Scheduling method and system for participation of large industrial load in demand side response

Through dispatching methods and systems where large industrial loads participate in demand-side response, power consumption behavior is dynamically adjusted, solving the problem of insufficient power regulation accuracy and achieving optimal allocation of power resources and cost reduction.

CN118739324APending Publication Date: 2024-10-01WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410828439.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing technology, there is still room for improvement in the accuracy of power regulation for demand-side response. Especially in terms of the participation of large industrial loads, it is difficult to effectively adjust the optimal allocation and efficient utilization of power resources, resulting in fluctuations in energy supply and demand.

Method used

Propose a dispatching method and system for large industrial loads to participate in demand-side response. By obtaining the rolling forecast curve of ultra-short-term load deficit and the forecast daily load curve of each industry, the regulation proportion and regulation time are determined, and the power consumption behavior of large industrial loads is dynamically adjusted. Achieve optimal allocation of power resources.

Benefits of technology

By guiding large industrial loads to reduce power consumption during peak hours and increase power consumption during valley hours, the overall load fluctuation of the power system is reduced, the accuracy of regulation is improved, power supply pressure is relieved, and electricity costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739324A_ABST
    Figure CN118739324A_ABST
Patent Text Reader

Abstract

The invention discloses a scheduling method and system for participation of a large industrial load in demand side response. According to the method, the large industrial load is guided to participate in the demand side response, the large industrial load serves as an important component of the power demand, the power consumption is large, the power consumption time is concentrated, and the adjustability is high, so that the power supply pressure can be relieved, the power consumption cost of a large industrial enterprise can be reduced, and the economic benefit is improved. The large industrial load participates in demand side response, the power consumption behavior of the large industrial load can be adjusted according to the real-time supply and demand condition of the power market, so that optimal configuration of power resources is achieved, and the power consumption of the large industrial load is reduced in the peak period, improved in the valley period and reduced in the overall load fluctuation of the power system. And thus, the regulation and control accuracy is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power system operation control, and in particular to a dispatching method and system for large industrial loads to participate in demand-side response. Background Art

[0002] With the acceleration of industrialization and the improvement of people's living standards, the growing demand for energy has caused a tight supply of energy. At the same time, the use of traditional energy has brought about serious environmental problems such as air pollution and global warming. How to effectively manage and utilize energy, reduce energy consumption, and reduce pollution emissions has become an urgent problem that needs to be solved. Nowadays, the relationship between electricity supply and demand has undergone profound changes. The electricity market has been gradually liberalized, and competition mechanisms have been introduced one after another, and the relationship between electricity supply and demand has further fluctuated. As an important part of the electricity market, demand-side response aims to achieve optimal allocation and efficient utilization of power resources by adjusting user demand behavior.

[0003] Among the related technologies, there is still room for improvement in the accuracy of power regulation based on demand-side response. Summary of the invention

[0004] In view of this, the present application provides a scheduling method and system for large industrial loads to participate in demand-side response.

[0005] In a first aspect, the present application provides a method for dispatching a large industrial load to participate in a demand-side response, including intraday regulation of a large industrial load; the intraday regulation of a large industrial load includes:

[0006] Obtain the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation;

[0007] Determine the peak value of the current round of shortage based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and determine the predicted power values ​​of different industries at the peak moment of the current round of shortage based on the predicted daily load curves of various industries before the current round of regulation;

[0008] Determine the regulation ratio of each industry in the current round of regulation based on the current round of shortage peak and the predicted power values ​​of different industries at the current round of shortage peak;

[0009] If the shortage does not exceed 0 after the current round of regulation, the current round of regulation and the entire regulation will be terminated, where the current round of regulation is based on the regulation ratio of each industry in the current round of regulation;

[0010] If there is still a shortage greater than 0 after the current round of regulation, the next round of regulation is performed. Optionally, the regulation ratio of each industry in the current round of regulation is determined based on the current round shortage peak and the predicted power values ​​of different industries at the current round shortage peak, including:

[0011] Determine the participation ratio K of the industry i in the prior control order based on the following formula: ni ,

[0012]

[0013] P i (t v ) is the predicted power value of the first-order industry i at the peak time of shortage, ΔP(t v ) is the peak value of the shortage;

[0014] If the participation rate K of the first-order industry i is ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , then the industry j in the later control order will not participate in the current round of regulation;

[0015] If the participation rate K of the first-order industry i is ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , then the industry j in the later control order will participate in the current regulation.

[0016] Optionally, determining the regulation ratio of each industry in the current round of regulation based on the current round shortage peak value and the predicted power values ​​of different industries at the current round shortage peak value also includes:

[0017] If the participation rate K of the first-order industry i is ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , update the proportion of controllable capacity of the first-order control industry i participating in regulating consumption;

[0018] If the participation rate K of the first-order industry i is ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , update the ultra-short-term load shortage rolling forecast curve before the current round of regulation, and determine the updated shortage peak value and the updated shortage peak time according to the updated ultra-short-term load shortage rolling forecast curve.

[0019] Optionally, the ultra-short-term load shortage rolling forecast curve before the current round of regulation is updated, specifically:

[0020] The difference between the ultra-short-term load shortage rolling forecast curve before the current round of regulation and the controllable capacity curve of the prior control order industry i is established as the updated ultra-short-term load shortage rolling forecast curve.

[0021] Optionally, the difference in controllable capacity curve of the first-order industry i is determined by the following formula:

[0022] Ci (t) = P i (t)×(K i -K i * );

[0023] P i (t) = P Mi ×P di (t), t=0,1,2,…,N;

[0024] In the above formula, K i is the controllable capacity ratio of the ith industry participating in regulation, K i * is the controllable capacity proportion of the ith industry participating in regulating consumption, P i (t) is the predicted daily load curve of the i-th industry, P Mi is the predicted daily load peak of the i-th industry, P di (t) is the typical daily load per unit value curve of the ith industry.

[0025] Optionally, the ultra-short-term load shortage rolling prediction curve before the current round of regulation is determined by the following formula:

[0026] ΔP(t)=L_Predicted(t)-G(t);

[0027] In the above formula, ΔP(t) is the ultra-short-term load shortage rolling prediction curve, L_Predicted(t) is the load rolling prediction curve, and G(t) is the system available power generation capacity curve.

[0028] Optionally, the intraday regulation of large industrial loads further includes:

[0029] Based on the peak control strategy, determine the timing of investment in each industry in the current round of regulation.

[0030] Optionally, the method further comprises:

[0031] Before the daily regulation of large industrial loads, it also includes:

[0032] Determine the ratio between the daily forecast shortfall and the power generation plan based on the daily load forecast and the daily power generation plan;

[0033] If the ratio between the predicted shortage and the power generation plan for the day exceeds a threshold, the grid adjustment operation is performed.

[0034] In a second aspect, the present application provides a dispatching system for large industrial loads to participate in demand-side response, including:

[0035] It includes a large industrial load intraday regulation device; the large industrial load intraday regulation device includes:

[0036] An acquisition module is used to obtain the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation;

[0037] The first determination module is used to determine the peak value of the current round of shortage based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and to determine the predicted power values ​​of different industries at the peak moment of the current round of shortage based on the predicted daily load curves of various industries before the current round of regulation;

[0038] The second determination module is used to determine the regulation ratio of each industry in the current round of regulation based on the current round of shortage peak value and the predicted power values ​​of different industries at the time of the current round of shortage peak value;

[0039] The end module is used to end this round of regulation and terminate the entire regulation if there is no shortage greater than 0 after the current round of regulation. This round of regulation is executed based on the regulation ratio of each industry in the current round of regulation;

[0040] The execution module is used to execute the next round of regulation if the shortage peak value of the previous round is still greater than 0 after regulation.

[0041] In a third aspect, the present application provides an execution device, including a processor and a memory, wherein the processor is coupled to the memory;

[0042] The memory is used to store programs;

[0043] The processor is used to execute the program in the memory, so that the execution device executes the above method.

[0044] In the method disclosed in this application, by guiding large industrial loads to participate in demand-side response, large industrial loads, as an important part of electricity demand, have large electricity consumption, concentrated electricity consumption time, and strong adjustability, which can not only alleviate the pressure of power supply, but also reduce the electricity cost of large industrial enterprises themselves and improve economic benefits. Large industrial loads participate in demand-side response, and can adjust their own electricity consumption behavior according to the real-time supply and demand situation of the electricity market, thereby achieving the optimal allocation of power resources, by guiding large industrial loads to reduce power consumption during peak hours, increase power consumption during off-peak hours, reduce the overall load fluctuation of the power system, and thus improve the accuracy of regulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] The technical solution and other beneficial effects of the present application will be made apparent by describing in detail the specific implementation methods of the present application in conjunction with the accompanying drawings.

[0046] Figure 1 An operational flow chart of a method for dispatching large industrial loads to participate in demand-side response provided by an exemplary embodiment is shown.

[0047] Figure 2 A controllable potential indicator system diagram of an electric power user provided by an exemplary embodiment is shown.

[0048] Figure 3 A diagram of a large industrial load intraday control management model provided by an exemplary embodiment is shown.

[0049] Figure 4 A flowchart of an exemplary embodiment for determining a peak control strategy for controlling a large industrial load during the day is shown.

[0050] Figure 5 A schematic diagram of curve intersection points provided by an exemplary embodiment is shown.

[0051] Figure 6 A shortage prediction curve and a predicted daily load curve provided by an exemplary embodiment are shown.

[0052] Figure 7 A flow chart showing the proportion of each industry participating in the first round of regulation provided by an exemplary embodiment is shown.

[0053] Figure 8 A logical flow chart of intraday regulation of large industrial loads provided by an exemplary embodiment is shown.

[0054] Fig. 9 A block diagram of a dispatching system for large industrial loads participating in demand-side response provided by an exemplary embodiment is shown.

[0055] Fig.10 A block diagram of the execution device provided by an exemplary embodiment is shown. DETAILED DESCRIPTION

[0056] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0057] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments described here can be implemented in an order other than that illustrated or described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or modules is not necessarily limited to those steps or modules clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices. The naming or numbering of steps in this application does not mean that the steps in the method flow must be executed in the time / logical sequence indicated by the naming or numbering. The process steps that have been named or numbered can change the execution order according to the technical purpose to be achieved, as long as the same or similar technical effects can be achieved. The division of units in this application is a logical division. There may be other division methods when it is implemented in actual applications. For example, multiple units can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between units can be electrical or other similar forms, which are not limited in this application. In addition, the units or sub-units described as separate components may or may not be physically separated, may or may not be physical units, or may be distributed in multiple circuit units, and some or all of the units may be selected according to actual needs to achieve the purpose of the present application.

[0058] Please refer to Figure 1 and Figure 8 ,in Figure 1 A flowchart of a method for dispatching a large industrial load to participate in demand-side response provided by an exemplary embodiment is shown. Figure 8 A logical flow chart of intraday regulation of large industrial loads provided by an exemplary embodiment is shown.

[0059] The intraday regulation of large industrial loads is achieved through steps 102-108.

[0060] In step 102, the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation are obtained.

[0061] It is understandable that the "current round" here can be the first round, the second round, or any round of regulation. It should be conceivable that although the operation of large industrial load intraday regulation discussed in steps 102-110 herein only involves any two adjacent rounds among many rounds of regulation (i.e., multiple cycles), no matter how many rounds of large industrial load intraday regulation there are, they all fall within the scope of protection requested by this application. For the convenience of explanation, the parameter n involved in the following text represents the meaning of the current round.

[0062] Regarding the daily load curves P of the above industries i The determination operation of (t) is general technical knowledge that is well-known to technicians in the relevant field and can be simply explained as follows.

[0063] 1.1. Typical industry load curve

[0064] The load characteristic analysis mainly starts from the annual load curve and daily load curve of large industrial load, and analyzes the load change trend by drawing relevant curves.

[0065] (1) Annual load curve

[0066] The annual maximum load curve is used to analyze the load characteristics. The value of each point of the annual maximum load curve is the ratio of the actual maximum load of a month (or week) to the actual maximum load of the year. The 12 (or 52) points thus obtained constitute the annual maximum load curve (per unit value). Its main function is to observe the volatility of production in a certain industry and to estimate the feasibility of using the daily load curve.

[0067] (2) Daily load curve

[0068] The daily load curve is a load curve drawn in chronological order, reflecting the load changes within a day, with time intervals of 5 minutes, 15 minutes, 1 hour, etc. In order to improve the typicality of the daily load curve, a typical day is selected as a reference, and a typical day can represent the characteristics of the daily load in a time period. The day whose daily load curve is closest to the average daily load curve in the time period and whose load curve has no abnormal distortion is selected as a typical day. When calculating the typical daily load curves of major industrial sectors, for the convenience of analysis, the curve composed of the ratio of the load at each point in the day to the maximum load of the day is taken as the typical daily load per unit value curve.

[0069] Taking into account the overall ranking of the total industrial load in the region and the commonality of the industry's processes, several industrial sectors are selected as the control objects participating in the demand-side response. For example, five industries F 1 、F 2 、F 3 、F 4 、F 5 .

[0070] 2.1 Analysis of controllable characteristics of typical industries

[0071] Analyze the market concentration of typical industries to understand the overall structure of the industry; analyze the production process of typical industries to understand the impact of power supply changes on the production of large industrial loads and determine the proportion of electricity used in each process; analyze the main electrical topology of large industrial loads (such as rectifier circuits, variable resistor circuits, etc.) and active power equivalent circuit models to understand the composition and adjustment process of large industrial loads; analyze the impact of interruptions in different processes of large industrial loads on production or products, and determine the maximum allowable power outage time of large industrial loads and the corresponding power reduction range. Based on the above analysis, the controllable characteristics of typical industries are obtained.

[0072] 2.2 Analysis of controllable potential of typical industries

[0073] Based on the annual (quarterly, monthly) load curves and daily load curves of various industries, we summarize the industry characteristics, analyze the controllable potential of large industrial loads, and obtain the adjustable conditions of typical industries.

[0074] In fact, the controllable capacity ratio and controllable time of large industrial loads in various industries are related to the advance notice time. Generally speaking, the more advance notice time, the more sufficient preparation time, the larger the adjustable space, and the longer the required control time, the smaller the controllable capacity ratio. For example, the summary is shown in Table 1.

[0075] Table 1 Summary of adjustable conditions in various industries

[0076]

[0077] The specific implementation of step 3 includes:

[0078] 3.1. Index system of controllable potential of typical industries

[0079] User's basic information indicator X 1 , controllable capability index X 2 , Participation willingness index X 3 The controllable potential of power users can be measured. Among them, the basic situation of users represents the inherent attributes of each user, such as whether they belong to high-energy-consuming industries, etc.; controllable capacity refers to the maximum load reduction of users in theory under a certain time and space, that is, the physical potential of users; and willingness to participate refers to the degree of willingness of users to reduce load after being affected by subjective and objective conditions, such as the degree of incentives, control time and user willingness.

[0080] The controllable potential index system of power users includes two layers of indicators. The first layer of indicators includes basic information of users, controllable ability of users and willingness of users to participate. The second layer of indicators includes 9 sub-indicators, including 4 basic information indicators (X 11 -X 14), 2 controllable capability indicators (X 21 -X 22 ) and three participation willingness indicators (X 31 -X 33 ), the controllable potential indicator system of power users is as follows Figure 2 shown.

[0081] Step 3.2: Evaluation and analysis of controllable potential of typical industries

[0082] When establishing an evaluation model, it is necessary to analyze the weights of each indicator in the indicator system. Various evaluation methods can be selected, such as expert scoring evaluation method, controllable potential evaluation method based on entropy weight method and hierarchical analysis method, etc. Through comprehensive analysis, the reference control order is obtained, such as F 5 、F 2 、F 1 、F 4 、F 3 Its function is to stipulate that when large industrial loads participate in demand-side response, the scheduling of various industries can follow the reference control sequence.

[0083] Here, the ultra-short-term load shortage rolling prediction curve △P(t) is the shortage prediction curve obtained by the dispatching load prediction department at a specific time. The time variable t=0,1,2,3,...,N. At present, 15 minutes is generally a point. N=95 means a total of 96 15 minutes in a day.

[0084] As a preferred embodiment, the ultra-short-term load shortage rolling prediction curve before the current round of regulation is determined by the following formula:

[0085] ΔP(t)=L_Predicted(t)-G(t);

[0086] In the above formula, ΔP(t) is the ultra-short-term load shortage rolling prediction curve, L_Predicted(t) is the load rolling prediction curve, and G(t) is the system available power generation capacity curve. Here, it should be noted that, as another implementation method, G(t) also includes the case of new energy power supply.

[0087] In step 104, the peak value of the current round of shortage is determined based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and the predicted power values ​​of different industries at the peak moment of the current round of shortage are determined based on the predicted daily load curves of each industry before the current round of regulation.

[0088] like Figure 6 As shown, it shows a shortage prediction curve and a predicted daily load curve provided by an exemplary embodiment. The following parameters can be obtained from the ultra-short-term load shortage rolling prediction curve ΔP(t): predicted shortage duration ΔT, shortage peak ΔP(t v), the time when the shortage starts t begin , the time when the vacancy ends t end , the peak time of shortage is t v From the predicted daily load curve, we can get the predicted power value P of the ith industry at the peak of the shortage. i (t).

[0089] In step 106, the regulation ratio of each industry in the current round of regulation is determined based on the current round shortage peak value and the predicted power values ​​of different industries at the current round shortage peak value.

[0090] As a preferred embodiment, the regulation ratio of each industry in the current round of regulation is determined based on the current round of shortage peak value and the predicted power values ​​of different industries at the current round of shortage peak value, including:

[0091] Step 106A1: Determine the participation ratio K of the industry i in the first control order based on the following formula: ni ,

[0092]

[0093] P i (t v ) is the predicted power value of the first-order industry i at the peak time of shortage, ΔP(t v ) is the peak value of the shortage.

[0094] The first control order industry i refers to the industry i with a relatively high ranking in the control order of each industry. The later control order industry j mentioned later refers to the industry j with a relatively high ranking in the control order of each industry. Specifically, the first control order industry i can be, for example, the first industry, and the later control order industry j can be, for example, the second industry. Here, the control order of each industry refers to the priority ranking of large industrial loads according to their contribution to intraday regulation. Assuming that five industries are ranked, the ranking is Y = {1, 2, 3, 4, 5}, hereinafter referred to as the first industry, the second industry, etc., and i is used to represent the i-th industry in the following text.

[0095] Step 106A2, case (i): if the participation rate K of the first control ranking industry i is ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , then the industry j in the later control order will not participate in the current round of regulation.

[0096] At this time, the proportion of participation in regulation of industry j in the latter control order is K nj Can be assigned a value of 0, that is, K 12 =K 13 =K 14 =K 15 =0 (taking the number of industries as 5 as an example).

[0097] As a better demonstration form, if the participation rate K of the first-ranked industry i is controlled ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , update the proportion of controllable capacity of the first-order industry i that participates in regulating consumption.

[0098] Here, taking the first controlled industry as the first industry and the current round as the first round as an example, the proportion of controllable capacity of the first controlled industry i (taking i as 1 as an example) participating in the regulation of consumption can be expressed as:

[0099] K 1 * ′=K 1 * +K 11 ;

[0100] In the above, K 1 * K is the proportion of controllable capacity consumed by the first industry in the first round of regulation before the update, 1 * ′ is the proportion of controllable capacity consumed by the first industry in the first round of regulation after update, K 11 It is the controllable capacity ratio of the first industry participating in regulation in the first round.

[0101] It should be added that ΔK 1 =K 1 -K 1 * , here, K 1 It is the controllable capacity ratio of the first industry participating in regulation in the first round.

[0102] Case (ii): If the participation rate K of the first-ranked industry i is ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , then the industry j in the later control order will participate in the current regulation.

[0103] As a better demonstration form, if the participation rate K of the first-ranked industry i is controlled ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , update the ultra-short-term load shortage rolling forecast curve before the current round of regulation, and determine the updated shortage peak value and the updated shortage peak time according to the updated ultra-short-term load shortage rolling forecast curve.

[0104] Here, the ultra-short-term load shortage rolling forecast curve before the current round of regulation is updated, specifically:

[0105] The difference between the ultra-short-term load shortage rolling forecast curve after the current round of regulation and the controllable capacity curve of the prior control order industry i is established as the updated ultra-short-term load shortage rolling forecast curve.

[0106] Here, the controllable capacity curve C of the first control order industry i i (t), is determined by the following formula,

[0107] C i (t) = P i (t)×(K i -K i * );

[0108] P i (t) = P Mi ×P di (t), t=0,1,2,…,N;

[0109] In the above formula, K i is the controllable capacity ratio of the ith industry participating in regulation, K i * is the controllable capacity proportion of the ith industry participating in regulating consumption, P i (t) is the predicted daily load curve of the i-th industry, P Mi is the predicted daily load peak of the i-th industry, P di (t) is the typical daily load per unit value curve of the ith industry.

[0110] Specifically, taking the first industry and the first round of regulation as an example, the ultra-short-term load shortage rolling forecast curve before the current round of regulation can be updated as follows:

[0111] ΔP(t)′=ΔP(t)-C i (t);

[0112] The controllable capacity curve C of each industry mentioned above i Substituting the formula of (t) into the expression of ΔP(t)′, we can get:

[0113] ΔP(t)′=ΔP(t)-P 1 (t)*K 11 ;

[0114] In the above formula, C i (t) is the controllable capacity of industry i, ΔP(t)′ is the shortage curve of industry i after updating, and ΔP(t) is the shortage curve of industry i before updating.

[0115] Taking the first round of regulation as an example, the regulation ratio of each industry can be expressed as K 1 (K 11 ,K 12 ,K13 …), here, K 11 is the proportion of the first industry participating in the first round of regulation, K 12 This is the proportion of the second industry participating in regulation in the first round, and so on.

[0116] In step 108, if there is no shortage greater than 0 after the current round of regulation, the current round of regulation is ended and the entire regulation is terminated, wherein the current round of regulation is executed based on the regulation ratio of each industry in the current round of regulation.

[0117] It can be understood that the statement here "there is no situation where the shortage is greater than 0 after the current wheel is regulated" can be understood as there is no load shortage at any time after the regulation.

[0118] After the current round of regulation is over, the regulation ratio K of each industry in this round of regulation (taking the nth round of regulation as an example) can also be output. n (K n1 ,K n2 ,K n3 …), where K n1 is the proportion of the first industry participating in the first round of regulation, K n2 This is the proportion of the second industry participating in regulation in the first round, and so on.

[0119] In step 110 , if the value of the previous round is still greater than 0 after the previous round is regulated, the next round regulation is performed.

[0120] That is, at this time, the intraday regulation of large industrial load executes the next cycle steps 102-110.

[0121] As a preferred demonstration example, the intraday regulation of large industrial loads also includes:

[0122] Based on the peak control strategy, determine the timing of investment in each industry in the current round of regulation.

[0123] Here, the specific operation process of the peak control strategy can be found in Figure 4 Due to space limitations, I will not elaborate on this. It is worth adding that in the operation process of the peak control strategy, t 1 ,t 2 The determination method can be found in Figure 5 , that is, F i Large industrial load controllable capacity curve C i The intersection of (t) and the deficit curve △P(t) is at time t 1 and t 2 , and each time a new load is added, the rolling update t 1 and t 2 .

[0124] After determining the time of investment in each industry in the current round of regulation, the controllable time of each industry in the large industrial load can be determined based on this. Specifically, the controllable time of the large industrial load corresponding to the intraday regulation of the large industrial load, taking 5 industries as an example, the controllable time set of the large industrial load TC = {TC 1 ,TC 2 ,TC 3 ,TC 4 ,TC 5}, in hours. Assuming that when the shortage ends, all major industrial loads exit regulation, there are two situations for the regulation duration of each industry: one is that the controllable duration of some large industrial loads is short, and if they are put into operation earlier, they will exit before the shortage ends; the other is that industries with longer intraday regulation duration or industries that start regulation later can exit regulation when the shortage ends. Based on the above analysis, the regulation duration of each industry is obtained, as shown in the following formula.

[0125] T δ_i =t end -t input_i , if(t end -t input_i )≤TC i ;

[0126] T δ_i =TC i , if(t end -t input_i )>TC i ;

[0127] Where, t input_i The time for the regulation investment of the i-th industry (t input_i Determination process), t end The time when the vacancy ends.

[0128] As a preferred example, the scheduling method for large industrial loads to participate in demand-side response in the present application also includes:

[0129] Please refer to Figure 3 , before the daily regulation of large industrial loads, it also includes:

[0130] Determine the ratio between the daily forecast shortfall and the power generation plan based on the daily load forecast and the daily power generation plan;

[0131] If the ratio between the predicted shortage and the power generation plan for the day exceeds a threshold, the grid adjustment operation is performed.

[0132] Specifically, if Figure 3It can be seen that large industrial loads participate in intraday peak regulation as a supplement to the day-ahead plan. Its main purpose is to cope with the uncertainty of renewable energy output forecasts and temporary changes in load. When the dispatching department finds that there is a shortage of electricity within the day, it first considers inter-provincial adjustments within the network, and then considers purchasing electricity through the interconnection line. When such measures cannot cope with the shortage of load, the intraday regulation process of large industrial loads is initiated. Among them, P L (t) is the daily load forecast, P S (t) is the daily power generation plan, S(t) is the daily forecast shortfall, PP(t) is the ratio of the forecast shortfall to the power generation plan, t is the forecast shortfall moment, △P L1 (t) is the external support power, △P L2 (t) is the power reduced by large industrial loads participating in regulation, P' L (t), S'(t), PP'(t) are P after considering the external support power. L (t), S(t), and PP(t).

[0133] Please refer to Fig. 9 , which shows a block diagram of the scheduling system for large industrial loads participating in demand-side response provided by the present application. The scheduling system 200 for large industrial loads participating in demand-side response includes a large industrial load intraday control device 210; the large industrial load intraday control device includes:

[0134] An acquisition module 2102 is used to obtain the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation;

[0135] The first determination module 2104 is used to determine the peak value of the current round of shortage based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and determine the predicted power values ​​of different industries at the peak moment of the current round of shortage based on the predicted daily load curves of various industries before the current round of regulation;

[0136] The second determination module 2106 is used to determine the regulation ratio of each industry in the current round of regulation based on the current round of shortage peak value and the predicted power values ​​of different industries at the time of the current round of shortage peak value;

[0137] End module 2108, used to end this round of regulation and terminate the entire regulation if the peak value of the shortage in the current round is less than 0 after regulation, wherein this round of regulation is executed based on the regulation ratio of each industry in the current round of regulation

[0138] The execution module 2110 is used to execute the next round of regulation if the peak value of the shortage in the previous round has not been less than 0 after regulation.

[0139] Since the above methods have been discussed in detail, the specific implementation of the above modules will not be repeated here.

[0140] Next, an execution device provided by an embodiment of the present application is introduced. Fig.10 , Fig.10 This is a schematic diagram of a structure of an execution device provided in an embodiment of the present application. The execution device 300 can be specifically manifested as an autonomous driving vehicle, a mobile phone, a tablet, a laptop computer, a desktop computer, a monitoring data processing device, etc., which is not limited here. Figure 1 The functions of the execution device in the corresponding embodiment. Specifically, the execution device 300 includes: a receiver 301, a transmitter 302, a processor 303 and a memory 304 (wherein the number of the processor 303 in the execution device 300 can be one or more, Fig.10 In the example of FIG. 3 , the processor 303 may include an application processor 3031 and a communication processor 3032. In some embodiments of the present application, the receiver 301, the transmitter 302, the processor 303 and the memory 304 may be connected via a bus or other means.

[0141] The memory 304 may include a read-only memory and a random access memory, and provides instructions and data to the processor 303. A portion of the memory 304 may also include a non-volatile random access memory (NVRAM). The memory 304 stores processor and operation instructions, executable modules or data structures, or subsets thereof, or extended sets thereof, wherein the operation instructions may include various operation instructions for implementing various operations.

[0142] The processor 303 controls the operation of the execution device. In a specific application, the various components of the execution device are coupled together through a bus system, wherein the bus system includes not only a data bus but also a power bus, a control bus, and a status signal bus, etc. However, for the sake of clarity, various buses are referred to as bus systems in the figure.

[0143] The method disclosed in the above embodiment of the present application can be applied to the processor 303, or implemented by the processor 303. The processor 303 can be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 303. The above processor 303 can be a general processor, a digital signal processor (digital signal processing, DSP), a microprocessor or a microcontroller, and can further include an application specific integrated circuit (application specific integrated circuit, ASIC), a field programmable gate array (field-programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The processor 303 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiments of the present application. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 304, and the processor 303 reads the information in the memory 304 and completes the steps of the above method in combination with its hardware.

[0144] The receiver 301 can be used to receive input digital or character information and generate signal input related to the relevant settings and function control of the execution device. The transmitter 302 can be used to output digital or character information through the first interface; the transmitter 302 can also be used to send instructions to the disk group through the first interface to modify the data in the disk group; the transmitter 302 can also include a display device such as a display screen.

[0145] In the embodiment of the present application, the processor 303 is used to execute Figure 1 The specific manner in which the application processor 3031 in the processor 303 performs the above steps is the same as that in the present application. Figure 1 The corresponding method embodiments are based on the same concept, and the technical effects they bring are the same as those in this application. Figure 1 The corresponding method embodiments are the same. For specific contents, please refer to the description in the method embodiments shown above in this application, which will not be repeated here.

[0146] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed in the present application should be covered within the protection scope of the present application.

Claims

1. A method for dispatching large industrial loads to participate in demand-side response, characterized in that: Including intraday regulation of large industrial loads; the intraday regulation of large industrial loads includes: Obtain the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation; Determine the peak value of the current round of shortage based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and determine the predicted power values ​​of different industries at the peak moment of the current round of shortage based on the predicted daily load curves of various industries before the current round of regulation; Determine the regulation ratio of each industry in the current round of regulation based on the current round of shortage peak and the predicted power values ​​of different industries at the current round of shortage peak; If there is no shortage greater than 0 after the current round of regulation, end this round of regulation and terminate the entire regulation, where this round of regulation is implemented based on the regulation ratio of each industry in the current round of regulation; If there is still a shortage greater than 0 after the previous round of regulation, the next round of regulation will be carried out.

2. The method according to claim 1, characterized in that The regulation ratio of each industry in the current round of regulation is determined based on the current round of shortage peak and the predicted power values ​​of different industries at the current round of shortage peak, including: Determine the participation ratio K of the industry i in the prior control order based on the following formula: ni , P i (t v ) is the predicted power value of the first-order industry i at the peak time of shortage, ΔP(t v ) is the peak value of the shortage; If the participation rate K of the first-order industry i is ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , then the industry j in the later control order will not participate in the current round of regulation; If the participation rate K of the first-order industry i is ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , then the industry j in the later control order will participate in the current regulation.

3. The method according to claim 2, characterized in that The regulation ratio of each industry in the current round of regulation is determined based on the current round of shortage peak and the predicted power values ​​of different industries at the current round of shortage peak, and also includes: If the participation rate K of the first-order industry i is ni No more than the remaining controllable capacity ratio ΔK of the industry in the first control order i , update the proportion of controllable capacity of the first-order control industry i participating in regulating consumption; If the participation rate K of the first-order industry i is ni The remaining controllable capacity ratio ΔK that exceeds the industry in the first control order i , update the ultra-short-term load shortage rolling forecast curve before the current round of regulation, and determine the updated shortage peak value and the updated shortage peak time according to the updated ultra-short-term load shortage rolling forecast curve.

4. The method according to claim 3, characterized in that Update the ultra-short-term load shortage rolling forecast curve before the current round of regulation, specifically: The difference between the ultra-short-term load shortage rolling forecast curve before the current round of regulation and the controllable capacity curve of the prior control order industry i is established as the updated ultra-short-term load shortage rolling forecast curve.

5. The method according to claim 4, characterized in that The controllable capacity curve C of the industry i in the first control order i (t), is determined by the following formula, C i (t)=P i (t)×(K i -K i * ); P i (t)=P Mi ×P di (t),t=0,1,2,…,N; In the above formula, K i is the controllable capacity ratio of the ith industry participating in regulation, K i * is the controllable capacity proportion of the ith industry participating in regulating consumption, P i (t) is the predicted daily load curve of the i-th industry, P Mi is the predicted daily load peak of the i-th industry, P di (t) is the typical daily load per unit value curve of the ith industry.

6. The method according to claim 1, characterized in that The ultra-short-term load shortage rolling forecast curve before the current round of regulation is determined by the following formula: ΔP(t)=L_Predicted(t)-G(t); In the above formula, ΔP(t) is the ultra-short-term load shortage rolling prediction curve, L_Predicted(t) is the load rolling prediction curve, and G(t) is the system available power generation capacity curve.

7. The method according to claim 1, characterized in that The intraday regulation of large industrial loads also includes: Based on the peak control strategy, determine the timing of investment in each industry in the current round of regulation.

8. The method according to claim 1, characterized in that The method further comprises: Before the daily regulation of large industrial loads, it also includes: Determine the ratio between the daily forecast shortfall and the power generation plan based on the daily load forecast and the daily power generation plan; If the ratio between the predicted shortage and the power generation plan for the day exceeds a threshold, the grid adjustment operation is performed.

9. A dispatching system for large industrial loads to participate in demand-side response, characterized in that: Including intraday control devices for large industrial loads; The large industrial load intraday control device comprises: An acquisition module is used to obtain the ultra-short-term load shortage rolling forecast curve and the forecast daily load curve of each industry before the current round of regulation; The first determination module is used to determine the peak value of the current round of shortage based on the ultra-short-term load shortage rolling prediction curve before the current round of regulation, and to determine the predicted power values ​​of different industries at the peak moment of the current round of shortage based on the predicted daily load curves of various industries before the current round of regulation; The second determination module is used to determine the regulation ratio of each industry in the current round of regulation based on the current round of shortage peak value and the predicted power values ​​of different industries at the time of the current round of shortage peak value; The end module is used to end this round of regulation and terminate the entire regulation if there is no shortage greater than 0 after the regulation of the current round of shortages. This round of regulation is executed based on the regulation ratio of each industry in the current round of regulation; The execution module is used to execute the next round of regulation if the shortage is still greater than 0 after the previous round of regulation.

10. An execution device, characterized in that: comprising a processor and a memory, wherein the processor is coupled to the memory; The memory is used to store programs; The processor is configured to execute the program in the memory so that the execution device executes the method according to any one of claims 1 to 8.