A portable pipe well filling device for foundation pit of water conservancy project

Through the design of the filling device of foundation pit pipe wells for moving water conservancy projects, the problem of uneven filling is solved by using technologies such as mobile brackets, rotating mechanisms and arc-shaped splash-proof boards, and efficient filling of earth or gravel is achieved. The uniform compaction of the gaps improves construction efficiency and accuracy.

CN118774198BActive Publication Date: 2024-11-15新沂市水利局阿湖水利站
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411253210.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-15
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

In the prior art, the fixed design of the filling device of foundation pit pipe wells in water conservancy engineering cannot effectively fill falling earth or sand and gravel into the gaps in the shape of rings, resulting in the problem of uneven filling.

Method used

A pipe well filling device for foundation pit of a moving water conservancy project was designed, using a mobile bracket, a cutter, a lifting mechanism, annular support frame, a rotating mechanism, a arc-shaped splash-proof board and a telescopic mechanism, through the rotation and lifting mechanism Make the bottom discharge port of the filler bin be above the gap, and use arc-shaped splash-proof board and agitation assembly to achieve uniform filling of earth or sand and gravel, combine infrared positioning instrument and clamping positioning assembly for positioning and clamping. Finally, Use the compaction mechanism to compact the gap.

Benefits of technology

The uniform filling of earth or sand and gravel is achieved, the filling rate is improved, the operation is simplified, and the impact of shaking of the pipe well parts is avoided, and an integrated machine for positioning, filling and tamping is formed, which improves construction efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774198B_ABST
    Figure CN118774198B_ABST
Patent Text Reader

Abstract

The present invention relates to a portable pipe well filling device for a foundation pit of a water conservancy project in the field of water conservancy projects, comprising: a mobile support frame, a plurality of mobile wheels sliding on the foundation are installed at the bottom of the mobile support frame, the foundation pit is pre-dug on the foundation, and the inner cavity of the foundation pit is vertically installed with pipe well parts; a lower material bin, the lower material bin is arranged in the middle area of ​​the mobile support frame, a center tube is installed at the middle position of the inner wall of the lower material bin, and the bottom of the lower material bin is provided with drop holes distributed in an annular shape at equal distances; an annular support frame, the lower material bin is rotatably arranged inside the annular support frame. The present invention realizes a pipe well filling device for a foundation pit of a water conservancy project that can be positioned when working and is easy to move when not working, and realizes a rotary filling operation, effectively filling earth or sand and gravel into a ring-shaped gap to ensure uniform filling, and can also fully drop earth or sand and gravel into the gap to ensure a higher filling rate of earth or sand and gravel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a pipe well filling device, in particular to a portable pipe well filling device for a foundation pit of a water conservancy project in the field of water conservancy projects. Background Art

[0002] Backfill construction refers to the engineering activities that level the ground and adjust the terrain by digging earth or gravel from the backfill location and transporting it to the excavation location for filling in the land leveling, road construction, and building construction. In water conservancy projects, it is necessary to fill the gaps between foundation pits and pipe wells. However, the existing technology mostly uses large-scale mechanical equipment to fill earth or gravel, which cannot effectively fill earth or gravel into the ring-shaped gaps, which easily causes uneven filling.

[0003] In order to solve the problem of uneven filling of pipe wells in foundation pits of water conservancy projects, a pipe well filling device for the foundation pit of a certain water conservancy project in the market is designed with circular backfill, which has a certain market share.

[0004] After searching, the invention patent with publication number CN113668543A discloses a pipe well landfill device for a water conservancy project foundation pit, including a supporting device, a pipe placing device is installed on the upper side of the supporting device, and a backfilling device is installed on the lower side of the supporting device, wherein the supporting device includes a lifting assembly, the lifting assembly drives the pipe placing device to move up and down, the pipe placing device includes a plurality of sliding assemblies, a tamping assembly is installed at the end of the sliding assembly, an arc plate is installed under the tamping assembly, and the plurality of arc plates together form a circle, and the backfilling device includes a center alignment sleeve, and the circle formed by the center alignment sleeve and the arc plate is on the same axis.

[0005] Based on the above search and in combination with the prior art, it is found that the holes for dropping earth or sand and gravel in the prior art pipe well filling device are of fixed design. When the entire backfill device is mounted on the pipe well, how to effectively match the holes for dropping earth or sand and gravel to the gaps between the foundation pit and the pipe well is a problem that needs to be solved. That is, the fallen earth or sand and gravel cannot be fully dropped into the gap. Therefore, a portable pipe well filling device for the foundation pit of a water conservancy project is proposed to improve the above problem. Summary of the invention

[0006] In view of the above-mentioned prior art, the technical problem to be solved by the present invention is that the holes for dropping earth or sand and gravel in the prior art pipe well filling device are of fixed design. When the entire backfill device is mounted on the pipe well, how to effectively make the holes for dropping earth or sand and gravel correspond to the gap between the foundation pit and the pipe well is a problem that needs to be solved.

[0007] In order to solve the above problems, the present invention provides a portable pipe well filling device for a foundation pit of a water conservancy project, comprising:

[0008] A mobile support frame, wherein a plurality of mobile wheels sliding on the foundation are installed at the bottom of the mobile support frame, a foundation pit is pre-dug on the foundation, and a pipe well member is vertically installed in the inner cavity of the foundation pit;

[0009] A lower material bin, which is arranged in the middle area of ​​the movable support frame, a central tube is installed in the middle position of the inner wall of the lower material bin, and the bottom of the lower material bin is provided with drop holes which are equidistantly distributed in an annular shape;

[0010] An annular support frame, the lower material bin is rotatably arranged inside the annular support frame, and a rotating mechanism is installed between the annular support frame and the lower material bin;

[0011] A lifting mechanism, the lifting mechanism is installed between the annular support frame and the movable support frame;

[0012] A conveying mechanism, wherein the conveying mechanism is installed on one side of the annular support frame;

[0013] A stirring assembly, the stirring assembly is installed at one end of the conveying mechanism, and the stirring assembly is located in the central area of ​​the lower silo;

[0014] A support ring is installed at the bottom of the outer wall of the lower material bin, and an annular mounting frame is installed at the bottom of the support ring, and the inner wall of the annular mounting frame is provided with equally distributed filling bins, and a telescopic mechanism is provided between the filling bin and the annular mounting frame, and the telescopic mechanism includes an inlet and an outlet opened at equal distances on the inner wall of the annular mounting frame, and a movable frame plugged into the inlet and outlet is installed on the top of one side of the filling bin, and a second tooth groove distributed at equal distances is opened on the inner wall of one side of the movable frame, and the inner rotation of the annular mounting frame is provided with an equidistantly connected second tooth groove. A tooth column meshing with the tooth grooves, a second bearing seat is installed on the outer inner wall of the annular mounting frame, and a gear ring meshing with the tooth column is fixed on the inner wall of the second bearing seat, a forward and reverse motor for driving the tooth column and the gear ring to rotate is installed on the top of the support ring, the filling bin moves below the drop hole, and an arc-shaped splash guard is installed on one side of the bottom of the filling bin, and the arc-shaped splash guard is inclined along the direction of the pipe well part, a clamping and positioning assembly is provided on the side of the filling bin close to the pipe well part, and a tamping mechanism is provided at one end of the filling bin.

[0015] Furthermore, the rotating mechanism includes a plurality of first bearing seats installed in the annular support frame, and the lower material bin is installed in the first bearing seat, a connecting port is opened on one side of the annular support frame, a rotating motor is installed on the top of the connecting port, a driving gear is installed on the output shaft of the rotating motor, a swivel seat located in the annular support frame is installed on the outer wall of the lower material bin, and the outer wall of the swivel seat is opened with first tooth grooves distributed in an annular shape at equal distances, and the first tooth grooves are meshed with the driving gear.

[0016] Furthermore, the lifting mechanism includes a first hydraulic cylinder installed at an equal distance on the top of the movable support frame, and the side of the movable support frame is provided with guide grooves distributed in an annular shape at an equal distance, and a lifting seat sliding in the guide groove is installed between the piston end of the first hydraulic cylinder and the outer wall of the annular support frame.

[0017] Furthermore, a plug hole is provided on one side of the bottom of the movable support frame, and a ground plug plugged into the plug hole is installed at the bottom of the lifting seat.

[0018] Furthermore, the conveying mechanism includes a mounting bracket installed on one side of the annular support frame, and a conveying frame is installed on the top of the mounting bracket, the conveying frame is located above the lower material bin, both ends of the inner wall of the conveying frame are rotatably connected with transmission rollers, and a conveyor belt is transmission-connected between the transmission rollers, and a conveying motor for driving the transmission rollers and the conveyor belt to rotate is installed on the side wall of the conveying frame.

[0019] Furthermore, the stirring assembly includes a support frame installed at one end of the conveying frame, and the support frame is provided with equidistant mounting holes, which are distributed in a ring shape below the center of the silo, and a stirring shaft is rotatably connected in the mounting holes, and spiral blades are installed at the bottom of the stirring shaft, and the spiral blades are located above the falling holes. A bevel gear is installed on the top of the stirring shaft, and a bevel gear ring is installed on the top of the center tube, and the bevel gear ring is meshed with the bevel gear.

[0020] Furthermore, the clamping and positioning assembly includes a clamping seat installed on one side of the filling bin, and the clamping seat is arc-shaped and cooperates with the pipe well member. A mounting groove is opened on one side of the clamping seat, and the inner wall of the mounting groove is rotatably connected to a vertical sliding rod.

[0021] Furthermore, an equipment hole is provided on the support frame, and an infrared locator is installed in the equipment hole. The equipment hole coincides with the center position of the central tube, and the infrared locator emits infrared target light for positioning.

[0022] Furthermore, the compaction mechanism includes a mounting plate installed on the top of the side wall of the fill bin, and a supporting tube is installed at the bottom of the mounting plate, a second hydraulic cylinder is installed on the inner wall of the supporting tube, and a movable tube inserted in the supporting tube is installed on the piston end of the second hydraulic cylinder, a compaction plate is installed at the bottom of the movable tube, movable grooves distributed at equal distances are opened on the supporting tube, and the outer wall of the movable tube is rotatably connected to a plurality of pulleys slidably arranged in the movable grooves, a plurality of heat dissipation holes are opened on the movable tube, and the mounting plate and the compaction plate are both designed to be ring-shaped, and the compaction plate does not fit the surface of the pipe well after being closed.

[0023] Furthermore, the bottom of the outer wall of the central tube and the inner wall of the lower silo are both designed to be inclined and distributed on both sides of the drop hole.

[0024] In summary, after adopting the above structure, the present invention has the following advantages compared with the prior art:

[0025] 1. The above-mentioned movable support frame, material lowering bin, lifting mechanism, filling bin, annular support frame, rotating mechanism, annular mounting frame, drop hole, arc splash plate, and telescopic mechanism are adopted. The positions of the filling bin and the arc splash plate can be adjusted under the action of the telescopic mechanism, so that the bottom discharge port of the filling bin can be fully located above the gap between the foundation pit and the pipe well, and the material lowering bin and the filling bin are driven to rotate under the rotation of the rotating mechanism. With the anti-splashing effect of the arc splash plate, the earth or sand and gravel can be dropped into the gap of the foundation pit along the drop hole. On the one hand, the rotary filling operation is realized, and the earth or sand and gravel are effectively filled into the annular gap to ensure uniform filling. On the other hand, the earth or sand and gravel can be fully dropped into the gap to ensure a higher filling rate of the earth or sand and gravel.

[0026] 2. By adopting the above-mentioned annular support frame, conveying mechanism and stirring assembly, the conveying mechanism can be used to automatically deliver earth or sand and gravel into the gap, thereby realizing the performance of convenient feeding, and when the lower bin rotates, the stirring assembly can be driven to rotate synchronously in the opposite direction, thereby stirring the rotating earth or sand and gravel, so that the earth or sand and gravel can quickly pass through the drop hole and the filling bin and fall into the gap, thereby realizing the performance of convenient feeding;

[0027] 3. The infrared locator and the clamping and positioning assembly mentioned above can be used to preliminarily position the entire filling device under the action of the infrared locator, and the clamping seat and the slide bar can be synchronously driven to move as the telescopic mechanism drives the filling bin to move, so that the slide bar fits on the outer wall of the pipe well component, thereby realizing the function of clamping and positioning the pipe well component, and avoiding the problem of shaking of the pipe well component during filling, which affects the installation efficiency and accuracy;

[0028] 4. The above-mentioned movable support frame, lifting mechanism, movable wheel, jack and ground plug can be used to drive the ground plug to be inserted into the foundation through the descending action of the lifting mechanism during operation, so as to realize the pipe well filling device for the foundation pit of the water conservancy project which can be positioned during operation and convenient to move when not in operation, and is easy to use;

[0029] 5. The above-mentioned rotating mechanism, telescopic mechanism, filling bin and tamping mechanism can synchronously drive the tamping mechanism to rotate and move during the rotation of the filling bin driven by the rotating mechanism and the movement of the filling bin driven by the telescopic mechanism, so that the filling bin and the tamping mechanism form a closed state, thereby being able to move the tamping mechanism to above the gap between the foundation pit and the pipe well, and realizing the tamping treatment of the gap after filling, without the need for tamping machinery to perform tamping operations, forming a positioning, filling and tamping all-in-one machine. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a front view of the present invention when it is working;

[0031] Figure 2 It is the working state diagram of the present invention;

[0032] Figure 3 It is a schematic diagram of the three-dimensional structure of the present invention;

[0033] Figure 4 It is a structural schematic diagram of the conveying mechanism and the rotating mechanism of the present invention;

[0034] Figure 5 It is a schematic diagram of the structure of the stirring assembly of the present invention;

[0035] Figure 6 It is a bottom-up stereoscopic view of the filling bin and the compacting mechanism of the present invention;

[0036] Figure 7 It is a cross-sectional view of the lower bin and the annular mounting frame of the present invention;

[0037] Figure 8 It is a schematic diagram of the structure of the swivel seat and the first tooth groove of the present invention;

[0038] Fig. 9 It is a top perspective view of the annular mounting frame and the tamping mechanism of the present invention;

[0039] Fig.10 It is a schematic diagram of the telescopic mechanism structure of the present invention;

[0040] Fig.11 It is a schematic diagram of the structure of the second tooth groove and the tamping plate of the present invention;

[0041] Fig.12 It is a schematic diagram of the compaction mechanism of the present invention;

[0042] Fig.13 This is a diagram showing the initial state of the filling bin and the compaction plate of the present invention;

[0043] Fig.14 This is a working state diagram of the filling bin and the compaction plate of the present invention.

[0044] Description of the numbers in the figure:

[0045] 1. Foundation; 2. Foundation pit; 3. Pipe well parts; 4. Mobile support frame; 5. Ground plug; 6. Unloading bin; 7. First hydraulic cylinder; 8. Stirring assembly; 801. Bevel gear ring; 802. Bevel gear; 803. Stirring shaft; 804. Spiral blade; 9. Conveying mechanism; 901. Mounting support frame; 902. Conveying motor; 903. Conveying frame; 904. Conveying belt; 10. Filling bin; 11. Moving wheel; 12. Lifting seat; 13. Guide groove; 14. Annular support frame; 15. Rotating mechanism; 1501. First bearing seat; 1502. Rotating motor; 1503. Driving gear; 1504. Connecting port; 1505. Swivel seat; 1506. First Tooth groove; 16, support ring; 17, annular mounting frame; 18, support frame; 19, center tube; 20, jack; 21, infrared locator; 22, drop hole; 23, arc splash plate; 24, clamping seat; 25, tamping mechanism; 2501, mounting plate; 2502, support tube; 2503, tamping plate; 2504, second hydraulic cylinder; 2505, movable groove; 2506, movable tube; 2507, pulley; 26, telescopic mechanism; 2601, forward and reverse motor; 2602, tooth column; 2603, second bearing seat; 2604, gear ring; 2605, movable frame; 2606, inlet and outlet; 2607, second tooth groove; 27, slide rod. DETAILED DESCRIPTION

[0046] The implementation methods of the present application are described in detail below with reference to the accompanying drawings.

[0047] See also Figure 1-Figure 14 The present invention provides a portable pipe well filling device for a foundation pit of a water conservancy project, comprising:

[0048] A movable support frame 4, wherein a plurality of movable wheels 11 sliding on the foundation 1 are installed at the bottom of the movable support frame 4, a foundation pit 2 is pre-dug on the foundation 1, and a pipe well member 3 is vertically installed in the inner cavity of the foundation pit 2;

[0049] The lower material bin 6 is arranged in the middle area of ​​the movable support frame 4. A central tube 19 is installed in the middle position of the inner wall of the lower material bin 6. The bottom of the lower material bin 6 is provided with drop holes 22 which are equidistantly distributed in an annular shape. The bottom of the outer wall of the central tube 19 and the inner wall of the lower material bin 6 are designed to be inclined and distributed on both sides of the drop holes 22.

[0050] The annular support frame 14 and the lower material bin 6 are rotatably arranged inside the annular support frame 14. A rotating mechanism 15 is installed between the annular support frame 14 and the lower material bin 6. The rotating mechanism 15 includes a plurality of first bearing seats 1501 installed inside the annular support frame 14, and the lower material bin 6 is installed inside the first bearing seats 1501. A connecting port 1504 is provided on one side of the annular support frame 14, and a rotating motor 1502 is installed on the top of the connecting port 1504. A driving gear 1503 is installed on the output shaft of the rotating motor 1502. A rotating ring seat 1505 located inside the annular support frame 14 is installed on the outer wall of the lower material bin 6, and first tooth grooves 1506 distributed in an annular pattern at equal distances are provided on the outer wall of the rotating ring seat 1505. The first tooth grooves 1506 mesh with the driving gear 1503. Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 6 , Figure 7 and Figure 8 As shown, the lower material bin 6 and the filling bin 10 can be driven to rotate under the rotation of the rotating mechanism 15 to realize the rotary filling operation, so that the earth or sand and gravel can be effectively filled into the ring-shaped gap to ensure uniform filling;

[0051] The lifting mechanism is installed between the annular support frame 14 and the mobile support frame 4. The lifting mechanism includes a first hydraulic cylinder 7 installed at an equal distance on the top of the mobile support frame 4, and the side of the mobile support frame 4 is provided with an annular guide groove 13 with equal distance. A lifting seat 12 sliding in the guide groove 13 is installed between the piston end of the first hydraulic cylinder 7 and the outer wall of the annular support frame 14. Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, it is convenient to adjust the height of the entire device through the lifting mechanism, so as to facilitate the disassembly and assembly of the entire device from the pipe well member 3;

[0052] The conveying mechanism 9 is installed on one side of the annular support frame 14. The conveying mechanism 9 includes a mounting bracket 901 installed on one side of the annular support frame 14, and a conveying frame 903 is installed on the top of the mounting bracket 901. The conveying frame 903 is located above the lower bin 6. Both ends of the inner wall of the conveying frame 903 are rotatably connected with transmission rollers, and a conveyor belt 904 is connected between the transmission rollers. The side wall of the conveying frame 903 is installed with a conveying motor 902 for driving the transmission rollers and the conveyor belt 904 to rotate. Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the conveying mechanism 9 can be used to automatically deliver earth or sand and gravel into the gap, thereby achieving convenient feeding performance;

[0053] The stirring assembly 8 is installed at one end of the conveying mechanism 9. The stirring assembly 8 is located in the central area of ​​the lower silo 6. The stirring assembly 8 includes a support frame 18 installed at one end of the conveying frame 903, and the support frame 18 is provided with mounting holes at equal distances. The mounting holes are distributed in a ring shape around the center of the lower silo 6. The mounting holes are rotatably connected with stirring shafts 803. The bottom of the stirring shafts 803 are installed with spiral blades 804. The spiral blades 804 are located above the drop holes 22. The top of the stirring shafts 803 are installed with bevel gears 802. The top of the center tube 19 is installed with bevel gear rings 801. The bevel gear rings 801 mesh with the bevel gears 802. Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, when the material discharge bin 6 rotates, the stirring assembly 8 can be driven to rotate synchronously in the opposite direction, so as to stir the rotating earth or gravel, so that the earth or gravel can quickly pass through the drop hole 22 and the filling bin 10 and fall into the gap, thus achieving the performance of facilitating material discharge;

[0054] A support ring 16 is installed at the bottom of the outer wall of the lower material bin 6, and an annular mounting frame 17 is installed at the bottom of the support ring 16. The inner wall of the annular mounting frame 17 is provided with equally spaced filling bins 10, and a telescopic mechanism 26 is provided between the filling bin 10 and the annular mounting frame 17. The telescopic mechanism 26 includes an inlet and outlet 2606 opened at equal distances on the inner wall of the annular mounting frame 17, and a movable frame 2605 inserted in the inlet and outlet 2606 is installed on the top of one side of the filling bin 10. The inner wall of one side of the movable frame 2605 is provided with second tooth grooves 2607 distributed at equal distances, and the internal rotation of the annular mounting frame 17 is provided with an equal distance from the second tooth groove 2607. The outer inner wall of the annular mounting frame 17 is provided with a second bearing seat 2603, and the inner wall of the second bearing seat 2603 is fixed with a gear ring 2604 meshing with the gear post 2602. The top of the support ring 16 is provided with a forward and reverse motor 2601 for driving the gear post 2602 and the gear ring 2604 to rotate. The filling bin 10 moves below the drop hole 22, and an arc-shaped splash plate 23 is installed on one side of the bottom of the filling bin 10. The arc-shaped splash plate 23 is inclined along the direction of the pipe well 3. A clamping and positioning assembly is provided on the side of the filling bin 10 close to the pipe well 3, and a tamping mechanism 25 is provided at one end of the filling bin 10. Figure 1 , Figure 2 , Figure 3 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 , Fig.13 and Fig.14As shown, the positions of the filling bin 10 and the arc-shaped splash guard 23 can be adjusted under the action of the telescopic mechanism 26, so that the bottom discharge port of the filling bin 10 can be fully located above the gap between the foundation pit 2 and the pipe well member 3, and the splash-proof effect of the arc-shaped splash guard 23 can cause the earth or sand and gravel to fall into the gap of the foundation pit 2 along the drop hole 22, thereby allowing the earth or sand and gravel to fully fall into the gap, ensuring a higher filling rate for the earth or sand and gravel.

[0055] Specifically, a plug hole 20 is provided on one side of the bottom of the movable support frame 4, and a ground plug 5 plugged into the plug hole 20 is installed on the bottom of the lifting seat 12. Figure 1 and Figure 2 As shown, the ground plug 5 can be driven to be inserted into the foundation 1 through the descending action of the lifting mechanism during operation, thereby realizing the function of positioning the entire device during operation.

[0056] Specifically, the clamping and positioning assembly includes a clamping seat 24 installed on one side of the filling bin 10, and the clamping seat 24 is arc-shaped and matched with the pipe well member 3. A mounting groove is provided on one side of the clamping seat 24, and a vertical slide bar 27 is rotatably connected to the inner wall of the mounting groove. An equipment hole is provided on the support frame 18, and an infrared positioning device 21 is installed in the equipment hole. The equipment hole coincides with the center position of the center tube 19, and the infrared positioning device 21 emits infrared target light for positioning. Figure 1 , Figure 3 , Figure 6 , Figure 7 , Fig. 9 , Fig.10 , Fig.11 , Fig.13 and Fig.14 , the entire filling device can be preliminarily positioned under the action of the infrared positioning device 21, and the clamping seat 24 and the sliding rod 27 are synchronously driven to move as the telescopic mechanism 26 drives the filling bin 10 to move, so that the sliding rod 27 fits against the outer wall of the pipe well member 3, thereby realizing the function of clamping and positioning the pipe well member 3, and avoiding the problem of shaking of the pipe well member 3 during filling, which affects the installation efficiency and accuracy.

[0057] Specifically, the compacting mechanism 25 includes a mounting plate 2501 mounted on the top of the side wall of the filling bin 10, and a support cylinder 2502 is mounted on the bottom of the mounting plate 2501, a second hydraulic cylinder 2504 is mounted on the inner wall of the support cylinder 2502, and a movable cylinder 2506 inserted into the support cylinder 2502 is mounted on the piston end of the second hydraulic cylinder 2504, and a compacting plate 2503 is mounted on the bottom of the movable cylinder 2506, and movable grooves 2505 distributed at equal distances are provided on the support cylinder 2502, and the outer wall of the movable cylinder 2506 is rotatably connected to a plurality of pulleys 2507 slidably arranged in the movable grooves 2505, and a plurality of heat dissipation holes are provided on the movable cylinder 2506, and the mounting plate 2501 and the compacting plate 2503 are both designed to be ring-shaped, and the compacting plate 2503 does not fit the surface of the pipe well member 3 after being closed. Figure 6 , Figure 7 , Fig. 9 , Fig.10 , Fig.11 , Fig.12 , Fig.13 and Fig.14 As shown, the compacting mechanism 25 can be synchronously driven to rotate and move during the rotation process of the filling bin 10 driven by the rotating mechanism 15 and the movement process of the filling bin 10 driven by the telescopic mechanism 26, so that the filling bin 10 and the compacting mechanism 25 form a closed state, and the compacting mechanism 25 can be moved to above the gap between the foundation pit 2 and the pipe well member 3, so as to realize the compaction treatment of the gap after filling, and there is no need to use compaction machinery for compaction operation.

[0058] In summary, the working principle of the present invention is as follows: when in use, the user uses the moving wheel 11 to move the entire device to the pipe well member 3, and uses the infrared positioning device 21 to preliminarily position the entire filling device, and then uses the first hydraulic cylinder 7 in the lifting mechanism to adjust the height of the lifting seat 12, the ground plug 5 and the annular support frame 14, and drives the ground plug 5 to be inserted into the foundation 1 to achieve the positioning operation of the entire device; then the user drives the tooth column 2602 and the gear ring 2604 to rotate through the forward and reverse motor 2601 in the telescopic mechanism 26, and cooperates with the tooth column 2602 and the second tooth groove 2607. The meshing action drives the movable frame 2605 to move in the inlet and outlet 2606, driving the filling bin 10, the clamping seat 24, the slide bar 27 and the tamping mechanism 25 to move, so that the filling bin 10 and the tamping mechanism 25 form a closed state, so that the slide bar 27 is attached to the outer wall of the pipe well member 3, and the operation of clamping and positioning the pipe well member 3 is realized, and the bottom end discharge port of the filling bin 10 can be fully located above the gap between the foundation pit 2 and the pipe well member 3; at this time, the user drives the driving gear 1503 to rotate through the rotating motor 1502 in the rotating mechanism 15, and cooperates with the driving gear 150 The meshing action of the first tooth groove 1506 and the first tooth groove 1506 drives the rotating ring seat 1505 and the lower material bin 6, the filling bin 10, the clamping seat 24, the arc-shaped splash plate 23 and the tamping mechanism 25 to rotate; the conveying motor 902 in the conveying mechanism 9 drives the driving roller and the conveyor belt 904 to rotate, and the earth or sand and gravel are automatically delivered to the lower material bin 6. When the lower material bin 6 rotates, the bevel gear ring 801 in the stirring assembly 8 can be driven to rotate, and the meshing action of the bevel gear ring 801 and the bevel gear 802 drives the stirring shaft 803 and the spiral blade 804 to rotate synchronously in the opposite direction, so that the rotating earth or sand and gravel can be moved. The stone is stirred so that the earth or sand and gravel can quickly pass through the drop hole 22 and the filling bin 10 and fall into the gap, realizing the performance of easy material discharge, and under the splash-proof effect of the arc-shaped splash-proof plate 23, the earth or sand and gravel can be dropped into the gap of the foundation pit 2 along the drop hole 22, realizing the rotary filling operation, and can fully drop the earth or sand and gravel into the gap; after the filling is completed, the user uses the second hydraulic cylinder 2504 in the tamping mechanism 25 to drive the movable cylinder 2506 and the tamping plate 2503 to move, so as to realize the tamping treatment of the gap after filling, forming a positioning, filling and tamping all-in-one machine.

[0059] In view of current practical needs, the above-mentioned implementation mode adopted in this application is not limited to the scope of protection. Various changes made within the knowledge scope of technical personnel in this field without departing from the concept of this application still fall within the scope of protection of the present invention.

Claims

1. A portable pipe well filling device for a foundation pit of a water conservancy project, characterized in that: include: A movable support frame (4), wherein a plurality of movable wheels (11) sliding on the foundation (1) are installed at the bottom of the movable support frame (4); a foundation pit (2) is pre-dug on the foundation (1); and a pipe well member (3) is vertically installed in the inner cavity of the foundation pit (2); A material lowering bin (6), the material lowering bin (6) being arranged in the middle area of ​​the movable support frame (4), a central tube (19) being installed in the middle position of the inner wall of the material lowering bin (6), and a bottom of the material lowering bin (6) being provided with drop holes (22) distributed in an annular pattern at equal distances; an annular support frame (14), the lower material bin (6) being rotatably arranged inside the annular support frame (14), and a rotating mechanism (15) being installed between the annular support frame (14) and the lower material bin (6); A lifting mechanism, the lifting mechanism being installed between the annular support frame (14) and the movable support frame (4); A conveying mechanism (9), the conveying mechanism (9) being mounted on one side of the annular support frame (14); A stirring assembly (8), the stirring assembly (8) being mounted at one end of the conveying mechanism (9), the stirring assembly (8) being located in a central area of ​​the lower silo (6); A support ring (16) is installed at the bottom of the outer wall of the lower material bin (6), and an annular mounting frame (17) is installed at the bottom of the support ring (16); the inner wall of the annular mounting frame (17) is provided with equally spaced filling bins (10), and a telescopic mechanism (26) is provided between the filling bin (10) and the annular mounting frame (17); the telescopic mechanism (26) comprises an inlet and outlet (2606) which are equidistantly provided on the inner wall of the annular mounting frame (17); a movable frame (2605) which is plugged into the inlet and outlet (2606) is installed at the top of one side of the filling bin (10); second tooth grooves (2607) which are equidistantly provided on the inner wall of one side of the movable frame (2605); and a plurality of tooth grooves (2607) which are equidistantly provided inside the annular mounting frame (17). The annular mounting frame (17) is provided with a second bearing seat (2603) on its outer inner wall, and a gear ring (2604) meshing with the gear seat (2602) is fixed on the inner wall of the second bearing seat (2603), and a forward and reverse motor (2601) for driving the gear seat (2602) and the gear ring (2604) to rotate is installed on the top of the support ring (16), the filling bin (10) moves below the drop hole (22), and an arc-shaped splash plate (23) is installed on one side of the bottom of the filling bin (10), and the arc-shaped splash plate (23) is arranged obliquely along the direction of the pipe well member (3), a clamping and positioning assembly is arranged on one side of the filling bin (10) close to the pipe well member (3), and a tamping mechanism (25) is arranged at one end of the filling bin (10); The rotating mechanism (15) comprises a plurality of first bearing seats (1501) installed in the annular support frame (14), and the lower material bin (6) is installed in the first bearing seat (1501); a communication port (1504) is provided on one side of the annular support frame (14); a rotating motor (1502) is installed on the top of the communication port (1504); a driving gear (1503) is installed on the output shaft of the rotating motor (1502); a rotating ring seat (1505) located in the annular support frame (14) is installed on the outer wall of the lower material bin (6); and first tooth grooves (1506) distributed in an annular shape and at equal distances are provided on the outer wall of the rotating ring seat (1505); the first tooth grooves (1506) are meshed with the driving gear (1503); The clamping and positioning assembly comprises a clamping seat (24) mounted on one side of the filling bin (10), and the clamping seat (24) is arc-shaped and matches with the pipe well member (3), a mounting groove is provided on one side of the clamping seat (24), and a sliding rod (27) in a vertical state is rotatably connected to the inner wall of the mounting groove.

2. The portable pipe well filling device for foundation pit of water conservancy project according to claim 1 is characterized in that: The lifting mechanism comprises a first hydraulic cylinder (7) which is equidistantly mounted on the top of the movable support frame (4), and the side of the movable support frame (4) is provided with guide grooves (13) which are equidistantly distributed in an annular shape, and a lifting seat (12) which slides in the guide groove (13) is installed between the piston end of the first hydraulic cylinder (7) and the outer wall of the annular support frame (14).

3. A portable pipe well filling device for a foundation pit of a water conservancy project according to claim 2, characterized in that: A plug hole (20) is provided on one side of the bottom of the movable support frame (4), and a ground plug (5) plugged into the plug hole (20) is installed on the bottom of the lifting seat (12).

4. A portable pipe well filling device for a foundation pit of a water conservancy project according to claim 3, characterized in that: The conveying mechanism (9) comprises a mounting support frame (901) mounted on one side of the annular support frame (14), and a conveying frame (903) is mounted on the top of the mounting support frame (901), the conveying frame (903) is located above the lower bin (6), both ends of the inner wall of the conveying frame (903) are rotatably connected to drive rollers, and a conveyor belt (904) is rotatably connected between the drive rollers, and a conveyor motor (902) for driving the drive rollers and the conveyor belt (904) to rotate is mounted on the side wall of the conveying frame (903).

5. The portable pipe well filling device for foundation pit of water conservancy project according to claim 4 is characterized in that: The stirring assembly (8) comprises a support frame (18) mounted at one end of the conveying frame (903), and the support frame (18) is provided with mounting holes at equal distances, the mounting holes being distributed in a ring shape below the center of the silo (6), a stirring shaft (803) being rotatably connected in each mounting hole, a spiral blade (804) being mounted at the bottom of each stirring shaft (803), the spiral blade (804) being located above the drop hole (22), a bevel gear (802) being mounted at the top of each stirring shaft (803), and a bevel gear ring (801) being mounted at the top of the center tube (19), the bevel gear ring (801) being meshed with the bevel gear (802).

6. A portable pipe well filling device for a foundation pit of a water conservancy project according to claim 5, characterized in that: The support frame (18) is provided with an equipment hole, and an infrared locator (21) is installed in the equipment hole. The equipment hole coincides with the center position of the center tube (19), and the infrared locator (21) emits infrared target light for positioning.

7. The portable pipe well filling device for foundation pit of water conservancy project according to claim 5, characterized in that: The compacting mechanism (25) comprises a mounting plate (2501) mounted on the top of the side wall of the filling bin (10), and a support cylinder (2502) is mounted on the bottom of the mounting plate (2501), a second hydraulic cylinder (2504) is mounted on the inner wall of the support cylinder (2502), and a movable cylinder (2506) inserted into the support cylinder (2502) is mounted on the piston end of the second hydraulic cylinder (2504), and a compacting plate (2506) is mounted on the bottom of the movable cylinder (2506). 2503), the support tube (2502) is provided with movable grooves (2505) distributed at equal distances, and the outer wall of the movable tube (2506) is rotatably connected to a plurality of pulleys (2507) slidably arranged in the movable grooves (2505), and the movable tube (2506) is provided with a plurality of heat dissipation holes, the mounting plate (2501) and the tamping plate (2503) are both designed to be ring-shaped, and the tamping plate (2503) does not fit the surface of the pipe well member (3) after being closed.

8. The portable pipe well filling device for foundation pit of water conservancy project according to claim 1, characterized in that: The bottom of the outer wall of the central tube (19) and the inner wall of the lower material bin (6) are both designed to be inclined and distributed on both sides of the drop hole (22).