A lifting device for installing road and bridge drilling equipment
By designing the installation lifting device of the bridge drilling equipment including the upper fixed part and the lower fixed support part, the problem of deformation and docking difficulty of sleeve during installation and lifting is solved, and the stable support and vertical lifting of sleeve are achieved, simplifying the simplification of the sleeve. The docking process.
Patent Information
- Application Number
- CN202411280669.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-13
AI Technical Summary
In the prior art, there are difficulties in deformation and docking during the installation and lifting of the sleeve, especially due to the local deformation of the upper end of the sleeve caused by rope connection and the contact position of the lower end of the ground is affected by gravity, so the vertical state of the sleeve cannot be completely guaranteed.
A lifting device for the bridge drilling equipment including an upper fixing part and a lower fixing support part is designed. The upper fixing part is connected to the upper end of the sleeve through an inner support ring. The lower fixing support part adopts an inner tensioning mechanism and a support mechanism, through The drive plate and sliding rod drive the support arc plate and trigger block to support it to ensure stable support and docking at the upper and lower ends of the sleeve.
It effectively avoids deformation of the upper and lower ends of the sleeve, ensures the vertical state of the sleeve during the lifting process, simplifies the sleeve docking process, and improves the accuracy and stability of the docking.
Smart Images

Figure CN118790875B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of drilling equipment lifting, and in particular relates to a road and bridge drilling equipment installation and lifting device. Background Art
[0002] Full-rotation drilling rigs are suitable for various complex geological conditions, such as thick silt layers, quicksand layers, and pebble layers, and can ensure the quality and verticality of bored piles. For example, in the construction of bridges in coastal areas, facing deep soft soil layers, full-rotation drilling rigs can ensure that bored piles are firmly buried underground. During construction, the casing plays a role in protecting the wall and supporting it to prevent the hole wall from collapsing. Since the casing is connected together in sections, as the drilling depth increases, the next section of the casing needs to be lifted by a crane and docked with the casing at the drilling position and connected together. During installation, the ends of the two sections of casing need to be aligned so that their center lines remain in the same straight line.
[0003] When the existing casing is hoisted, the upper end of the casing is connected to the threaded opening of the casing through a rope and then hung on the hook of the crane. The crane lifts the upper end of the casing to rise, and the lower end of the casing is used as a fulcrum until the casing is completely suspended. At this time, the casing is approximately vertical, and then the suspended casing is moved to the top of the casing at the drilling position and the position is manually adjusted to align the two casings and complete the docking. The following problems exist in the process of hoisting and docking casings in the prior art: first, the inner diameter of the casing is between 800 mm and 2500 mm. When the rope is connected to the casing and hoisted, due to the small number of connection points of the rope, when the rope is affected by the gravity of the casing, the upper end of the casing will be partially deformed under the reaction force of the rope; second, when the casing is hoisted, the contact position between the lower end of the casing and the ground will also be affected by gravity and deformed; third, the vertical state of the casing cannot be completely guaranteed by hoisting with a rope, which increases the difficulty of docking the two casings.
[0004] In summary, the problems existing in casing installation and lifting when drilling with a full-rotation drilling rig need further improvement. Summary of the invention
[0005] The purpose of the present invention is to solve the problems of casing deformation and failure of casing to be completely vertical during casing installation and lifting process in the prior art, and to propose a road and bridge drilling equipment installation and lifting device.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a lifting device for installing road and bridge drilling equipment, comprising an upper fixed part and a lower fixed support part, the upper fixed part is detachably connected to the upper end of the casing, the upper fixed part is connected to the hook of the crane, and the lower fixed support part is arranged at the lower end of the casing, the lower fixed support part comprises an internal tensioning mechanism, a support mechanism, a connecting shaft and a driving disk, the driving disk is rotatably sleeved on the connecting shaft, the internal tensioning mechanism and the support mechanism are both arranged on the connecting shaft, the internal tensioning mechanism is arranged above the driving disk, the support mechanism is arranged below the driving disk, the connecting shaft and the upper fixed part are connected by a cable, when the casing is lifted, the upper fixed part is connected to the upper end of the casing, the internal tensioning mechanism supports the lower end part of the casing from the inside of the casing, and the support mechanism is used to support the lower end surface of the casing.
[0007] As a further description of the above technical solution: the upper fixing part includes an inner support ring, connecting bolts and a lifting ring. The inner support ring and the sleeve are connected by connecting bolts. The lifting ring is used to be hung on the hook of the crane. The lifting ring is arranged at the central axis of the inner support ring. A rotating seat is arranged at the central axis of the inner support ring, and the lifting ring is rotatably arranged on the rotating seat.
[0008] As a further description of the above technical solution: the internal tensioning mechanism includes a supporting arc plate, and a plurality of supporting arc plates are arranged at equal intervals around the circumference of the connecting shaft. A guide rail is arranged on the connecting shaft, and the guide rail is arranged radially along the connecting shaft. A sliding rod is arranged radially on the back side of the supporting arc plate, and the sliding rod is slidably arranged on the guide rail. A planar vortex thread is arranged on the upper surface of the driving disk, and a planar tooth groove meshing with the planar vortex thread is arranged on the lower surface of the sliding rod. When the driving disk rotates, the sliding rod slides along the guide rail, driving the supporting arc plate to retract or expand.
[0009] As a further description of the above technical solution: three supporting arc plates are arranged at equal intervals around the circumference of the connecting shaft, three guide rails are arranged, and the guide rails correspond to the sliding rods one by one.
[0010] As a further description of the above technical solution: the supporting mechanism includes a trigger block, a plurality of trigger blocks are arranged at equal intervals around the circumference of the connecting shaft, a downward inclined slope is arranged on the outer side of the trigger block away from the connecting shaft, a guide rod is arranged on the back side of the trigger block, and the guide rod is passed through the connecting shaft along the diameter of the connecting shaft, a driving groove is opened on the lower surface of the driving disk, and a protruding shaft is arranged on the trigger block, and the protruding shaft is adapted to correspond to the driving groove.
[0011] As a further description of the above technical solution: three trigger blocks are arranged at equal intervals around the connecting shaft, and a roller is arranged on the outer side of the trigger block away from the connecting shaft.
[0012] As a further description of the above technical solution: a support plate is rotatably provided at the lower end of the connecting shaft, and a ratchet pawl assembly is provided at the rotating shaft of the support plate.
[0013] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0014] (1) When the device of the present application is used to lift the casing, the upper end of the casing is connected to the inner support ring. On the one hand, the lifting ring is located on the central axis of the casing, and on the other hand, the inner support ring can support the upper end of the casing so that the upper end of the casing will not be deformed; the inner tensioning mechanism of the lower fixed support part arranged at the lower end of the casing supports the lower end of the casing so that the lower end of the casing will not be deformed.
[0015] (2) The lower fixed support portion of the present application can keep the two sleeves in a concentric state when they are docked, and the internal tensioning mechanism and the support mechanism are driven by the driving disk, so that during the docking process of the two sleeves, the internal tensioning mechanism can release the internal support effect on the sleeve and the lower fixed support portion can be removed smoothly due to the roller set on the trigger block.
[0016] (3) The support plate is provided so that the lower end of the casing will not be released from the ground or the pedestal when the casing is lifted, thereby avoiding deformation of the edge of the lower end of the casing. In addition, the rotation direction of the connecting arm of the support plate is determined during lifting, making the movement of the casing more stable during lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;
[0018] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention from another angle;
[0019] Figure 3 It is a schematic diagram of the three-dimensional structure of the lower fixed support part of the present invention;
[0020] Figure 4 It is a schematic diagram of the three-dimensional structure of the lower fixed support part of the present invention from another angle;
[0021] Figure 5 It is a schematic diagram of the working state of the present invention;
[0022] Figure 6 This is a schematic diagram of the casing lifting state of the present invention;
[0023] Figure 7 This is a schematic diagram of the butt joint state of the lifting casing of the present invention;
[0024] Figure 8 This is a schematic diagram of the structure in which the lower fixed support part of the present invention is located at the connection position of two sleeves;
[0025] Fig. 9 It is a schematic diagram of the three-dimensional structure of the present invention in which the lower fixed support part does not support the sleeve;
[0026] Fig.10 This is a schematic diagram of the support plate structure of the present invention;
[0027] Fig.11 This is a cross-sectional view of the support plate of the present invention.
[0028] Legend: 01, full-rotation drilling rig; 1, crane; 2, hook; 3, casing; 4, inner support ring; 5, connecting bolt; 6, lifting ring; 7, connecting frame; 8, rotating seat; 9, connecting shaft; 10, driving plate; 11, connecting ring; 12, wire rope; 13, supporting arc plate; 14, guide rail; 15, adjusting bolt; 16, sliding rod; 17, vortex thread; 18, flat tooth groove; 19, inclined plane; 20, guide rod; 21, driving groove; 22, protruding shaft; 23, roller; 24, support plate; 25, connecting plate; 26, rotating ear seat; 27, connecting arm; 28, ratchet; 29, pawl; 30, toggle rod; 31, through hole; 32, trigger block. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1-11 The present invention provides a technical solution for installing a lifting device for road and bridge drilling equipment:
[0031] A lifting device for installing road and bridge drilling equipment is used for lifting and installing the casing 3 of the full-rotation drilling rig 01. When lifting the casing 3, it is installed on the hook 2 of the crane 1 to fix and support the casing 3. The casing 3 in this embodiment is made of Q355B steel plate, with a wall thickness of 3cm and an inner diameter of 1.6m. The length of each section of the casing 3 is 6m. The lowest section is used to fix the alloy cutter head, with a wall thickness of 5cm. The connection between the casings 3 is made of high-strength alloy material. Male and female joints.
[0032] A lifting device for installing road and bridge drilling equipment includes an upper fixing part and a lower fixing support part. The upper fixing part is detachably connected to the upper end of a casing 3. The upper fixing part includes an inner support ring 4, a connecting bolt 5 and a lifting ring 6. The outer diameter of the inner support ring 4 is adapted to the inner diameter of the casing 3, so that when the inner support ring 4 is installed on the upper end of the casing 3, the inner support ring 4 supports the casing 3 to prevent deformation of the casing.
[0033] The inner support ring 4 is provided with threaded holes corresponding to the connecting threaded holes on the sleeve 3 on its circumferential side. The inner support ring 4 is fixedly connected to the upper end of the sleeve 3 by connecting bolts 5. A connecting frame 7 is provided on the upper end of the inner support ring 4. A rotating seat 8 is rotatably provided on the connecting frame 7. The rotating axis of the rotating seat 8 coincides with the central axis of the inner support shaft. The lifting ring 6 is rotatably provided on the rotating seat 8, and the lifting ring 6 is hung on the hook 2 of the crane 1.
[0034] The lower fixed support part includes an internal tensioning mechanism, a supporting mechanism, a connecting shaft 9 and a driving disk 10. The driving disk 10 is rotatably mounted on the connecting shaft 9. The internal tensioning mechanism and the supporting mechanism are both arranged on the connecting shaft 9. The internal tensioning mechanism is arranged above the driving disk 10, and the supporting mechanism is arranged below the driving disk 10. The connecting shaft 9 and the upper fixed part are connected by a cable. Specifically, the connecting shaft 9 is a threaded shaft. The upper end of the connecting shaft 9 is threadedly connected with a connecting ring 11. The connecting ring 11 and the connecting frame 7 are connected by a cable, and the cable is a steel wire rope 12.
[0035] The inner tensioning mechanism includes a support arc plate 13, and a plurality of support arc plates 13 are arranged at equal intervals around the circumference of the connecting shaft 9. In this embodiment, three support arc plates 13 are arranged, and the three support arc plates 13 are arranged at equal intervals around the circumference of the connecting shaft 9. The support arc plate 13 is an arc-shaped steel plate, and a rubber layer (not shown in the figure) is arranged on the surface of the support arc plate 13. The radius of the support arc plate 13 is adapted to the inner diameter of the sleeve 3. A guide rail 14 is arranged on the connecting shaft 9, and the guide rail 14 is arranged radially along the connecting shaft 9. There are three guide rails 14, and the three guide rails 14 are arranged at equal intervals around the circumference of the connecting shaft 9. Specifically, an adjusting bolt 15 is arranged on the connecting shaft 9, and the ends of the three guide rails 14 are fixed on the adjusting bolt 15, and the guide rail 14 is welded and fixed on the adjusting bolt 15. A sliding rod 16 is provided on the back side of the supporting arc plate 13 along its radial direction. The sliding rod 16 is slidably provided on the guide rail 14 . A planar spiral thread 17 is provided on the upper surface of the driving disk 10 . A planar tooth groove 18 meshing with the planar spiral thread 17 is provided on the lower surface of the sliding rod 16 .
[0036] In this embodiment, when the driving disk 10 rotates clockwise in a top view, the driving disk 10 drives the planar spiral thread 17 to rotate and drives the sliding rod 16 to move toward the connecting shaft 9 so that the supporting arc plate 13 moves toward the connecting shaft 9.
[0037] The supporting mechanism includes a trigger block 32, and a plurality of trigger blocks 32 are arranged at equal intervals around the circumference of the connecting shaft 9. In this embodiment, three trigger blocks 32 are arranged at equal intervals around the connecting shaft 9. The trigger block 32 is provided with an inclined surface 19 inclined downward on the outer side away from the connecting shaft 9. A guide rod 20 is provided on the back of the trigger block 32. The guide rod 20 is penetrated on the connecting shaft 9 along the diameter of the connecting shaft 9. The guide rods 20 corresponding to the three trigger blocks 32 are staggered. A driving groove 21 is provided on the lower surface of the driving disk 10. A protruding shaft 22 is provided on the trigger block 32, and the protruding shaft 22 is adapted to the driving groove 21. A roller 23 is provided on the outer side of the trigger block 32 away from the connecting shaft 9.
[0038] In a top view, when the three trigger blocks 32 simultaneously move toward the direction close to the connecting shaft 9 , the driving disc 10 rotates clockwise under the action of the protruding shaft 22 and the driving groove 21 .
[0039] A support plate 24 is rotatably provided at the lower end of the connecting shaft 9. Specifically, a connecting plate 25 is provided on the connecting shaft 9, a rotating ear seat 26 is provided on the connecting plate 25, a connecting arm 27 is rotatably provided on the rotating ear seat 26, a support plate 24 is provided on the end of the connecting arm 27 away from the connecting plate 25, a ratchet 28 is provided on the rotating shaft of the connecting arm 27, a pawl 29 is provided on the rotating ear seat 26, a toggle rod 30 is provided on the end of the pawl 29 away from the ratchet 28, a through hole 31 is provided on the connecting plate 25 for the guide rod 20 to pass through, the guide rod 20 corresponds to the toggle rod 30, when the trigger block 32 approaches the connecting shaft 9, the guide rod 20 corresponding to the through hole 31 triggers the toggle rod 30, so that the pawl 29 is not engaged with the ratchet 28, and the connecting arm 27 can rotate freely.
[0040] Working principle:
[0041] When lifting the casing 3, the casing 3 is generally placed on the ground or on a platform. First, the lifting device of the present application is installed on the casing 3. The installation is completed as shown in FIG. Figure 5 As shown. At this time, the upper fixing part is fixedly connected to the upper end of the sleeve 3, and the lower fixed support part is arranged at the lower end of the sleeve 3. At this time, the support arc plate 13 expands outward to contact the inner wall of the lower end of the sleeve 3 and is in a tight state. The upper surface of the trigger block 32 contacts the lower end surface of the sleeve 3, and the trigger block 32 is in a position away from the connecting shaft 9. The diameter of the ring formed by the three trigger blocks 32 is greater than the diameter of the sleeve 3. The support plate 24 contacts the ground or the pedestal, that is, the connecting arm 27 rotates to a state approximately perpendicular to the axis of the connecting shaft 9. At this time, under the action of the ratchet 28 and the pawl 29, the support plate 24 can rotate in a direction away from the sleeve 3.
[0042] It should be noted that during installation, the upper fixed part is first installed on the upper end of the pipe segment, and then the driving disk 10 of the lower fixed support part is rotated to make the trigger block 32 and the support arc plate 13 expand outward at the same time until the support arc plate 13 is pressed against the inner wall of the casing 3. At this time, the upper end of the trigger block 32 is pressed against the lower end surface of the casing 3.
[0043] As the crane 1 is lifted, Figure 6 The figure shows a state of the crane 1 during the lifting process. The upper end of the sleeve 3 rises, and the lower end of the sleeve 3 rotates. Under the action of the support plate 24, the sleeve 3 rotates around the support plate 24, and the support plate 24 rotates around the rotating ear seat 26. Until the crane 1 completely lifts the sleeve 3 so that the support plate 24 leaves the ground, the sleeve 3 is in a vertical state.
[0044] Finally, the crane 1 moves the next casing section 3 to the top of the previous casing section 3. Figure 7 As shown. Then adjust the position so that the two casings 3 are approximately coaxial, and then the crane 1 lowers the next casing 3. When the inclined surfaces 19 of the three trigger blocks 32 contact the pipe opening of the previous casing 3, the three trigger blocks 32 move toward the connecting shaft 9 at the same time under the gravity of the next casing 3, so that the driving disk 10 rotates, so that the supporting arc plate 13 also moves toward the connecting shaft 9. When the three trigger blocks 32 completely enter the previous casing 3, the male and female joints of the two casings 3 are also completely socketed together, and at this time, the roller 23 on the trigger block 32 contacts the inner wall of the casing 3. Finally, after the two casings 3 are connected together by bolts, the full-rotation drilling rig 01 can drill normally. Since the lifting ring 6 is connected to the rotating seat 8, when the sleeve 3 rotates and descends, the crane 1 only needs to be lowered until it reaches the specified height, and the upper fixed part is removed from the upper end of the sleeve 3. Then the crane 1 completely takes out the device of the present application. Since the roller 23 rolls along the inner arm of the sleeve 3, the lower fixed support part can be smoothly taken out.
[0045] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Within the technical scope disclosed by the present invention, technicians familiar with the technical field can make equivalent replacements or changes based on the technical scheme and inventive concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A lifting device for installing road and bridge drilling equipment, characterized in that The invention comprises an upper fixing part and a lower fixing support part, wherein the upper fixing part is detachably connected to the upper end of the sleeve (3), the upper fixing part is connected to the hook (2) of the crane (1), and the lower fixing support part is arranged at the lower end of the sleeve (3). The lower fixing support part comprises an internal tensioning mechanism, a support mechanism, a connecting shaft (9) and a driving disk (10), the driving disk (10) is rotatably sleeved on the connecting shaft (9), the internal tensioning mechanism and the support mechanism are both arranged on the connecting shaft (9), the internal tensioning mechanism is arranged above the driving disk (10), and the support mechanism is arranged below the driving disk (10), the connecting shaft (9) and the upper fixing part are connected by a cable, when the sleeve (3) is lifted, the upper fixing part is connected to the upper end of the sleeve (3), the internal tensioning mechanism supports the lower end of the sleeve (3) from the inside of the sleeve (3), and the support mechanism is used to support the lower end surface of the sleeve (3); The upper fixing part comprises an inner support ring (4), a connecting bolt (5) and a lifting ring (6); the inner support ring (4) and the sleeve (3) are connected via the connecting bolt (5); the lifting ring (6) is used to be hung on the hook (2) of the crane (1); the lifting ring (6) is arranged at the central axis of the inner support ring (4); a rotating seat (8) is arranged at the central axis of the inner support ring (4); and the lifting ring (6) is rotatably arranged on the rotating seat (8); The inner tensioning mechanism comprises a supporting arc plate (13), wherein a plurality of supporting arc plates (13) are arranged at equal intervals around the circumference of the connecting shaft (9), a guide rail (14) is arranged on the connecting shaft (9), and the guide rail (14) is arranged radially along the connecting shaft (9), a sliding rod (16) is arranged radially on the back side of the supporting arc plate (13), and the sliding rod (16) is slidably arranged on the guide rail (14), a planar spiral thread (17) is arranged on the upper surface of the driving disk (10), and a planar tooth groove (18) meshing with the planar spiral thread (17) is arranged on the lower surface of the sliding rod (16), and when the driving disk (10) rotates, the sliding rod (16) slides along the guide rail (14), driving the supporting arc plate (13) to retract or expand; The support mechanism comprises a trigger block (32), a plurality of trigger blocks (32) are arranged at equal intervals around the circumference of the connecting shaft (9), a roller (23) is arranged on the outer side of the trigger block (32) away from the connecting shaft (9), a downwardly inclined inclined surface (19) is arranged on the outer side of the trigger block (32) away from the connecting shaft (9), a guide rod (20) is arranged on the back side of the trigger block (32), and the guide rod (20) is penetrated on the connecting shaft (9) along the diameter of the connecting shaft (9), a driving groove (21) is opened on the lower surface of the driving disk (10), and a protruding shaft (22) is arranged on the trigger block (32), and the protruding shaft (22) is correspondingly matched with the driving groove (21).
2. The installation and lifting device for road and bridge drilling equipment according to claim 1 is characterized by: Three supporting arc plates (13) are arranged at equal intervals around the circumference of the connecting shaft (9), and three guide rails (14) are arranged, and the guide rails (14) correspond one to one with the sliding rods (16).
3. The installation and lifting device for road and bridge drilling equipment according to claim 1 is characterized by: Three trigger blocks (32) are arranged at equal intervals around the connecting shaft (9).
4. The installation and lifting device for road and bridge drilling equipment according to claim 1 is characterized by: A support plate (24) is rotatably provided at the lower end of the connecting shaft (9), and a ratchet pawl assembly is provided at the rotation axis of the support plate (24).
Citation Information
Patent Citations
All-casing geological survey construction method
CN113107368A
Casing pipe connecting, feeding and placing device for high-position large-diameter drilling and using method of casing pipe connecting, feeding and placing device
CN117514007A