Magnetic attraction collapsible boarding ladder supporting device of LNG transport ship and operation method of magnetic attraction collapsible boarding ladder supporting device

Through the use of the magnetic reversible boarding ladder support device, the problems of traditional boarding ladder support devices that are time-consuming, labor-intensive and poor in stability are solved, and the effects of simplified operation, space saving and improved stability are achieved.

CN118744774APending Publication Date: 2024-10-08RES INST 708 OF CHINA STATE SHIPBUILDING CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410936094.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The boarding ladder support device of traditional LNG carriers is time-consuming and labor-intensive to place and remove, and the lifting dock boarding ladder is easy to deflect and lacks stable fastening devices.

Method used

The magnetic reversible boarding ladder support device is adopted, including supporting thick railings, reversible handrails, rotating mechanisms and pneumatic motors. The magnetic adsorption and pneumatic winch provide power to rotate and fix the reversible handrails, thereby realizing the dock ladder's stability. Stable adsorption.

Benefits of technology

Simplifying the installation and removal of the boarding ladder, saving time and effort, improving the stability of the dock ladder, and increasing the use of pneumatic winches.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744774A_ABST
    Figure CN118744774A_ABST
Patent Text Reader

Abstract

The invention relates to a magnetic attraction collapsible boarding ladder supporting device of an LNG transport ship and an operation method, and relates to the technical field of LNG transport ships. The magnetic attraction collapsible boarding ladder supporting device comprises a supporting thick handrail used for supporting a lifting type wharf boarding ladder and a collapsible handrail arranged on the supporting thick handrail; a rotating mechanism and a fastening device are arranged between the thick supporting handrail and the collapsible handrail, so that the collapsible handrail can rotate or be fixed relative to the thick supporting handrail, and the collapsible handrail is used for being supported by a person when not collapsed; the turnover hand rail further comprises a rotating power device and a rotating power guiding mechanism, the rotating power device is used for providing power for the turnover hand rail to rotate on the rotating mechanism, and the rotating power guiding mechanism is used for guiding the power which is provided by the rotating power device and enables the turnover hand rail to rotate to the turnover hand rail. According to the lifting type wharf boarding ladder, the butt joint work of the lifting type wharf boarding ladder and the LNG transport ship is more conveniently, rapidly and firmly achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of LNG transport ships, and in particular to a magnetically attracted retractable boarding ladder support device and an operating method for the LNG transport ship. Background Art

[0003] The lifting dock boarding ladder is an important traffic channel for personnel, equipment, and materials to get on and off the ship during the berthing of the LNG carrier. As one of the important equipment supporting the lifting dock boarding ladder on the LNG carrier, the boarding ladder support device usually adopts the method of installing a detachable railing on the supporting thick railing. The detachable railing is provided for personnel to hold on to, which plays a role in protecting personnel safety, but the detachable railing is low in strength and cannot directly support the lifting dock boarding ladder. Therefore, when placing the lifting dock boarding ladder, the detachable railing on the boarding ladder support railing is first removed. The operator of the dock operates the lifting dock boarding ladder and places it on the supporting thick railing from which the detachable railing is removed. The supporting thick railing is usually strong and can support the lifting dock boarding ladder. The detachable railing of a large LNG carrier is generally about 40 meters. It is often time-consuming and labor-intensive to disassemble and install all the detachable railings. At the same time, the lifting dock boarding ladder is directly against the supporting railing without relevant fastening devices, which is easy to deviate. Summary of the invention

[0004] In view of the above problems, a magnetically attracted retractable boarding ladder support device and an operating method for an LNG transport ship are provided, which can realize the docking work between the lifting dock boarding ladder and the LNG transport ship more conveniently, quickly and reliably.

[0005] In order to achieve the above-mentioned purpose, the technical solution of the present invention provides a magnetically attracted reversible boarding ladder support device for an LNG carrier, comprising a supporting thick railing for supporting a lifting dock boarding ladder and a reversible handrail provided on the supporting thick railing, a rotating mechanism and a fastening device are provided between the supporting thick railing and the reversible handrail, so that the reversible handrail can be rotated or fixed relative to the supporting thick railing, and the reversible handrail is used for personnel support when it is not reversible;

[0006] It also includes a rotation power device and a rotation power guiding mechanism, wherein the rotation power device is used to provide power for the reversible handrail to rotate on the rotation mechanism, and the rotation power guiding mechanism is used to guide the power provided by the rotation power device to rotate the reversible handrail to the reversible handrail.

[0007] Preferably, the supporting thick railing includes a supporting thick railing column installed on the deck, a supporting thick railing top railing arranged at the top of the supporting thick railing column, and a supporting thick railing middle cross bar arranged in the middle of the supporting thick railing column.

[0008] Preferably, a groove is provided on the top railing of the supporting thick railing, and a magnetic angle steel is installed in the groove for adsorbing the reversible handrail and the lifting dock boarding ladder.

[0009] Preferably, a connecting eye plate is installed at the end of the reversible handrail, which can be tilted by the rotating mechanism. The rotating mechanism adopts an inclined eye plate and is installed at the lower end of the top rail of the supporting thick rail.

[0010] Preferably, a magnetic pad is installed at the middle end of the reversible handrail, which is adsorbed on the middle crossbar of the supporting thick railing when the reversible handrail is fallen down.

[0011] Preferably, the rotary power device adopts an air motor of a gangway, and the air motor is equipped with an additional auxiliary drum, and the rotary power is guided to the retractable handrail through the rotary power guiding mechanism.

[0012] Preferably, the rotational power guiding mechanism is composed of a cable, a guide pulley, and a guide eye plate. The cable is unloaded from the auxiliary drum of the pneumatic winch of the gangway, passes through the guide pulley installed on the middle cross bar of the supporting thick railing, and is fastened to the guide eye plate on the reversible handrail, thereby providing power for rotating the reversible handrail.

[0013] Preferably, after the reversible handrail is fallen down, the lifting dock boarding ladder is operated onto the supporting thick railing.

[0014] Preferably, a deck base of the lifting dock boarding ladder is installed below the lifting dock boarding ladder, and one end of the base is adsorbed on the magnetic angle steel.

[0015] The technical solution of the present invention provides an operating method of a magnetically attracted retractable boarding ladder support device for an LNG carrier, comprising the following steps:

[0016] Step 1, the LNG carrier docks and completes mooring, one end of the cable is connected to the auxiliary drum of the pneumatic winch of the gangway, and the other end is connected to the guide eye plate on the inboard side of the reversible handrail through the guide pulley on the inboard side of the middle crosspiece of the supporting thick railing;

[0017] Step 2, releasing the fastening bolts of the fastening device;

[0018] Step 3, starting the pneumatic winch of the gangway, the reversible handrail is laid down, and the reversible handrail is adsorbed on the middle crossbar of the supporting thick railing through the magnetic pad;

[0019] Step 4, operate the lifting dock boarding ladder and place it against the top railing of the supporting thick railing. The magnetic angle steel on the top railing of the supporting thick railing adsorbs the lifting dock boarding ladder, and personnel, equipment, and materials can get on and off the ship through the lifting dock boarding ladder;

[0020] Step 5, the LNG carrier is unmoored and ready to leave the port, and the lifting dock boarding ladder is operated to separate it from the top railing of the supporting thick railing;

[0021] Step 6, keep one end of the cable tied to the auxiliary drum of the pneumatic winch of the gangway, and connect the other end of the cable to the other guide eye plate on the reversible handrail through the guide pulley on the outer side of the middle crosspiece of the supporting thick railing;

[0022] Step 7, starting the pneumatic winch of the gangway to raise the retractable handrail;

[0023] Step 8, tighten the fastening bolts of the fastening device and release the cable, and the LNG carrier is unmoored and leaves the port.

[0024] In summary, the present invention includes the following beneficial technical effects:

[0025] 1. When a traditional LNG carrier docks at a dock, personnel usually have to remove the detachable railings on the supporting thick railings and move the detachable railings to a fixed location for storage, which takes a lot of time and effort and requires space to store the detachable railings. With this invention, the pneumatic winch of the gangway can be used to fold down the detachable railings on the supporting thick railings in one step, saving time and effort, and eliminating the requirement for storage space.

[0026] 2. The traditional dock ladder will sway left and right when it is supported on the thick railing. The invention allows the dock ladder to be adsorbed on the supporting thick railing, thereby increasing the stability of the dock ladder.

[0027] 3. The invention uses the pneumatic winch of the existing gangway on the LNG carrier as a dumping power source, which can improve the utilization rate of the pneumatic winch. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is an overall top view of a magnetically attracted foldable boarding ladder support device and an operating method of an LNG carrier of the present invention when not folded down;

[0029] Figure 2 It is a side view of a magnetically attracted foldable boarding ladder support device and an operating method of an LNG carrier of the present invention when the device is not folded down;

[0030] Figure 3This is a front view of a magnetically-attracted retractable boarding ladder support device and an operating method for an LNG carrier of the present invention when the device is not retracted;

[0031] Figure 4 It is a top view of a magnetically attracted foldable boarding ladder support device and an operating method of an LNG carrier of the present invention when the device is not folded down;

[0032] Figure 5 It is a side view of a magnetically attracted retractable boarding ladder support device and an operating method of an LNG carrier of the present invention, which is connected to a lifting dock boarding ladder when the device is folded down;

[0033] Figure 6 A side view of a magnetically attracted retractable boarding ladder support device and an operating method for an LNG carrier of the present invention when the device is ready to be folded;

[0034] Figure 7 is a side view of a node of a fastening device;

[0035] Figure numerals: 1. Supporting top railing of thick railing; 2. Supporting column of thick railing; 3. Supporting middle cross bar of thick railing; 4. Magnetic angle steel; 5. Reversible handrail; 6. Reversible handrail connecting eye plate; 7. Magnetic pad; 8. Guide pulley; 9. Gangway; 10. Gangway pneumatic winch; 11. Guide eye plate; 12. Inclined eye plate; 13. Cable; 14. Lifting dock boarding ladder; 15. Lifting dock boarding ladder deck base; 16. Fastening nut; 17. Fastening bolt. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] The embodiment of the present invention discloses a magnetically attracted retractable boarding ladder support device for an LNG carrier, comprising:

[0038] The supporting thick railing includes a supporting thick railing top railing 1, a supporting thick railing column 2, and a supporting thick railing middle crossbar 3. The supporting thick railing column 2 is installed on the deck, and a supporting thick railing middle crossbar 3 is installed in the middle, on which the supporting thick railing top railing 1 is installed;

[0039] Supporting thick rail top rail 1 for supporting lifting dock boarding ladder 14;

[0040] A supporting thick railing post 2 is used to support the top railing 1 of the thick railing;

[0041] The middle cross bar 3 of the thick railing is supported to strengthen the overall rigidity of the magnetic retractable boarding support device;

[0042] A retractable handrail 5 is used for people to support when it is not retracted;

[0043] A rotating mechanism, used to rotate the reversible handrail 5;

[0044] A fastening device for fixing the reversible handrail 5;

[0045] A rotating power device, used to provide power for the reversible handrail 5 to rotate on the rotating mechanism;

[0046] A rotational power guiding mechanism, used to guide the power provided by the rotational power device to rotate the retractable handrail 5 to the retractable handrail 5;

[0047] Further, the top railing 1 of the supporting thick railing can support the weight of the lifting dock boarding ladder 14 on the LNG carrier; a groove is opened on the top railing 1 of the supporting thick railing, and a magnetic angle steel 4 is installed in the groove. The magnetic angle steel 4 is made of magnetic metal material, and can provide a magnetic force to attract the lifting dock boarding ladder 14, and the magnetic angle steel 4 can provide a magnetic force to attract the retractable handrail 5;

[0048] Further, the supporting thick railing posts 2 are installed on the deck and are distributed at equal intervals, and the supporting thick railing middle crossbar 3 is installed between the supporting thick railing posts 2;

[0049] Furthermore, a connecting eye plate is installed at the bottom of the reversible handrail 5, which can be tilted by a rotating mechanism, and a magnetic pad 7 is installed at the middle end of the reversible handrail 5, which can allow the reversible handrail 5 to be adsorbed on the middle crossbar 3 of the supporting thick railing when the railing falls;

[0050] Further, multiple sets of rotating mechanisms are installed at the bottom of the top railing 1 supporting the thick railing, and each set of rotating mechanisms uses two inclined eye plates 12, in the middle of which the eye plate on the reversible handrail 5 can be inserted; the fastening device uses a fastening nut 16 and a fastening bolt 17, which can lock the reversible handrail 5 on the rotating mechanism;

[0051] Furthermore, the rotary power device is a pneumatic winch (pneumatic motor) of the gangway 9 on both sides of the support railing of the magnetically attracted retractable boarding ladder. The pneumatic motor is equipped with an additional auxiliary drum, and the rotary power guiding mechanism guides the power emitted by the pneumatic motor that can tilt the retractable handrail 5 to the retractable handrail 5; the rotary power guiding mechanism is composed of a cable 13, a guide pulley 8, and a guide eye plate 11. The cable 13 can be fastened to the auxiliary drum of the pneumatic motor, and the rope is unloaded from the auxiliary drum of the pneumatic winch of the gangway 9. The guide pulley 8 is installed on both sides of the middle cross bar 3 supporting the thick railing. The cable 13 can be bound to the guide eye plate 11 through the guide pulley 8, and the guide eye plate 11 is installed on both sides of the top of the retractable handrail 5. After the reversible railing falls down, the dock operator operates the lifting dock boarding ladder 14 to the supporting thick railing, and installs the lifting dock boarding ladder deck base 15 under the lifting dock boarding ladder 14, and one end of the base is adsorbed on the magnetic angle steel 4.

[0052] The operating method of the magnetically retractable boarding ladder support device of an LNG carrier of the present invention mainly comprises the following steps:

[0053] Step 1, the LNG carrier docks and completes mooring. The personnel connect one end of the cable 13 to the auxiliary drum of the pneumatic winch 10 of the gangway, and the other end is connected to the guide eye plate 11 on the inboard side of the reversible handrail 5 through the guide pulley 8 on the inboard side of the middle crosspiece 3 of the supporting thick railing;

[0054] Step 2, releasing the fastening bolt 17 of the fastening device;

[0055] Step 3, start the pneumatic winch 10 of the gangway, and the reversible handrail 5 is laid down, and the reversible handrail 5 is adsorbed on the middle crossbar 3 of the supporting thick railing through the magnetic pad 7;

[0056] Step 4, the dock operator operates the lifting dock boarding ladder 14 and places it against the top railing 1 of the supporting thick railing, and the magnetic angle steel 4 on the top railing 1 of the supporting thick railing absorbs the lifting dock boarding ladder 14. Personnel, equipment, and materials can get on and off the ship through the lifting dock boarding ladder 14.

[0057] Step 5: The LNG carrier is unmoored and ready to leave the port. The terminal operator operates the lifting terminal boarding ladder 14 to separate it from the top railing 1 supporting the thick railing.

[0058] Step 6, keep one end of the cable 13 tied to the auxiliary drum of the pneumatic winch 10 of the gangway, and connect the other end of the cable 13 to another guide eye plate 11 on the reversible handrail 5 through the guide pulley 8 on the outer side of the supporting thick railing middle crossbar 3.

[0059] Step 7, start the pneumatic winch 10 of the gangway to raise the handrail 5;

[0060] Step 8, tighten the fastening bolts 17 of the fastening device and release the cable 13, and the LNG carrier is unmoored and leaves the port.

[0061] For details, see Figures 1 to 7 As shown, in an embodiment of the present invention, a magnetically attracted reversible boarding ladder support device and an operating method for an LNG carrier are shown, including a supporting thick railing top railing 1, a supporting thick railing column 2, a supporting thick railing middle crossbar 3, a magnetic angle steel 4, a reversible handrail 5, a reversible handrail connecting eye plate 6, a magnetic pad 7, a guide pulley 8, a gangway 9, a gangway pneumatic winch 10, a guide eye plate 11, an inclined eye plate 12, a cable 13, a lifting dock boarding ladder 14, a lifting dock boarding ladder deck base 15, a fastening nut 16, and a fastening bolt 17.

[0062] The supporting thick railing column 2 is installed on the side of the deck of the LNG carrier, the supporting thick railing top railing 1 is installed thereon, and the supporting thick railing middle cross bar 3 is installed in the middle of the supporting thick railing column 2.

[0063] Furthermore, slots for installing magnetic angle steel 4 are provided on the top and one side of the top railing 1 of the supporting thick railing, an inclined eye plate 12 is installed below the top railing 1 of the supporting thick railing, and a guide pulley 8 is installed in the middle section of the middle cross bar 3 of the supporting thick railing. One side of the reversible handrail 5 can be adsorbed by the magnetic angle steel 4 on one side of the top railing 1 of the supporting thick railing, a reversible handrail connecting eye plate 6 is installed at the lower end of the reversible handrail 5, and the reversible handrail connecting eye plate 6 is fastened to the inclined eye plate 12 by a fastening nut 16 and a fastening bolt 17, two guide eye plates 11 are installed at the upper end of the reversible handrail 5, and the reversible handrail 5 can be tilted with the reversible handrail connecting eye plate 6 as a rotating shaft, and a magnetic pad 7 is provided on the inner side of the reversible handrail 5. After the reversible handrail 5 falls, the magnetic pad 7 on the reversible handrail 5 contacts the middle cross bar 3 of the supporting thick railing, which plays a role of limiting and adsorption.

[0064] Furthermore, the gangway 9 and the gangway pneumatic winch 10 are arranged on one side of the supporting thick railing column 2. A person fastens one end of the cable 13 to the auxiliary drum on the gangway pneumatic winch 10, and the other end is fastened to the guide eye plate 11 on the inner side through the guide pulley 8 on the inner side. The person loosens the fastening nut 16 and the fastening bolt 17, and then starts the gangway pneumatic winch 10, and the gangway pneumatic winch 10 pulls down the reversible handrail 5 through the cable 13.

[0065] Further, the dock operator operates the lifting dock boarding ladder 14 to the top of the railing 1 supporting the top of the thick railing, and the magnetic angle steel 4 can absorb the lower end of the lifting dock boarding ladder 14. The personnel install the lifting dock boarding ladder deck base 15 below the lifting dock boarding ladder 14, and one end is adsorbed on the magnetic angle steel 4 of the inboard part of the top railing 1 supporting the thick railing. After the lifting dock boarding ladder deck base 15 and the lifting dock boarding ladder 14 are evacuated, the personnel pass the cable 13 through the guide pulley 8 on the outboard side, bypass the top railing 1 supporting the thick railing, and tie it to the guide eye plate 11 on the inboard side at this time. The personnel start the gangway pneumatic winch 10, and the gangway pneumatic winch 10 pulls up the reversible handrail 5 through the cable 13, tightens the fastening nut 16 and the fastening bolt 17, and completes one operation.

[0066] The present invention can simplify the operation amount and time of personnel operating the boarding ladder support device, save the storage space of the handrail, improve the stability of the lifting dock boarding ladder 14, and increase the utilization rate of the gangway pneumatic winch 10.

[0067] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A magnetically retractable boarding ladder support device for an LNG carrier, characterized in that: It comprises a supporting thick railing for supporting a lifting dock boarding ladder (14) and a reversible handrail (5) arranged on the supporting thick railing, a rotating mechanism and a fastening device are arranged between the supporting thick railing and the reversible handrail (5), so that the reversible handrail (5) can be rotated or fixed relative to the supporting thick railing, and the reversible handrail (5) is used for people to support when it is not reversible; It also comprises a rotational power device and a rotational power guiding mechanism, wherein the rotational power device is used to provide power for the reversible handrail (5) to rotate on the rotational mechanism, and the rotational power guiding mechanism is used to guide the power provided by the rotational power device to rotate the reversible handrail (5) to the reversible handrail (5).

2. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 1, characterized in that: The supporting thick railing comprises a supporting thick railing column (2) installed on the deck, a supporting thick railing top railing (1) arranged on the top of the supporting thick railing column (2), and a supporting thick railing middle cross bar (3) arranged in the middle of the supporting thick railing column (2).

3. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 2, characterized in that: A groove is provided on the top railing (1) of the supporting thick railing, and a magnetic angle steel (4) is installed in the groove for adsorbing the reversible handrail (5) and the lifting dock boarding ladder (14).

4. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 3, characterized in that: The end of the reversible handrail (5) is equipped with a connecting eye plate, which can be tilted by the rotating mechanism. The rotating mechanism adopts an inclined eye plate (12) installed at the lower end of the top railing (1) of the supporting thick railing.

5. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 4, characterized in that: A magnetic pad (7) is installed at the middle end of the reversible handrail (5) and is adsorbed on the middle crossbar (3) of the supporting thick railing when the reversible handrail (5) is fallen.

6. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 5, characterized in that: The rotary power device adopts the pneumatic motor of the gangway (9), and the pneumatic motor is equipped with an additional auxiliary drum, which guides the rotary power to the retractable handrail (5) through the rotary power guiding mechanism.

7. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 6, characterized in that: The rotational power guiding mechanism is composed of a cable (13), a guide pulley (8), and a guide eye plate (11). The cable (13) is unwound from the auxiliary drum of the pneumatic winch of the gangway (9), passes through the guide pulley (8) installed on the middle cross bar (3) of the supporting thick railing, and is fastened to the guide eye plate (11) on the reversible handrail (5), thereby providing power for rotating the reversible handrail (5).

8. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 7, characterized in that: After the reversible handrail (5) is collapsed, the lifting dock boarding ladder (14) is operated onto the supporting thick railing.

9. The magnetically retractable boarding ladder support device for an LNG carrier according to claim 8, characterized in that: A liftable dock boarding ladder deck base (15) is installed below the liftable dock boarding ladder (14), and one end of the base is adsorbed on the magnetic angle steel (4).

10. The method for operating the magnetically retractable boarding ladder support device for an LNG carrier according to claim 9, characterized in that: The following steps are involved: Step 1, the LNG carrier docks and completes mooring, one end of the cable (13) is connected to the auxiliary drum of the pneumatic winch (10) of the gangway, and the other end is connected to the guide eye plate (11) on the inboard side of the reversible handrail (5) through the guide pulley (8) on the inboard side of the middle crosspiece (3) of the supporting thick railing; Step 2, releasing the fastening bolts (17) of the fastening device; Step 3, starting the pneumatic winch (10) of the gangway, the reversible handrail (5) is laid down, and the reversible handrail (5) is adsorbed on the middle crossbar (3) of the supporting thick railing through the magnetic pad (7); Step 4, operate the lifting dock boarding ladder (14) and place it against the top railing (1) of the supporting thick railing, so that the magnetic angle steel (4) on the top railing (1) of the supporting thick railing absorbs the lifting dock boarding ladder (14), and personnel, equipment, and materials can get on and off the ship through the lifting dock boarding ladder (14); Step 5, the LNG carrier is unmoored and ready to leave the port, and the lifting dock boarding ladder (14) is operated to separate it from the top railing (1) of the supporting thick railing; Step 6, keep one end of the cable (13) tied to the auxiliary drum of the pneumatic winch (10) of the gangway, and connect the other end of the cable (13) to the other guide eye plate (11) on the reversible handrail (5) through the guide pulley (8) on the outer side of the middle crosspiece (3) of the supporting thick railing; Step 7, starting the pneumatic winch (10) of the gangway to raise the retractable handrail (5); Step 8, tighten the fastening bolts (17) of the fastening device and release the cable (13), and the LNG carrier is unmoored and leaves the port.