A method for constructing an immersed tube tunnel with reusable joint sealing doors

The method of using reusable joint sealing doors and buoyancy boxes optimizes immersed tube tunnel construction by reducing dry dock size and construction time, lowering dredging costs, and enhancing urban adaptability through efficient, cost-effective water-tight connections.

CN118774172BActive Publication Date: 2024-12-06CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411266136.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-06
Estimated Expiration
2044-09-11

AI Technical Summary

Technical Problem

Existing immersed tube tunnel construction methods face challenges such as large dry dock requirements, high construction costs, difficulty in site selection, increased dredging costs due to deep draft, complex support systems, and labor-intensive temporary ballast water tanks, which hinder urban adaptability and increase project costs.

Method used

A method involving reusable joint sealing doors and buoyancy boxes for pipe segments, eliminating the need for temporary sealing doors and ballast tanks, allowing for shallow dry docks and optimized pipe segment thickness, using inflatable airbags and hydraulic pressure for water-tight connections, and enabling horizontal movement of sealing doors for efficient construction.

Benefits of technology

Reduces dry dock size and construction time, lowers dredging costs, minimizes structural reinforcement needs, and enhances urban applicability by simplifying the construction process and reducing overall project costs while ensuring watertight integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774172B_ABST
    Figure CN118774172B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing an immersed tube tunnel with reusable joint sealing doors. In the process of constructing a tunnel pipe segment, the method does not need to set temporary sealing doors at both ends of the pipe segment, nor does it need to set temporary ballast water tanks, and the inside and outside of the pipe segment are completely immersed in water. The floating transportation of the pipe segment is achieved by a buoyancy tank arranged in the pipe segment. A reusable steel sealing door is built into one end of the pipe segment. A circle of air bags is arranged around the steel sealing door, and a connection embedded part for connecting the steel sealing door and the pipe segment is reserved near each port in the pipe segment. After the pipe segment is sunk into place, the pipe segments are butt-jointed. Water is pumped at the pipe segment joint, and the two steel sealing doors are hydraulically pressed together by the GINA waterstop strips between the pipe segments under huge water pressure. The installed pipe segment is backfilled and locked. The pipe segment without sealing doors is sunk in the lower section, and the steel sealing door is moved to the joint of the pipe segment to complete the hydraulic pressing, and so on, and finally the shore structure is connected to form an immersed tube tunnel. The method can greatly improve work efficiency and comprehensively reduce construction costs and construction risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a method for constructing an immersed tube tunnel with reusable joint sealing doors. Background Art

[0002] An immersed tube tunnel is an underwater tunnel built by prefabrication of pipe segments in a dry dock, hauling, sinking and docking, foundation treatment, backfilling and covering. The tunnel is shallow, short, and can be flexibly connected to the roads on both sides of the water. Once successfully built, it can greatly save land resources in the central urban area, and is one of the main methods for building underwater tunnels in cities.

[0003] A dry dock needs to be built near the tunnel site for the prefabrication of pipe sections in immersed tube tunnels. Dry docks are divided into large, medium and small dry docks. A small dry dock generally prefabricates 1-2 pipe sections, a medium dry dock can prefabricate 3-4 pipe sections, and a large dry dock can prefabricate 4-6 pipe sections. A large dry dock covers an area of ​​150,000-200,000 square meters. The construction time is 6-12 months. The cost is about 60-100 million yuan. The construction cost of the dry dock for the Hong Kong-Zhuhai-Macao immersed tube tunnel is 200-300 million yuan. The dry dock is a temporary dry dock. In my country, only the Hong Kong-Zhuhai-Macao immersed tube tunnel dry dock is reused, and all other immersed tube tunnels have one tunnel and one dock. Especially for immersed tube tunnels in cities, the site selection of dry docks is very difficult, and the adaptability of building immersed tube tunnels in cities is greatly reduced.

[0004] In my country's immersed tube tunnels, the pipe segments are prefabricated in the dry dock, and the two ends of the pipe segments are closed. They are floated, sunk, and docked in the water. A temporary ballast water tank is set inside the pipe segment with both ends closed. During the sinking process of the pipe segment, water is added to the ballast water tank. After sinking into place, the ballast water tank is replaced with a concrete ballast layer to achieve the purpose of anti-floating. According to statistics, the concrete ballast layer of domestic immersed tube tunnels is more than 1m, and even reaches 1.5m. The thicker the ballast layer of the pipe segment, the greater the draft of the pipe segment, the deeper the dry dock, floating channel, and tunnel foundation trench of the pipe segment, and the higher the construction cost of the immersed tube tunnel.

[0005] The existing immersed tube tunnel construction has the following problems:

[0006] 1) In order for the pipe section to float out of the dry dock, it is often necessary to dig a very deep dry dock. The dry dock occupies a large area, and the construction time and cost of the dry dock are long.

[0007] 2) Land in cities is extremely valuable and it is difficult to find a suitable dry dock site, which greatly reduces the adaptability of immersed tube tunnel construction in cities.

[0008] 3) The riverbeds in cities are shallow, and pipes are floated by their own buoyancy. The pipes have a deep draft, which greatly increases the time and cost of river dredging.

[0009] 4) Temporary steel or reinforced concrete sealing doors are designed at both ends of the pipe section. A series of support systems such as steel sections, steel brackets, and reinforced concrete pillow beams need to be set up inside the sealing doors. After the hydraulic connection is completed, the sealing doors need to be removed, which greatly increases the construction period and project cost.

[0010] 5) During the floating and sinking stage, temporary ballast water tanks are set up along both sides of the side walls in the pipe segment. The ballast water tanks are 7-8 meters long, 5-6 meters wide, and 3-4 meters high. They are mostly made of steel plates and steel sections. The temporary ballast water tanks need to be removed, which is time-consuming and labor-intensive, and also causes damage to the tunnel body.

[0011] 6) In order to meet the buoyancy of the pipe segment, the pipe segment structure cannot be too thick and the internal space volume cannot be too small. Therefore, the pipe segment height is much larger than the size of the vehicle building limit. The excess space in the height direction of the pipe segment is backfilled with concrete inside the tunnel, which greatly increases the amount of concrete used.

[0012] 7) The height of the pipe segment structure has increased, which greatly increases the depth of the pipe segment floating channel and tunnel foundation trench excavation, and increases the construction cost of the project.

[0013] 8) The height of the pipe segment structure has increased, and the depth of the dry dock excavation for the prefabricated pipe segment has increased, requiring the construction of a large dry dock, which occupies a larger area and has a high project cost. Summary of the invention

[0014] In view of the deficiencies in the prior art, the present invention provides a method for constructing an immersed tube tunnel with reusable joint sealing doors.

[0015] The present invention is achieved through the following technical solutions:

[0016] A method for constructing an immersed tube tunnel with reusable joint sealing doors comprises the following steps:

[0017] Step 1: Prefabricate the pipe segment in the dry dock, set the external top plates at both ends of the pipe segment with embedded structures for jack docking and pulling, install GINA waterstop at one end of the pipe segment, and reserve embedded parts for connecting the steel sealing door and the pipe segment near each port inside the pipe segment;

[0018] Step 2: a reusable steel sealing door is arranged inside the two initial pipe sections, and a circle of airbags is arranged around the steel sealing door and between the inner wall of the pipe section;

[0019] Step 3: Place a pontoon in the pipe segment, fill the dry dock with water, and use the pontoon to float the pipe segment in the water to the sinking position;

[0020] Step 4: After the pipe segment is sunk into place, the two pipe segments are pulled together with a jack to achieve preliminary water stopping of the GINA waterstop between the pipe segments; the steel sealing door is connected and installed with the embedded parts on the docking port side, and air is inflated into the airbags around the steel sealing door to stop the water between the steel sealing door and the pipe segment; water is pumped out from the pipe segment joint between the two steel sealing doors, and the steel sealing doors are hydraulically pressed together under huge water pressure, and the GINA waterstop between the pipe segments is further squeezed to complete the water stopping between the pipe segments;

[0021] Step 5: Backfill and lock the installed pipe section, remove the jack at the pipe section joint, release the air in the airbag around the steel sealing door, remove the connection between the steel sealing door and the pipe section, and move the buoy for the next pipe section to be docked;

[0022] Step 6: Starting from the third pipe segment, float and sink the pipe segment without steel sealing doors for docking installation. When docking, move the two steel sealing doors to the position of the connection embedded parts on the docking port side of the two pipe segments for installation. After the airbag stops water, pump water from the joints between the pipe segments to achieve hydraulic pressure connection, and dock and install the remaining pipe segments in sequence;

[0023] Step 7: Connect the onshore structure, reclaim the steel sealing door, drain the water inside the pipe section, construct the internal structure, and form an underwater tunnel.

[0024] Furthermore, the steel sealed door is a closed waterproof component with a motor installed inside. A pulley is provided at the bottom of the steel sealed door to achieve horizontal movement under the action of the electromechanical system.

[0025] Furthermore, the motor is provided with a drainage function.

[0026] Furthermore, the motor pumps water from the two pipe joints between the steel sealing doors into the buoyancy box.

[0027] Furthermore, gates are provided on both sides of the steel sealing door.

[0028] Furthermore, the length of the pipe segment is 80-130 meters.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. This method can adopt shallow dry dock, which can greatly reduce the scale of dry dock, save construction time and save project cost.

[0031] 2. The two ends of the pipe section are not closed, so there is no need to consider the freeboard value of the pipe section, and the floating safety factor of the pipe section is higher.

[0032] 3. The pipe section does not need to float by itself, but can be floated by a pontoon. The draft of the pipe section is reduced, which can greatly reduce the cost of dredging the waterway.

[0033] 4. Both ends of the pipe joint are not closed, which reduces the need to set up sealing doors and the complex support system behind the sealing doors, saves construction time and cost, and reduces the risk of sealing door leakage.

[0034] 5. No ballast water tank is installed in the pipe section, which greatly reduces the construction and dismantling work of the ballast water tank, and greatly saves construction time and cost.

[0035] 6. The thickness of the pipe segment structure is not limited by the buoyancy during the floating and sinking stage of the pipe segment. During the operation stage, the deadweight of the structural wall panels or the setting of wall sites can be used to resist floating, which can greatly optimize the height of the pipe segment structure.

[0036] 7. The thickness of the pipe section is guaranteed, which can greatly reduce the structural reinforcement and reduce the cost of the tunnel project.

[0037] 8. After the height of the pipe segment is optimized, the excavation depth of the pipe segment floating channel and the tunnel foundation trench is greatly reduced, which saves construction time and engineering cost.

[0038] 9. The size of the pipe segment dry dock is reduced, and it is easy to find a suitable site even in the core area of ​​the city, making the immersed tube tunnel more applicable in the city.

[0039] 10. Steel sealed doors can be reused, which greatly improves work efficiency and reduces construction costs and risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0041] Figure 1 Flow chart for implementing the present invention;

[0042] Figure 2 This is a schematic diagram of the prefabricated structure of a pipe segment according to an embodiment of the present invention;

[0043] Figure 3 This is a schematic diagram of the floating transportation of a pipe segment according to an embodiment of the present invention;

[0044] Figure 4 This is a schematic diagram of pipe joint connection according to an embodiment of the present invention;

[0045] Figure 5 It is a schematic diagram of an immersed tube tunnel according to an embodiment of the present invention.

[0046] Reference numerals in the figure: 1-pipe joint, 2-GINA waterstop, 3-steel sealing door, 4-motor, 5-pulley, 6-gate, 7-connecting embedded parts, 8-airbag, 9-floating box, 10-jack, 11-working well. DETAILED DESCRIPTION

[0047] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to be able to fully convey the scope of the present invention to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

[0048] The present invention discloses a method for constructing an immersed tube tunnel with reusable joint sealing doors. In the process of constructing the tunnel pipe segment, the method does not require temporary sealing doors at both ends of the pipe segment, nor does it require temporary ballast water tanks, and the inside and outside of the pipe segment are completely immersed in water. The floating transportation of the pipe segment can be achieved by a buoyancy box arranged in the pipe segment. A reusable steel sealing door is built into the pipe segment. The steel sealing door is a closed and waterproof component, with a motor installed inside. A pulley is arranged at the bottom of the steel sealing door, and the overall horizontal movement of the steel sealing door is achieved under the action of the motor; gates are arranged on both sides of the steel sealing door, and staff can enter and exit the sealing door through the gates; a circle of air bags are arranged around the steel sealing door, and when the air bags are inflated, the contact surfaces of the air bags with the top plate, side wall and bottom plate of the pipe segment play a water-stopping role; bolt holes and other connecting embedded parts for connecting the steel sealing door and the pipe segment are reserved near each port in the pipe segment. After the pipe segment is sunk into place, the pipe segment is placed in a zero buoyancy state (floating) with the help of the buoyancy box. The embedded structure on the top plate of the pipe segment is pulled and closed with a jack. The GMIA waterstop at the joint of the two butted pipe segments is squeezed to achieve initial water stopping. The embedded parts connecting the steel sealing door to the top, bottom plate and side wall of the pipe segment are installed and connected, and air is inflated into the airbag to stop the water between the steel sealing door and the pipe segment. Water is pumped out of the joint of the pipe segment between the two steel sealing doors. Under the huge water pressure, the two steel sealing doors further squeeze the GINA waterstop to achieve hydraulic pressure connection of the pipe segment. Then the pipe segment is backfilled and locked. The air in the airbag is released, the embedded parts connecting the steel sealing door and the pipe segment at the butt-jointed port are removed, and the steel sealing door is moved for butt-jointing with the next pipe segment. In the same way, other pipe segments of the immersed tube tunnel are sunk. In this method, pipe segments can be lowered from the middle of the tunnel to both sides, or from both sides of the tunnel to the middle. After all the tunnel pipe segments are sunk, they are connected to the shore structure to form a closed and watertight structure. The water in the tunnel is drained, and the internal structure is installed to finally form an underwater tunnel.

[0049] A specific embodiment of the present invention refers to Figures 1 to 5 , the implementation process is as follows:

[0050] Step 1: Prefabricate the pipe segment 1 in the dry dock with a length of 80-130 meters. The external top plates at both ends of the pipe segment 1 are provided with embedded structures for the jacks 10 to connect and pull together. Install the GINA waterstop 2 at one end of the pipe segment 1. The top plate, side wall and bottom plate inside the pipe segment 1 near each port are reserved with steel sealing doors 3 and embedded connection parts 7 for connecting the pipe segment 1.

[0051] Step 2: The first two pipe sections 1 are connected at the butt ends with a reusable steel sealing door 3. The steel sealing door 3 is a closed and waterproof component with two motors 4 installed inside. The motors 4 have the function of pumping and draining water. Gates 6 are arranged on both sides of the steel sealing door 3, so that the staff can enter and exit the sealing door. Four pulleys 5 are arranged at the bottom of the steel sealing door 3, which can move horizontally under the action of the motor 4. A circle of airbags 8 are arranged around the steel sealing door 3.

[0052] Step 3: Place a pontoon 9 in the pipe segment 1, fill the dry dock with water, and use the pontoon 9 to float the pipe segment 1 in the water to the sinking position.

[0053] Step 4: The pipe segment 1 is sunk into place, and the ports on the sides of the steel sealing doors 3 of the two pipe segments 1 are butt-jointed. A GINA waterstop 2 is provided at the port joint of one of the pipe segments 1, and no waterstop is provided at the port joint of the other pipe segment 1. A jack 10 is installed at the butt joint position of the two pipe segments 1 to pull the two pipe segments 1 together, and the pipe segment 1 achieves preliminary water stopping under the action of the GINA waterstop 2; the steel sealing door 3 is connected to the embedded connecting parts 7 of the top, bottom plate and side wall of the pipe segment 1, and air is inflated into the airbag 8 at the same time. The contact surface between the airbag 8 and the top plate, side wall and bottom plate of the pipe segment 1 plays a water stopping role, and water stopping between the steel sealing door 3 and the pipe segment 1 is achieved; the water at the joint of the pipe segment 1 is pumped into the buoy 9 through the motor 4, and the two steel sealing doors 3 are under huge water pressure, and the GINA waterstop 2 of the pipe segment 1 is further squeezed to achieve hydraulic crimping.

[0054] For the two initially installed pipe segments 1, the steel sealing door 3 can also be connected and fixed to the connection embedded parts 7 on the docking port side before floating, and the pipe segments 1 can be directly docked after being floated and sunk into place.

[0055] Step 5: Backfill and lock the pipe section 1 that has been docked and installed, remove the jack 10 at the docking point of the two pipe sections 1, release the air in the airbag 8, remove the connection between the steel sealing door 3 and the pipe section 1, and move the buoy 9 for floating and sinking the next docking pipe section 1.

[0056] Step six: The first two pipe segments 1 are equipped with steel sealing doors 3. The third pipe segment starts to float and sink the pipe segment 1 without sealing doors. When docking, the two removed steel sealing doors 3 are moved to the position of the connecting embedded parts 7 on the docking port side of the two pipe segments 1 for installation and fixation. At the same time, the airbag 8 is inflated, and then water is pumped from the joint of the pipe segment 1 port between the two steel sealing doors 3 to achieve hydraulic compression connection of the pipe segment 1. The other immersed tube tunnel pipe segments 1 are sunk in turn for docking and installation.

[0057] Step 7: Connect the working well 11 and other structures on the shore, recover the steel sealing door 3, drain the water inside the pipe section 1, construct the internal structure, and form an underwater tunnel.

[0058] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0059] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A method for constructing an immersed tube tunnel with reusable joint sealing doors, characterized in that: The following steps are involved: Step 1: Prefabricate the pipe segment in the dry dock, set the external top plates at both ends of the pipe segment with embedded structures for jack docking and pulling, install GINA waterstop at one end of the pipe segment, and reserve embedded parts for connecting the steel sealing door and the pipe segment near each port inside the pipe segment; Step 2: A reusable steel sealing door is set inside the two initial pipe sections, and a circle of air bags is set around the steel sealing door and between the inner wall of the pipe section; the steel sealing door is a closed waterproof component, and a motor with a pumping and drainage function is installed inside. A pulley is set at the bottom of the steel sealing door to achieve horizontal movement under the action of electromechanics; Step 3: Place a pontoon in the pipe segment, fill the dry dock with water, and use the pontoon to float the pipe segment in the water to the sinking position; Step 4: The pipe segment is sunk into place, and the two pipe segments are pulled together with a jack to achieve preliminary water stopping of the GINA waterstop between the pipe segments; the steel sealing door is connected and installed with the embedded connection parts on the docking port side, and air is inflated into the airbags around the steel sealing door to stop the water between the steel sealing door and the pipe segment; water is pumped out from the pipe segment joints between the two steel sealing doors, and the motor pumps the water from the two pipe segment joints between the steel sealing doors into the buoyancy box, and the steel sealing doors are hydraulically pressed together under huge water pressure, and the GINA waterstop between the pipe segments is further squeezed to complete the water stopping between the pipe segments; Step 5: Backfill and lock the installed pipe section, remove the jack at the pipe section joint, release the air in the airbag around the steel sealing door, remove the connection between the steel sealing door and the pipe section, and move the buoy for the next pipe section to be docked; Step 6: Starting from the third pipe segment, float and sink the pipe segment without steel sealing doors for docking installation. When docking, move the two steel sealing doors to the position of the connection embedded parts on the docking port side of the two pipe segments for installation. After the airbag stops water, pump water from the joints between the pipe segments to achieve hydraulic pressure connection, and dock and install the remaining pipe segments in sequence; Step 7: Connect the onshore structure, reclaim the steel sealing door, drain the water inside the pipe section, construct the internal structure, and form an underwater tunnel.

2. The method for constructing an immersed tube tunnel with reusable joint sealing doors according to claim 1, characterized in that: Gates are arranged on both sides of the steel sealing door.

3. The method for constructing an immersed tube tunnel with reusable joint sealing doors according to claim 1, characterized in that: The length of the pipe section is 80-130 meters.

Citation Information

Patent Citations

  • Immersed tube tunnel non-welding assembly type steel end sealing door and sealing method

    CN113718851A

  • Immersed tunnel construction method without sealing door and ballast water tank for pipe joints

    CN118273385A

  • A final joint docking mechanism for immersed tunnels

    CN215165824U