Granitic plaster dry-hanging construction method and granitic plaster dry-hanging device

Through the combination of hydrated stone molds and dry-hanging devices, the problems of complexity and quality control of hydrated stone construction are solved, mass production and batch dry-hanging of hydrated stone are realized, construction quality and efficiency are improved, and enhanced Improves the thermal insulation and maintenance convenience of the building.

CN118745801APending Publication Date: 2024-10-08CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410842288.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The construction process of terrazzo is complex and lacks quality control methods, resulting in differences in manufacturing and construction. Mass production and batch dry hanging cannot be achieved, and quality is difficult to guarantee.

Method used

Water-washed stone molds are used for construction. Water-washed stone modules are formed by pouring concrete, pre-embedding steel wire mesh, and applying cement slurry and cement gravel slurry surface layers, and are installed on the wall facade using dry-hanging devices to realize the module chemical construction.

Benefits of technology

It has realized the mass production and batch dry-hanging construction of water-brushed stone, improved the construction quality, reduced the requirements for workers' skills and experience, improved the construction efficiency, and enhanced the building's thermal insulation and maintenance convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745801A_ABST
    Figure CN118745801A_ABST
Patent Text Reader

Abstract

The invention provides a granitic plaster dry hanging construction method and a granitic plaster dry hanging device, and relates to the field of building construction. The granitic plaster dry hanging construction method comprises the steps that a granitic plaster mold is manufactured, and the granitic plaster mold is fixed; concrete with the preset thickness is poured into the granitic plaster mold, and a steel wire mesh fixing piece is pre-buried in the concrete; after the concrete reaches the preset strength, binding and overlapping the galvanized steel wire mesh and the steel wire mesh fixing piece; the galvanized steel wire mesh is coated with cement paste; a cement-rock-slag slurry surface layer is smeared on the surface of the cement slurry until the surface of the cement-rock-slag slurry surface layer is flush with the surface of the granitic plaster mold; brushing the cement-rock ballast slurry surface layer, and brushing rock ballast to appear; after the cement stone slag slurry surface layer is hardened, the granitic plaster mold is dismantled, and the granitic plaster module is taken out; and the granitic plaster module is installed on the outer vertical face of the wall. Mass production of the granitic plaster modules can be achieved, finally, the granitic plaster modules are installed on the outer vertical face of the wall, batch dry hanging construction is achieved, and the construction quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction, and in particular to a water-brushed stone dry-hanging construction method and a water-brushed stone dry-hanging device. Background Art

[0002] Water-brushed stone, as a traditional and modern building decoration material, has been widely used in contemporary architecture and decoration due to its unique natural texture, good air permeability and environmental protection performance. It is mainly made of cement, sand, gravel and other materials mixed in proportion, and colorants are added during construction. It is brushed on the wall through professional technology to form a surface effect similar to natural stone.

[0003] Water-brushed stone is not only widely used in indoor and outdoor wall decoration of residences, commercial spaces, office buildings, etc., but also used for outdoor ground paving such as sidewalks, parks, and squares due to its wear-resistant and weather-resistant properties. Its natural and simple beauty and environmentally friendly characteristics make it one of the indispensable materials in modern urban architecture and landscape design.

[0004] However, the water-brushed stone process is relatively old and complex, and there is no precise quality control method for each process link. It can only be controlled by visual perception, so its quality mainly depends on the workers' skills and experience. However, there are differences in the manufacturing and construction of water-brushed stone at present, and it is impossible to carry out mass production and batch dry hanging construction, and the quality is difficult to guarantee. Summary of the invention

[0005] The purpose of the present application is to provide a water-brushed stone dry-hanging construction method and a water-brushed stone dry-hanging device, which can realize the mass production and batch dry-hanging construction of water-brushed stone and improve the construction quality.

[0006] In a first aspect, the present invention provides a water-brushed stone dry hanging construction method, the water-brushed stone dry hanging construction method comprising:

[0007] Making a water-brushed stone mold and fixing the water-brushed stone mold;

[0008] Pouring concrete of a preset thickness into the water-brushed stone mold, and embedding a steel mesh fixing part in the concrete;

[0009] After the concrete reaches a preset strength, the galvanized steel mesh is tied and overlapped with the steel mesh fixings;

[0010] Apply cement slurry on the galvanized steel wire mesh;

[0011] Apply a cement slag slurry surface layer on the cement slurry surface until the surface of the cement slag slurry surface layer is flush with the surface of the water-brushed stone mold;

[0012] Scrubbing the cement slag slurry surface layer to make the slag visible;

[0013] After the cement slag slurry surface layer is hardened, the water-brushed stone mold is removed and the water-brushed stone module is taken out;

[0014] The water-brushed stone module is installed on the outer facade of the wall.

[0015] In an optional embodiment, when making the water-brushed stone mold, a wooden board is used as a bottom template, and four wooden squares are connected end to end as side templates and fixed on the bottom template.

[0016] In an optional embodiment, a convex strip is installed on each of two opposite side templates, and the length of the convex strip is equal to the length of the side template.

[0017] In an optional embodiment, when dismantling the water-brushed stone mold, the four side templates are first dismantled, and after taking out the water-brushed stone module, the bottom template is obtained.

[0018] In an optional embodiment, during the pouring of concrete, the water-brushed stone mold is struck to vibrate the concrete.

[0019] In an alternative embodiment, the vibrating time is at least 5 minutes.

[0020] In an optional implementation, the cement slag slurry surface layer is applied from bottom to top in multiple times, patted and smoothed while applying, and the flatness of the cement slag slurry surface layer is checked in time to fill in pits and defects.

[0021] In an optional embodiment, the cement slag slurry surface layer is beaten until the cement slag slurry surface layer is compacted and the cement slurry inside is squeezed out.

[0022] In an optional embodiment, after compaction, the slag is placed with the large surface facing upwards, and then smoothed and compacted with an iron trowel.

[0023] In the second aspect, the present invention provides a water-brushed stone dry hanging device for implementing the water-brushed stone dry hanging construction method as described in the aforementioned embodiment, the water-brushed stone dry hanging device includes an embedded plate, a connecting piece, a square tube, an angle steel, a hanger and a water-brushed stone module, the embedded plate is used to be fixedly connected to the outer facade of the wall, the connecting piece is respectively connected to the embedded plate and the square tube, the square tube is arranged in the vertical direction, the angle steel is arranged in the horizontal direction and fixedly connected to the square tube, a plurality of the hangers are arranged at intervals on the angle steel, and the water-brushed stone module is fixed to at least two of the hangers.

[0024] Compared with the prior art, the beneficial effects of this application are:

[0025] The present application achieves the purpose of limiting the appearance of the water-brushed stone module by making a water-brushed stone mold, and then obtains the water-brushed stone module after pouring concrete in the water-brushed stone mold, pre-embedding steel mesh fixings, overlapping galvanized steel mesh, brushing cement slurry, applying cement slag slurry surface layer and brushing the cement slag slurry surface layer, which can realize the mass production of water-brushed stone modules. Finally, the present application installs the water-brushed stone module to the exterior facade of the wall, realizes the batch dry-hanging construction of the water-brushed stone module, and improves the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 It shows the structural schematic diagram of the water-brushed stone module in some embodiments;

[0028] Figure 2 It shows the structural schematic diagram of the water-brushed stone mold in some embodiments;

[0029] Figure 3 Shows a schematic diagram of the structure of a wire mesh fixing member in some embodiments;

[0030] Figure 4 The figure shows the connection diagram of the water-brushed stone dry hanging device in some embodiments.

[0031] Description of main component symbols:

[0032] 100-water-brushed stone mold; 110-bottom template; 120-side template; 121-convex strip; 200-water-brushed stone module; 210-concrete layer; 220-wire mesh fixings; 221-horizontal fixing part; 222-vertical fixing part; 223-arc fixing part; 230-galvanized steel mesh layer; 240-cement slag slurry surface layer; 250-groove; 201-first water-brushed stone module; 202-second water-brushed stone module; 300-buried plate; 310-installation hole; 400-connector; 500-square tube; 600-angle steel; 700-hanging parts; 800-expansion bolts; 900-bolts. DETAILED DESCRIPTION

[0033] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0034] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0036] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0037] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0038] Embodiment 1

[0039] The present embodiment is applicable to the mass production of water-brushed stone. For the convenience of description and understanding, the water-brushed stone is described here as a water-brushed stone module 200 to reflect the convenience of mass production.

[0040] See also Figure 1This embodiment provides a water-brushed stone dry hanging construction method, which includes the following steps:

[0041] See also Figure 1 and Figure 2 .

[0042] S100. Making a water-brushed stone mold 100 and fixing the water-brushed stone mold 100.

[0043] A wooden board is used as a bottom template 110, and four wooden squares are connected end to end as side templates 120 and fixed on the bottom template 110. A convex strip 121 is installed on two opposite side templates 120 respectively, and the length of the convex strip 121 is equal to the length of the side template 120.

[0044] Exemplarily, the length of the convex strip 121 is 10 mm and the width is 2 mm. Thus, after the manufacturing process of the water-brushed stone is completed, a groove 250 of 2 mm×10 mm will be formed at the corresponding position of the water-brushed stone module 200 .

[0045] In this embodiment, a clamp is used to fix the wooden board and the wooden planks, so as to prevent the occurrence of problems such as leakage of mortar and expansion of the mold, and ensure that the obtained water-brushed stone module 200 has a good appearance and meets the construction requirements.

[0046] S200. Pour concrete of a preset thickness into the water-brushed stone mold 100, and embed the wire mesh fixing part 220 in the concrete.

[0047] In this embodiment, the poured concrete is ultra-high performance concrete (UHPC) to meet the construction standards and prevent the water-brushed stone module 200 from cracking. The poured concrete is preset to have a thickness of 1.5 cm.

[0048] During the pouring of concrete, the water-brushed stone mold 100 is struck to vibrate the concrete, and the vibration time is at least 5 minutes.

[0049] After the vibration is completed, a wire mesh fixing part 220 is embedded in the concrete surface.

[0050] See also Figure 1 and Figure 3 The wire mesh fixing part 220 includes a horizontal fixing part 221, a vertical fixing part 222 and an arc-shaped fixing part 223. The horizontal fixing part 221 and the vertical fixing part 222 are embedded in concrete. The horizontal fixing part 221 and the arc-shaped fixing part 223 are respectively located at two ends of the vertical fixing part 222, and the horizontal fixing part 221 is a plate-like structure, and the vertical fixing part 222 and the arc-shaped fixing part 223 are rod-like structures.

[0051] The construction personnel can design the number and arrangement positions of the wire mesh fixings 220 as needed to ensure the strength of the water-brushed stone module 200 .

[0052] S300. After the concrete reaches a preset strength, the galvanized steel mesh and the steel mesh fixing member 220 are tied and overlapped.

[0053] The concrete reaches a preset strength to form a concrete layer 210 .

[0054] The galvanized steel wire mesh is tied and overlapped with the steel wire fixing piece through the arc-shaped fixing part 223 to form a galvanized steel wire mesh layer 230. It can be understood that the galvanized steel wire mesh has a mesh structure, and the size of the galvanized steel wire mesh is roughly the same as the size of the concrete surface. The galvanized steel wire mesh is laid flat on the concrete, and then the galvanized steel wire mesh is tied and overlapped with the arc-shaped fixing part 223 of the steel wire mesh fixing piece 220, which can greatly improve the tensile strength of the water-brushed stone module 200.

[0055] In addition, the galvanized steel wire mesh is a product obtained by galvanizing the surface of the steel wire, has good corrosion resistance and rigidity, and is suitable for this embodiment.

[0056] S400. Apply cement slurry to galvanized steel wire mesh.

[0057] The cement slurry is applied by using a roller brush. The cement slurry mixed with polyvinyl formal adhesive (107 glue) on the roller brush has the advantages of being non-flammable, low in price and easy to use.

[0058] See also Figure 1 and Figure 2 .

[0059] S500. Apply a cement slag slurry surface layer 240 on the surface of the cement slurry until the surface of the cement slag slurry surface layer 240 is flush with the surface of the water-brushed stone mold 100.

[0060] Apply the cement slag slurry surface layer 240 from bottom to top in multiple times, pat and smooth it while applying, check the flatness of the cement slag slurry surface layer 240 in time, and fill in pits and defects.

[0061] Exemplarily, the cement slag slurry surface layer 240 is applied twice from bottom to top, and each time the cement slag slurry surface and the wooden surface need to be smoothed, so as to ensure that the surface of the water-brushed stone module 200 is smooth and the flatness is improved.

[0062] In addition, applying the cement slag slurry in batches can timely discover the grooves 250 and defects of the cement slag slurry surface layer 240, and take filling measures in advance to prevent the formation of holes inside the water-brushed stone module 200 that cannot be repaired, thereby reducing the construction defect rate.

[0063] The cement slag slurry surface layer 240 is tapped until the cement slag slurry surface layer 240 is compacted and the cement slurry inside is squeezed out.

[0064] After compaction, place the slag with its large surface facing upwards, and then use an iron trowel to smooth and compact it. Repeat this process 3 to 4 times to ensure the smoothness of the surface of the water-brushed stone module 200.

[0065] S600. Scrub the cement slag slurry surface layer 240 to make the slag visible.

[0066] S700. After the cement slag slurry surface layer 240 hardens, remove the water-brushed stone mold 100 and take out the water-brushed stone module 200.

[0067] When dismantling the water-brushed stone mold 100 , firstly dismantle the four side mold plates 120 , take out the water-brushed stone module 200 , and then obtain the bottom mold plate 110 .

[0068] S800. Install the water-brushed stone module 200 to the exterior surface of the wall.

[0069] This embodiment achieves the purpose of limiting the appearance of the water-brushed stone module 200 by manufacturing a water-brushed stone mold 100, and then pours concrete in the water-brushed stone mold 100, embeds the wire mesh fixings 220, overlaps the galvanized wire mesh, applies cement slurry, applies a cement slag slurry surface layer 240, and brushes the cement slag slurry surface layer 240 to obtain the water-brushed stone module 200, which can realize mass production of the water-brushed stone module 200.

[0070] Embodiment 2

[0071] See also Figure 4 The present embodiment provides a water-brushed stone dry hanging device, which is used to implement the water-brushed stone dry hanging construction method of the first embodiment. Specifically, the water-brushed stone dry hanging device includes an embedded plate 300, a connecting piece 400, a square tube 500, an angle steel 600, a hanger 700 and a water-brushed stone module 200. The embedded plate 300 is used to be fixedly connected to the outer facade of the wall. The connecting piece 400 connects the embedded plate 300 and the square tube 500 respectively. The square tube 500 is arranged in a vertical direction, the angle steel 600 is arranged in a horizontal direction and fixedly connected to the square tube 500, and a plurality of hangers 700 are arranged at intervals on the angle steel 600. The water-brushed stone module 200 is fixed on at least two hangers 700.

[0072] Here, the number of embedded plates 300, connecting parts 400, square tubes 500, and angle steels 600 is one respectively, the number of water-brushed stone modules 200 is two, and the number of hangers 700 is multiple is used for exemplary description. For ease of description and understanding, the water-brushed stone module 200 located above is defined as the first water-brushed stone module 201, and the water-brushed stone module 200 located below is defined as the second water-brushed stone module 202.

[0073] The embedded plate 300 is a square block structure, and a plurality of mounting holes 310 are provided on the embedded plate 300. The embedded plate 300 is fixed to the outer facade of the wall by inserting expansion bolts 800 through the mounting holes 310.

[0074] See also Figure 1 and Figure 4 Each water-brushed stone module 200 includes a concrete layer 210, a galvanized steel mesh layer 230, and a cement slag slurry surface layer 240. During construction, the concrete layer 210 is located in the innermost layer and is arranged close to the outer facade of the wall, the galvanized steel mesh layer 230 is located in the middle layer, and the galvanized steel mesh layer 230 is provided with steel wire fixings. Cement slurry is also applied to the galvanized steel mesh layer 230, and the cement slag slurry surface layer 240 is located in the outermost layer.

[0075] Each water-brushed stone module 200 is provided with two grooves 250 disposed opposite to each other, with a size of 2 mm×10 mm. The two grooves 250 are respectively located on two sides of the concrete layer 210 .

[0076] In this embodiment, the groove 250 below the first water-brushed stone module 201 is connected to the hanger 700, and the groove 250 above the second water-brushed stone module 202 is connected to the hanger 700. It can be understood that multiple water-brushed stone modules 200 are arranged in an array through the connection between the grooves 250 and the hanger 700, so that the water-brushed stone modules 200 are spread all over the wall facade to form a good visual effect.

[0077] In this embodiment, the water-brushed stone modules 200 are installed on the outer facade of the wall, thereby realizing batch dry-hanging construction of the water-brushed stone modules 200 and improving construction quality.

[0078] Based on the above content, the use principle of the water-brushed stone dry hanging device is further explained as follows:

[0079] S110 . Use expansion bolts 800 to fix the embedded plate 300 to the outer surface of the wall, and adjust the verticality and horizontality of the embedded plate 300 .

[0080] S120. After the square tube 500 is adjusted to be horizontal and straight, the square tube 500 and the embedded plate 300 are connected by the connecting piece 400.

[0081] In this embodiment, the connecting member 400 is firstly welded to the buried plate 300 , and then the connecting member 400 is connected to the square tube 500 using bolts 900 after the square tube 500 is adjusted.

[0082] In some other embodiments, the connecting member 400 may be welded to the embedded plate 300 first, and then the embedded plate 300 may be fixed to the outer surface of the wall, and finally the square tube 500 may be fixed to the connecting member 400 .

[0083] In some other embodiments, the number of the connecting members 400 may also be two, and the two connecting members 400 are respectively installed on both sides of the square tube 500, which can improve the stability of the square tube 500.

[0084] S130. Fix the angle steel 600 to the square tube 500 by means of screws, and fix the hanger 700 to the angle steel 600.

[0085] The angle steel 600 is fixed to the square tube 500 by means of bolts 900, and the hanger 700 is fixed to the angle steel 600 by means of bolts 900. These two steps can be interchanged.

[0086] S140 . Install the water-brushed stone module 200 onto the hanger 700 .

[0087] By adjusting the bolts 900 on the hanger 700, the water-brushed stone module 200 can be leveled to ensure flatness.

[0088] This embodiment has the following advantages:

[0089] 1. Easy to control the construction quality: The construction quality of the dry-hanging water-brushed stone module 200 is affected by many factors, such as the flatness of the base wall, the complexity of the construction process, etc. If these factors cannot be effectively controlled and coordinated, it may lead to quality problems such as uneven stone installation and loose joints, affecting the overall decorative effect. The use of dry hanging can effectively reduce the impact of various factors.

[0090] 2. Greatly improved construction efficiency: The construction environment of the dry-hanging water-brushed stone module 200 is transformed from the original construction on the scaffolding to the construction on the construction site, which greatly improves the construction efficiency.

[0091] 3. Reduced requirements on workers’ skills and experience: The dry-hanging water-brushed stone module 200 transforms large-scale construction into module construction, which can greatly reduce the requirements on workers.

[0092] 4. Good thermal insulation: The dry-hanging water-brushed stone module 200 forms a thermal insulation layer on the exterior wall of the building, which can effectively isolate the impact of outdoor high or low temperatures on indoor air, improve the building's energy-saving performance, and reduce the energy consumption of air conditioning and heating.

[0093] 5. Easy maintenance: After the dry hanging water brushed stone module 200 is installed, the surface will generally undergo simple maintenance work such as dust removal and cleaning. This maintenance method is relatively simple and does not require a lot of manpower and material investment, and can effectively extend the service life of the stone.

[0094] 5. Easy replacement: If the water-brushed stone module 200 is contaminated, damaged, etc. and needs to be replaced or upgraded, it has high flexibility and convenience. Since the dry-hanging water-brushed stone module 200 adopts a modular design, the stone is usually installed separately on the supporting structure. Therefore, when part of the stone needs to be replaced or the whole needs to be updated, it is relatively easy to dismantle and replace the specific stone module without the need for destructive reconstruction of the entire exterior wall.

[0095] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0096] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A water-brushed stone dry hanging construction method, characterized in that: include: Making a water-brushed stone mold and fixing the water-brushed stone mold; Pouring concrete of a preset thickness into the water-brushed stone mold, and embedding a steel mesh fixing part in the concrete; After the concrete reaches a preset strength, the galvanized steel mesh is tied and overlapped with the steel mesh fixings; Apply cement slurry on the galvanized steel wire mesh; Apply a cement slag slurry surface layer on the cement slurry surface until the surface of the cement slag slurry surface layer is flush with the surface of the water-brushed stone mold; Scrubbing the cement slag slurry surface layer to make the slag visible; After the cement slag slurry surface layer is hardened, the water-brushed stone mold is removed and the water-brushed stone module is taken out; The water-brushed stone module is installed on the outer facade of the wall.

2. The water-brushed stone dry hanging construction method according to claim 1, characterized in that: When making a water-brushed stone mold, a wooden board is used as a bottom template, and four wooden squares are connected end to end as side templates and fixed on the bottom template.

3. The water-brushed stone dry hanging construction method according to claim 2, characterized in that: A convex strip is respectively installed on two opposite side templates, and the length of the convex strip is equal to the length of the side template.

4. The water-brushed stone dry hanging construction method according to claim 2, characterized in that: When dismantling the water-brushed stone mold, first dismantle the four side templates, take out the water-brushed stone module, and then obtain the bottom template.

5. The water-brushed stone dry hanging construction method according to any one of claims 1 to 3, characterized in that: During the process of pouring concrete, the water-brushed stone mold is struck to vibrate the concrete.

6. The water-brushed stone dry hanging construction method according to claim 5, characterized in that: The vibration time should be at least 5 minutes.

7. The water-brushed stone dry hanging construction method according to any one of claims 1 to 3, characterized in that: Apply the cement slag slurry surface layer from bottom to top in multiple times, pat and smooth it while applying, check the flatness of the cement slag slurry surface layer in time, and fill in pits and defects.

8. The water-brushed stone dry hanging construction method according to claim 7, characterized in that: The cement slag slurry surface layer is tapped until the cement slag slurry surface layer is compacted and the cement slurry inside is squeezed out.

9. The water-brushed stone dry hanging construction method according to claim 8, characterized in that: After compaction, place the slag with the large surface facing upwards, and then use an iron trowel to smooth and compact it.

10. A water-brushed stone dry hanging device, used for implementing the water-brushed stone dry hanging construction method according to any one of claims 1 to 9, characterized in that: The water-brushed stone dry hanging device includes an embedded plate, a connecting piece, a square tube, an angle steel, a hanger and a water-brushed stone module. The embedded plate is used to be fixedly connected to the outer facade of the wall. The connecting piece is respectively connected to the embedded plate and the square tube. The square tube is arranged in the vertical direction. The angle steel is arranged in the horizontal direction and fixedly connected to the square tube. A plurality of the hangers are arranged at intervals on the angle steel. The water-brushed stone module is fixed to at least two of the hangers.