Underground station construction method, construction structure and underground station thereof
By digging a shield tunnel below the groundwater level and installing bite piles and jet-jet cement slurry, the problem of groundwater treatment in water-rich strata is solved, a waterless environment for underground station construction is achieved, the construction procedures are simplified and the durability of the bottom seal structure is improved. stability.
Patent Information
- Application Number
- CN202411019500.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When constructing underground stations, it is difficult to treat groundwater in water-rich strata. Existing methods such as open excavation and dewatering, freezing bottom sealing and grouting water blockage have problems with large social impact, high cost and high risk. It is difficult to reduce the impact on the city. While normal activities are affected, the construction procedures are simplified and the back cover structure is ensured to be stable.
The shield tunnel is excavated below the groundwater level, and preparation platform areas are set up on both sides. Engagement piles are constructed from above the groundwater level to the depth of the bottom of the shield tunnel, jet grouting cement slurry is laid, and a pipe curtain structure is installed to make the shield tunnel and The interlocking piles form a construction space without groundwater to avoid the influence of groundwater.
It realizes that the construction of the underground station is not affected by groundwater, simplifies the construction procedures, reduces the impact on normal urban activities, and ensures the stability of the bottom cover structure of the underground station.
Smart Images

Figure CN118774852A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of construction technology, and in particular to an underground station construction method, a construction structure and an underground station thereof. Background Art
[0002] With the increasing density of underground rail transit network planning, affected by existing lines and underground structures, the buried depth of underground rail transit stations in urban built-up areas will gradually increase in the future. As the buried depth of stations increases, how to deal with groundwater in extremely thick and water-rich strata has always been a difficult point in the project.
[0003] Existing rail transit projects generally use open excavation and precipitation to solve the groundwater treatment problem in the project. At the same time, there are three main methods for building underground stations in water-rich strata: the first is to use concrete bottom sealing combined with continuous walls to achieve closed construction of station foundation pits. This solution is subject to the conditions of road traffic, pipelines and surrounding buildings around subway stations in the core area of the city. The implementation of open-cut stations has a great social impact, and the implementation period and cost of large-diameter pipeline relocation are long; the second is to use frozen bottom sealing combined with continuous walls to achieve closed construction of station foundation pits. This solution also requires open excavation for construction, and has the same problems as the first method; secondly, the groundwater flow rate in water-rich strata is relatively large, and the risk and cost of freezing are high; the third is to set a pipe curtain at the bottom in the direction of the station in combination with the underground excavation station, and set a freezing pipe inside the pipe curtain to form a closed construction at the bottom of the station. This solution proposes grouting or freezing water blocking for the water inlet of the lower vertical shaft and the horizontal channel, but a large amount of groundwater leakage is a common problem of grouting water blocking in the current stratum, and the cost and risk of grouting are high.
[0004] Therefore, how to simplify the construction procedures and ensure the stability of the bottom structure of underground stations while reducing the impact of building underground stations on normal urban activities in the construction environment of high water level strata has become a problem that needs to be solved in this field. Summary of the invention
[0005] In view of this, the present application proposes an underground station construction method, a construction structure and an underground station thereof, so as to achieve underground construction without being affected by groundwater.
[0006] In a first aspect, the present application proposes an underground station construction method, comprising:
[0007] Digging a shield tunnel below the groundwater level; both sides of the shield tunnel correspond to the preparation platform area;
[0008] At both ends of the underground station, engaging piles are constructed from above the groundwater level to the depth of the bottom of the shield tunnel, so that the engaging piles pass through the groundwater level;
[0009] In the shield tunnel, jet cement slurry is poured into the bottom of the preparatory platform areas on both sides, and a pipe curtain structure is arranged to be inserted into the corresponding interlocking piles at both ends of the underground station, so that the jet cement and pipe curtain at the bottom of the underground station and the interlocking piles on both sides of the underground station form a construction space without groundwater;
[0010] The shield tunnel is used to excavate the station toward the preparatory platform areas on both sides.
[0011] Preferably, the method further comprises:
[0012] At one end of the underground station, a pilot tunnel is constructed above the groundwater level and below the ground surface;
[0013] In-hole interlocking piles are constructed below the guide tunnel, so that the in-hole interlocking piles, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the interlocking piles at the other end of the underground station form a construction space without groundwater.
[0014] Further preferably, the method further comprises:
[0015] At the other end of the underground station, a station hall is constructed above the groundwater level and below the ground surface;
[0016] Open-cut station hall interlocking piles are constructed at one end of the station hall, so that the open-cut station hall interlocking piles, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the interlocking piles in the hole form a construction space without groundwater.
[0017] Further preferably, the method further comprises:
[0018] A connecting passage is constructed between the station hall and the guide tunnel.
[0019] Preferably, the method further comprises:
[0020] At both ends of the underground station, a pilot tunnel is constructed above the groundwater level and below the ground surface;
[0021] In-hole interlocking piles are constructed under the guide tunnels at both ends, so that the in-hole interlocking piles at one end, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the in-hole interlocking piles at the other end form a construction space without groundwater.
[0022] Preferably, the rotary spraying includes: three layers of ultra-high pressure rotary spraying.
[0023] Preferably, the method further comprises:
[0024] Tunnel support structures are arranged on both sides of the shield tunnel.
[0025] Preferably, the method further comprises:
[0026] Platform support structures are arranged in the preparatory platform areas on both sides.
[0027] Preferably, the method further comprises:
[0028] constructing a station hall connecting passage above the station;
[0029] A channel support structure is arranged in the station hall connecting channel.
[0030] In a second aspect, the present application further provides an underground station construction structure, which is constructed using the method described in the first aspect, and comprises:
[0031] Shield tunnel, set below the groundwater level;
[0032] A preparatory platform area is arranged on both sides of the shield tunnel;
[0033] two interlocking piles, respectively arranged on both sides of the underground station and extending from above the groundwater level to the bottom of the shield tunnel;
[0034] The jet grouting and pipe curtain structure is arranged at the bottom of the preparatory platform area, and is respectively locked and engaged with two engagement piles from the bottom of the shield tunnel to form a construction space without groundwater;
[0035] The shield tunnel and the preparatory platform area are located in a construction space without groundwater.
[0036] Preferably, the structure further comprises: a guide hole;
[0037] The pilot tunnel is arranged on the groundwater level;
[0038] The engaging piles extend from below the pilot hole to the bottom of the shield tunnel.
[0039] Further preferably, there are two guide tunnels; two engaging piles extend from below the corresponding guide tunnels to the bottom of both sides of the shield tunnel respectively.
[0040] Further preferably, there is one guide tunnel, and the structure further comprises: a station hall;
[0041] The station hall is arranged above the groundwater level and below the ground surface;
[0042] A snap pile extends from one end of the station hall to the bottom of one side of the shield tunnel;
[0043] Another engagement pile extends from below the pilot hole to the bottom of the other side of the shield tunnel.
[0044] In a third aspect, the present application further provides an underground station, which includes the construction structure described in the second aspect.
[0045] The underground station construction method provided by the present application constructs interlocking piles from above the groundwater level to the depth of the bottom of the shield tunnel at both ends of the underground station, injects rotary spraying cement slurry into the bottom of the preparatory platform areas on both sides of the shield tunnel, and arranges a pipe curtain structure to be inserted into the corresponding interlocking piles at both ends of the underground station, so that the rotary spraying cement and pipe curtain at the bottom of the underground station and the interlocking piles on both sides of the underground station constitute a construction space without groundwater, so that the construction of the underground station will not be affected by groundwater, avoiding the implementation of groundwater treatment at the station hall level, and reducing the impact on pipelines and road traffic. At the same time, the construction procedure is simple and the bottom sealing structure of the underground station is very stable.
[0046] Other features and advantages of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The accompanying drawings constituting a part of the present application are used to provide a further understanding of the present application, and the schematic implementation modes and descriptions of the present application are used to explain the present application. In the accompanying drawings:
[0048] Figure 1 This is a flow chart of the underground station construction method according to the preferred embodiment of the present application;
[0049] Figure 2 A schematic diagram of the construction structure of an underground station according to a preferred embodiment of the present application;
[0050] Figure 3 This is a schematic diagram of the structure of the rotary jet pipe curtain structure and the interlocking piles in the preferred embodiment of the present application;
[0051] Figure 4 This is a schematic diagram of the structure of the rotary spraying and pipe curtain according to the preferred embodiment of the present application.
[0052] Figure numbers: 1- shield tunnel; 11- tunnel support structure; 12- tunnel secondary lining structure; 2- preparatory platform area; 21- platform primary support structure; 22- platform secondary lining structure; 3- interlocking piles; 4- rotary grouting and pipe curtain structure; 41- rotary grouting; 42- pipe curtain; 5- guide tunnel; 6- station hall; 7- station hall connecting passage; 71- passage primary support mechanism; 72- passage secondary lining structure. DETAILED DESCRIPTION
[0053] The technical solution of the present application will be described in detail below with reference to the accompanying drawings and in combination with the implementation modes.
[0054] In the first aspect, Figure 1 As shown, this application first proposes a construction method for an underground station, and at the same time combines Figure 2-3The structure shown in the figure, the underground station construction method provided by the present application includes steps 110-140:
[0055] Step 110, digging a shield tunnel below the groundwater level;
[0056] Specifically, water-rich strata are a common geological structure, which has the following characteristics: loose strata, unstable soil structure, shallow aquifer depth, large water content, etc. When constructing underground infrastructure in this scenario, the location of the underground infrastructure and groundwater needs to be considered.
[0057] In this application, in order not to waste urban water resources, the track area and platform part of the underground station are set below the groundwater level. In addition, a single-hole double-line section shield construction is adopted in this application, and there are corresponding prepared platform areas on both sides of the shield tunnel. The shield method is a fully mechanized construction method in the dark excavation construction. It is to push the shield machine into the ground, and the surrounding rock is supported by the shield shell and pipe segments to prevent collapse into the tunnel. The shield tunnel dug is used for the track area in this application.
[0058] To be more specific, the underground station of the present application is an underground rail transit station. The space formed by the shield tunnel is used for two-way lane travel of underground rail transit such as subways. Obviously, each rail transit stop has platforms on both sides for people to get on and off the train. During construction, the platforms are the prepared platform area spaces on both sides of the shield tunnel.
[0059] It is understandable that, in this step, only the corresponding preparation platform areas on both sides of the shield tunnel are explained, but the platform area has not been excavated in this step or before.
[0060] Preferably, in the present application, tunnel support structures are provided on both sides of the shield tunnel, and the tunnel support structures are vertically arranged to support the tunnel.
[0061] Further preferably, in the present application, a secondary lining structure is provided inside the shield tunnel at the top and bottom, and another ring of lining is made inside the initial support to further improve the bearing capacity and durability of the tunnel.
[0062] Step 120, constructing interlocking piles from above the groundwater level to the bottom depth of the shield tunnel at both ends of the underground station, so that the interlocking piles pass through the groundwater level;
[0063] Specifically, from the above description, it can be seen that the underground station of the present application includes a shield tunnel and the corresponding preparatory platform areas on both sides thereof. Interlocking piles are constructed at the outermost ends of the underground station, that is, the side where the two station preparatory platform areas are not connected to the shield tunnel. Interlocking piles are partially embedded in the circumference between adjacent concrete piles, and steel cages are inserted into the piles constructed in sequence later, so as to form an overall continuous waterproof and retaining enclosure structure with good anti-seepage effect. This structure realizes its function by forming a mutual interlocking arrangement between the piles.
[0064] Moreover, in the present application, the interlocking piles on both sides start from above the groundwater level, pass downward through the groundwater level and reach directly to the bottom of the shield tunnel. Combined with the above-mentioned characteristics of the interlocking piles, a border can be formed on both sides of the underground station, framing the shield tunnel and the preparatory platform area.
[0065] It can be understood that in this step, the outermost ends of the underground station have structures that can be engaged with the engaging piles.
[0066] Preferably, in order to facilitate the construction of the bite pile, the present application constructs a pilot hole at one end of the underground station, above the groundwater level and below the ground. The pilot hole space is utilized to construct the bite pile in the hole on one side of the underground station below the pilot hole.
[0067] Further preferably, the present application constructs a station hall at the other end of the underground station, still above the groundwater level and below the ground. After entering the underground, passengers will first arrive at the station hall area, and then further enter the underground from the station hall area to arrive at the platform area. Using the station hall space, open-cut station hall interlocking piles are constructed at the end opposite to the station hall and the platform, corresponding to the in-hole interlocking piles constructed using the guide tunnel space, forming the interlocking piles on both sides of the underground station.
[0068] Further preferably, in the present application, a connecting passage is constructed and set up between the station hall and the guide tunnel for horizontally connecting the station hall and the guide tunnel to facilitate unified management of the construction process.
[0069] The advantage of the above construction method is that it effectively utilizes the space in the station hall to construct the interlocking piles, making the construction process faster and saving construction space.
[0070] Further preferably, if the distance between the station hall and one side platform is far, or the current station hall structure is not conducive to the construction of interlocking piles, guide holes on both sides can be constructed at both ends of the underground station, above the groundwater level and below the ground. The interlocking piles on both sides are constructed using guide holes.
[0071] Step 130, in the shield tunnel, spraying cement slurry to the bottom of the preparatory platform area on both sides, and setting a pipe curtain structure to be inserted into the corresponding interlocking piles at both ends of the underground station, so that the spraying cement and pipe curtain at the bottom of the underground station, as well as the interlocking piles on both sides of the underground station, form a construction space without groundwater;
[0072] Specifically, after the construction of the shield tunnel is completed, the space of the shield tunnel is used to spray cement slurry at the bottom of the preparatory platform area on both sides. Spraying can be achieved by ultra-high pressure spraying piles and other equipment. Ultra-high pressure spraying piles inject cement slurry and other materials into the ground through a rotating nozzle to form a ring-shaped or spiral spray hole. In this process, ultra-high pressure air is used to reinforce it into spray piles to achieve the purposes of soil densification, strong tamping, horizontal reinforcement, etc., thereby improving the bearing capacity and earthquake resistance of the soil. In addition, the present application utilizes the protection of spraying to set up a pipe curtain structure that is inserted from both sides into the corresponding interlocking piles at both ends of the underground station to form a closed force system at the bottom of the underground station. The pipe curtain is a method of underground space construction. It uses steel pipes with larger diameters to be arranged at a higher density underground to form a steel pipe curtain. The steel pipes are guided by locks and waterproof materials are injected to form an underground space enclosure structure.
[0073] From the above description of the interlocking piles, it can be seen that the interlocking piles penetrate from above the groundwater level to below the groundwater level, that is, the interlocking piles have blocked the groundwater from the side, and, in this step, the bottom side of the interlocking piles is intersected with the rotary jet and pipe curtain structure, so that the rotary jet cement and pipe curtain at the bottom of the underground station, as well as the interlocking piles on both sides of the underground station, constitute a construction space that is closed on the sides and the ground and is free of groundwater, that is, groundwater is excluded from the underground station space, so that the entire underground station can carry out subsequent construction in the absence of water, avoiding the implementation of groundwater treatment at the station hall level, and reducing the impact on pipelines and road traffic.
[0074] In addition, with regard to the construction methods of rotary grouting and pipe curtain, this application first implements ultra-high pressure rotary grouting at the bottom of the underground station to create conditions for the implementation of the pipe curtain and avoid large amounts of groundwater leakage at the opening when the pipe curtain is opened. At the same time, ultra-high pressure rotary grouting can form a protective layer on the outside of the pipe curtain to avoid groundwater leakage at the locking position of the pipe curtain and at the joints between the pipe curtain and the bite piles.
[0075] In the above preferred embodiment, when there is a station hall under construction, the interlocking piles of the open-cut station hall, the jet cement and pipe curtain at the bottom of the underground station, and the interlocking piles in the hole form a construction space without groundwater. Alternatively, when there are pilot tunnels at both ends, the interlocking piles in the hole at one end, the jet cement and pipe curtain at the bottom of the underground station, and the interlocking piles in the hole at the other end form a construction space without groundwater.
[0076] Preferably, the rotary spraying in the present application includes: three layers of ultra-high pressure rotary spraying to improve construction efficiency and structural bearing capacity.
[0077] Step 140, using a shield tunnel to excavate the station towards the prepared platform areas on both sides.
[0078] Specifically, after forming a construction space without groundwater, the station is excavated toward the preparatory platform areas on both sides using a shield tunnel so that the station is located below the groundwater level, but its construction is not affected by groundwater.
[0079] Preferably, the present application sets up a platform support structure in the preparatory platform area on both sides, and the platform support structure can specifically be a second lining structure on both sides of the platform to support the platform.
[0080] Preferably, the present application constructs a station hall connecting passage above the station to connect the station and the station hall, and sets a passage support structure in the station hall connecting passage. The passage support structure may specifically include a primary support mechanism and a secondary lining structure to support the passage.
[0081] The underground station construction method provided by the present application constructs interlocking piles from above the groundwater level to the depth of the bottom of the shield tunnel at both ends of the underground station, injects rotary spraying cement slurry into the bottom of the preparatory platform areas on both sides of the shield tunnel, and arranges a pipe curtain structure to be inserted into the corresponding interlocking piles at both ends of the underground station, so that the rotary spraying cement and pipe curtain at the bottom of the underground station and the interlocking piles on both sides of the underground station constitute a construction space without groundwater, so that the construction of the underground station will not be affected by groundwater, avoiding the implementation of groundwater treatment at the station hall level, and reducing the impact on pipelines and road traffic. At the same time, the construction procedure is simple and the bottom sealing structure of the underground station is very stable.
[0082] In a second aspect, the present application also proposes an underground station construction structure, which is constructed using the construction method of the first aspect. Figure 2-4 As shown, the underground station construction structure includes:
[0083] Shield tunnel 1, set below the groundwater level;
[0084] The preparatory platform area 2 is arranged on both sides of the shield tunnel 1;
[0085] Two interlocking piles 3 are respectively arranged on both sides of the underground station and extend from above the groundwater level to the bottom of the shield tunnel 1;
[0086] The jet grouting and pipe curtain structure 4 is arranged at the bottom of the preparatory platform area 2, and is respectively locked and engaged with two engagement piles 3 from the bottom 1 of the shield tunnel, forming a construction space without groundwater;
[0087] The shield tunnel 1 and the preparatory platform area 2 are located in a construction space without groundwater.
[0088] Preferably, the structure of the present application further includes: a pilot tunnel 5; the pilot tunnel 5 is arranged on the groundwater level; and the bite piles 3 extend from below the pilot tunnel 5 to the bottom of the shield tunnel 1 .
[0089] Further preferably, there are two pilot holes 5 , and two engaging piles 3 extend from below the corresponding pilot holes 5 to the bottom of both sides of the shield tunnel 1 .
[0090] Further preferably, the structure of the present application also includes: a station hall 6; the station hall 6 is arranged above the groundwater level and below the ground; an interlocking pile 3 extends from one end of the station hall 6 to the bottom of one side of the shield tunnel 1; another interlocking pile 3 extends from below the guide tunnel 5 to the bottom of the other side of the shield tunnel 1.
[0091] Preferably, a tunnel support structure 11 and a tunnel secondary lining structure 12 are provided inside the shield tunnel 1 to support the shield tunnel 1 .
[0092] Preferably, a platform primary support structure 21 and a platform secondary lining structure 22 are arranged inside the preparation platform area 2 to prepare the platform area 2 .
[0093] Preferably, the structure of the present application also includes a station hall connecting passage 7 located above the preparatory platform area 2 on one side; a channel primary branch mechanism 71 and a channel secondary lining structure 72 are arranged in the station hall connecting passage 7 to support the station hall connecting passage 7.
[0094] Preferably, the structure of the present application also includes constructing a connecting passage 8 between the station hall 6 and the guide tunnel 5 .
[0095] In a third aspect, the present application also proposes an underground station, comprising the construction structure described in the above second aspect.
[0096] The other preferred embodiments, technical problems that can be solved, and technical effects that can be achieved in the second and third aspects of the present application are the same as those in the first aspect and will not be elaborated here.
[0097] The preferred embodiments of the present application are described in detail above; however, the present application is not limited to the specific details in the above embodiments. Within the technical concept of the present application, a variety of simple modifications can be made to the technical solution of the present application, and these simple modifications all fall within the protection scope of the present application.
[0098] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, this application will not further describe various possible combinations.
[0099] In addition, the various implementation modes of the present application may be arbitrarily combined, and as long as they do not violate the concept of the present application, they should also be regarded as the contents disclosed by the present invention.
Claims
1. A method for constructing an underground station. It is characterized in that The method comprises: Digging a shield tunnel below the groundwater level; both sides of the shield tunnel correspond to the preparation platform area; At both ends of the underground station, engaging piles are constructed from above the groundwater level to the depth of the bottom of the shield tunnel, so that the engaging piles pass through the groundwater level; In the shield tunnel, jet cement slurry is poured into the bottom of the preparatory platform areas on both sides, and a pipe curtain structure is arranged to be inserted into the corresponding interlocking piles at both ends of the underground station, so that the jet cement and pipe curtain at the bottom of the underground station and the interlocking piles on both sides of the underground station form a construction space without groundwater; The shield tunnel is used to excavate the station toward the preparatory platform areas on both sides.
2. The method according to claim 1, It is characterized in that The method further comprises: At one end of the underground station, a pilot tunnel is constructed above the groundwater level and below the ground surface; In-hole interlocking piles are constructed below the guide tunnel, so that the in-hole interlocking piles, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the interlocking piles at the other end of the underground station form a construction space without groundwater.
3. The method according to claim 2, It is characterized in that The method further comprises: At the other end of the underground station, a station hall is constructed above the groundwater level and below the ground surface; Open-cut station hall interlocking piles are constructed at one end of the station hall, so that the open-cut station hall interlocking piles, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the interlocking piles in the hole form a construction space without groundwater.
4. The method according to claim 3, It is characterized in that The method further comprises: A connecting passage is constructed between the station hall and the guide tunnel.
5. The method according to claim 1, It is characterized in that The method further comprises: At both ends of the underground station, a pilot tunnel is constructed above the groundwater level and below the ground surface; In-hole interlocking piles are constructed under the guide tunnels at both ends, so that the in-hole interlocking piles at one end, the rotary sprayed cement and pipe curtain at the bottom of the underground station, and the in-hole interlocking piles at the other end form a construction space without groundwater.
6. The method according to claim 1, It is characterized in that The rotary spraying includes: three layers of ultra-high pressure rotary spraying.
7. The method according to claim 1, It is characterized in that The method further comprises: Tunnel support structures are arranged on both sides of the shield tunnel.
8. The method according to claim 1, It is characterized in that The method further comprises: Platform support structures are arranged in the preparatory platform areas on both sides.
9. The method according to claim 1, It is characterized in that The method further comprises: constructing a station hall connecting passage above the station; A channel support structure is arranged in the station hall connecting channel.
10. An underground station construction structure, It is characterized in that The structure is constructed using the method according to any one of claims 1 to 9, and the structure comprises: Shield tunnel, set below the groundwater level; A preparatory platform area is arranged on both sides of the shield tunnel; two interlocking piles, respectively arranged on both sides of the underground station and extending from above the groundwater level to the bottom of the shield tunnel; The jet grouting and pipe curtain structure is arranged at the bottom of the preparatory platform area, and is respectively locked and engaged with two engagement piles from the bottom of the shield tunnel to form a construction space without groundwater; The shield tunnel and the preparatory platform area are located in a construction space without groundwater.
11. The structure according to claim 10, It is characterized in that The structure further comprises: a guide hole; The pilot tunnel is arranged on the groundwater level; The engaging piles extend from below the pilot hole to the bottom of the shield tunnel.
12. The structure according to claim 11, It is characterized in that There are two pilot tunnels; two engaging piles extend from the bottom of the corresponding pilot tunnel to the bottom of both sides of the shield tunnel respectively.
13. The structure according to claim 11, It is characterized in that There is one guide tunnel, and the structure further comprises: a station hall; The station hall is arranged above the groundwater level and below the ground surface; A snap pile extends from one end of the station hall to the bottom of one side of the shield tunnel; Another engagement pile extends from below the pilot hole to the bottom of the other side of the shield tunnel.
14. An underground station, It is characterized in that The station comprises the construction structure described in any one of claims 10-13.
Citation Information
Patent Citations
Whole station water stop structure and construction method during construction of mined metro station