Upstroke type movable formwork reinforcement cage integral hoisting bridge girder erection machine and bridge girder erection method
By designing an upward mobile formwork steel cage integral hoisting bridge erecting machine, multiple processes can be carried out simultaneously and the dual main beam structure is adopted, which solves the problems of long waiting time and high construction cost in the existing technology, and improves construction efficiency. and stability.
Patent Information
- Application Number
- CN202411153251.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-15
AI Technical Summary
The existing mobile formwork bridge-making machines have long waiting times for different types of work, insufficient labor utilization, long construction period, high construction costs, and poor economic efficiency.
Design an upward mobile formwork steel cage integral hoisting bridge erecting machine, including a front guide beam, main load-bearing beam, rear guide beam, outriggers and hanging outer rib group, using a sinking guide trolley and a steel cage integral lifting structure , to realize multiple processes at the same time, the double main beam structure and the cover beam are connected, and the hoisting operation and the lowering structure are separated.
It improves construction efficiency, shortens construction time, reduces construction costs, improves the stability and load-bearing capacity of the entire machine, and meets most bridge construction needs.
Smart Images

Figure CN118774040A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge construction, and specifically designs an upward movable formwork steel cage integrally hoisting bridge erecting machine and a bridge erecting method. Background Art
[0002] Mobile formwork bridge machine is a construction machine with its own formwork, using abutments or piers as support to cast bridges on site. It has been widely used in the construction of railways, highways and other bridges in my country. my country has a large land area and a vast territory, and the construction mileage of railways, highways and other bridges is long. The existing mobile formwork in-situ cast-in-place construction process includes: the first step, tying and rolling the bottom plate, web steel bars, and laying prestressed pipes; the second step, passing steel strands in the pipes; the third step, installing the inner mold; the fourth step, tying and rolling the top plate steel bars on site, and checking; the fifth step, pouring concrete and curing; the sixth step, applying prestress and grouting; the seventh step, demoulding, opening and shifting the formwork; the third step, closing the mold and adjusting the formwork; the existing mobile formwork in-situ cast-in-place construction process needs to be carried out in sequence, with low work efficiency, long waiting time for different types of work, insufficient utilization of labor, long construction period, high construction cost, and poor economy. Summary of the invention
[0003] The purpose of the present invention is to overcome the deficiencies in the above-mentioned prior art and to provide an upward mobile formwork steel cage integral hoisting bridge-building machine and a bridge-building method to solve the problems in the prior art of long waiting time for different types of work in mobile formwork bridge-building machines, insufficient utilization of labor, long construction period, high construction cost and poor economy.
[0004] In order to solve the above problems, the present invention provides an upward movable formwork steel cage integral hoisting bridge erecting machine, characterized in that it comprises: a front guide beam, a load-bearing main beam, a rear guide beam, a front support leg, a formwork moving trolley, a middle support leg, a rear support leg, a longitudinal support leg and a rear support, wherein the front guide beam, the load-bearing main beam and the rear guide beam are arranged in sequence along the same straight line, and one end of the front guide beam is connected to one end of the load-bearing main beam, and the other end of the load-bearing main beam is connected to one end of the rear guide beam, the front support leg is installed below the front guide beam, the formwork moving trolley is arranged below the front guide beam and can be moved along the front guide beam to the load-bearing main beam for pushing the formwork to move as a whole, the middle support leg is installed below one end of the load-bearing main beam near the front guide beam, the rear support leg is installed below one end of the load-bearing main beam near the rear guide beam, the longitudinal support leg is installed below one end of the rear guide beam near the load-bearing main beam, and the rear support is installed below one end of the rear guide beam away from the load-bearing main beam;
[0005] The rear support includes a first supporting leg, a second supporting leg, a first cantilever beam, a second cantilever beam and two supports, one end of the first cantilever beam is fixedly connected to the side wall on one side of the rear guide beam, the upper end of the first supporting leg is fixedly connected to the bottom of the other end of the first cantilever beam, one end of the second cantilever beam is fixedly connected to the side wall on the other side of the rear guide beam, the upper end of the second supporting leg is fixedly connected to the bottom of the other end of the second cantilever beam, and the distance between the first supporting leg and the second supporting leg is greater than the width of the steel cage binding frame; the two supports are respectively arranged below the first supporting leg and the second supporting leg.
[0006] The above-mentioned upward movable formwork steel cage integral hoisting bridge erection machine is characterized in that: the rear guide beam includes a binding construction section and a feeding section, the binding construction section is located at one end close to the load-bearing main beam, the feeding section is located at the end away from the load-bearing main beam, and a canopy is arranged on the upper part of the binding construction section.
[0007] The above-mentioned upward movable formwork steel cage integral hoisting bridge erection machine is characterized in that: the front guide beam, the load-bearing main beam and the rear guide beam all include a first main beam, a second main beam and a cap beam, the cap beam is arranged between the first main beam and the second main beam, and one end of the cap beam is fixedly connected to the upper part of the first main beam, and the other end of the cap beam is fixedly connected to the upper part of the second main beam.
[0008] The above-mentioned upward movable formwork steel cage integral hoisting bridge erecting machine is characterized in that: the upward movable formwork steel cage integral hoisting bridge erecting machine also includes a plurality of hanging outer rib groups, and the plurality of hanging outer rib groups are sequentially spaced and installed on the load-bearing main beam;
[0009] The hanging outer rib group includes a hanging outer rib, an upper cross beam, a thrust cylinder and a lifting cylinder. The hanging outer rib is connected to the load-bearing main beam through the upper cross beam. One end of the thrust cylinder is connected to the upper cross beam, and the other end of the thrust cylinder is connected to the hanging outer rib. The thrust cylinder can push the hanging outer rib to move along the length direction of the upper cross beam to realize the opening and closing of the hanging outer rib. One end of the lifting cylinder is connected to the load-bearing main beam, and the other end of the lifting cylinder is connected to the upper cross beam, and is used to drive the upper cross beam to move up and down along the load-bearing main beam.
[0010] The above-mentioned upward movable formwork steel cage integral hoisting bridge erection machine is characterized in that: an upper crossbeam installation through hole is opened on the load-bearing main beam, and the upper crossbeam is inserted into the upper crossbeam installation through hole.
[0011] The above-mentioned upward movable formwork steel cage integral hoisting bridge erection machine is characterized in that: the lower parts of the first main beam and the second main beam are both provided with longitudinal walking platforms;
[0012] The upward movable formwork steel cage integral lifting bridge-building machine also includes a steel cage integral lifting structure, and the steel cage integral lifting structure includes a moving crossbeam, a longitudinal travel drive, a steel cage lifting mechanism and a lifting mechanism travel drive. The moving crossbeam is arranged below the first main beam and the second main beam, the longitudinal travel drive is fixed on the moving crossbeam, and the longitudinal travel drive is rollingly connected to the longitudinal travel platform, and is used to drive the moving crossbeam to move along the longitudinal travel platform. The steel cage lifting mechanism is arranged on the moving crossbeam and is located between the first main beam and the second main beam. One end of the lifting mechanism travel drive is connected to the moving crossbeam, and the other end of the lifting mechanism travel drive is connected to the steel cage lifting mechanism, and is used to drive the steel cage lifting mechanism to move along the moving crossbeam.
[0013] The above-mentioned upward movable formwork reinforcement cage integral hoisting bridge erecting machine is characterized by:
[0014] The longitudinal movement leg includes a left longitudinal movement leg and a right longitudinal movement leg, and the left longitudinal movement leg and the right longitudinal movement leg are respectively arranged on the left and right sides of the rear guide beam. The structures of the left longitudinal movement leg and the right longitudinal movement leg are the same and both include a longitudinal movement leg body and a guide wheel. The guide wheel is installed at the lower end of the longitudinal movement leg body. The longitudinal movement leg body is hinged to the rear guide beam through an intersection axis, so that the longitudinal movement leg body can be folded upward on the outside of the rear guide beam.
[0015] The above-mentioned upward movable formwork steel cage integral hoisting bridge-building machine is characterized in that: the upward movable formwork steel cage integral hoisting bridge-building machine also includes a sinking guide trolley, and the steel cage binding tire frame is fixedly installed on the sinking guide trolley.
[0016] The present invention also discloses a method for integrally hoisting and bridging steel bars of an upward movable formwork, which is characterized by comprising the following steps:
[0017] Step 1: After the upward movable formwork steel bar integral hoisting bridge erection machine is put into place through the hole, the front legs, middle legs, rear legs and rear supports support the front guide beam, the load-bearing main beam and the rear guide beam;
[0018] The sinking guide trolley carries the steel cage tyre frame and enters the lower part of the tying construction section of the rear guide beam, where the tying workers tie the steel cage;
[0019] Step 2: After the steel cage is tied, the steel cage is hoisted using the steel cage hoisting structure;
[0020] Step 3: The overall lifting structure of the steel cage passes through the front legs and enters directly above the outer mold system including multiple hanging outer rib groups;
[0021] Step 4: The overall lifting structure of the steel cage lowers the overall steel cage into the cavity of the outer mold system. At the same time, the material is fed into the steel cage binding frame through the feeding section at the end of the rear guide beam to start binding the next span of steel cage;
[0022] Step 5: Check the mobile formwork bridge-building machine and the steel cage, pour concrete, cure the concrete, tension it, and complete the binding of the integral steel cage under the rear guide beam;
[0023] Step 6: After the concrete is cured and tensioned, the upper crossbeam moves downward, the hanging outer ribs move to the left and right sides, the outer formwork system is separated from the concrete, and the formwork moving trolley moves along the front guide beam to the load-bearing main beam. The lower end of the formwork moving trolley is supported on the poured bridge piece, and the longitudinal outrigger rotates to the bottom of the rear guide beam and is fixed to the rear guide beam. The guide wheel at the lower end of the longitudinal outrigger is supported on the track set on the bridge piece, and the middle outrigger, rear outrigger and rear support are retracted and emptied, and the formwork moving trolley moves forward a span distance to re-support; the sinking guide trolley carries the steel cage tyre frame and moves forward a span distance;
[0024] Step 7: The front outrigger is retracted and emptied, moved to the next pier, and fixed in place; the lower end of the formwork moving trolley is retracted and moved along the load-bearing main beam to the front guide beam; the longitudinal outrigger is rotated along the hinge axis to the outside of the rear guide beam;
[0025] Step 8. Repeat steps (2) to (7) to complete the construction of the remaining spans of the bridge.
[0026] The above-mentioned upward movable formwork steel bar integral hoisting bridge erection method is characterized in that: in the step (five), concrete pouring, curing, and tensioning are carried out simultaneously with the binding of the integral steel bar cage of the next span.
[0027] Compared with the prior art, the present invention has the following advantages:
[0028] 1. The sunken guide trolley of the present invention moves the steel cage binding frame from the rear poured beam surface directly to the bottom of the rear guide beam. While carrying the main beam concrete pouring, curing and tensioning processes, the binding workers bind the steel cage on the steel cage binding frame, saving the construction site and the process of transporting the steel cage. The binding and the main beam concrete pouring, curing and tensioning processes are carried out simultaneously, realizing multiple processes at the same time, which can greatly improve work efficiency.
[0029] 2. The double main beam structure adopted in the present invention has better bearing capacity and can meet most of the current bridge construction needs.
[0030] 3. The present invention adopts a double main beam connected by a cap beam, and a running space for the steel cage lifting mechanism is reserved at the lower part between the double main beams, so that the structure of the whole machine is more compact, the center of gravity of the whole machine is lowered, and the stability of the whole machine is improved.
[0031] 4. The present invention adopts the method of demoulding by moving the hanging outer rib downward and outward, which makes full use of the space on both wings of the cast bridge and avoids the interference of the pre-embedded steel bars on the pier top. It can quickly demould and move the formwork to the next span without affecting the pre-embedded steel bars on the pier top, which can greatly improve work efficiency.
[0032] 5. The present invention separates the hoisting and operating structure from the lowering structure, and places the lowering winch between the two main beams, thereby lowering the center of gravity of the whole machine and improving the stability of the whole machine.
[0033] The invention is further described in detail below through the accompanying drawings and examples. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0035] Figure 1 It is a schematic diagram of the overall structure of the bridge erecting machine in an embodiment of the present invention.
[0036] Figure 2 It is a schematic diagram of a partial cross section of the bridge erecting machine at the rear support in an embodiment of the present invention.
[0037] Figure 3 It is a schematic diagram of a partial cross section of the bridge erecting machine at the longitudinal displacement leg in an embodiment of the present invention.
[0038] Figure 4 It is a schematic diagram of a partial cross section of the bridge erecting machine at the rear legs in an embodiment of the present invention.
[0039] Figure 5 It is a schematic diagram of a partial cross section of the bridge erecting machine when the outer ribs are hung in the embodiment of the present invention and the outer ribs are closed.
[0040] Figure 6 It is a schematic diagram of a partial cross section of the bridge erecting machine when the hanging outer ribs are unfolded in an embodiment of the present invention.
[0041] Figure 7 It is a schematic diagram of a partial cross section of the bridge erecting machine at the middle leg in an embodiment of the present invention.
[0042] Figure 8 It is a partial cross-sectional schematic diagram of the bridge erecting machine at the formwork moving trolley in an embodiment of the present invention.
[0043] Fig. 9 It is a schematic diagram of a partial cross section of the bridge erecting machine at the front legs in an embodiment of the present invention.
[0044] Fig.10 It is a structural schematic diagram of the overall lifting structure of the main beam and the steel cage in an embodiment of the present invention.
[0045] Fig.11 Schematic diagram of the mold transfer process in an embodiment of the present invention.
[0046] Description of reference numerals:
[0047] 11—front guide beam; 111—first main beam; 112—second main beam;
[0048] 113 - cap beam; 114 - longitudinal walking platform 12 - load-bearing main beam;
[0049] 121—upper crossbeam installation through hole; 13—rear guide beam; 131—binding construction section;
[0050] 132—feeding section; 133—canopy; 21—front outrigger; 22—middle outrigger;
[0051] 23—rear support leg; 24—rear support; 241—first support leg;
[0052] 242—second supporting leg; 243—first cantilever beam; 244—second cantilever beam;
[0053] 245—two supports; 31—mold frame moving trolley; 32—longitudinal moving legs;
[0054] 321—outrigger body; 322—guide wheel; 41—hanging outer rib group;
[0055] 411—hanging outer rib; 412—upper crossbeam; 413—propulsion cylinder;
[0056] 414—lifting cylinder; 51—integral lifting structure of steel cage;
[0057] 511—moving crossbeam; 512—longitudinal travel drive;
[0058] 513—reinforcement cage lifting mechanism; 514—lifting mechanism travel drive;
[0059] 61—sinking guide trolley; 71—binding hoisting trolley, DETAILED DESCRIPTION
[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] In order to solve the problems of insufficient labor utilization, long construction period, high construction cost and poor economy in the bridge erection process of the prior art bridge erection machine, the present invention provides an upward movable formwork steel cage integral hoisting bridge erection machine and a bridge erection method.
[0062] like Figures 1 to 11 As shown, the term "front" used in the present invention refers to the same direction as the construction direction, and the term "rear" refers to the direction opposite to the construction direction; the term "longitudinal" refers to the length direction of the bridge, and the term "transverse" refers to the width direction of the bridge; the term "vertical" refers to the height direction of the bridge, and the "hole" and "span" in the term "through-hole in place" both refer to the part between two piers; the terms "mobile formwork bridge-building machine", "bridge-building machine" and "mobile formwork" have the same meaning in the industry, and in this article they all refer to the entire bridge-building machine.
[0063] like Figure 1 , Figure 2 As shown, the upward movable formwork steel cage integral hoisting bridge erecting machine disclosed in the present invention comprises: a front guide beam 11, a load-bearing main beam 12, a rear guide beam 13, a front leg 21, a formwork moving trolley 31, a middle leg 22, a rear leg 23, a longitudinal leg 32 and a rear support 24, wherein the front guide beam 11, the load-bearing main beam 12 and the rear guide beam 13 are arranged in sequence along the same straight line, and one end of the front guide beam 11 is connected to one end of the load-bearing main beam 12, and the other end of the load-bearing main beam 12 is connected to one end of the rear guide beam 13, the front leg 21 is installed below the front guide beam 11, the formwork moving trolley 31 is arranged below the front guide beam 11, and can be moved along the front guide beam 11 to the load-bearing main beam 12, so as to push the formwork to move as a whole, the middle leg 22 is installed below the end of the load-bearing main beam 12 close to the front guide beam 11, the rear leg 23 is installed below the end of the load-bearing main beam 12 close to the rear guide beam 13, and the longitudinal leg 32 is installed at the bottom of the front guide beam 11. The movable support leg 32 is installed below the end of the rear guide beam 13 close to the load-bearing main beam 12, and the rear support 24 is installed below the end of the rear guide beam 13 away from the load-bearing main beam 12; the rear support 24 includes a first supporting leg 241, a second supporting leg 242, a first cantilever beam 243, a second cantilever beam 244 and two supports 245, one end of the first cantilever beam 243 is fixedly connected to the side wall of one side of the rear guide beam 13, the upper end of the first supporting leg 241 is fixedly connected to the bottom of the other end of the first cantilever beam 243, one end of the second cantilever beam 244 is fixedly connected to the side wall on the other side of the rear guide beam 13, the upper end of the second supporting leg 242 is fixedly connected to the bottom of the other end of the second cantilever beam 244, and the distance between the first supporting leg 241 and the second supporting leg 242 is greater than the width of the steel cage binding tire frame; the two supports 245 are respectively arranged below the first supporting leg 241 and the second supporting leg 242.
[0064] In this embodiment, the front guide beam 11, the load-bearing main beam 12 and the rear guide beam 13 are supported on the pier column or the bridge piece by the front support leg 21, the middle support leg 22, the rear support leg 23 and the rear support 24. The rear support 24 adopts a portal structure, and its width is greater than the width of the steel cage binding frame, so that the sinking guide trolley 61 can move the steel cage binding frame from the rear poured beam surface directly to the bottom of the rear guide beam 13. During construction, the sinking guide trolley 61 moves the steel cage binding frame from the rear poured beam surface directly to the bottom of the rear guide beam 13. While the concrete of the load-bearing main beam is being poured, cured and tensioned, the binding workers bind the steel cage on the steel cage binding frame, which saves the construction site and the process of transporting the steel cage. Moreover, the binding and the concrete pouring, curing and tensioning of the load-bearing main beam are carried out simultaneously, so that multiple processes can be carried out simultaneously, which can greatly improve work efficiency.
[0065] In this embodiment, the support 245 is a gate-type structure, and the cast reserved steel bars are located inside the gate-type structure. The support 245 can not only support other structures of the rear support 24, but also protect the cast reserved steel bars.
[0066] like Figure 1 As shown, the rear guide beam 13 in this embodiment includes a binding construction section 131 and a feeding section 132. The binding construction section 131 is located at one end close to the load-bearing main beam 12, and the feeding section 132 is located at one end away from the load-bearing main beam 12. A canopy 133 is provided on the upper part of the binding construction section 131. The binding operation site is set below the rear guide beam 13, and the front and rear operation sites are compact in structure and the operation is closely connected, which can shorten the operation time and improve the operation efficiency. The binding operation site is advanced as the bridge piece is advanced. The canopy 133 is set on the rear guide beam 13 and is advanced together with the rear guide beam 13. There is no need to repeatedly disassemble and assemble, thus saving work time.
[0067] In this embodiment, the rear guide beam 13 is also provided with a tying and lifting trolley 71 for lifting heavy objects during the tying process. The tying and lifting trolley 71 can move along the length direction of the rear guide beam 13. The tying and lifting trolley 71 may include a lifting beam, a walking structure and a lifting structure. The walking structure is fixed at both ends of the lifting beam and is connected to the longitudinal walking platform 114 on the rear guide beam 13 in a rolling suspension manner, so that the lifting beam can move along the direction of the longitudinal walking platform 114. The structure may be a walking mechanism similar to a trolley or a cart. The lifting structure is arranged on the lifting beam and can move along the lifting beam. The structure may be a trolley structure similar to a crane.
[0068] like Figures 3 to 9As shown, in this embodiment, the front guide beam 11, the load-bearing main beam 12 and the rear guide beam 13 are all longitudinal double-main beam structures designed in a transverse symmetrical manner, which include a first main beam 111, a second main beam 112 and a cap beam 113. The cap beam 113 is arranged between the first main beam 111 and the second main beam 112, and one end of the cap beam 113 is fixedly connected to the upper part of the first main beam 111, and the other end of the cap beam 113 is fixedly connected to the upper part of the second main beam 112, wherein the number of the cap beams 113 is several, which are used to connect the first main beam 111 and the second main beam 112. The double-main beam structure in this embodiment has better bearing capacity and can meet most of the current bridge construction needs. In this embodiment, the double main beams are connected by a cap beam 113, that is, the cap beam 113 is located at the upper part between the first main beam 111 and the second main beam 112, and the lower part between the first main beam 111 and the second main beam 112 reserves an operating space for the steel cage lifting mechanism 513, so that the structure of the whole machine is more compact, the center of gravity of the whole machine is lowered, and the stability of the whole machine is improved.
[0069] like Figure 1 , Figure 5 and Figure 6 As shown, in this embodiment, the upward mobile formwork steel cage integral hoisting bridge erecting machine also includes a plurality of hanging outer rib groups 41, and the plurality of hanging outer rib groups 41 are sequentially installed on the load-bearing main beam 12 at intervals; the hanging outer rib group 41 includes a hanging outer rib 411, an upper crossbeam 412, a propulsion cylinder 413 and a lifting cylinder 414, the hanging outer rib 411 is connected to the load-bearing main beam 12 through the upper crossbeam 412, and one end of the propulsion cylinder 413 is connected to the upper crossbeam 412. The specific connection can be a sliding connection. The other end of the thrust cylinder 413 is connected to the hanging outer rib 411, and the thrust cylinder 413 can push the hanging outer rib 411 to move along the length direction of the upper crossbeam 412 to realize the opening and closing of the hanging outer rib 411. One end of the lifting cylinder 414 is connected to the load-bearing main beam 12, and the other end of the lifting cylinder 414 is connected to the upper crossbeam 412, and is used to drive the upper crossbeam 412 to move up and down along the load-bearing main beam 12.
[0070] In this embodiment, the hanging outer rib 411 includes two parts, the upper end of the left hanging outer rib is slidably connected to the upper crossbeam 412, the upper end of the right hanging outer rib is slidably connected to the upper crossbeam 412, and the lower end of the left hanging outer rib is connected to the lower end of the right hanging outer rib, and a pin shaft connection that is convenient for disassembly can be used here; when demoulding, the left hanging outer rib moves to the left along the upper crossbeam 412 while the upper crossbeam 412 moves downward, and the right hanging outer rib moves to the right along the upper crossbeam 412, so that the hanging outer rib 411 is just located between the cast bridge and the pre-embedded steel bars on the pier top. The demoulding by moving the hanging outer rib 411 downward and outward makes full use of the space on both wings of the cast bridge, avoids the interference of the pre-embedded steel bars on the pier top, can quickly demould and move the formwork to the next span without affecting the pre-embedded steel bars on the pier top, and can improve work efficiency.
[0071] like Figure 1 As shown, in this embodiment, an upper crossbeam mounting through hole 121 is opened on the load-bearing main beam 12 , and the upper crossbeam 412 is passed through the upper crossbeam mounting through hole 121 .
[0072] like Figure 2-Figure 10 As shown, in this embodiment, the lower parts of the first main beam 111 and the second main beam 112 are both provided with a longitudinal walking platform 114; the upward mobile formwork steel cage integral hoisting bridge erecting machine also includes a steel cage integral hoisting structure 51, the steel cage integral hoisting structure 51 includes a moving crossbeam 511, a longitudinal walking drive 512, a steel cage hoisting mechanism 513 and a hoisting mechanism walking drive 514, the moving crossbeam 511 is arranged below the first main beam 111 and the second main beam 112, the longitudinal walking drive 512 is fixed on the moving crossbeam 511 11, and the longitudinal travel drive 512 is rollingly connected with the longitudinal travel platform 114, used to drive the moving crossbeam 511 to move along the longitudinal travel platform 114, the steel cage lifting mechanism 513 is arranged on the moving crossbeam 511, and is located between the first main beam 111 and the second main beam 112, one end of the lifting mechanism travel drive 514 is connected to the moving crossbeam 511, and the other end of the lifting mechanism travel drive 514 is connected to the steel cage lifting mechanism 513, used to drive the steel cage lifting mechanism 513 to move along the moving crossbeam 511. In this embodiment, the hoisting operation structure and the lowering structure are designed separately, and the lowering winch is placed between the two main beams, which reduces the center of gravity of the whole machine and improves the stability of the whole machine.
[0073] like Figure 3As shown, in the present embodiment, the longitudinal moving leg 32 comprises a left longitudinal moving leg and a right longitudinal moving leg, and the left longitudinal moving leg and the right longitudinal moving leg are respectively arranged on the left and right sides of the rear guide beam 13, and the structures of the left longitudinal moving leg and the right longitudinal moving leg are the same and both comprise a longitudinal moving leg body 321 and a guide wheel 322, and the guide wheel 322 is installed at the lower end of the longitudinal moving leg body 321, and the longitudinal moving leg body 321 is hinged to the rear guide beam 13 through a connecting axis, so that the longitudinal moving leg body 321 can be folded upward on the outside of the rear guide beam 13.
[0074] like Figure 1 , Figure 2 As shown, in this embodiment, the upward movable formwork steel cage integral hoisting bridge erecting machine also includes a sinking guide trolley 61, and the steel cage binding frame is fixedly installed on the sinking guide trolley 61.
[0075] The present invention also provides a method for integrally hoisting and bridging steel bars of an upward movable formwork, which is characterized by comprising the following steps:
[0076] Step 1: After the upward movable formwork steel bar integral hoisting bridge erecting machine described in claims 1-8 is put into place, the front legs 21, the middle legs 22, the rear legs 23 and the rear support 24 support the front guide beam 11, the load-bearing main beam 12 and the rear guide beam 13;
[0077] The sinking guide trolley 61 carries the steel cage tyre frame and enters the lower part of the tying construction section 131 of the rear guide beam 13, where the tying workers tie the steel cage;
[0078] Step 2: After the steel cage is tied, the steel cage overall lifting structure 51 is used to lift the overall steel cage;
[0079] Step 3: The steel cage integral lifting structure 51 passes through the front legs 21 and enters directly above the outer mold system including a plurality of hanging outer rib groups 41;
[0080] Step 4: The overall lifting structure 51 of the steel cage lowers the overall steel cage into the cavity of the outer mold system. At the same time, the material is fed into the steel cage binding frame through the feeding section 132 at the end of the rear guide beam 13 to start binding the next span of steel cage;
[0081] Step 5: Check the mobile formwork bridge-building machine and the steel cage, pour concrete, cure the concrete, tension it, and complete the binding of the overall steel cage under the rear guide beam 13;
[0082] Step six, after concrete curing and tensioning are completed, the upper cross beam 412 moves downward, the hanging outer rib 411 moves to the left and right sides, the outer formwork system is separated from the concrete, and the formwork moving trolley 31 moves along the front guide beam 11 to the load-bearing main beam 12. The lower end of the formwork moving trolley 31 is supported on the cast bridge piece, and the longitudinal moving leg 32 rotates to the bottom of the rear guide beam 13 and is fixed to the rear guide beam 13. The guide wheel 322 at the lower end of the longitudinal moving leg 32 is supported on the track set on the bridge piece, the middle leg 22, the rear leg 23 and the rear support 24 shrink and become empty, and the formwork moving trolley 31 moves forward a span distance and is supported again; the sunken guide trolley 61 carries the steel cage tyre frame and moves forward a span distance.
[0083] Step 7: The front leg 21 is retracted and emptied, moved to the next pier, and fixed in place; the lower end of the mold frame moving trolley 31 is retracted and moved along the load-bearing main beam 12 to the front guide beam 11; the longitudinal moving leg 32 is rotated along the hinge axis to the outside of the rear guide beam 13;
[0084] Step 8. Repeat steps 2 to 7 to complete the construction of the remaining spans of the bridge.
[0085] In this embodiment, in step five, concrete pouring, curing, and tensioning are carried out simultaneously with the binding of the next span of the integral reinforcement cage.
[0086] In this embodiment, in step six, the bridge erection machine formwork and the sinking guide trolley 61 carrying the steel cage binding frame are moved to the next span at the same time.
[0087] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An upward mobile formwork steel cage integral hoisting bridge erecting machine, characterized in that: include: A front guide beam (11), a load-bearing main beam (12), a rear guide beam (13), a front leg (21), a mold frame moving trolley (31), a middle leg (22), a rear leg (23), a longitudinal moving leg (32) and a rear support (24), wherein the front guide beam (11), the load-bearing main beam (12) and the rear guide beam (13) are sequentially arranged along the same straight line, and one end of the front guide beam (11) is connected to one end of the load-bearing main beam (12), and the other end of the load-bearing main beam (12) is connected to one end of the rear guide beam (13), the front leg (21) is installed below the front guide beam (11), and the mold frame moving trolley (31) is installed below the front guide beam (11). The moving trolley (31) is arranged below the front guide beam (11) and can move along the front guide beam (11) to the bearing main beam (12) to push the mold frame to move as a whole. The middle support leg (22) is installed below the end of the bearing main beam (12) close to the front guide beam (11), the rear support leg (23) is installed below the end of the bearing main beam (12) close to the rear guide beam (13), the longitudinal moving support leg (32) is installed below the end of the rear guide beam (13) close to the bearing main beam (12), and the rear support (24) is installed below the end of the rear guide beam (13) away from the bearing main beam (12); The rear support (24) comprises a first support leg (241), a second support leg (242), a first cantilever beam (243), a second cantilever beam (244) and two supports (245); one end of the first cantilever beam (243) is fixedly connected to the side wall on one side of the rear guide beam (13); the upper end of the first support leg (241) is fixedly connected to the bottom of the other end of the first cantilever beam (243); one end of the second cantilever beam (244) is fixedly connected to the side wall on the other side of the rear guide beam (13); the upper end of the second support leg (242) is fixedly connected to the bottom of the other end of the second cantilever beam (244); the spacing between the first support leg (241) and the second support leg (242) is greater than the width of the steel cage binding frame; the two supports (245) are respectively arranged below the first support leg (241) and the second support leg (242).
2. The upward movable formwork steel cage integral hoisting bridge erecting machine according to claim 1 is characterized in that: The rear guide beam (13) comprises a tying construction section (131) and a feeding section (132); the tying construction section (131) is located at one end close to the load-bearing main beam (12); the feeding section (132) is located at one end away from the load-bearing main beam (12); and a canopy (133) is provided on the upper part of the tying construction section (131).
3. The upward movable formwork steel cage integral hoisting bridge erecting machine according to claim 1 is characterized in that: The front guide beam (11), the load-bearing main beam (12) and the rear guide beam (13) all include a first main beam (111), a second main beam (112) and a cap beam (113); the cap beam (113) is arranged between the first main beam (111) and the second main beam (112); one end of the cap beam (113) is fixedly connected to the upper part of the first main beam (111), and the other end of the cap beam (113) is fixedly connected to the upper part of the second main beam (112).
4. The upward movable formwork steel cage integral hoisting bridge erecting machine according to claim 1 is characterized in that: The upward movable formwork steel cage integral hoisting bridge erecting machine further comprises a plurality of hanging outer rib groups (41), wherein the plurality of hanging outer rib groups (41) are sequentially installed at intervals on the load-bearing main beam (12); The hanging outer rib group (41) comprises a hanging outer rib (411), an upper crossbeam (412), a propulsion cylinder (413) and a lifting cylinder (414); the hanging outer rib (411) is connected to the load-bearing main beam (12) via the upper crossbeam (412); one end of the propulsion cylinder (413) is connected to the upper crossbeam (412); the other end of the propulsion cylinder (413) is connected to the hanging outer rib (411); and the propulsion cylinder (413) can push the hanging outer rib (411) to move along the length direction of the upper crossbeam (412) to realize the opening and closing of the hanging outer rib (411); one end of the lifting cylinder (414) is connected to the load-bearing main beam (12); the other end of the lifting cylinder (414) is connected to the upper crossbeam (412) and is used to drive the upper crossbeam (412) to move up and down along the load-bearing main beam (12).
5. The upward movable formwork steel cage integral hoisting bridge erecting machine according to claim 4 is characterized in that: An upper crossbeam mounting through hole (121) is provided on the load-bearing main beam (12), and the upper crossbeam (412) is passed through the upper crossbeam mounting through hole (121).
6. The upward movable formwork steel cage integral hoisting bridge erecting machine according to claim 1 is characterized by: A longitudinal walking platform (114) is disposed at the lower part of each of the first main beam (111) and the second main beam (112); The upward movable formwork steel cage integral hoisting bridge erecting machine further comprises a steel cage integral hoisting structure (51), wherein the steel cage integral hoisting structure (51) comprises a movable crossbeam (511), a longitudinal travel drive (512), a steel cage hoisting mechanism (513) and a hoisting mechanism travel drive (514), wherein the movable crossbeam (511) is arranged below the first main beam (111) and the second main beam (112), and the longitudinal travel drive (512) is fixed on the movable crossbeam (511), and the longitudinal travel drive (512) is connected to the longitudinal travel crossbeam (511). The platform (114) is rollingly connected and is used to drive the moving crossbeam (511) to move along the longitudinal walking platform (114); the steel cage lifting mechanism (513) is arranged on the moving crossbeam (511) and is located between the first main beam (111) and the second main beam (112); one end of the lifting mechanism walking drive (514) is connected to the moving crossbeam (511), and the other end of the lifting mechanism walking drive (514) is connected to the steel cage lifting mechanism (513) and is used to drive the steel cage lifting mechanism (513) to move along the moving crossbeam (511).
7. The upward movable formwork steel cage integral hoisting bridge erecting machine according to any one of claim 1, characterized in that: The longitudinal moving leg (32) comprises a left longitudinal moving leg and a right longitudinal moving leg, the left longitudinal moving leg and the right longitudinal moving leg are respectively arranged on the left and right sides of the rear guide beam (13), the left longitudinal moving leg and the right longitudinal moving leg have the same structure and both comprise a longitudinal moving leg body (321) and a guide wheel (322), the guide wheel (322) is installed at the lower end of the longitudinal moving leg body (321), the longitudinal moving leg body (321) is hinged to the rear guide beam (13) via a cross shaft, so that the longitudinal moving leg body (321) can be folded upwards on the outside of the rear guide beam (13).
8. An upward mobile formwork steel cage integral hoisting bridge erecting machine according to any one of claims 1 to 7, characterized in that: The upward movable formwork steel cage integral hoisting bridge erecting machine further comprises a sinking guide trolley (61), and the steel cage binding frame is fixedly mounted on the sinking guide trolley (61).
9. A method for integrally hoisting and bridging steel bars of an upward movable formwork, characterized in that: The following steps are involved: Step 1: After the upward movable formwork steel bar integral hoisting bridge erection machine as described in claim 8 is passed through the hole into place, the front legs (21), the middle legs (22), the rear legs (23) and the rear support (24) support the front guide beam (11), the load-bearing main beam (12) and the rear guide beam (13); The sinking guide trolley (61) carries the steel cage tyre frame and enters the lower part of the tying construction section (131) of the rear guide beam (13), where the tying workers tie the steel cage; Step 2: After the steel cage is tied, the steel cage is hoisted by the steel cage hoisting structure (51); Step 3: The steel cage integral lifting structure (51) passes through the front legs (21) and enters directly above the outer mold system including a plurality of hanging outer rib groups (41); Step 4: The overall lifting structure (51) of the steel cage lowers the overall steel cage into the cavity of the outer mold system. At the same time, the material is fed into the steel cage binding frame through the feeding section (132) at the end of the rear guide beam (13) to start binding the next span of steel cage; Step 5: Check the mobile formwork bridge-building machine and the steel cage, pour concrete, cure the concrete, tension it, and complete the binding of the entire steel cage under the rear guide beam (13); Step 6: After the concrete is cured and tensioned, the upper crossbeam (412) moves downward, the hanging outer rib (411) moves to the left and right sides, the outer formwork system is separated from the concrete, and the formwork moving trolley (31) moves along the front guide beam (11) to the load-bearing main beam (12). The lower end of the formwork moving trolley (31) is supported on the cast bridge piece, and the longitudinal support leg (32) rotates to the bottom of the rear guide beam (13) and is fixed to the rear guide beam (13). The guide wheel (322) at the lower end of the longitudinal support leg (32) is supported on the track set on the bridge piece, and the middle support leg (22), the rear support leg (23) and the rear support (24) are retracted and emptied, and the formwork moving trolley (31) moves forward a span distance and supports again; the sinking guide trolley (61) carries the steel cage tyre frame and moves forward a span distance; Step 7: The front leg (21) is retracted and emptied, moved to the next pier, and fixed in place; the lower end of the mold frame moving trolley (31) is retracted and moved along the load-bearing main beam (12) to the front guide beam (11); the longitudinal moving leg (32) is rotated along the hinge axis to the outside of the rear guide beam (13); Step 8. Repeat steps (2) to (7) to complete the construction of the remaining spans of the bridge.
10. The method for integrally hoisting and bridging steel bars of an upward movable formwork according to claim 9, characterized in that: In the step (five), the concrete pouring, curing and tensioning are carried out simultaneously with the binding of the integral reinforcement cage of the next span.