Fracturing blasting collaborative tunneling method for hard rock roadway

By adopting a collaborative method of drilling, pre-splitting and blasting in hard rock tunnel excavation, and using high-pressure water injection to form pre-split cracks and control the blasting sequence, the problems of complex procedures and high costs in hard rock tunnel excavation are solved, and the tunnel is realized Safe, efficient, low-cost and rapid excavation.

CN118774840APending Publication Date: 2024-10-15ANHUI KAIFA MINING IND +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411153786.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing technology has the problems of complicated procedures and high costs in hard rock tunnel excavation, and fails to achieve effective and rapid tunnel excavation.

Method used

Using a collaborative method of drilling, pre-cracking, fracturing and blasting, smooth blasting holes and central fracturing holes are arranged around the tunnel section, and high-pressure water injection is used to form an annular radial pre-cracking crack. Combined with blasting technology, blasting is initiated first. After the central hole, the surrounding holes are blasted to control the surrounding rock fragmentation.

Benefits of technology

It achieves safe, efficient, low-cost and rapid excavation of hard rock tunnels, reduces the hazards of dust and blasting vibration, has a simple process and significant economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774840A_ABST
    Figure CN118774840A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of roadway tunneling, in particular to a fracturing blasting collaborative tunneling method for a hard rock roadway. The device comprises a blasting hole, a fracturing hole, a presplitting nozzle, a high-pressure water injection pump, a hole packer and an observation hole opening. According to the fracturing blasting cooperative tunneling method for the hard rock roadway, hydraulic fracturing advanced softening crushing and blasting roadway section control can be fully utilized, the process is simple, and safe, efficient and low-cost rapid tunneling of the hard rock roadway is achieved. Drilling holes are formed in the middle of the roadway tunneling section, and smooth blasting holes are formed in the periphery of the roadway section. And then high-pressure pulse presplitting is carried out at the designated position of the fracturing hole, and a radial presplitting crack is formed. Then, high-pressure water is used for carrying out crack initiation expansion on the pre-split cracks, and a crack network in the surrounding rock is controlled. And after fracturing is completed, millisecond blasting is conducted on the blasting drill hole, the center hole is detonated firstly, and then the peripheral holes are detonated. According to the method, the technical advantages of hydraulic fracturing, blasting and the like are combined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel excavation, and in particular to a hard rock tunnel fracturing and blasting coordinated excavation method. Background Art

[0002] Hard rock tunnel blasting is a commonly used construction method in mining engineering, especially suitable for strata with high rock hardness. This blasting technology can effectively break rocks and create conditions for tunnel excavation. Hard rock blasting usually involves a variety of blasting methods, including medium-deep hole blasting and smooth surface blasting, which can improve blasting efficiency, reduce blasting vibration, control the size of blasting fragments, and reduce damage to surrounding rocks.

[0003] The key to hard rock blasting lies in the optimization of blasting parameters, the control of blasting vibration and the innovative application of blasting technology. Blasting parameters include detonation series, drug type and ratio, charging method, etc. The rational selection of these parameters is crucial to improving the blasting effect. In addition, blasting vibration control research helps to reduce the adverse effects of blasting on the surrounding environment, while hydraulic blasting technology provides a new blasting charging method that can significantly improve the blasting effect.

[0004] However, the existing patent number CN112943279B, entitled "A construction method for excavating hard rock tunnels using hydraulic fracturing and directional blasting", provides a construction method for excavating hard rock tunnels using hydraulic fracturing and directional blasting. Through the construction methods of drilling, grooving, sealing, water injection fracturing, water softening and charge blasting, the hard rock mass can be softened quickly, economically and efficiently, thereby realizing rapid tunnel excavation. The above method only pre-softens the surrounding rock of the tunnel excavation face, does not realize tunnel excavation, requires the cooperation of a tunnel boring machine for construction, and has the problems of complex procedures and high costs. Summary of the invention

[0005] The main purpose of the present invention is to provide a method for coordinated excavation of hard rock tunnels by fracturing and blasting, which can effectively solve the problems mentioned in the background technology of complex procedures and high costs in construction with a tunnel boring machine.

[0006] To achieve the above object, the technical solution adopted by the present invention is:

[0007] A method for cooperative excavation of a hard rock tunnel by fracturing and blasting, comprising:

[0008] S1. Drilling: Drilling is performed at the front of the rock tunnel excavation working face with a drilling rig. Smooth blasting holes are arranged around the tunnel section, and fracturing holes are arranged in the center of the tunnel.

[0009] S2. Pre-splitting: Connect the pre-splitting nozzle to the high-pressure water injection pump, and send the pre-splitting nozzle to the bottom of the fracturing hole, withdraw the pre-splitting nozzle from the bottom of the fracturing hole to the specified position, control the output water pressure of the water pump, form an annular radial pre-splitting crack on the inner wall of the borehole, complete the pre-splitting work, then reduce the water pump pressure, withdraw the nozzle to the next pre-splitting position, and repeat the pre-splitting operation in sequence until all pre-splitting operations are completed;

[0010] S3. Fracturing: Push the sealer into the fracturing hole to perform staged fracturing. Inject high-pressure water into the sealing section and perform fracturing from the bottom of the hole to the hole mouth in sequence. Stop fracturing when water is observed to flow out of the hole mouth.

[0011] S4. Charge: After fracturing, take out the sealer, load the blasting explosive into the designated blasting hole and seal it;

[0012] S5. Blasting: After the explosives are loaded, fill and seal the opening of the fracturing hole, connect the blasting network and detonate.

[0013] The fracturing holes are arranged around the blasting holes at the center of the tunnel section.

[0014] There are two groups of fracturing holes, which are arranged above and below the central blasting hole respectively.

[0015] A group of fracturing holes above the central blasting hole is distributed in a triangular shape.

[0016] A group of fracturing holes below the central blasting hole are distributed in a straight line.

[0017] The crack propagation pressure of the pre-crack in S2 is calculated using the following formula:

[0018] [\sigma_f=\frac{K_I}{\sqrt{2\pi r}}]

[0019] Where (\sigma_f) is the crack growth pressure, (K_I) is the stress intensity factor, and (r) is the crack radius.

[0020] In step S5, when detonating the blasting holes, the central blasting hole is detonated first, and then the peripheral blasting holes are detonated.

[0021] Compared with the prior art, the beneficial effects of the present invention are as follows: the method of coordinated excavation of hard rock tunnels by fracturing and blasting provided by the present invention can make full use of hydraulic fracturing for advanced softening and crushing, and control of the blasting tunnel section, and the process is simple, so as to realize safe, efficient, low-cost and rapid excavation of hard rock tunnels. Drill holes (including fracturing holes and center holes) are arranged in the middle of the tunnel excavation section, and smooth blasting holes are arranged around the tunnel section. Then, high-pressure pulse pre-cracking is performed at the specified position of the fracturing hole to form radial pre-cracking cracks. Subsequently, high-pressure water is used to initiate and expand the pre-cracking cracks to control the crack network in the surrounding rock. After the fracturing is completed, micro-difference blasting is performed on the blasting borehole, first detonating the center hole and then the peripheral holes. This method combines the advantages of hydraulic fracturing, blasting and other technologies, overcomes the shortcomings of existing technologies, effectively utilizes hydraulic fracturing to weaken and crush surrounding rock in advance, creates more free surfaces for subsequent blasting, and controls the cross-sectional morphology of the tunnel by blasting, thereby achieving safe, efficient, and low-cost rapid excavation of hard rock tunnels, while reducing dust on the excavation working face and the hazards of blasting vibration. The technology is mature, the process is simple, the economic benefits are significant, and it has great promotion and application value. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the specific embodiments of the present invention, but do not constitute a limitation of the present invention.

[0023] Figure 1 This is a schematic diagram of step S1 of the present invention.

[0024] Figure 2 This is a schematic diagram of step S2 of the present invention.

[0025] Figure 3 This is a schematic diagram of step S3 of the present invention.

[0026] Numbers in the figure: 1. blasting hole; 2. fracturing hole; 3. pre-fracture nozzle; 4. high-pressure water injection pump; 5. hole sealer; 6. observation hole. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "disposed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] like Figure 1-3 As shown, a method of coordinated excavation of hard rock tunnels by fracturing and blasting is used. This method aims to improve the excavation efficiency of hard rock tunnels, mainly through the combination of fracturing and blasting technology. The whole process can be divided into five steps: drilling, pre-splitting, fracturing, charging and blasting.

[0030] S1. Drilling: At the head of the hard rock tunnel excavation working face, use a drilling rig to construct fracturing and blasting drilling at the head of the vertical excavation. Smooth blasting drilling holes are arranged around the tunnel section, and fracturing holes 2 are arranged in the center of the tunnel. The drilling diameter, hole spacing, drilling depth, etc. are determined according to the rock properties, tunnel length, tunnel section size, etc.;

[0031] S2. Pre-splitting: Connect the pre-splitting nozzle 3 to the high-pressure water injection pump 4, and send the pre-splitting nozzle 3 to the bottom of the fracturing hole 2, and slowly withdraw the pre-splitting nozzle 3 from the bottom of the fracturing hole 2 to the designated position, control the output water pressure of the water pump, and form an annular radial pre-splitting crack on the inner wall of the borehole to complete the pre-splitting work. Then reduce the water pump pressure, withdraw the nozzle to the next pre-splitting position, and repeat the pre-splitting operation in sequence until all pre-splitting operations are completed;

[0032] S3. Fracturing: Push the sealer 5 into the fracturing hole 2 to perform staged fracturing. Inject high-pressure water into the sealing section to expand the cracks. The water flows into the cracks to soften the tunnel section. Fracturing is performed from the bottom of the hole to the hole mouth in sequence. After the cracks are expanded to the observation hole mouth 6, fracturing is stopped when water flows out of the hole.

[0033] S4. Charge: After fracturing, remove the sealer 5, load the blasting explosive into the designated blasting hole 1 and seal it;

[0034] S5. Blasting: After the explosives are filled, the opening of the closed fracturing hole 2 is filled, and the blasting network is connected for detonation. When detonating the blasting hole 1, the central blasting hole 1 is detonated first, and then the peripheral blasting holes 1 are detonated.

[0035] Preferably, the smooth blasting drill holes in S1 are located at the periphery of the tunnel for subsequent blasting operations. The fracturing holes 2 are located in the center of the tunnel and can be used for both pre-fracture and actual fracturing operations. The parameters such as the diameter, spacing and depth of these holes will be determined according to the actual rock properties, the length and width of the tunnel and other conditions to ensure the best effect. And the fracturing holes 2 are arranged around the blasting hole 1 at the center of the tunnel section. There are two groups of fracturing holes 2, and the two groups of fracturing holes 2 are arranged above and below the central blasting hole 1, respectively. A group of fracturing holes 2 above the central blasting hole 1 is distributed in a triangular shape. A group of fracturing holes 2 below the central blasting hole 1 is distributed in a straight line.

[0036] Preferably, the crack expansion pressure of the pre-crack in S2 is calculated using the following formula:

[0037] [\sigma_f=\frac{K_I}{\sqrt{2\pi r}}]

[0038] Among them, (\sigma_f) is the crack expansion pressure, (K_I) is the stress intensity factor, and (r) is the crack radius. The significance of the crack expansion pressure formula is mainly reflected in the fact that through the formula, the critical pressure of rock crack expansion under specific conditions can be estimated, which is crucial for understanding and predicting the fracture behavior of rock under different geological conditions. When conducting underground excavation or tunnel construction. The crack expansion pressure formula can help accurately calculate the water pressure required to form pre-cracks. By adjusting the water pressure, you can ensure the formation of stable and effective pre-cracks in the rock. These cracks can guide the distribution of subsequent blasting energy, reduce the disordered crushing of rocks, and improve the pre-crack effect.

[0039] Finally, after the charging is completed, the orifice of the fracturing hole 2 is filled and closed to ensure safety. All relevant orifices are connected to the blasting network and detonation operations are performed to complete the excavation of the tunnel. The central blasting hole 1 is detonated first, and then the peripheral blasting holes 1 are detonated. First, the blasting of the central hole can quickly form an initial fracture area in the rock, which will change the stress distribution inside the rock, causing the stress state of the surrounding rock to change and the stress concentration to decrease, thereby making it easier for subsequent peripheral blasting to produce cracks, reducing the energy required for blasting and improving energy utilization. The blasting of the central blasting hole can first form a more regular fracture surface, which provides a preset crack path for the peripheral blasting, helps to control the direction and range of the peripheral blasting, reduces the impact of disordered blasting on the tunnel surrounding rock, and improves the predictability and controllability of the blasting effect.

[0040] By blasting the center first and then the periphery, the propagation path and intensity of the stress wave generated by the blasting can be effectively controlled to avoid excessive damage to the surrounding rock caused by the superposition of stress waves. Blasting the center hole first can absorb part of the stress wave generated by the subsequent peripheral blasting, thereby reducing the damage to the surrounding rock. Blasting the center first can form a relatively stable blasting area in advance, providing a more stable environment for subsequent peripheral blasting, which helps to control the impact of blasting on the overall stability of the tunnel. At the same time, by controlling the blasting sequence, the shape of the tunnel after blasting can be better managed, reducing the damage to the integrity of the tunnel structure caused by irregular blasting.

[0041] While embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for cooperative excavation of hard rock tunnels by fracturing and blasting, characterized in that: The following steps are involved: S1. Drilling: Drilling is performed using a drilling rig at the head of the rock tunnel excavation working face. Smooth blasting holes (1) are arranged around the tunnel section, and fracturing holes (2) are arranged in the center of the tunnel. S2. Pre-splitting: Connect the pre-splitting nozzle (3) to the high-pressure water injection pump (4), and send the pre-splitting nozzle (3) to the bottom of the fracturing hole (2), and withdraw the pre-splitting nozzle (3) from the bottom of the fracturing hole (2) to a specified position, control the output water pressure of the water pump, form an annular radial pre-splitting crack on the inner wall of the borehole, complete the pre-splitting work, and then reduce the water pump pressure, withdraw the nozzle to the next pre-splitting position, and repeat the pre-splitting operation in sequence until all pre-splitting operations are completed; S3. Fracturing: Push the sealer (5) into the fracturing hole (2) to perform segmented fracturing, inject high-pressure water into the sealing section, and perform fracturing from the bottom of the hole to the orifice in sequence, until water flows out of the orifice (6) and the fracturing is stopped; S4. Charge: After fracturing, remove the sealer (5), load the blasting explosive into the designated blasting hole (1) and seal it; S5. Blasting: After the explosives are loaded, the opening of the closed fracturing hole (2) is filled and connected to the blasting network for detonation.

2. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: The fracturing holes (2) are arranged around the blasting holes (1) at the center of the tunnel section.

3. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: Two groups of fracturing holes (2) are provided, and the two groups of fracturing holes (2) are arranged above and below the central blasting hole (1), respectively.

4. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: A group of fracturing holes (2) above the central blasting hole (1) is distributed in a triangular shape.

5. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: A group of fracturing holes (2) below the central blasting hole (1) are distributed in a straight line.

6. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: The crack propagation pressure of the pre-crack in S2 is calculated using the following formula: [\sigma_f=\frac{K_I}{\sqrt{2\pi r}}] Where (\sigma_f) is the crack growth pressure, (K_I) is the stress intensity factor, and (r) is the crack radius.

7. A method for cooperative excavation of hard rock tunnels by fracturing and blasting according to claim 1, characterized in that: In step S5, when detonating the blasting holes (1), the central blasting hole (1) is detonated first, and then the peripheral blasting holes (1) are detonated.

Citation Information

Patent Citations

  • A construction method for excavating hard rock tunnels using hydraulic fracturing and directional blasting.

    CN112943279B