Narrow and deep foundation pit material stacking platform and method

By setting height adjustment components on the tower crane standard section, laying steel plates on the Bere beams, and equipped with a mobile counterweight mechanism, the problems of fixed height of the tower crane and poor stability of the steel platform in narrow and deep foundation pits are solved, and height flexibility adjustment is achieved and material stacking is safe and efficient.

CN118790898BActive Publication Date: 2024-11-15CHINA CONSTRUCTION THIRD BUREAU URBAN CONSTRUCTION CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411289683.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-15
Estimated Expiration
2044-09-14

AI Technical Summary

Technical Problem

In the prior art, the standard section height of the tower crane is fixed, which cannot meet the needs of different deep foundation pits and floor heights. In the narrow deep foundation pit, the uneven distribution of lattice columns leads to poor stability of the steel platform.

Method used

The height adjustment component is set up on the standard section of the tower crane, and the height adjustment of the support surface is achieved through the nesting structure and locking parts of the inner sleeve and outer sleeve. Steel plates are laid on the Bere beams and equipped with a mobile counterweight mechanism to ensure the steel plates smooth.

Benefits of technology

It realizes flexible adjustment of the height of the support frame, adapts to the construction needs of foundation pits and heights at different depths, improves the stability and bearing capacity of steel plates, is suitable for the stacking of materials for narrow and deep foundation pits, and reduces construction costs and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118790898B_ABST
    Figure CN118790898B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of building foundation construction, and provides a narrow and deep foundation pit material stacking platform and method, the platform includes: a support frame, which is set up at the bottom of the foundation pit, and the support frame includes multiple layers of tower crane standard sections assembled section by section and a height adjustment component connected to the uppermost tower crane standard section; the height adjustment component includes an inner sleeve frame, an outer sleeve frame and a locking member, the outer sleeve frame is connected to the tower crane standard section, the inner sleeve frame is nested in the outer sleeve frame, the inner sleeve frame is vertically movable relative to the outer sleeve frame, and the locking member is detachably connected to the inner sleeve frame and the outer sleeve frame; multiple support beams are arranged on the support surface of the support frame; multiple Bailey beams are arranged on the multiple support beams; one end of the Bailey beam is set up on the support beam, and the other end is set up on the building floor plate; and a steel plate is paved on the multiple Bailey beams. The platform of the present invention can flexibly adjust the platform height and size according to the size of the installation space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building foundation construction, and in particular relates to a narrow and deep foundation pit material stacking platform and method. Background Art

[0002] During foundation pit construction, it is necessary to set up a steel platform on the ground or on the building floor slab to stack materials. The Chinese invention patent with publication number CN108019040A discloses a method for constructing a Bailey frame platform for a high-rise building transition layer, which includes the steps of installing lattice columns, erecting Bailey beams, hoisting I-beams, building beam mold bottoms, building sandwich panels, and constructing transition layers. It is said to have many advantages such as convenience, safety and reliability. However, when the actual platform is erected, the height is adjusted by a standard section of a tower crane with a fixed height, which cannot meet the requirements of any deep foundation pit and floor height; in addition, for narrow and deep foundation pits, due to space limitations, lattice columns are difficult to be evenly distributed at the bottom of the foundation pit, resulting in poor stability of the steel platform. Summary of the invention

[0003] In response to the above-mentioned problems in the prior art, the present application proposes a narrow and deep foundation pit material stacking platform and method, which overcomes the problem of inflexible platform height adjustment caused by the fixed height of the tower crane standard section by arranging a height adjustment component on the tower crane standard section.

[0004] In a first aspect, the present invention provides a narrow and deep foundation pit material stacking platform, comprising:

[0005] A support frame is erected at the bottom of the foundation pit, the support frame includes multiple layers of tower crane standard sections assembled section by section and a height adjustment component connected to the uppermost tower crane standard section; the height adjustment component is used to adjust the height of its top support surface; the height adjustment component includes an inner sleeve frame, an outer sleeve frame and a locking member, the outer sleeve frame is connected to the tower crane standard section, the inner sleeve frame is nested in the outer sleeve frame, the top of the inner sleeve frame is provided with the support surface, the inner sleeve frame is vertically movable relative to the outer sleeve frame to adjust the height of the support surface, and the locking member is detachably connected to the inner sleeve frame and the outer sleeve frame to limit the vertical movement of the inner sleeve frame relative to the outer sleeve frame;

[0006] A plurality of support beams are arranged on the support surface of the support frame;

[0007] A plurality of Bailey beams are arranged on the plurality of support beams; one end of the Bailey beam is placed on the support beam, and the other end is placed on the building floor slab; and

[0008] A steel plate is paved on the multiple Bailey beams for stacking materials; a movable counterweight mechanism is arranged at the lower end of the steel plate; the movable counterweight mechanism comprises: an I-beam, a suspension bracket, a counterweight assembly, a screw rod, a sleeve and a motor; the top of the I-beam is connected to the steel plate, and the suspension bracket is suspended at the lower end of the I-beam; the counterweight assembly is suspended below the suspension bracket; the screw rod is arranged below the I-beam along the length direction of the I-beam, the motor drives the screw rod to rotate, the sleeve is sleeved on the screw rod, and the sleeve is connected to the suspension bracket.

[0009] Furthermore, the I-beam includes a plurality of steel units spaced apart along its length, and each steel unit is connected to the bottom of the steel plate; the screw rod includes a plurality of rod units spaced apart along its length; a detachable connector is provided between adjacent rod units to achieve connection or separation of adjacent rod units; an inwardly recessed mounting cavity for mounting the detachable connector is provided at the end of the rod unit; the detachable connector includes a coupling and an electrically-controlled telescopic member; the coupling includes a first sleeve, a second sleeve, and a slider or elastic member disposed between the first sleeve and the second sleeve; the slider or elastic member is fixed to the first sleeve, and a tooth groove for matching with the slider or elastic member is provided at the axial end of the second sleeve facing the slider or elastic member, and the first sleeve is fixed to the electrically-controlled telescopic member, and the electrically-controlled telescopic member and the second sleeve are respectively fixedly mounted in the mounting cavities of adjacent rod units.

[0010] Furthermore, the suspension bracket includes two C-shaped channel steels with openings arranged opposite to each other; the two C-shaped channel steels are clamped on both sides of the I-beam; the mobile counterweight mechanism also includes a wheel assembly, and the wheel assembly is supported between the C-shaped channel steel and the I-beam.

[0011] Furthermore, the mobile counterweight mechanism also includes a connecting rod; one end of the connecting rod is connected to the sleeve, and the other end of the connecting rod is connected to the suspension bracket.

[0012] Furthermore, the movable counterweight mechanism also includes a support, which is arranged at both ends of the screw rod and cooperates with the screw rod thread, and the support is also fixedly connected to the I-beam.

[0013] Furthermore, the counterweight assembly includes a suspension rod, a support plate and a counterweight block; the bottom of the suspension rod is connected to the support plate, the suspension rod passes through the counterweight block, and the top of the suspension rod is connected to the suspension bracket; the counterweight block is arranged on the support plate.

[0014] Furthermore, there are multiple movable counterweight mechanisms, which are distributed between multiple Bailey beams.

[0015] Furthermore, the narrow and deep foundation pit material stacking platform also includes a translation trolley; a channel steel guide rail is laid on the upper end of the steel plate, and the translation trolley moves along the channel steel guide rail.

[0016] Furthermore, connecting pieces are provided at both ends of the Bailey beam, and the connecting pieces are provided with limiting cavities; the connecting pieces are connected to the support beam or the steel plate, and the ends of the Bailey beam are inserted into the limiting cavities of the connecting pieces.

[0017] Furthermore, the connecting member includes a limit plate and a positioning plate; one positioning plate is connected to each of the two ends of the limit plate, and the positioning plate is also connected to the support beam or the steel plate, and the limit plate and the positioning plate enclose the limit cavity; the chord of the Bailey beam is inserted into the limit cavity.

[0018] Furthermore, there are at least four support frames, and the at least four support frames are arranged at intervals in the transverse and longitudinal directions at the bottom of the foundation pit.

[0019] Furthermore, the support beam includes a transverse beam and a longitudinal beam; the longitudinal beam is longitudinally arranged on the top of the support frame; the transverse beam is transversely arranged on the top of at least two of the longitudinal beams; one end of the Bailey beam is connected to one end of the transverse beam.

[0020] Furthermore, there are multiple transverse beams, which are arranged at intervals in the longitudinal direction. The Bailey beam is connected to the multiple transverse beams.

[0021] Furthermore, the support beam also includes stiffening ribs; the stiffening ribs are welded to both sides of the transverse beam and / or the longitudinal beam.

[0022] In a second aspect, the present invention further proposes a construction method for the above-mentioned narrow and deep foundation pit material stacking platform, comprising the following steps:

[0023] According to the height of the building floor, determine the number of tower crane standard sections of the support frame and the height of the top support surface of the height adjustment assembly; assemble the tower crane standard sections section by section, and adjust the height of the height adjustment assembly so that the top of the inner sleeve of the height adjustment assembly is at the target height of the support surface;

[0024] Installing multiple support beams on the inner frame;

[0025] Installing a plurality of Bailey beams on the plurality of support beams, with one end of each Bailey beam being placed on the support beam and the other end being placed on the building floor slab;

[0026] Steel plates are laid on the plurality of Bailey beams to form a platform for stacking materials.

[0027] The beneficial effects of the present invention are as follows: by arranging a height adjustment component on the tower crane standard section of the support frame, the height of the top support surface of the support frame can be flexibly adjusted according to actual needs, so as to adapt to foundation pits of different depths or building floor plates of different heights; by arranging multiple Bailey beams to support the steel plate, one end of the Bailey beam is erected on the support beam, and the other end is erected on the building floor plate, so as to minimize the number of support frames, the support frame is flexibly arranged in the foundation pit, and the multiple Bailey beams ensure the stability of the steel plate, which is very suitable for material stacking in narrow and deep foundation pits, with large bearing capacity and fast construction; the platform of the present invention can flexibly adjust the platform height and size according to the size of the installation space, has large bearing capacity, adopts an assembly method to improve construction efficiency, and can be disassembled and assembled for turnover, reducing construction costs. By arranging a mobile counterweight mechanism at the lower end of the steel plate, the position of the counterweight assembly of the mobile counterweight mechanism at the lower end can be flexibly adjusted according to the material stacking position or the stress condition of the steel plate, so that the steel plate always remains stable and fits, and there will be no jumping phenomenon, thereby ensuring the safety of material stacking and construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the main structure of an embodiment of a narrow and deep foundation pit material stacking platform of the present invention.

[0029] Figure 2 for Figure 1 Schematic diagram of the side structure.

[0030] Figure 3 for Figure 1 Schematic diagram of the top view structure.

[0031] Figure 4 for Figure 3 Schematic diagram of the structure after the steel plate is viewed in perspective.

[0032] Figure 5 for Figure 1 Schematic diagram of the three-dimensional structure of a height adjustment component.

[0033] Figure 6 for Figure 5 Schematic diagram of the exploded structure of the mid-height adjustment assembly.

[0034] Figure 7 for Figure 1 Schematic diagram of the enlarged structure of the connection node between the middle support frame, support beam and Bailey beam.

[0035] Figure 8 for Figure 7 Schematic diagram of the partial structure of the transverse beam and longitudinal beam of the middle support beam from a top view.

[0036] Fig. 9 It is a schematic diagram of the end structure of the chord of the Bailey beam of the present invention inserted into the limiting cavity of the connecting piece under the steel plate.

[0037] Fig.10 It is a schematic diagram of the end structure of the chord of the Bailey beam of the present invention inserted into the limiting cavity of the connecting piece on the support beam.

[0038] Fig.11 for Figure 2 Schematic diagram of the enlarged structure of the translation trolley and channel steel guide rails on the middle steel plate.

[0039] Fig.12 It is a schematic diagram of the main structure of another embodiment of the narrow and deep foundation pit material stacking platform of the present invention.

[0040] Fig.13 for Fig.12 Schematic diagram of the side structure.

[0041] Fig.14 for Fig.13 An enlarged structural schematic diagram of a mobile counterweight mechanism.

[0042] Fig.15 for Fig.14 AA cross-sectional structure schematic diagram.

[0043] In the figure: 1- tower crane standard section; 2- height adjustment assembly; 2.1- inner frame; 2.2- outer frame; 2.3- locking piece; 3- support beam; 3.1- stiffening rib; 3.2- transverse beam; 3.3- longitudinal beam; 4- Bailey beam; 5- steel plate; 6- guardrail; 7- channel steel guide rail; 8- wheel; 9- translation trolley; 10- connection piece; 11- mobile counterweight mechanism; 11.1- I-beam; 11.1 .1-steel unit; 11.2-suspension bracket; 11.3-wheel assembly; 11.4-counterweight assembly; 11.4.1-hanging rod; 11.4.2-pallet; 11.4.3-counterweight block; 11.5-screw; 11.5.1-rod unit; 11.6-sleeve; 11.7-connecting rod; 11.8-motor; 11.9-support; 11.10-coupling; 11.11-electrically controlled telescopic part. DETAILED DESCRIPTION

[0044] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0045] like Figure 1-Figure 4 The narrow and deep foundation pit material stacking platform shown includes: a support frame, a plurality of support beams 3, a plurality of Bailey beams 4, a steel plate 5, and a translation trolley 9.

[0046] There are at least four support frames, and at least four support frames are respectively set up at the bottom of the foundation pit in a horizontal and vertical interval. The four support frames of this embodiment are arranged at the bottom of the foundation pit in an array of 2 rows and 2 columns. When constructing the bottom plate at the bottom of the foundation pit, anchors for connecting with the bottom of the support frame can be pre-buried in advance. The anchors can be anchor bolts.

[0047] Each support frame includes multiple layers of tower crane standard sections 1 assembled section by section and a height adjustment component 2 connected to the uppermost tower crane standard section 1; the tower crane standard section 1 is an existing structure, and its specific structure and assembly method can adopt the existing method. The support frame of the present invention is characterized in that a height adjustment component 2 is also arranged on the uppermost tower crane standard section 1, and the height of the height adjustment component 2 is usually less than the height of a tower crane standard section 1, so that the height of the support frame can be adjusted to a smaller extent.

[0048] like Figure 5 , Figure 6 As shown, the height adjustment component 2 is used to adjust the height of its top support surface; the height adjustment component 2 includes an inner sleeve frame 2.1, an outer sleeve frame 2.2 and a locking member 2.3, the outer sleeve frame 2.2 is connected to the tower crane standard section 1, the inner sleeve frame 2.1 is nested in the outer sleeve frame 2.2, a support surface is arranged on the top of the inner sleeve frame 2.1, the inner sleeve frame 2.1 is vertically movable relative to the outer sleeve frame 2.2 to adjust the height of the support surface, and the locking member 2.3 is detachably connected to the inner sleeve frame 2.1 and the outer sleeve frame 2.2 to limit the vertical movement of the inner sleeve frame 2.1 relative to the outer sleeve frame 2.2; in the present invention, the locking member 2.3 includes a threaded hole and a locking bolt; the inner sleeve frame 2.1 and the outer sleeve frame 2.2 are both composed of four upright angle steels and diagonal webs connected between the angle steels. The difference is that the cross-sectional dimension of the inner sleeve frame 2.1 is smaller than the cross-sectional dimension of the outer sleeve frame 2.2, so that the inner sleeve frame 2.1 can be nested in the outer sleeve frame 2.2, and a plurality of vertically spaced threaded holes are provided on the angle steels of the inner sleeve frame 2.1 and the outer sleeve frame 2.2. The inner sleeve frame 2.1 and the outer sleeve frame 2.2 can be fixed by connecting the threaded holes with locking bolts, and the inner sleeve frame 2.1 can be fixed at different heights by connecting the locking bolts with threaded holes at different heights, so that the top height of the inner sleeve frame 2.1 can be adjusted, thereby realizing the adjustment of the support surface height of the support frame.

[0049] like Figure 4 , Figure 7 , Figure 8As shown, multiple support beams 3 are arranged on the support surface of the support frame. Specifically, the support beam 3 includes a transverse beam 3.2 and a longitudinal beam 3.3; the longitudinal beam 3.3 is arranged on the top of the support frame in the longitudinal direction; the transverse beam 3.2 is arranged on the top of at least two longitudinal beams 3.3 in the transverse direction; one end of the Bailey beam 4 is connected to one end of the transverse beam 3.2, and the other end is mounted on the building floor slab. Specifically, there are four longitudinal beams 3.3, and one longitudinal beam 3.3 is fixedly connected to the top of each support frame. There are two transverse beams 3.2, and the two transverse beams 3.2 are arranged at intervals in the longitudinal direction. Each transverse beam 3.2 is fixed on the two transverse longitudinal beams 3.3. The upper end surface of the transverse beam 3.2 is at the same height as the upper end surface of the building floor slab. Each Bailey beam 4 is connected to the two transverse beams 3.2. Multiple Bailey beams 4 are arranged at intervals along the length direction of the transverse beam 3.2. In this embodiment, the transverse direction refers to the width direction of the steel plate 5, and the longitudinal direction refers to the length direction of the steel plate 5. The support beam 3 further comprises stiffening ribs 3.1; the stiffening ribs 3.1 are welded to both sides of the transverse beam 3.2 and / or the longitudinal beam 3.3.

[0050] Steel plates 5 are laid on top of multiple Bailey beams 4 for stacking materials. Fig.11 As shown, a channel steel rail 7 is laid on the upper end of the steel plate 5, and the length direction of the channel steel rail 7 is arranged in the longitudinal direction. The translation trolley 9 moves along the channel steel rail 7. The wheels 8 of the parallel trolley are located in the channel steel rail 7.

[0051] like Fig. 9 , Fig.10 As shown, the two ends of the Bailey beam 4 are also provided with connectors 10, and the connectors 10 are configured with a limiting cavity; the connectors 10 are connected to the support beam 3 or the steel plate 5, and the end of the Bailey beam 4 is inserted into the limiting cavity of the connector 10. The connector 10 includes a limiting plate and a positioning plate; the two ends of the limiting plate are respectively connected to a positioning plate, and the positioning plate is also connected to the support beam 3 or the steel plate 5, and the limiting plate and the positioning plate enclose a limiting cavity; the chord of the Bailey beam 4 is inserted into the limiting cavity. The limiting cavity of the connector 10 provides positioning for the installation of the chord of the Bailey beam 4 and provides a buffer area for the up and down movement of the chord; by setting the connector 10, the Bailey beam 4 is not damaged and the structural force is safer.

[0052] Based on the same inventive concept, the present invention also proposes a construction method for the above-mentioned narrow and deep foundation pit material stacking platform, comprising the following steps:

[0053] According to the height of the building floor plate, determine the number of tower crane standard sections 1 of the support frame and the height of the top support surface of the height adjustment component 2; assemble the tower crane standard sections 1 section by section, and adjust the height of the height adjustment component 2 so that the top of the inner sleeve 2.1 of the height adjustment component 2 is at the target height of the support surface;

[0054] Install multiple support beams 3 on the inner frame 2.1; first install the longitudinal beam 3.3 on the top of each support frame, then install the transverse beam 3.2 on the transversely adjacent longitudinal beam 3.3, and fix the transverse beam 3.2 and the longitudinal beam 3.3 with bolts.

[0055] A plurality of Bailey beams 4 are sequentially installed on the transverse beams 3.2 of a plurality of supporting beams 3 in the transverse direction, one end of each Bailey beam 4 is placed on the transverse beam 3.2 of the supporting beam 3, and the other end is placed on the building floor slab; the upper ends of all Bailey beams 4 are on the same horizontal plane, and steel plates 5 are laid on the plurality of Bailey beams 4 to form a platform for stacking materials.

[0056] The guardrail 6 is installed around the steel plate 5. The channel steel guide rail 7 is laid on the steel plate 5, and the translation trolley 9 is installed on the channel steel guide rail 7, and the translation trolley 9 is used to transfer the materials.

[0057] The upper end surface of the steel plate 5 is located on one side of the channel steel guide rail 7 and is also provided with a material stacking area for stacking materials. When materials are stacked on the steel plate 5 or the material is circulated by the translation trolley 9, the steel plate 5 may be deformed and bent due to uneven loads, and the deformed steel plate 5 may jump up when repeatedly loaded or unloaded, making a loud noise, and is prone to pinching accidents or safety hazards.

[0058] like Figure 12-Figure 15 As shown, in order to ensure that the steel plate 5 fits smoothly and avoids deformation of the steel plate 5, in another embodiment of the present invention, a mobile counterweight mechanism 11 is arranged at the lower end of the steel plate 5; the mobile counterweight mechanism 11 includes: an I-beam 11.1, a suspension bracket 11.2, a counterweight assembly 11.4, a screw 11.5, a sleeve 11.6 and a motor 11.8; the top of the I-beam 11.1 is connected to the steel plate 5, and the suspension bracket 11.2 is suspended at the lower end of the I-beam 11.1; the counterweight assembly 11.4 is suspended below the suspension bracket 11.2; the screw 11.5 is arranged below the I-beam 11.1 along the length direction of the I-beam 11.1, the motor 11.8 drives the screw 11.5 to rotate, the sleeve 11.6 is sleeved on the screw 11.5, and the sleeve 11.6 is connected to the suspension bracket 11.2.

[0059] like Fig.14 As shown, the suspension bracket 11.2 includes two C-shaped channel steels with openings facing each other; the upper parts of the two C-shaped channel steels are clamped on both sides of the I-shaped steel 11.1, and the lower parts are connected as a whole; the mobile counterweight mechanism 11 also includes a wheel assembly 11.3, which is supported between the C-shaped channel steel and the I-shaped steel 11.1. The wheel assembly 11.3 is connected to the suspension bracket 11.2, fits with the web and lower flange plate of the I-shaped steel 11.1, guides the suspension bracket 11.2 to move on the I-shaped steel 11.1, and plays a role in supporting the suspension bracket 11.2.

[0060] The mobile counterweight mechanism 11 also includes a connecting rod 11.7; one end of the connecting rod 11.7 is connected to the sleeve 11.6, and the other end is connected to the suspension bracket 11.2. The sleeve 11.6 is provided with multiple groups of connecting rods 11.7 along its length direction. Under the action of the connecting rod 11.7, the suspension bracket 11.2 is connected to the sleeve 11.6 and can move with the sleeve 11.6. Among them, the length direction of the screw rod 11.5 is consistent with the length direction of the sleeve 11.6, both of which are the length direction of the steel plate 5.

[0061] There are multiple movable counterweight mechanisms 11 distributed between multiple Bailey beams 4 .

[0062] The mobile counterweight mechanism 11 also includes a support 11.9, which is arranged at both ends of the screw rod 11.5 and is threadedly matched with the screw rod 11.5. The support 11.9 is also fixedly connected to the I-beam 11.1. Under the action of the motor 11.8, the screw rod 11.5 is driven to rotate, so that the sleeve 11.6 on the screw rod 11.5 moves along the length direction of the screw rod 11.5, thereby driving the suspension bracket 11.2 to move, changing the position of the counterweight assembly 11.4 suspended below the suspension bracket 11.2, thereby achieving dynamic balance of the load of the steel plate 5. For example, when the material of the steel plate 5 is stacked at one end close to the building floor plate, in order to ensure the stability of the steel plate 5, the motor 11.8 is used to drive the screw rod 11.5 to rotate, and the counterweight assembly 11.4 is driven to move toward the end away from the building floor plate. For another example, when the translation trolley 9 on the steel plate 5 is loaded with materials and moves toward the direction close to the building floor, the counterweight assemblies 11.4 of the plurality of mobile counterweight mechanisms 11 located below the translation trolley 9 move synchronously toward the direction away from the building floor.

[0063] The I-beam 11.1 includes a plurality of steel units 11.1.1 spaced apart along its length, and the upper flange plate of each steel unit 11.1.1 is fixedly connected to the bottom of the steel plate 5, which can be fixed by welding. The spacing between adjacent steel units 11.1.1 is less than 1 cm, and the wheel diameter of the wheel assembly 11.3 is greater than 2 cm. The wheels of the wheel assembly 11.3 can roll smoothly on each steel unit 11.1.1 without being affected by the gaps between the steel units 11.1.1.

[0064] The screw rod 11.5 includes a plurality of rod units 11.5.1 spaced apart along its length direction; the two ends of the rod unit 11.5.1 are respectively aligned with the two ends of the steel unit 11.1.1 above it. Each rod unit 11.5.1 is a screw having a length greater than the length of the sleeve 11.6. The rod units 11.5.1 of the screw rod 11.5 are all coaxial. A detachable connector is provided between adjacent rod units 11.5.1 to realize the connection or separation of adjacent rod units 11.5.1. When adjacent rod units 11.5.1 are connected, they can rotate synchronously and coaxially; the spacing between adjacent rod units 11.5.1 is less than the length of the sleeve 11.6. In this embodiment, the spacing between adjacent rod units 11.5.1 is one twentieth of the length of the sleeve 11.6. The length of the sleeve 11.6 is 50cm. The outer wall of each rod unit 11.5.1 is provided with a thread that matches with the sleeve 11.6. The adjacent rod units 11.5.1 are coaxially arranged. When the adjacent rod units 11.5.1 rotate coaxially, the sleeve 11.6 can move from one rod unit 11.5.1 to another adjacent rod unit 11.5.1. The end of the rod unit 11.5.1 is provided with a concave installation cavity for installing a detachable connector; the detachable connector is located in the installation cavity, so that the sleeve 11.6 can move on two adjacent rod units 11.5.1 without being hindered by the detachable connector.

[0065] The detachable connector comprises a coupling 11.10 and an electric telescopic member 11.11, wherein the electric telescopic member 11.11 can be an electric telescopic rod. The coupling 11.10 can be an existing cross slider coupling or a plum blossom-shaped elastic coupling. In this embodiment, the coupling 11.10 includes a first sleeve, a second sleeve, and a slider or elastic member disposed between the first sleeve and the second sleeve; the slider or elastic member is fixed to the first sleeve, and the axial end of the second sleeve facing the slider or elastic member is provided with a tooth groove for matching with the slider or elastic member, the first sleeve is fixed to the electric telescopic member 11.11, and the electric telescopic member 11.11 and the second sleeve are respectively fixedly installed in the mounting cavity of the adjacent rod unit 11.5.1, when the electric telescopic member 11.11 shrinks, the first sleeve also shrinks to the mounting cavity of the rod unit 11.5.1 that fixes the electric telescopic member 11.11, so that the first sleeve and the second sleeve are respectively located in the mounting cavity of the two rod units 11.5.1, and the two rod units 11.5.1 remain disconnected and separated. When the electric telescopic member 11.11 stretches, the first sleeve is pushed out to the vicinity of the second sleeve until the slider or elastic member matches with the tooth groove of the second sleeve. To realize the connection of two rod units 11.5.1, the two rod units 11.5.1 can rotate synchronously, and the sleeve 11.6 can move from one rod unit 11.5.1 to the other rod unit 11.5.1. When the couplings 11.10 between the multi-section rod units 11.5.1 are in a matching state, the sleeve 11.6 can move continuously on the multi-section rod units 11.5.1.

[0066] When it is necessary to counterweight a certain area of ​​the steel plate 5, the screw rod 11.5 is driven to rotate to move the sleeve 11.6 to the bottom of the area of ​​the steel plate 5 that needs counterweight, and then the electrically controlled telescopic parts 11.11 of the detachable connectors at both ends of the rod unit 11.5.1 where the sleeve 11.6 is located are controlled to contract, so that the couplings 11.10 at both ends of the rod unit 11.5.1 are in a disconnected and separated state, and the force of the counterweight assembly 11.4 applied to the rod unit 11.5.1 cannot be transmitted to other rod units 11.5.1. The gravity of the counterweight assembly 11.4 is applied to the suspension bracket 11.2, and then transmitted to the steel unit 11.1.1 of the I-beam 11.1 above the rod unit 11.5.1 through the wheel assembly 11.3, and finally transmitted to the steel plate 5, so that the area of ​​the steel plate 5 is subjected to force.

[0067] In this embodiment, the counterweight assembly 11.4 includes a suspension rod 11.4.1, a support plate 11.4.2 and a counterweight block 11.4.3; the bottom of the suspension rod 11.4.1 is connected to the support plate 11.4.2, the suspension rod 11.4.1 passes through the counterweight block 11.4.3, and the top of the suspension rod 11.4.1 is connected to the suspension bracket 11.2; the counterweight block 11.4.3 is set on the support plate 11.4.2. There can be multiple counterweight blocks 11.4.3, and the number of counterweight blocks 11.4.3 can be increased or decreased according to demand. Multiple counterweight assemblies 11.4 are suspended on the suspension bracket 11.2.

[0068] The mobile counterweight mechanism 11 also includes a control host and a plurality of sensor components connected to the control host by electrical signals. A sensor component is embedded between the upper flange plate and the steel plate 5 of each steel unit 11.1.1 of the I-beam 11.1, and is used to monitor the deformation amount or pressure value of the steel unit 11.1.1. Each I-beam 11.1 has a plurality of steel units 11.1.1, and a mobile counterweight mechanism 11 is arranged under each I-beam 11.1. The control host obtains the feedback signals of the sensor components of all the steel units 11.1.1 of the I-beam 11.1, determines the position information of the steel unit 11.1.1 with the minimum deformation or minimum pressure value of the I-beam 11.1, and sends a control command to the motor 11.8 of the mobile counterweight mechanism 11, and the motor 11.8 drives the sleeve 11.6 in the initial position to move to the bottom of the steel unit 11.1.1 with the minimum deformation or minimum pressure value, and disconnects the couplings 11.10 at both ends of the rod unit 11.5.1 where the sleeve 11.6 is located. Among them, the initial position of the sleeve 11.6 is located at the center position of the screw rod 11.5.

[0069] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A narrow and deep foundation pit material stacking platform, characterized in that: include: A support frame is erected at the bottom of the foundation pit, the support frame includes multiple layers of tower crane standard sections assembled section by section and a height adjustment component connected to the uppermost tower crane standard section; the height adjustment component is used to adjust the height of its top support surface; the height adjustment component includes an inner sleeve frame, an outer sleeve frame and a locking member, the outer sleeve frame is connected to the tower crane standard section, the inner sleeve frame is nested in the outer sleeve frame, the top of the inner sleeve frame is provided with the support surface, the inner sleeve frame is vertically movable relative to the outer sleeve frame to adjust the height of the support surface, and the locking member is detachably connected to the inner sleeve frame and the outer sleeve frame to limit the vertical movement of the inner sleeve frame relative to the outer sleeve frame; A plurality of support beams are arranged on the support surface of the support frame; A plurality of Bailey beams are arranged on the plurality of support beams; one end of the Bailey beam is placed on the support beam, and the other end is placed on the building floor slab; as well as Steel plates, laid on the plurality of Bailey beams, for stacking materials; A movable counterweight mechanism is provided at the lower end of the steel plate; The mobile counterweight mechanism includes: an I-beam, a suspension bracket, a counterweight assembly, a screw rod, a sleeve and a motor; the top of the I-beam is connected to the steel plate, and the suspension bracket is suspended at the lower end of the I-beam; the counterweight assembly is suspended below the suspension bracket; the screw rod is arranged below the I-beam along the length direction of the I-beam, the motor drives the screw rod to rotate, the sleeve is sleeved on the screw rod, and the sleeve is connected to the suspension bracket.

2. The narrow and deep foundation pit material stacking platform according to claim 1 is characterized in that: The I-beam includes a plurality of steel units spaced apart along its length, and each steel unit is connected to the bottom of the steel plate; the screw rod includes a plurality of rod units spaced apart along its length; a detachable connector is provided between adjacent rod units to achieve connection or separation of adjacent rod units; an inwardly recessed mounting cavity for mounting the detachable connector is provided at the end of the rod unit; the detachable connector includes a coupling and an electrically-controlled telescopic member; the coupling includes a first sleeve, a second sleeve, and a slider or an elastic member disposed between the first sleeve and the second sleeve; the slider or the elastic member is fixed to the first sleeve, and a tooth groove for matching with the slider or the elastic member is provided at the axial end of the second sleeve facing the slider or the elastic member, and the first sleeve is fixed to the electrically-controlled telescopic member, and the electrically-controlled telescopic member and the second sleeve are respectively fixedly mounted in the mounting cavities of adjacent rod units.

3. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: The suspension bracket includes two C-shaped channel steels with openings arranged opposite to each other; the two C-shaped channel steels are clamped on both sides of the I-shaped steel; the mobile counterweight mechanism also includes a wheel assembly, which is supported between the C-shaped channel steel and the I-shaped steel.

4. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: The movable counterweight mechanism also includes a connecting rod; one end of the connecting rod is connected to the sleeve, and the other end of the connecting rod is connected to the suspension bracket.

5. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: The movable counterweight mechanism also includes a support, which is arranged at both ends of the screw rod and is threadably matched with the screw rod. The support is also fixedly connected to the I-beam.

6. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: The counterweight assembly includes a suspension rod, a support plate and a counterweight block; the bottom of the suspension rod is connected to the support plate, the suspension rod passes through the counterweight block, and the top of the suspension rod is connected to the suspension bracket; the counterweight block is arranged on the support plate.

7. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: There are multiple movable counterweight mechanisms distributed between multiple Bailey beams.

8. The narrow and deep foundation pit material stacking platform according to claim 2 is characterized in that: The narrow and deep foundation pit material stacking platform also includes a translation trolley; a channel steel guide rail is laid on the upper end of the steel plate, and the translation trolley moves along the channel steel guide rail.

9. The narrow and deep foundation pit material stacking platform according to claim 1 is characterized in that: Connectors are also provided at both ends of the Bailey beam, and the connectors are provided with limiting cavities; the connectors are connected to the support beam or the steel plate, and the ends of the Bailey beam are inserted into the limiting cavities of the connectors.

10. A construction method for a narrow and deep foundation pit material stacking platform as claimed in claim 1, characterized in that: The following steps are involved: According to the height of the building floor, determine the number of tower crane standard sections of the support frame and the height of the top support surface of the height adjustment assembly; assemble the tower crane standard sections section by section, and adjust the height of the height adjustment assembly so that the top of the inner sleeve of the height adjustment assembly is at the target height of the support surface; Installing multiple support beams on the inner frame; Installing a plurality of Bailey beams on the plurality of support beams, with one end of each Bailey beam being placed on the support beam and the other end being placed on the building floor slab; Steel plates are laid on the plurality of Bailey beams to form a platform for stacking materials.