A regional integrated energy system operation method and system based on virtual power plant

Through the regional integrated energy system operation method of virtual power plants, through classification, emergency judgment and regional division, the indiscriminate retrieval problem during power matching in the existing technology is solved, and the system's response speed and efficiency are improved.

CN118761604BActive Publication Date: 2024-11-05JINAN PENTIUM TIMES ELECTRIC POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411237876.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-05
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

The existing regional integrated energy system needs to be searched indiscriminately during power matching, which increases the system operating load and is not responding quickly enough.

Method used

Using the regional comprehensive energy system operation method based on virtual power plants, the allocation area and resource area are divided by obtaining the classification of power allocation requirements and resources, emergency judgment, dynamic sorting and feature identification point generation, and the allocation area is established, and the power distribution relationship is established. .

Benefits of technology

It reduces the system operation load, improves the response speed, and can quickly find power resources that are almost consistent with the power allocation needs, avoiding indiscriminate retrieval.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761604B_ABST
    Figure CN118761604B_ABST
Patent Text Reader

Abstract

The present invention discloses a regional integrated energy system operation method and system based on a virtual power plant, which relates to the field of electric power engineering technology, including: obtaining at least one power allocation demand category; obtaining at least one power resource category; obtaining the emergency value of the power allocation demand; obtaining a dynamic allocation demand sequence; obtaining a dynamic power resource sequence; obtaining at least one characteristic identification point; dividing the dynamic allocation demand sequence into at least one allocation area; dividing the dynamic power resource sequence into at least one resource area; and distributing power based on the correspondence between the allocation area and the resource area. By setting an urgency judgment module, a dynamic sorting module, an identification point generation module, a first area division module, a second area division module and a power distribution module, there is no need to perform indiscriminate retrieval of the power resources in the entire regional integrated energy system, which can reduce the system operation load and improve the system response speed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power engineering technology, and in particular to a regional integrated energy system operation method and system based on a virtual power plant. Background Art

[0002] Integrated Energy System, referred to as IES, refers to the use of advanced big data information and communication technology and integrated energy management models in the process of planning, construction and operation, and applied to various links such as production, transmission, conversion and storage of diversified energy. Finally, it is jointly managed and coordinated by the integrated energy dispatching and operation center to realize the safe, economical and flexible service of multiple energy flows to users, thereby forming an integrated energy production, supply and marketing system.

[0003] When matching electricity, the existing regional integrated energy system needs to conduct indiscriminate searches to match the corresponding electricity resources to the electricity demand, which will increase the system operating load. At the same time, the system response speed is not fast enough. Summary of the invention

[0004] In order to solve the above technical problems, a regional integrated energy system operation method and system based on a virtual power plant are provided. This technical solution solves the problem that the existing regional integrated energy system proposed in the above background technology needs to perform indiscriminate search when matching power in order to match the corresponding power resources for power demand, thereby increasing the system operation load and the system response speed is not fast enough.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] A method for operating a regional integrated energy system based on a virtual power plant, comprising:

[0007] Acquire at least one power dispatch demand in the regional integrated energy system, classify the at least one power dispatch demand according to the power value of the demand, and obtain at least one power dispatch demand category;

[0008] Acquire at least one power resource connected to the regional integrated energy system, classify the at least one power resource according to the power value, and obtain at least one power resource category;

[0009] Make an emergency judgment on the power allocation demand and obtain the emergency value of the power allocation demand;

[0010] Taking the average of the power values ​​of the power dispatching requirements in the power dispatching requirement category as the judgment value of the power dispatching requirement category, sorting at least one power dispatching requirement category in ascending order, and obtaining a dynamic dispatching requirement sequence;

[0011] Taking the average of the power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorting at least one power resource category in ascending order to obtain a dynamic power resource sequence;

[0012] Based on the power value range of the power resource and the power value range of the power dispatching demand, obtaining at least one characteristic identification point;

[0013] Based on at least one characteristic identification point, selecting at least one power dispatch demand category in the dynamic dispatch demand sequence as a characteristic power dispatch demand category;

[0014] At least one characteristic power dispatch demand category divides the dynamic dispatch demand sequence into at least one dispatch area, the two ends of the dispatch area are characteristic power dispatch demand categories, and the dispatch area does not contain characteristic power dispatch demand categories;

[0015] Based on the at least one characteristic identification point, selecting at least one power resource category in the dynamic power resource sequence as a characteristic power resource category;

[0016] At least one characteristic power resource category divides the dynamic power resource sequence into at least one resource region, the two ends of the resource region are characteristic power resource categories, and the resource region does not contain characteristic power resource categories;

[0017] A one-to-one correspondence is established between the allocation area and the resource area, and power distribution is performed based on the correspondence between the allocation area and the resource area.

[0018] Preferably, the step of classifying at least one power allocation requirement according to the power value of the requirement to obtain at least one power allocation requirement category comprises the following steps:

[0019] At least one power allocation requirement is classified into a power allocation requirement category, wherein a difference between power values ​​of any two power allocation requirements within the power allocation requirement category is smaller than a preset value.

[0020] Preferably, the step of classifying at least one power resource according to the power value to obtain at least one power resource category comprises the following steps:

[0021] At least one electric power resource is classified into an electric power resource category, wherein a difference between electric power values ​​of any two electric power resources within the electric power resource category is smaller than a preset value.

[0022] Preferably, the step of determining the urgency of the power allocation demand and obtaining the urgency value of the power allocation demand comprises the following steps:

[0023] Obtaining an economic loss value generated when at least one power allocation demand is not met;

[0024] Obtaining a value range of economic loss values, dividing the value range of economic loss values ​​at equal intervals, and obtaining at least one emergency area;

[0025] An emergency area including power dispatching requirements is obtained as a target emergency area;

[0026] The value of the midpoint of the target emergency area is used as the emergency value of the power dispatch demand.

[0027] Preferably, the acquiring at least one characteristic identification point based on the power value range of the power resource and the power value range of the power allocation demand comprises the following steps:

[0028] Obtaining an overlapping portion of the power value range of the power resource and the power value range of the power dispatching demand as an overlapping power value range;

[0029] The portion of the power value range of the power resource that exceeds the overlapping power value range is used as the first power value range;

[0030] The portion of the power value range of the power allocation demand that exceeds the overlapping power value range is used as the second power value range;

[0031] The overlapping power value range, the first power value range and the second power value range are combined to obtain a target power value range;

[0032] The target power value range is divided into equal intervals to obtain at least one characteristic recognition point.

[0033] Preferably, the selecting at least one power allocation requirement category in the dynamic allocation requirement sequence as the characteristic power allocation requirement category comprises the following steps:

[0034] The power dispatch demand category whose difference between the judgment value and the value of the characteristic identification point in the dynamic dispatch demand sequence is less than the preset value is taken as the characteristic power dispatch demand category.

[0035] Preferably, the selecting at least one power resource category in the dynamic power resource sequence as the characteristic power resource category comprises the following steps:

[0036] The power resource category whose difference between the judgment value and the value of the characteristic identification point in the dynamic power resource sequence is less than the preset value is taken as the characteristic power resource category.

[0037] Preferably, establishing a one-to-one correspondence between the deployment area and the resource area comprises the following steps:

[0038] When the difference between the judgment value of the characteristic power allocation demand category at the left end of the allocation area and the judgment value of the characteristic power resource category at the left end of the resource area is less than twice the preset value, and the difference between the judgment value of the characteristic power allocation demand category at the right end of the allocation area and the judgment value of the characteristic power resource category at the right end of the resource area is less than twice the preset value, the allocation area and the resource area are matched one by one.

[0039] Preferably, the power distribution based on the correspondence between the deployment area and the resource area includes the following steps:

[0040] When distributing electricity, the electricity allocation demands are sorted based on their emergency values, and the electricity allocation demands with large emergency values ​​are given priority in electricity distribution;

[0041] Obtaining the power allocation demand waiting for power allocation as the target power allocation demand;

[0042] Obtaining the power dispatch demand category to which the target power dispatch demand belongs as the target power dispatch demand category;

[0043] Obtaining a dispatching area including a target power dispatching demand category as a target dispatching area;

[0044] Obtain a resource area corresponding to the target deployment area as the target resource area;

[0045] Acquire a target power resource category in the target resource area, wherein a relative position of the target power resource category in the target resource area is consistent with a relative position of the target power dispatch demand category in the target dispatch area;

[0046] Taking any one of the electric power resources in the target electric power resource category as the target electric power resource;

[0047] Allocating target power resources to target power dispatching needs;

[0048] When the target power allocation demand is allocated, the target power allocation demand is deleted from the target power allocation demand category, and the target power resource is deleted from the target power resource category.

[0049] A regional integrated energy system operation system based on a virtual power plant, used to implement the above-mentioned regional integrated energy system operation method based on a virtual power plant, comprising:

[0050] A demand classification module, wherein the demand classification module obtains at least one power allocation demand in the regional integrated energy system, classifies the at least one power allocation demand according to the power value of the demand, and obtains at least one power allocation demand category;

[0051] A resource classification module, wherein the resource classification module obtains at least one power resource connected to the regional integrated energy system, classifies the at least one power resource according to the power value, and obtains at least one power resource category;

[0052] An emergency judgment module, wherein the emergency judgment module performs an emergency judgment on the power allocation demand to obtain an emergency value of the power allocation demand;

[0053] a dynamic sorting module, wherein the dynamic sorting module uses the average value of the power allocation requirements in the power allocation requirement category as the judgment value of the power allocation requirement category, sorts at least one power allocation requirement category in ascending order to obtain a dynamic allocation requirement sequence, and uses the average value of the power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorts at least one power resource category in ascending order to obtain a dynamic power resource sequence;

[0054] An identification point generation module, wherein the identification point generation module obtains at least one characteristic identification point based on a power value range of the power resource and a power value range of the power allocation demand;

[0055] A first area division module, wherein the first area division module selects at least one power allocation demand category in the dynamic allocation demand sequence as a characteristic power allocation demand category based on at least one characteristic power allocation demand point, wherein the at least one characteristic power allocation demand category divides the dynamic allocation demand sequence into at least one allocation area, wherein both ends of the allocation area are characteristic power allocation demand categories, and the allocation area does not contain the characteristic power allocation demand category;

[0056] a second area division module, wherein the second area division module selects at least one power resource category as a characteristic power resource category in the dynamic power resource sequence based on at least one characteristic identification point, wherein the at least one characteristic power resource category divides the dynamic power resource sequence into at least one resource area, wherein both ends of the resource area are characteristic power resource categories, and the interior of the resource area does not contain the characteristic power resource category;

[0057] A power distribution module is provided, wherein the power distribution module establishes a one-to-one correspondence between the allocation area and the resource area, and performs power distribution based on the correspondence between the allocation area and the resource area.

[0058] Compared with the prior art, the present invention has the following beneficial effects:

[0059] By setting up an urgency judgment module, a dynamic sorting module, an identification point generation module, a first area division module, a second area division module and a power distribution module, the power allocation demand and power resources in the regional integrated energy system are classified in order. When it is necessary to allocate power resources to the power allocation demand, the power resources can be quickly located according to the classified and divided areas, and the power resources that are almost consistent with the power allocation demand can be found without indiscriminately searching the power resources in the entire regional integrated energy system. Thus, the system operating load can be reduced and the system response speed can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 It is a schematic flow chart of a method for operating a regional integrated energy system based on a virtual power plant according to the present invention;

[0061] Figure 2 A schematic diagram of a flow chart of determining the urgency of power allocation demand and obtaining the emergency value of power allocation demand according to the present invention;

[0062] Figure 3 A schematic diagram of a process of obtaining at least one characteristic identification point for the power value range based on the power resource and the power value range based on the power allocation demand of the present invention;

[0063] Figure 4 The figure is a schematic diagram of a power distribution process based on the correspondence between the deployment area and the resource area according to the present invention. DETAILED DESCRIPTION

[0064] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0065] Reference Figure 1 As shown, a method for operating a regional integrated energy system based on a virtual power plant includes:

[0066] Acquire at least one power dispatch demand in the regional integrated energy system, classify the at least one power dispatch demand according to the power value of the demand, and obtain at least one power dispatch demand category;

[0067] Acquire at least one power resource connected to the regional integrated energy system, classify the at least one power resource according to the power value, and obtain at least one power resource category;

[0068] Make an emergency judgment on the power allocation demand and obtain the emergency value of the power allocation demand;

[0069] Taking the average of the power values ​​of the power dispatching requirements in the power dispatching requirement category as the judgment value of the power dispatching requirement category, sorting at least one power dispatching requirement category in ascending order, and obtaining a dynamic dispatching requirement sequence;

[0070] Taking the average of the power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorting at least one power resource category in ascending order to obtain a dynamic power resource sequence;

[0071] Based on the power value range of the power resource and the power value range of the power dispatching demand, obtaining at least one characteristic identification point;

[0072] Based on at least one characteristic identification point, selecting at least one power dispatch demand category in the dynamic dispatch demand sequence as a characteristic power dispatch demand category;

[0073] At least one characteristic power dispatch demand category divides the dynamic dispatch demand sequence into at least one dispatch area, the two ends of the dispatch area are characteristic power dispatch demand categories, and the dispatch area does not contain characteristic power dispatch demand categories;

[0074] Based on the at least one characteristic identification point, selecting at least one power resource category in the dynamic power resource sequence as a characteristic power resource category;

[0075] At least one characteristic power resource category divides the dynamic power resource sequence into at least one resource region, the two ends of the resource region are characteristic power resource categories, and the resource region does not contain characteristic power resource categories;

[0076] A one-to-one correspondence is established between the allocation area and the resource area, and power distribution is performed based on the correspondence between the allocation area and the resource area.

[0077] Classifying at least one power allocation requirement according to the power value of the requirement to obtain at least one power allocation requirement category includes the following steps:

[0078] At least one power allocation requirement is classified into a power allocation requirement category, wherein a difference between power values ​​of any two power allocation requirements within the power allocation requirement category is smaller than a preset value.

[0079] The classification of power dispatch demand categories is consistent with the classification of power resource categories. Therefore, a corresponding relationship can be generated based on the classification relationship. Then, based on the corresponding relationship, when the power dispatch demand needs to be allocated, the required power resources can be found based on the corresponding relationship.

[0080] Classifying at least one power resource according to the power value to obtain at least one power resource category includes the following steps:

[0081] At least one electric power resource is classified into an electric power resource category, wherein a difference between electric power values ​​of any two electric power resources within the electric power resource category is smaller than a preset value.

[0082] The purpose of power resource classification is that when the power resource category to which power needs to be allocated is determined, since the power resource gap within the power resource category is small enough, any one of them can allocate power and meet actual needs.

[0083] Reference Figure 2 As shown, judging the urgency of the power allocation demand and obtaining the emergency value of the power allocation demand includes the following steps:

[0084] Obtaining an economic loss value generated when at least one power allocation demand is not met;

[0085] Obtaining a value range of economic loss values, dividing the value range of economic loss values ​​at equal intervals, and obtaining at least one emergency area;

[0086] An emergency area including power dispatching requirements is obtained as a target emergency area;

[0087] The value of the midpoint of the target emergency area is used as the emergency value of the power dispatch demand.

[0088] The urgency value of the power allocation demand is to evaluate the urgency of the power allocation demand. When allocating power, power resources may be insufficient. Therefore, it is necessary to prioritize power allocation for more urgent power allocation demands.

[0089] Reference Figure 3 As shown, based on the power value range of the power resource and the power value range of the power allocation demand, obtaining at least one characteristic identification point includes the following steps:

[0090] Obtaining an overlapping portion of the power value range of the power resource and the power value range of the power dispatching demand as an overlapping power value range;

[0091] The portion of the power value range of the power resource that exceeds the overlapping power value range is used as the first power value range;

[0092] The portion of the power value range of the power allocation demand that exceeds the overlapping power value range is used as the second power value range;

[0093] The overlapping power value range, the first power value range and the second power value range are combined to obtain a target power value range;

[0094] The target power value range is divided into equal intervals to obtain at least one characteristic recognition point.

[0095] The characteristic identification point is used to obtain at least one characteristic power allocation demand category in the dynamic allocation demand sequence and at least one characteristic power resource category in the dynamic power resource sequence. Since they all refer to the characteristic identification point, the characteristic power allocation demand category and the characteristic power resource category can correspond to each other, and the difference between the judgment values ​​of the corresponding characteristic power allocation demand category and the characteristic power resource category is less than twice the preset value.

[0096] Selecting at least one power dispatch demand category as a characteristic power dispatch demand category in the dynamic dispatch demand sequence comprises the following steps:

[0097] The power dispatch demand category whose difference between the judgment value and the value of the characteristic identification point in the dynamic dispatch demand sequence is less than the preset value is taken as the characteristic power dispatch demand category.

[0098] Selecting at least one power resource category as a characteristic power resource category in the dynamic power resource sequence comprises the following steps:

[0099] The power resource category whose difference between the judgment value and the value of the characteristic identification point in the dynamic power resource sequence is less than the preset value is taken as the characteristic power resource category.

[0100] Establishing a one-to-one correspondence between the deployment area and the resource area includes the following steps:

[0101] When the difference between the judgment value of the characteristic power allocation demand category at the left end of the allocation area and the judgment value of the characteristic power resource category at the left end of the resource area is less than twice the preset value, and the difference between the judgment value of the characteristic power allocation demand category at the right end of the allocation area and the judgment value of the characteristic power resource category at the right end of the resource area is less than twice the preset value, the allocation area and the resource area are matched one by one.

[0102] The allocation areas are matched one by one with the resource areas. When the allocation area where the power allocation demand category is located is determined, the resource area where the power resource category used to allocate power to it is located can be determined accordingly. Since the difference between the judgment value of the characteristic power allocation demand category at both ends of the allocation area and the resource area and the judgment value of the characteristic power resource category is small, the difference between the judgment value of the power allocation demand category at the corresponding position within the allocation area and the resource area and the judgment value of the power resource category is also small.

[0103] Reference Figure 4 As shown, based on the correspondence between the dispatching area and the resource area, the power distribution includes the following steps:

[0104] When distributing electricity, the electricity allocation demands are sorted based on their emergency values, and the electricity allocation demands with large emergency values ​​are given priority in electricity distribution;

[0105] Obtaining the power allocation demand waiting for power allocation as the target power allocation demand;

[0106] Obtaining the power dispatch demand category to which the target power dispatch demand belongs as the target power dispatch demand category;

[0107] Obtaining a dispatching area including a target power dispatching demand category as a target dispatching area;

[0108] Obtain a resource area corresponding to the target deployment area as the target resource area;

[0109] Acquire a target power resource category in the target resource area, wherein a relative position of the target power resource category in the target resource area is consistent with a relative position of the target power dispatch demand category in the target dispatch area;

[0110] Taking any one of the electric power resources in the target electric power resource category as the target electric power resource;

[0111] Allocating target power resources to target power dispatching needs;

[0112] When the target power allocation demand is allocated, the target power allocation demand is deleted from the target power allocation demand category, and the target power resource is deleted from the target power resource category.

[0113] When using this method to distribute electricity, as long as at least one electricity allocation demand category and at least one allocation area are judged according to the target electricity allocation demand, the target electricity resources can be found according to the corresponding relationship. The gap between the target electricity resources and the target electricity allocation demand is small enough to meet the electricity distribution demand. Therefore, the number of retrievals can be greatly reduced, thereby improving the system operation efficiency.

[0114] A regional integrated energy system operation system based on a virtual power plant, used to implement the above-mentioned regional integrated energy system operation method based on a virtual power plant, comprising:

[0115] A demand classification module, wherein the demand classification module obtains at least one power allocation demand in the regional integrated energy system, classifies the at least one power allocation demand according to the power value of the demand, and obtains at least one power allocation demand category;

[0116] A resource classification module, wherein the resource classification module obtains at least one power resource connected to the regional integrated energy system, classifies the at least one power resource according to the power value, and obtains at least one power resource category;

[0117] An emergency judgment module, wherein the emergency judgment module performs an emergency judgment on the power allocation demand to obtain an emergency value of the power allocation demand;

[0118] a dynamic sorting module, wherein the dynamic sorting module uses the average value of the power allocation requirements in the power allocation requirement category as the judgment value of the power allocation requirement category, sorts at least one power allocation requirement category in ascending order to obtain a dynamic allocation requirement sequence, and uses the average value of the power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorts at least one power resource category in ascending order to obtain a dynamic power resource sequence;

[0119] An identification point generation module, wherein the identification point generation module obtains at least one characteristic identification point based on a power value range of the power resource and a power value range of the power allocation demand;

[0120] A first area division module, wherein the first area division module selects at least one power allocation demand category in the dynamic allocation demand sequence as a characteristic power allocation demand category based on at least one characteristic power allocation demand point, wherein the at least one characteristic power allocation demand category divides the dynamic allocation demand sequence into at least one allocation area, wherein both ends of the allocation area are characteristic power allocation demand categories, and the allocation area does not contain the characteristic power allocation demand category;

[0121] a second area division module, wherein the second area division module selects at least one power resource category as a characteristic power resource category in the dynamic power resource sequence based on at least one characteristic identification point, wherein the at least one characteristic power resource category divides the dynamic power resource sequence into at least one resource area, wherein both ends of the resource area are characteristic power resource categories, and the interior of the resource area does not contain the characteristic power resource category;

[0122] A power distribution module is provided, wherein the power distribution module establishes a one-to-one correspondence between the allocation area and the resource area, and performs power distribution based on the correspondence between the allocation area and the resource area.

[0123] Furthermore, the present solution also proposes a storage medium on which a computer-readable program is stored, and when the computer-readable program is called, the above-mentioned regional integrated energy system operation method based on the virtual power plant is executed.

[0124] It is understandable that the storage medium may be a magnetic medium, such as a floppy disk, a hard disk, or a magnetic tape; an optical medium, such as a DVD; or a semiconductor medium, such as a solid state drive (SSD).

[0125] To sum up, the advantages of the present invention are: by setting an urgency judgment module, a dynamic sorting module, an identification point generation module, a first area division module, a second area division module and a power distribution module, the power allocation demand and power resources in the regional integrated energy system are classified in order, and then when it is necessary to allocate power resources to the power allocation demand, the power resources can be quickly located according to the classified and divided areas, and then the power resources that are almost consistent with the power allocation demand can be found, without the need to indiscriminately search the power resources in the entire regional integrated energy system, thereby reducing the system operation load and at the same time, the system response speed can be improved.

[0126] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for operating a regional integrated energy system based on a virtual power plant, characterized in that: include: Obtaining at least one power allocation demand within the regional integrated energy system, and classifying the at least one power allocation demand according to the power value of the demand to obtain at least one power allocation demand category; Acquire at least one power resource connected to the regional integrated energy system, classify the at least one power resource according to power value, and obtain at least one power resource category; Make an urgency judgment on the power allocation demand and obtain the emergency value of the power allocation demand; Taking the average of the power values ​​of the power allocation demands in the power allocation demand category as the judgment value of the power allocation demand category, sorting at least one power allocation demand category in ascending order to obtain a dynamic allocation demand sequence; Taking the average of the power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorting at least one power resource category in ascending order to obtain a dynamic power resource sequence; Obtaining at least one characteristic identification point based on a power value range of the power resource and a power value range of the power allocation demand; Based on at least one characteristic identification point, selecting at least one power allocation demand category in the dynamic allocation demand sequence as a characteristic power allocation demand category; At least one characteristic power allocation demand category divides the dynamic allocation demand sequence into at least one allocation area, the two ends of the allocation area are characteristic power allocation demand categories, and the allocation area does not contain characteristic power allocation demand categories; selecting, based on at least one characteristic identification point, at least one power resource category in the dynamic power resource sequence as a characteristic power resource category; At least one characteristic power resource category divides the dynamic power resource sequence into at least one resource region, with the characteristic power resource categories at both ends of the resource region and no characteristic power resource category inside the resource region; A one-to-one correspondence is established between the allocation area and the resource area, and power distribution is performed based on the correspondence between the allocation area and the resource area.

2. A method for operating a regional integrated energy system based on a virtual power plant according to claim 1, characterized in that: The classifying at least one power allocation demand according to the power value of the demand to obtain at least one power allocation demand category comprises the following steps: At least one power allocation requirement is classified into a power allocation requirement category, wherein a difference between power values ​​of any two power allocation requirements within the power allocation requirement category is smaller than a preset value.

3. The method for operating a regional integrated energy system based on a virtual power plant according to claim 2, characterized in that: The classifying at least one power resource according to the power value to obtain at least one power resource category comprises the following steps: At least one power resource is classified into a power resource category, wherein a difference between power values ​​of any two power resources within the power resource category is smaller than a preset value.

4. A method for operating a regional integrated energy system based on a virtual power plant according to claim 3, characterized in that: The step of determining the urgency of the power allocation demand and obtaining the urgency value of the power allocation demand comprises the following steps: Obtaining an economic loss value generated when at least one power allocation demand is not met; Obtaining a value range of economic loss values, dividing the value range of economic loss values ​​into equal intervals, and obtaining at least one emergency area; Acquire an emergency area including power allocation requirements as a target emergency area; The value of the midpoint of the target emergency area is used as the emergency value of the power allocation demand.

5. The method for operating a regional integrated energy system based on a virtual power plant according to claim 4, characterized in that: The obtaining of at least one characteristic identification point based on the power value range of the power resource and the power value range of the power allocation demand comprises the following steps: Obtaining an overlapping portion of the power value range of the power resource and the power value range of the power dispatch demand as an overlapping power value range; The portion of the power value range of the power resource that exceeds the overlapping power value range is used as the first power value range; The portion of the power value range of the power allocation demand that exceeds the overlapping power value range is used as the second power value range; Merging the overlapping power value range, the first power value range, and the second power value range to obtain a target power value range; The target power value range is divided into equal intervals to obtain at least one feature recognition point.

6. A method for operating a regional integrated energy system based on a virtual power plant according to claim 5, characterized in that: The step of selecting at least one power allocation requirement category in the dynamic allocation requirement sequence as a characteristic power allocation requirement category comprises the following steps: The power allocation demand category whose difference between the judgment value and the value of the characteristic identification point in the dynamic allocation demand sequence is less than the preset value is taken as the characteristic power allocation demand category.

7. A method for operating a regional integrated energy system based on a virtual power plant according to claim 6, characterized in that: The selecting at least one power resource category as a characteristic power resource category in the dynamic power resource sequence comprises the following steps: The power resource category whose difference between the judgment value and the value of the characteristic identification point in the dynamic power resource sequence is less than a preset value is taken as the characteristic power resource category.

8. A method for operating a regional integrated energy system based on a virtual power plant according to claim 7, characterized in that: The step of establishing a one-to-one correspondence between the allocation area and the resource area includes the following steps: When the difference between the judgment value of the characteristic power allocation demand category at the left end of the allocation area and the judgment value of the characteristic power resource category at the left end of the resource area is less than twice the preset value, and the difference between the judgment value of the characteristic power allocation demand category at the right end of the allocation area and the judgment value of the characteristic power resource category at the right end of the resource area is less than twice the preset value, the allocation area and the resource area are matched one by one.

9. A method for operating a regional integrated energy system based on a virtual power plant according to claim 8, characterized in that: The power distribution based on the correspondence between the deployment area and the resource area includes the following steps: When distributing electricity, the electricity allocation demands are sorted based on their urgency values, and the electricity allocation demands with larger urgency values ​​are given priority in electricity distribution; Obtaining the power allocation demand waiting for power allocation as the target power allocation demand; Obtaining the power allocation demand category of the target power allocation demand as the target power allocation demand category; Obtaining a dispatching area including a target power dispatching demand category as a target dispatching area; Obtain the resource area corresponding to the target deployment area as the target resource area; Acquire a target power resource category in the target resource area, wherein a relative position of the target power resource category in the target resource area is consistent with a relative position of the target power allocation demand category in the target allocation area; Taking any one of the electric power resources in the target electric power resource category as the target electric power resource; Allocate target power resources to target power allocation needs; When the target power allocation demand is allocated, the target power allocation demand is deleted from the target power allocation demand category, and the target power resource is deleted from the target power resource category.

10. A regional integrated energy system operation system based on a virtual power plant, used to implement the regional integrated energy system operation method based on a virtual power plant according to any one of claims 1 to 9, characterized in that: include: a demand classification module, the demand classification module obtaining at least one power allocation demand in the regional integrated energy system, classifying the at least one power allocation demand according to the power value of the demand, and obtaining at least one power allocation demand category; a resource classification module, the resource classification module acquiring at least one power resource connected to the regional integrated energy system, classifying the at least one power resource according to power value, and obtaining at least one power resource category; An urgency determination module, which performs urgency determination on the power allocation demand to obtain an urgency value of the power allocation demand; a dynamic sorting module, the dynamic sorting module using the average power values ​​of the power allocation demands in the power allocation demand category as the judgment value of the power allocation demand category, sorting at least one power allocation demand category in ascending order to obtain a dynamic allocation demand sequence, and using the average power values ​​of the power resources in the power resource category as the judgment value of the power resource category, sorting at least one power resource category in ascending order to obtain a dynamic power resource sequence; an identification point generation module, the identification point generation module acquiring at least one characteristic identification point based on a power value range of the power resource and a power value range of the power allocation demand; a first area division module, wherein the first area division module selects at least one power allocation demand category in the dynamic allocation demand sequence as a characteristic power allocation demand category based on at least one characteristic power allocation demand category, wherein the at least one characteristic power allocation demand category divides the dynamic allocation demand sequence into at least one allocation area, wherein both ends of the allocation area are the characteristic power allocation demand category, and the allocation area does not contain the characteristic power allocation demand category; a second region division module, wherein the second region division module selects at least one power resource category as a characteristic power resource category in the dynamic power resource sequence based on at least one characteristic identification point, wherein the at least one characteristic power resource category divides the dynamic power resource sequence into at least one resource region, wherein both ends of the resource region are the characteristic power resource category, and the interior of the resource region does not contain the characteristic power resource category; The power distribution module establishes a one-to-one correspondence between the allocation area and the resource area, and performs power distribution based on the correspondence between the allocation area and the resource area.