LYSO scintillation crystal material preparation equipment and method

The air pump provides inert gas support and precise control of the pressure-sensitive device, which solves the problem of vibration damage to the crystal surface in the traditional crucible drop method, improves the crystal quality and reduces the failure rate, and achieves a more stable nitrogen protection environment.

CN118756315BActive Publication Date: 2024-11-05ANHUI CRESTRON CRYSTAL MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411252288.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-05
Estimated Expiration
2044-09-09

Smart Images

  • Figure CN118756315B_ABST
    Figure CN118756315B_ABST
Patent Text Reader

Abstract

The invention discloses a LYSO scintillation crystal material preparation device and method, and relates to the field of scintillation crystal material preparation. The device comprises a furnace body, a heat preservation layer is arranged inside the furnace body, and a heater is arranged inside the heat preservation layer; a crucible and the heat preservation layer are adapted and slidably arranged, so that the crucible can be vertically lifted and lowered, and an air guide channel penetrating from top to bottom is provided on the surface of the crucible, and the cross-sectional size of the air guide channel is uniform; the furnace body is filled with inert gas, and the air inlet and exhaust ends of an air pump are respectively connected to the upper and lower parts of the furnace body, and the air pump conveys the inert gas to the lower part of the crucible. The invention adopts an air pump to input inert gas of a certain strength into the lower part of the crucible, and the crucible is supported by upward movement due to the effect of air pressure, and the inert gas penetrates the air guide channel and is recycled, so that the LYSO scintillation crystal is surrounded by nitrogen during the crystallization growth process to avoid oxidation, and the crucible is controlled to descend and crystallize by controlling the gas supply intensity, so as to realize flexible suspension support for the crucible, avoid the crucible being affected by vibration during movement, and improve the quality of crystallization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of scintillation crystal material preparation, and in particular to a LYSO scintillation crystal material preparation device and method. Background Art

[0002] There are many ways to prepare LYSO scintillation crystal materials. The melting method is a more common method. The melting method for preparing LYSO scintillation crystals is to mix the raw materials in a certain proportion, heat them to a high temperature to melt them, and then quickly cool the melt so that the material gradually crystallizes to form LYSO crystals during the cooling process. This cooling and crystallization process is called growing LYSO crystals. Common ways to grow LYSO crystals by melting include the crucible descent method and the pulling method, and large-sized LYSO scintillation crystals are mostly made by the crucible descent method.

[0003] The crucible descent method is to control the crucible containing molten material to descend steadily. The temperature of the descent path decreases in steps, and the temperature of the molten material in the crucible gradually decreases and crystallizes. To avoid oxidation of the material, the entire crystallization process is in a closed environment and filled with inert gases such as nitrogen for protection. The traditional crucible descent control is controlled by a screw rod or other lifting equipment. The lifting device is in hard contact with the crucible. The vibration generated by the drive of the lifting device is easily transmitted to the crucible. The vibration will destroy the orderly extension of the crystal surface in the crucible and reduce the quality of crystallization. In addition, the entire crystallization process is in a relatively high temperature environment. The lifting device is also prone to malfunction if it is kept in a high temperature environment for a long time. Summary of the invention

[0004] The purpose of the present invention is to provide a LYSO scintillation crystal material preparation device and method, which is used to solve the problem that the traditional crucible is controlled to lower its height by a lifting device with hard contact, and the vibration of the lifting device is easy to damage the crystal surface of the crystal.

[0005] In order to solve the problems existing in the prior art, the technical solution of the present invention is as follows:

[0006] The LYSO scintillation crystal material preparation device and method include a furnace body, a heat preservation layer is arranged inside the furnace body, and a heater is arranged inside the heat preservation layer;

[0007] A crucible, wherein the crucible and the insulation layer are adapted to be slidably arranged so that the crucible can be vertically lifted and lowered, and an air guide channel is provided on the surface of the crucible, which is connected vertically and has a uniform cross-sectional size;

[0008] An air pump, wherein the furnace body is filled with inert gas, and the air inlet and exhaust ends of the air pump are respectively connected to the upper and lower parts of the furnace body. The air pump delivers inert gas to the lower part of the crucible, and the inert gas passes through the air guide channel upward. The amount of gas delivered by the air pump is balanced with the amount of gas guided by the air channel, so that a stable air pressure is formed at the bottom of the crucible to support the crucible to maintain its height;

[0009] The pressure sensing device is used to monitor the air pressure strength at the bottom of the crucible. The pressure sensing device is connected to the air pump through a controller. The air pump gradually reduces the gas delivery rate, so that the air pressure at the bottom of the crucible is gradually reduced and the height of the crucible is gradually reduced.

[0010] Preferably, the bottom of the furnace body is provided with a plurality of air inlets distributed in a ring shape, and the air inlets are commonly connected to a lower ring cavity, the exhaust end of the air pump is connected to the lower ring cavity, an upper ring cavity is provided between the insulation layer and the furnace body, the upper ring cavity is connected to the upper part of the furnace body through a plurality of return air ducts distributed in a ring shape, the air inlet end of the air pump is connected to the upper ring cavity, and a plurality of air guide ducts are distributed in a ring shape on the edge of the crucible.

[0011] Preferably, the bottom of the crucible is in a spherical or conical shape protruding downward, the bottom edge of the crucible has a ring seat extending downward, and the air guide channels are distributed on the inner side of the ring seat.

[0012] Preferably, the pressure sensing device includes a piston cylinder and a resistance rod. The piston cylinder passes through the bottom of the furnace body. The piston body is elastically slidably arranged in the piston cylinder by a spring. The resistance rod is arranged parallel to the piston cylinder. A moving contact body is slidably arranged on the surface of the resistance rod. The moving contact body is connected to the piston body. One end of the resistance rod and the moving contact body are connected to a controller through a line. The controller is connected to a control air pump.

[0013] Preferably, the heater is composed of a plurality of vertically arranged electric heating rings, and the temperatures of the electric heating rings decrease from top to bottom.

[0014] Preferably, the several electric heating rings of the heater are divided into multiple groups, the distribution height of each group of electric heating rings is greater than the height of the crucible, and multiple position switches are axially arranged on the outside of the piston cylinder. The position switches are connected one by one with each group of electric heating rings through a controller, and the piston body is connected with a contact block, which is used to touch the position switch.

[0015] Preferably, the air inlet end of the air pump is connected to an inert gas source for providing inert gas via a reversing valve.

[0016] Preferably, the reversing valve comprises a valve housing, an air inlet pipe, an air return pipe, an external pipe and an air supply pipe are cross-distributed on the edge of the valve housing, the air inlet pipe is connected to the air inlet end of the air pump, the air return pipe is connected to the upper annular cavity, the external pipe is connected to the external environment, and the air supply pipe is connected to the inert gas source, a valve plate is rotatably arranged in the valve housing to divide the interior of the valve housing into two parts, the valve plate is transmission-connected to a motor, and the motor drives the valve plate to rotate, so that the air inlet pipe is connected to the air return pipe, the external pipe is connected to the air supply pipe, or the air return pipe is connected to the external pipe, and the air inlet pipe is connected to the air supply pipe;

[0017] Preferably, two limiting bodies are arranged on both sides of the connecting part of the air supply pipe inside the valve housing, and a stopper is arranged between the two limiting bodies for elastic sliding by a spring, and one end of the valve plate is used to resist the movement of the stopper to open or close the air supply pipe.

[0018] A method for preparing a LYSO scintillation crystal material based on the LYSO scintillation crystal material preparation device, the specific steps are as follows:

[0019] A. Turn on the air pump to deliver inert gas to the bottom of the furnace body. The inert gas forms a high-pressure area at the bottom of the crucible. The high pressure causes the crucible to rise to the upper part of the furnace body. The inert gas enters the upper part of the crucible through the air guide and is guided back to the air pump, so that the crucible maintains a stable height at the upper part of the furnace body.

[0020] B. Turn on the heater to heat and melt the material in the crucible, and the temperature of the heater gradually decreases from top to bottom;

[0021] C. Gradually reduce the gas supply pressure of the air pump to gradually lower the crucible, and reduce the heating temperature of the crucible to allow the molten material to crystallize.

[0022] Compared with the related art, the present invention has the following beneficial effects:

[0023] 1. The present invention adopts an air pump to input a certain strength of inert gas into the lower part of the crucible. The air pressure causes the crucible to be supported by moving upward. The inert gas passes through the air guide and is recycled, so that the LYSO scintillation crystal is surrounded by nitrogen during the crystallization growth process to avoid oxidation. The crucible is controlled to descend and crystallize by controlling the gas supply intensity, so as to achieve flexible suspension support for the crucible, avoid the crucible from being affected by vibration during movement, and improve the quality of crystallization.

[0024] 2. The present invention senses the air pressure strength at the bottom of the crucible through a pressure sensing device, and the piston body drives the moving contact body to move to change the circuit resistance, which is used to feedback the air pressure, thereby more accurately controlling the lifting and lowering movement of the crucible. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is one of the overall structural schematic diagrams of the present invention.

[0026] Figure 2 This is the second schematic diagram of the overall structure of the present invention.

[0027] Figure 3 It is a schematic diagram of the internal structure of the furnace body of the present invention.

[0028] Figure 4 It is a schematic diagram of the crucible structure of the present invention.

[0029] Figure 5 It is a schematic structural diagram of the pressure sensing device of the present invention.

[0030] Figure 6 It is a schematic diagram of the structure of the reversing valve of the present invention.

[0031] Figure 7 It is a schematic diagram of the state of the reversing valve of the present invention.

[0032] Figure 8 It is a schematic diagram of the second state of the reversing valve of the present invention.

[0033] Figure numerals: 1. furnace body; 11. insulation layer; 12. upper ring cavity; 13. return air duct; 14. lower ring cavity; 15. air inlet; 2. heater; 3. crucible; 31. air guide duct; 32. ring seat; 4. reversing valve; 41. valve housing; 42. air inlet pipe; 43. return air pipe; 44. external pipe; 45. air supply pipe; 46. motor; 47. valve plate; 48. block; 49. limit body; 5. air pump; 6. pressure sensing device; 61. piston cylinder; 62. piston body; 63. resistance rod; 64. moving contact body; 65. contact block; 66. position switch; 7. inert gas source. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0035] like Figure 1-3 As shown, the furnace body 1 has a cylindrical inner cavity, a sealing cover is installed on the top of the furnace body 1, and an observation window is arranged on the surface of the sealing cover. A heat preservation layer 11 is arranged on the inner wall of the furnace body 1 to reduce heat loss. A heater 2 is arranged on the inner wall of the heat preservation layer 11. The heater 2 is composed of a plurality of vertically arranged electric heating rings. The electric heating rings are equipped with a heating controller to control the temperature of the electric heating rings from top to bottom to decrease in sequence, forming a heating space with a stepped temperature decrease. The heater 2 can also be a ring-shaped electromagnetic heater;

[0036] like Figure 3-4 As shown, the crucible 3 is slidably matched with the inner diameter of the heater 2, so that the crucible 3 can be vertically lifted and lowered in the furnace body 1, and a plurality of air guide channels 31 penetrating from top to bottom are distributed in an annular manner on the edge of the crucible 3, and the cross-sectional size of the air guide channels 31 is uniform. A plurality of air inlets 15 are distributed in an annular manner on the bottom surface of the furnace body 1, and the air inlets 15 are connected to the lower annular cavity 14 together. An upper annular cavity 12 is provided between the insulation layer 11 and the furnace body 1, and the upper annular cavity 12 is connected to the upper part of the furnace body 1 through a plurality of annularly distributed return air channels 13. The air pump 5 is arranged outside the furnace body 1, and the air inlet end of the air pump 5 is connected to the upper annular cavity 12, and the exhaust end of the air pump 5 is connected to the lower annular cavity 14, and the furnace body 1 is filled with an inert gas, such as nitrogen;

[0037] The air pump 5 is turned on to drive nitrogen to be injected into the lower part of the furnace body 1 through the lower annular cavity 14 and the air inlet 15, and a high pressure zone is formed at the lower part of the crucible 3. The nitrogen passes through the air guide 31 and enters the upper part of the furnace body 1, and is guided back to the air pump 5 through the return air duct 13 and the upper annular cavity 12, so that the nitrogen is recycled. Since the cross-section of the air guide 31 is fixed, the air supply intensity of the air pump 5 is increased, and the air guide amount of the air guide 31 is less than the air intake amount at the bottom of the furnace body 1, so that the air pressure at the lower part of the crucible 3 gradually increases, and the air pressure pushes the crucible 3 upward to move to the upper position of the furnace body 1. At this time, the air guide amount of the air guide 31 is balanced with the air intake amount at the lower part of the crucible 3, so that the crucible 3 is kept in this position, and the material is placed in the crucible 3, and the material is heated to a molten state by the heater 2, and then the air supply pressure of the air pump 5 is gradually reduced, so that the air pressure intensity at the lower part of the crucible 3 is gradually reduced, and the crucible 3 gradually moves downward through the stepped lowered heating zone, so that crystals are gradually formed in the crucible 3.

[0038] like Figure 4 As shown, the bottom of the crucible 3 is in a spherical or conical shape protruding downward, and the bottom edge of the crucible 3 has a ring seat 32 extending downward, and the air guide channel 31 is distributed on the inner side of the ring seat 32. Since the air inlet 15, the air guide channel 31, and the return air channel 13 are all evenly distributed in an annular shape, the conduction path of the nitrogen is evenly distributed, and the supporting force generated on the crucible 3 is more even, thereby maintaining the stability of the downward movement of the crucible 3.

[0039] The pressure at the bottom of the crucible 3 directly reflects the height of the crucible 3, and the pressure change also reflects the extent of the descent of the crucible 3. The air pressure at the bottom of the crucible 3 is monitored to control the stable descent of the crucible 3. The operation is as follows:

[0040] like Figure 5 As shown, the pressure sensing device 6 is arranged at the bottom of the furnace body 1, and the pressure sensing device 6 includes a piston cylinder 61, the piston cylinder 61 passes through the bottom of the furnace body 1, a piston body 62 is elastically slidably arranged in the piston cylinder 61 through a spring, the outer shell of the piston cylinder 61 is fixed, a resistor rod 63 is fixed in the shell, the resistor rod 63 is arranged parallel to the piston cylinder 61, a moving contact body 64 is slidably arranged on the surface of the resistor rod 63, the moving contact body 64 is fixedly connected to the piston body 62, one end of the resistor rod 63 and the moving contact body 64 are connected to the controller through a line, and the controller is connected to control the air pump 5;

[0041] The piston cylinder 61 has the same air pressure as the bottom of the furnace body 1. The air pressure acts on the surface of the piston body 62, causing the piston body 62 to compress the spring to reach a balanced state. When the air pressure at the bottom of the crucible 3 changes, the piston body 62 will move, causing the moving contact body 64 to move on the surface of the resistor rod 63, changing the resistance value of the circuit. The control determines the position change of the crucible 3 by monitoring the change in the resistance value, adjusts the air supply intensity of the air pump 5, improves the stability of the air pressure change at the bottom of the crucible 3, and makes the descent of the crucible 3 more precise and stable.

[0042] like Figure 3 , 5 As shown, the several electric heating rings of the heater 2 are divided into multiple groups, and the distribution height of each group of electric heating rings is greater than the height of the crucible 3. A plurality of position switches 66 are axially arranged on the outside of the piston cylinder 61. The position switches 66 are connected to each group of electric heating rings one by one through a controller. The piston body 62 is connected to a contact block 65, and the contact block 65 is used to touch the position switch 66;

[0043] According to the displacement of the piston body 62, the height of the crucible 3 is reacted. After the crucible 3 descends, the heating work of the electric heating rings above it cannot play a substantial role, and the energy consumption is relatively high. When the crucible 3 descends to the position of the next group of electric heating rings, the contact block 65 touches the corresponding position switch 66, and the controller closes the circuit of the upper group of electric heating rings, so that the upper group of electric heating rings stops working, reducing energy consumption. As the crucible 3 gradually descends, the work of each group of electric heating rings is gradually shut down from top to bottom, but the work of the lowest group of electric heating rings will not be shut down.

[0044] In the initial state of the processing work, it is necessary to introduce inert gas to replace the air in the furnace body 1, and it is necessary to increase the gas volume to balance the air pressure in the upper and lower parts of the crucible 3. The specific operation is as follows:

[0045] like Figure 6-8 As shown, the air inlet end of the air pump 5 is connected to an inert gas source 7 for providing inert gas through a reversing valve 4. The inert gas source 7 can be an inert gas compression tank. The reversing valve 4 includes a valve housing 41. An air inlet pipe 42, an air return pipe 43, an external pipe 44, and an air supply pipe 45 are cross-distributed on the edge of the valve housing 41. The air inlet pipe 42 is connected to the air inlet end of the air pump 5, the air return pipe 43 is connected to the upper annular cavity 12, the external pipe 44 is connected to the external environment, and the air supply pipe 45 is connected to the inert gas source 7. A valve plate 47 is rotatably arranged in the valve housing 41 to divide the interior of the valve housing 41 into two parts. The valve plate 47 is transmission-connected to a motor 46. Two limit bodies 49 are arranged on both sides of the connecting portion of the air supply pipe 45 in the valve housing 41, and a stopper 48 is arranged between the two limit bodies 49 through spring elastic sliding.

[0046] In the initial state, the motor 46 is turned on to drive the valve plate 47 to rotate, and the end of the valve plate 47 squeezes the stopper 48 to slide, so that the air supply pipe 45 is connected with the air inlet pipe 42, and the external pipe 44 is connected with the air return pipe 43. The air pump 5 is turned on to extract the inert gas in the inert gas source 7 and introduce it from the bottom of the furnace body 1, and the air in the furnace body 1 is discharged from the top through the external pipe 44. When the furnace body 1 is filled with inert gas and the crucible 3 is supported and maintained at the upper part of the furnace body 1 by the bottom air pressure, the motor 46 is turned on to drive the valve plate 47 to rotate, so that the air inlet pipe 42 is connected with the air return pipe 43, and the stopper 48 is reset by the elastic force to block the air supply pipe 45 to prevent the inert gas source 7 from continuously leaking inert gas. At this time, the inert gas in the upper part of the furnace body 1 is re-guided back to the air pump 5 through the return pipe 43 and the air inlet pipe 42, so as to realize the reuse of the inert gas.

[0047] The preparation method of LYSO scintillation crystal material includes the following specific steps:

[0048] A. Turn on the air pump 5 to deliver inert gas to the bottom of the furnace body 1. The inert gas forms a high-pressure area at the bottom of the crucible 3. The high pressure causes the crucible 3 to rise to the upper part of the furnace body 1. The inert gas enters the upper part of the crucible 3 through the air guide 31 and is guided back to the air pump 5, so that the crucible 3 maintains a stable height at the upper part of the furnace body 1.

[0049] B. Turn on the heater 2 to heat and melt the material in the crucible 3, and the temperature of the heater 2 gradually decreases from top to bottom;

[0050] C. Gradually reduce the gas supply pressure of the air pump 5 to gradually lower the crucible 3, and reduce the heating temperature of the crucible 3 to crystallize the molten material.

[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. LYSO scintillation crystal material preparation equipment, characterized in that: include: A furnace body (1), a heat-insulating layer (11) is arranged inside the furnace body (1), and a heater (2) is arranged inside the heat-insulating layer (11); A crucible (3), wherein the crucible (3) and the heat-insulating layer (11) are adapted to be slidably arranged so that the crucible (3) can be lifted and lowered vertically, and a gas guide channel (31) is provided on the surface of the crucible (3) and is connected vertically, and the cross-sectional dimensions of the gas guide channel (31) are uniform; An air pump (5), wherein the furnace body (1) is filled with an inert gas, and the air inlet and exhaust ends of the air pump (5) are respectively connected to the upper and lower parts of the furnace body (1). The air pump (5) delivers the inert gas to the lower part of the crucible (3), and the inert gas passes through the air guide channel (31) upward. The amount of gas delivered by the air pump (5) is balanced with the amount of gas guided by the air guide channel, so that a stable air pressure is formed at the bottom of the crucible (3) to support the crucible (3) to maintain its height; The pressure sensing device (6) is used to monitor the air pressure intensity at the bottom of the crucible (3). The pressure sensing device (6) is connected to the air pump (5) via a controller. The air pump (5) gradually reduces the gas delivery rate, so that the air pressure at the bottom of the crucible (3) gradually decreases, and the height of the crucible (3) gradually decreases.

2. The LYSO scintillation crystal material preparation equipment according to claim 1, characterized in that: The bottom of the furnace body (1) is provided with a plurality of air inlets (15) distributed in an annular pattern, the air inlets (15) are commonly connected to a lower annular cavity (14), an exhaust end of the air pump (5) is connected to the lower annular cavity (14), an upper annular cavity (12) is provided between the thermal insulation layer (11) and the furnace body (1), the upper annular cavity (12) is connected to the upper part of the furnace body (1) through a plurality of annularly distributed air return passages (13), an air inlet end of the air pump (5) is connected to the upper annular cavity (12), and a plurality of air guide passages (31) are distributed in an annular pattern at the edge of the crucible (3).

3. The LYSO scintillation crystal material preparation equipment according to claim 2, characterized in that: The bottom of the crucible (3) is in the shape of a sphere or a pointed cone that protrudes downwards, the bottom edge of the crucible (3) has a ring seat (32) that extends downwards, and the air guide channel (31) is distributed on the inner side of the ring seat (32).

4. The LYSO scintillation crystal material preparation equipment according to claim 1, characterized in that: The pressure sensing device (6) comprises a piston cylinder (61) and a resistance rod (63). The piston cylinder (61) passes through the bottom of the furnace body (1). A piston body (62) is elastically slidably arranged in the piston cylinder (61) via a spring. The resistance rod (63) is arranged parallel to the piston cylinder (61). A moving contact body (64) is slidably arranged on the surface of the resistance rod (63). The moving contact body (64) is connected to the piston body (62). One end of the resistance rod (63) and the moving contact body (64) are connected to a controller via a line. The controller is connected to a control air pump (5).

5. The LYSO scintillation crystal material preparation equipment according to claim 4, characterized in that: The heater (2) is composed of a plurality of vertically arranged electric heating rings, and the temperatures of the electric heating rings decrease from top to bottom.

6. The LYSO scintillation crystal material preparation equipment according to claim 5, characterized in that: The plurality of electric heating rings of the heater (2) are divided into a plurality of groups, the distribution height of each group of electric heating rings being greater than the height of the crucible (3), a plurality of position switches (66) are axially arranged outside the piston cylinder (61), the position switches (66) are connected one by one to each group of electric heating rings via a controller, and the piston body (62) is connected to a contact block (65), which is used to touch the position switch (66).

7. The LYSO scintillation crystal material preparation equipment according to claim 2, characterized in that: The air inlet end of the air pump (5) is connected to an inert gas source (7) for providing inert gas via a reversing valve (4).

8. The LYSO scintillation crystal material preparation equipment according to claim 7, characterized in that: The reversing valve (4) comprises a valve housing (41). An air inlet pipe (42), an air return pipe (43), an external pipe (44), and an air supply pipe (45) are arranged in a cross shape on the edge of the valve housing (41). The air inlet pipe (42) is connected to the air inlet end of the air pump (5), the air return pipe (43) is connected to the upper annular cavity (12), the external pipe (44) is connected to the external environment, and the air supply pipe (45) is connected to the inert gas source (7). A valve plate (47) is rotatably arranged in the valve housing (41) to divide the interior of the valve housing (41) into two parts. The valve plate (47) is transmission-connected to a motor (46). The motor (46) drives the valve plate (47) to rotate, so that the air inlet pipe (42) is connected to the air return pipe (43), the external pipe (44) is connected to the air supply pipe (45), or the air return pipe (43) is connected to the external pipe (44), and the air inlet pipe (42) is connected to the air supply pipe (45).

9. The LYSO scintillation crystal material preparation equipment according to claim 8, characterized in that: Two limiting bodies (49) are arranged inside the valve housing (41) on both sides of a portion connected to the air supply pipe (45), a stopper (48) is arranged between the two limiting bodies (49) to slide elastically via a spring, and one end of the valve plate (47) is used to resist the movement of the stopper (48) so that the stopper (48) opens or closes the air supply pipe (45).

10. A method for preparing LYSO scintillation crystal material based on the LYSO scintillation crystal material preparation device according to any one of claims 1 to 9, characterized in that: The specific steps are as follows: A. Turn on the air pump (5) to deliver inert gas to the bottom of the furnace body (1). The inert gas forms a high-pressure area at the bottom of the crucible (3). The high pressure causes the crucible (3) to rise to the upper part of the furnace body (1). The inert gas enters the upper part of the crucible (3) through the air guide (31) and is then guided back to the air pump (5), so that the crucible (3) maintains a stable height above the furnace body (1); B. Turning on the heater (2) to heat and melt the material in the crucible (3), the temperature of the heater (2) gradually decreasing from top to bottom; C. Gradually reduce the gas supply pressure of the air pump (5) so that the crucible (3) gradually descends, thereby reducing the heating temperature of the crucible (3) to allow the molten material to crystallize.