deformation, and achieving an efficient lead filling process.
Smart Images

Figure CN118737508A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of dry storage of spent fuel of heavy water reactor, and in particular relates to a lead filling device and method for loading and unloading plugs. Background Art
[0002] The loading and unloading plugs for heavy water reactors are used to shield the radioactivity when the spent fuel is dry stored in the storage area for fuel loading, to ensure that the workers are protected from accidental doses of radiation. However, a certain amount of lead needs to be filled into the chamber of the loading and unloading plugs to meet the above requirements. Therefore, it is necessary to develop a set of lead-filling processes and methods for loading and unloading plugs to ensure that the shielding effect of the loading and unloading plugs meets the requirements, and at the same time it can be promoted and applied to similar industries.
[0003] Using the existing technology, the compressed air may not be removed due to the gradual narrowing of the space inside the loading and unloading plug, thereby affecting the radiation shielding effect of the loading and unloading plug; the poor density of the lead layer after pouring and the metal shrinkage cause the loading and unloading plug to deform, which will affect the precise assembly of the loading and unloading plug. Summary of the invention
[0004] The purpose of the present invention is to provide a lead-filling device and method for a loading and unloading plug. When the spent fuel is dry-stored and loaded in a storage area, the loading and unloading plug plays a role in shielding radioactive rays, ensuring that the workers avoid the risk of being exposed to accidental doses and effectively protecting the safety of the workers.
[0005] The technical solution of the present invention is as follows: a loading and unloading plug lead filling device, comprising a loading and unloading plug, a lead filling funnel, a boiler, an inlet valve, a water tank, an electronic scale, a drain valve and a heating belt, a loading and unloading plug is placed on the water tank, a casting hole is opened on the top of the loading and unloading plug, a heating belt is wrapped around the side of the loading and unloading plug, the water tank is placed on the electronic scale as a whole, a water inlet valve connected to a pipeline is arranged on the upper part of the water tank, a drain valve is connected to the bottom of the water tank through a pipeline, and the lead filling funnel and the boiler are located outside the water tank.
[0006] The water tank is a square structure.
[0007] The loading and unloading plug is a hollow truncated cone structure.
[0008] The top of the loading and unloading plug is provided with four evenly distributed casting holes along the circumferential direction.
[0009] The pouring holes are respectively a first pouring hole, a second pouring hole, a third pouring hole and a fourth pouring hole.
[0010] A method for loading and unloading plugs and filling lead, comprising the following steps:
[0011] Step 1: Place the sink on the electronic scale;
[0012] Step 2: Place the processed loading and unloading plug on the sink;
[0013] Step 3: Apply infrared heating tape to the plug sleeve during loading and unloading;
[0014] Step 4: Open the water inlet valve, and when the water level reaches two-thirds of the tank level, open the drain valve;
[0015] Step 5: Record the weight displayed on the electronic scale;
[0016] Step 6: Load the cleaned lead ingot into the furnace, start heating the furnace, and in this state, stir the lead liquid slowly and evenly;
[0017] Step 7: Move the boiler to the top of the loading and unloading plug, and install the lead-filling funnel to the first pouring hole, the second pouring hole, the third pouring hole and the fourth pouring hole in sequence;
[0018] Step 8: Start the heating belt to tilt the boiler;
[0019] Step 9: Pour lead into the loading and unloading plug. When the electronic scale shows that the weight reaches 98% of the theoretical value of lead filling, it is confirmed that the lead filled meets the requirements;
[0020] Step 10: After the weight reaches the requirement, turn off the heating belt;
[0021] Step 11: The inlet and outlet valves are opened for 3 hours and then closed to confirm that the loading and unloading plugs have cooled down and the deformation meets the requirements;
[0022] Step 12: Cover the four casting holes of the loading and unloading plugs with corresponding blind plates and weld and polish them.
[0023] In step 6, the furnace heating rate is about 50°C / second, and the temperature is raised to 450°C and then kept warm.
[0024] The beneficial effects of the present invention are as follows: the device and method have been demonstrated many times, and so far, 100,000 spent fuel rod bundles have been assembled, the amount of radiation dose received by the workers is "zero", the shielding effect is excellent, and the use effect meets the requirements. There are 4 evenly distributed casting holes on the top of the loading and unloading plug along the circumferential direction. In conjunction with the use of a lead pouring device, sequential pouring, and water tank filling and drainage methods, during the pouring process, the liquid lead produces a similar "rock spray" (similar to the arc produced by the bursting of bubbles in magma), and all gases in the lead water are removed to the greatest extent, ensuring the density and compactness of the final state, and effectively reducing the deformation of the shielding plug caused by the metal shrinkage of the loading and unloading plug. The quality of the lead pouring fully meets the technical requirements. It can be seen that the present invention solves the problems of poor lead layer density and plug deformation caused by metal shrinkage in the prior art, and achieves the effect of improving the shielding effect and installation accuracy of the loading and unloading plug. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of a plug-filling lead filling device provided by the present invention.
[0026] In the figure: 1 loading and unloading plug, 2 first pouring hole, 3 second pouring hole, 4 third pouring hole, 5 fourth pouring hole, 6 lead filling funnel, 7 boiler, 8 water inlet valve, 9 sink, 10 electronic scale, 11 drain valve, 12 heating belt. DETAILED DESCRIPTION
[0027] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0028] like Figure 1 As shown, a loading and unloading plug lead filling device comprises a loading and unloading plug 1, a lead filling funnel 6, a boiler 7, an inlet valve 8, a water tank 9, an electronic scale 10, a drain valve 11 and a heating belt 12. The water tank 9 is a square structure, on which a hollow truncated cone-shaped loading and unloading plug 1 is placed. Four evenly distributed casting holes are opened along the circumferential direction on the top of the loading and unloading plug 1, which are respectively a first casting hole 2, a second casting hole 3, a third casting hole 4 and a fourth casting hole 5. A heating belt 12 is wrapped around the side of the loading and unloading plug 1. The water tank 9 is placed on the electronic scale 10 as a whole. A water inlet valve 8 connected to a pipeline is arranged on the upper part of the water tank 9. The bottom of the water tank is connected to the drain valve 11 through a pipeline. The lead filling funnel 6 and the boiler 7 are located outside the water tank.
[0029] The use process of the present invention is as follows:
[0030] The water tank 9 is placed on an electronic scale 10, and the processed loading and unloading plug 1 is placed in the water tank 9. The water tank inlet valve 8 is opened. When the water level reaches two-thirds of the water tank 9, the outlet valve 11 is opened to ensure that the water level in the water tank remains unchanged. The corresponding heating belt 12 is put on the loading and unloading plug 1 to ensure that the lead filled in succession can be dissolved and solidified together, and the water level remains unchanged to ensure that the loading and unloading plug does not deform. At the same time, the electronic scale records the current weight, and the weight is continuously monitored later to ensure that the amount of lead filled in the loading and unloading plug reaches 98% of the theoretical value.
[0031] Place the water tank 9 on the electronic scale 10; place the processed loading and unloading plug 1 on the water tank 9; and cover the loading and unloading plug 1 with an infrared heating belt 12;
[0032] Open the water inlet valve 8, and when the water level reaches two-thirds of the liquid level of the water tank 9, open the drain valve 11; record the weight displayed on the electronic scale 10; load the cleaned lead ingot into the furnace 7, and start heating the furnace at a heating rate of about 50°C / second, and start keeping warm when it rises to 450°C. In this state, stir the lead liquid at a uniform and slow speed to achieve the purpose of degassing and deslagging; use the factory crane to move the boiler 7 above the loading and unloading plug, and load the lead filling funnel 6 to the casting hole in turn; start the heating belt 12, and operate the boiler 7 handle in turn to tilt the boiler 7; pour the lead into the loading and unloading plug 1, and when the weight displayed on the electronic scale (excluding the gross weight) reaches 98% of the theoretical value of the lead filling, it is confirmed that the lead poured meets the requirements; after the above weight meets the requirements, turn off the heating belt; the inlet and outlet valves are opened for 3 hours and then closed to confirm that the loading and unloading plug has cooled to the right place and the deformation amount meets the requirements; cover the four casting holes of the loading and unloading plug with corresponding blind plates for welding and grinding.
[0033] A method for loading and unloading plugs and filling lead, comprising the following steps:
[0034] Step 1: Place the water tank 9 on the electronic scale 10;
[0035] Step 2: Place the processed loading and unloading plug 1 on the water tank 9;
[0036] Step 3: Put the infrared heating belt 12 on the loading and unloading plug 1;
[0037] Step 4: Open the water inlet valve 8, and when the water level reaches two-thirds of the liquid level of the water tank 9, open the drain valve 11;
[0038] Step 5: Record the weight displayed by the electronic scale 10;
[0039] Step 6: Load the cleaned lead ingot into the melting furnace 7, and start heating the melting furnace at a heating rate of about 50°C / second until the temperature reaches 450°C and then start to keep the temperature. In this state, stir the lead liquid slowly and evenly to achieve the purpose of degassing and deslagging.
[0040] Step 7: Use the plant crane to move the boiler 7 to the top of the loading and unloading plug, and sequentially install the lead pouring funnel 6 to the first pouring hole 2, the second pouring hole 3, the third pouring hole 4 and the fourth pouring hole 5;
[0041] Step 8: Start the heating belt 12 and operate the handles of the boiler 7 in sequence to tilt the boiler 7;
[0042] Step 9: Pour lead into the loading and unloading plug 1. When the weight displayed on the electronic scale (excluding the gross weight) reaches 98% of the theoretical value of lead filling, it is confirmed that the lead filled meets the requirements;
[0043] Step 10: After the above weight reaches the requirement, turn off the heating belt;
[0044] Step 11: The inlet and outlet valves are opened for 3 hours and then closed to confirm that the loading and unloading plugs have cooled down to the point where the deformation meets the requirements;
[0045] Step 12: Cover the four casting holes of the loading and unloading plugs with corresponding blind plates and weld and polish them.
[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that modifying the technical solutions described in the aforementioned embodiments, or replacing some or all of the technical features therein by equivalents, does not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A device for loading and unloading plugs and filling lead, characterized in that: The utility model comprises a loading and unloading plug, a lead-filling funnel, a boiler, an inlet valve, a water tank, an electronic scale, a drain valve and a heating belt. The loading and unloading plug is placed on the water tank, a casting hole is opened on the top of the loading and unloading plug, a heating belt is wrapped around the side of the loading and unloading plug, the water tank is placed on the electronic scale as a whole, a water inlet valve connected to a pipeline is arranged on the upper part of the water tank, a drain valve is connected to the bottom of the water tank through a pipeline, and the lead-filling funnel and the boiler are located outside the water tank.
2. A plug-filling device for loading and unloading lead according to claim 1, characterized in that: The water tank is a square structure.
3. A plug-filling device for loading and unloading lead according to claim 1, characterized in that: The loading and unloading plug is a hollow truncated cone structure.
4. A plug-filling device for loading and unloading lead according to claim 1, characterized in that: The top of the loading and unloading plug is provided with four evenly distributed casting holes along the circumferential direction.
5. A plug-filling device for loading and unloading lead according to claim 1, characterized in that: The pouring holes are respectively a first pouring hole, a second pouring hole, a third pouring hole and a fourth pouring hole.
6. A method for loading and unloading plugs and filling lead, characterized in that: The steps include: Step 1: Place the sink on the electronic scale; Step 2: Place the processed loading and unloading plug on the sink; Step 3: Apply infrared heating tape to the plug sleeve during loading and unloading; Step 4: Open the water inlet valve, and when the water level reaches two-thirds of the tank level, open the drain valve; Step 5: Record the weight displayed on the electronic scale; Step 6: Load the cleaned lead ingot into the furnace, start heating the furnace, and in this state, stir the lead liquid slowly and evenly; Step 7: Move the boiler to the top of the loading and unloading plug, and install the lead-filling funnel to the first pouring hole, the second pouring hole, the third pouring hole and the fourth pouring hole in sequence; Step 8: Start the heating belt to tilt the boiler; Step 9: Pour lead into the loading and unloading plug. When the electronic scale shows that the weight reaches 98% of the theoretical value of lead filling, it is confirmed that the lead filled meets the requirements; Step 10: After the weight reaches the requirement, turn off the heating belt; Step 11: The inlet and outlet valves are opened for 3 hours and then closed to confirm that the loading and unloading plugs have cooled down and the deformation meets the requirements; Step 12: Cover the four casting holes of the loading and unloading plugs with corresponding blind plates and weld and polish them.
7. A method for loading and unloading plugs and filling lead according to claim 6, characterized in that: In step 6, the furnace heating rate is about 50°C / second, and the temperature is raised to 450°C and then kept warm.
Citation Information
Patent Citations
System and method for filling shielding cavity of spent fuel storage container with lead
CN107680702A
Lead filling process for nuclear radiation shielding barrel
CN108511097A
Lead pouring device and method for radioactive material container
CN109128100A
Plumbous system is irritated to separately cooling formula to irritating plumbous in spent fuel storage container
CN207572072U
Refueling transfer device, and refueling method
WO2021248387A1