Anti-erosion parting structure of dam crest spillway of concrete faced rockfill dam and combined discharge chute of anti-erosion parting structure

By designing an anti-erosion joint structure in the top spillway of the face dam, and using anti-corrosion covers and installation components to isolate high-speed water flow, the problem of cavitation caused by uneven deformation of the structure is solved, ensuring the safety of the spillway and the stability of the chute. properties, expanding the application scenarios of spillways.

CN118793022APending Publication Date: 2024-10-18WENSHAN BAINIU PLANT WATER DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411138311.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

When the reservoir water level changes, the spillway on the top of the face dam will cause uneven structural deformation, resulting in staggered levels and rough structural joints between chute sections, which can easily cause concrete cavitation damage, increase safety hazards, and limit the width of the spillway chute.

Method used

An anti-erosion joint structure of the spillway on the top of the face dam is designed, which includes a bottom plate component, an anti-corrosion cover, an installation component and a water-stop component. The longitudinal joint is covered by the anti-corrosion cover, combined with the plastic filler and anchor plate structure, to maintain the anti-erosion joint structure. The corrosion cover has a smooth surface, which isolates the high-speed water flow from the base plate assembly to prevent cavitation erosion, and locks the base plate assembly through the anchor assembly to prevent slipping and overturning.

Benefits of technology

It effectively avoids cavitation damage at longitudinal joints, ensures the safety of the chute and dam, supports the application of large-span chute on the top spillway of the face dam, and improves the application scenarios and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793022A_ABST
    Figure CN118793022A_ABST
Patent Text Reader

Abstract

The invention provides a panel dam crest spillway anti-erosion parting structure and a combined discharge chute thereof, and the parting structure is characterized in that a bottom plate assembly is arranged on a plain concrete cushion layer of the panel dam spillway discharge chute, and the bottom plate assembly is provided with a longitudinal joint; the anti-corrosion cover covers the longitudinal seam; the anti-corrosion cover is arranged on the bottom plate assembly through the mounting assembly; the water stop assembly is arranged in the bottom plate assembly. Through the arrangement of the anti-corrosion cover and the installation assembly, the anti-corrosion cover covers the longitudinal joint and adapts to slab staggering generated by uneven settlement between the bottom plates, high-speed water flow is isolated from the slab staggering of the bottom plate assembly through the smooth and flat anti-corrosion cover, and therefore it is guaranteed that the overflowing face at the longitudinal joint is flat and smooth; therefore, the gas corrosion of the staggered slab at the longitudinal joint of the bottom plate assembly under the action of high-speed water flow is effectively avoided, the safety of the discharge chute and the dam is ensured, the safety parting of the spillway discharge chute at the crest of the concrete faced rockfill dam becomes possible, and a support is provided for the application of the large-span discharge chute of the spillway at the crest of the concrete faced rockfill dam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of spillways of panel dams, and in particular to an anti-erosion slot structure of a spillway on a panel dam crest and a combined spillway thereof. Background Art

[0002] Concrete dam is the abbreviation of rockfill dam. It is an earth-rock dam that relies on the concrete panel in front of the dam body to retain water. The main body of the dam body is made of loose earth and stone materials. The spillway chute refers to the drainage channel between the control section and the energy dissipator of the open spillway, also known as the steep trough. The top spillway of the concrete dam refers to the spillway built on the top of the concrete dam, so that the dam can both retain water and discharge floods. Compared with the conventional slope spillway, the top spillway of the concrete dam avoids the excavation and construction of the spillway on the shore, which can save 30% to 38% of the project cost, and avoid causing large-scale ecological damage and soil and water conservation problems. It has significant economic advantages, but also brings huge technical challenges.

[0003] The stress on the spillway on the top of the panel dam is very complex. For the reservoir with panel dam retaining water, when the height of the panel dam retaining water changes, it will cause uneven deformation of the panel dam body. Therefore, for the spillway built on the panel dam, the change of reservoir water level will cause uneven deformation between the spillway chute sections and the chute sections, which will inevitably cause the high and low misalignment and rough structural seams between the chute sections and the chute sections on the flow surface. When the spillway is discharging, the water flow speed at the end of the spillway is very high. When the high-speed water flow encounters the misalignment and rough structural seams between the chute sections, it is easy to cause cavitation damage to the concrete chute structure, which brings huge safety hazards to the spillway and dam safety, so that the width of the spillway chute on the panel dam is limited. Summary of the invention

[0004] The embodiment of the present application provides an anti-erosion split structure of a spillway on a panel dam top and a combined spillway thereof to solve the problems existing in the related art. The technical solution is as follows:

[0005] In a first aspect, an embodiment of the present application provides a slit structure for preventing erosion of a spillway on a top of a panel dam, comprising:

[0006] A bottom plate assembly, the bottom plate assembly is arranged on the plain concrete cushion layer of the spillway trough of the panel dam, and the bottom plate assembly has a longitudinal seam extending along the thickness direction of the bottom plate assembly;

[0007] An anti-corrosion cover is provided on the bottom plate assembly, and covers the longitudinal seam;

[0008] An installation component, the installation component is arranged on the base plate component, and the corrosion protection cover is arranged on the base plate component through the installation component;

[0009] A water-stop assembly is arranged in the base plate assembly and is located at the longitudinal seam.

[0010] In one embodiment,

[0011] The erosion shield includes:

[0012] The anti-corrosion panel is covered on the surface of the bottom plate assembly and is arranged on the bottom plate assembly through a mounting assembly;

[0013] Plastic filler, the plastic filler is filled between the anti-corrosion panel and the bottom plate assembly.

[0014] In one embodiment,

[0015] The installation components include:

[0016] An anchor plate, the anchor plate is arranged on the steel frame of the bottom plate assembly, and the water stop assembly is arranged in the bottom plate assembly;

[0017] A vertical plate, a portion of which is connected to the anchor plate, and another portion of which extends to the outside of the bottom plate assembly and is connected to the anti-corrosion panel;

[0018] Countersunk rivets are set at the connection between the vertical plate and the anti-corrosion panel.

[0019] In one embodiment,

[0020] The base plate assembly includes:

[0021] Two side bottom plates, the two side bottom plates are spliced ​​together, and a longitudinal seam is formed at the splicing position of the two side bottom plates;

[0022] And side walls, the number of side walls corresponds to the number of side bottom plates, the corresponding side walls are connected to the side bottom plates, and the side bottom plates and the side walls are embedded in the wall body.

[0023] In one embodiment,

[0024] The base plate assembly also includes:

[0025] A plurality of middle bottom plates are spliced ​​along one of the side bottom plates toward another side bottom plate, and longitudinal seams are formed between adjacent middle bottom plates after splicing, and longitudinal seams are also formed at the splicing positions of the middle bottom plates and the side bottom plates.

[0026] In one embodiment,

[0027] The adjacent sides of the two side bottom plates are respectively provided with a tenon structure and a mortise structure. When the two side bottom plates are spliced ​​together, the tenon structure and the mortise structure are spliced ​​together correspondingly.

[0028] In one embodiment,

[0029] One end of the middle bottom plate is a tenon structure, and the other end is a mortise structure. When adjacent middle bottom plates are spliced ​​or the middle bottom plate is spliced ​​with the side bottom plate, the tenon structure and the mortise structure are spliced ​​correspondingly.

[0030] In one embodiment, it further includes:

[0031] A flexible cushion layer is located at the longitudinal seam, and the flexible cushion layer is located between the tenon structure and the mortise structure.

[0032] In one embodiment,

[0033] The water stop assembly is located above the mortise structure and below the anchor plate.

[0034] In a second aspect, an embodiment of the present application provides a combined spillway chute of a panel dam crest, including: an anti-erosion slotted structure of a panel dam spillway as described in any one of the above embodiments.

[0035] The advantages or beneficial effects of the above technical solution include at least:

[0036] Through the setting of the anti-corrosion cover and the installation assembly, the anti-corrosion cover covers the longitudinal joints to adapt to the misalignment caused by uneven settlement between the bottom plates and keep the surface of the anti-corrosion cover smooth and flat. The high-speed water flow is isolated from the misalignment and longitudinal joints of the bottom plate assembly by the smooth and flat anti-corrosion cover to ensure that the flow surface at the longitudinal joints is flat and smooth, thereby effectively avoiding cavitation of the concave and convex structure at the longitudinal joints of the bottom plate assembly under the action of high-speed water flow, ensuring the safety of the spillway and the dam, making the safe splitting of the spillway of the panel dam top spillway possible, and providing support for the application of large-span spillways on the top of the panel dam.

[0037] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present application will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.

[0039] Figure 1 It is a schematic diagram of the cross-sectional structure of the discharge chute in the present invention;

[0040] Figure 2 for Figure 1 A schematic diagram of the enlarged structure at A in the middle;

[0041] Figure 3 is a schematic diagram of the split structure;

[0042] Figure 4 The schematic diagram of the structure of the chute from a top view is shown in FIG.

[0043] In the figure:

[0044] 100. Split structure;

[0045] 110, anti-corrosion cover; 111, plastic filler; 112, vertical plate; 113, anti-corrosion panel; 114, anchor plate; 115, countersunk rivet;

[0046] 120. Water stop assembly;

[0047] 130. Install components;

[0048] 200, chute; 201, steel frame; 202, plain concrete cushion;

[0049] 210, midsole plate; 211, tenon structure; 212, mortise structure; 213, flexible cushion layer;

[0050] 220, side bottom plate;

[0051] 230, longitudinal seam;

[0052] 240, side wall;

[0053] 250, anchoring assembly; 251, anchor reinforcement; 252, anchoring piece;

[0054] 260, reserved hole;

[0055] 270. Base plate assembly. DETAILED DESCRIPTION

[0056] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present application. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0057] Figure 1-Figure 4 FIG. 1 is a schematic diagram of a slit structure 100 for preventing erosion of a spillway on a top of a panel dam according to an embodiment of the present application. Figure 1-Figure 4 As shown, the anti-erosion slotted structure 100 may include:

[0058] A bottom plate assembly 270, the bottom plate assembly 270 is disposed on the plain concrete cushion layer 202 of the spillway chute 200 of the panel dam, and the bottom plate assembly 270 has a longitudinal seam 230, and the longitudinal seam 230 extends along the thickness direction of the bottom plate assembly 270;

[0059] The corrosion protection cover 110 is disposed on the bottom plate assembly 270 , and the corrosion protection cover 110 covers the longitudinal seam 230 ;

[0060] An installation assembly 130, the installation assembly 130 is disposed on the base plate assembly 270, and the corrosion protection cover 110 is disposed on the base plate assembly 270 through the installation assembly 130;

[0061] The water-stop assembly 120 is disposed in the bottom plate assembly 270 , and the water-stop assembly 120 is located at the longitudinal seam 230 .

[0062] In this embodiment, the chute 200 is formed by splicing the bottom plate components 270, and the splicing of the bottom plate components 270 has a longitudinal seam 230, the corrosion protection cover 110 is arranged on the bottom plate components 270, and the corrosion protection cover 110 is located on the top surface of the longitudinal seam 230, and the mounting component 130 is fixedly connected to the steel frame 201 of the bottom plate components 270. When the water retaining height of the dam body changes, the water pressure in the reservoir will cause the dam body to deform, thereby causing the bottom plate components 270 to deform, so that the bottom plate components 270 are displaced at the longitudinal seam 230 to form a misalignment; the existence of the misalignment and the longitudinal seam 230 affects the flatness of the flow surface. When the chute 200 discharges water, the water flow is accelerated by gravity to form a high-speed water flow, which easily causes the misalignment and the longitudinal seam 230 at the bottom plate components 270 to be cavitated under the action of the high-speed water flow;

[0063] By setting the anti-corrosion cover 110 and the mounting assembly 130, the anti-corrosion cover 110 can cover the longitudinal seam 230, and the deformation of the plastic filler 111 can adapt to the misalignment caused by the uneven settlement between the bottom plates and the deformation of the longitudinal seam 230, and keep the anti-corrosion cover 110 smooth and flat;

[0064] The high-speed water flow is isolated from the misalignment of the bottom plate assembly 270 by the smooth and flat anti-corrosion cover 110, so as to ensure that the flow surface at the longitudinal seam 230 is flat and smooth, thereby effectively preventing the misalignment at the longitudinal seam 230 of the bottom plate assembly 270 and the cavitation of the longitudinal seam 230 under the action of the high-speed water flow, avoiding the damage of the bottom plate assembly 270 and the water-stop assembly 120, and ensuring the safety of the chute 200 and the dam. The longitudinal seam 230 is waterproofed by the setting of the water-stop assembly 120, so as to prevent the water in the chute 200 from leaking from the longitudinal seam 230 to the dam body outside the chute 200, so as to avoid scouring of the dam body and instability of the dam slope;

[0065] Furthermore, the anti-corrosion cover 110 can, on one hand, cover the misalignment and the longitudinal seam 230 generated when the bottom plate assembly 270 is displaced;

[0066] The anti-erosion slot structure 100 allows limited displacement of the bottom plate assembly 270 of the adjacent structure, which has high safety and reliability. It provides important support and guarantee for increasing the discharge volume and discharge width of the spillway on the top of the panel dam and reducing the single-width flow, which greatly improves the application scenarios of the spillway on the top of the panel dam.

[0067] When laying the bottom plate assembly 270, the reserved position of the chute 200 on the panel dam is leveled and compacted in advance; then a 0.05m-0.3m thick plain concrete cushion layer 202 is laid along the slope at the reserved position to facilitate the erection of the bottom plate assembly 270 formwork and the erection of the steel bar skeleton 201 (the 0.05m-0.3m thick plain concrete cushion layer 202 has a thin cushion layer thickness and is not equipped with steel bars, so its bending and tensile strengths are very weak, and its influence on the internal force of the bottom plate assembly 270 of the chute 200 is not considered, and it only provides flat construction conditions for the casting of the bottom plate assembly 270). After the installation assembly 130 is welded to the steel bar skeleton 201 of the bottom plate assembly 270 in advance, the bottom plate assembly 270 is cast, and the position of the water stop assembly 120 is reserved during the casting process;

[0068] A reserved hole 260 can be set on the bottom plate assembly 270. After the bottom plate assembly 270 is spliced, the anchor assembly 250 is set in the reserved hole 260. When the chute 200 discharges water, the high-speed water flow generates a large lateral water pressure and acts on the side of the bottom plate assembly 270, so that the side of the bottom plate assembly 270 tends to deform to both sides. The bottom plate assembly 270 is locked together by the anchor assembly 250, which effectively limits the bottom plate assembly 270 from excessive slippage or overturning under the action of water pressure, so as to improve the stability of the bottom plate assembly 270 and avoid damage to the water-stop assembly 120, thereby preventing the leakage of water from eroding the dam body and causing a dam breach accident.

[0069] like Figure 2-Figure 3 As shown, in one embodiment,

[0070] The anti-corrosion cover 110 includes:

[0071] The anti-corrosion panel 113 is covered on the surface of the bottom plate assembly 270, and the anti-corrosion panel 113 is arranged on the bottom plate assembly 270 through the mounting assembly 130;

[0072] The plastic filler 111 is filled between the anti-corrosion panel 113 and the bottom plate assembly 270 .

[0073] In this embodiment, the corrosion protection cover 110 is arranged on the top surface of the longitudinal seam 230, and is composed of a corrosion protection panel 113 and a plastic filler 111. The corrosion protection panel 113 is connected to the steel bars of the bottom plate assembly 270 through the mounting assembly 130, and the plastic filler 111 is filled in the corrosion protection panel 113, and the plastic filler 111 is in contact with the surface of the bottom plate assembly 270. The plastic filler 111 tightly supports the corrosion protection panel 113, reduces the vibration of the corrosion protection panel 113, and can better absorb the deformation of the bottom plate assembly 270, prevent the corrosion protection panel 113 from being torn, and can also assist in playing an anti-seepage role, thereby improving the anti-seepage, compactness and safety of the seam;

[0074] Furthermore, the plastic filler 111 may be a neoprene rod, SR flexible filler, etc.;

[0075] The anti-corrosion panel 113 is made of anti-corrosion and anti-rust metal material, such as stainless steel; the thickness of the anti-corrosion panel 113 is 1 to 4 mm to resist the maximum water pressure during leakage;

[0076] The smooth and flat stainless steel anti-corrosion cover 110 isolates the high-speed water flow from the misalignment and longitudinal seam 230 generated by the bottom plate assembly 270 when the chute 200 is discharged, thereby effectively digesting and covering the misalignment caused by uneven settlement between the bottom plates, ensuring that the flow surface at the longitudinal seam 230 is flat and smooth, thereby effectively avoiding the misalignment and longitudinal seam 230 at the bottom plate joints from cavitation under the action of high-speed water flow; at the same time, it avoids the direct scouring and abrasion of the joints by high-speed water flow, especially high-speed sand-containing water flow, thereby avoiding the damage to the bottom plate and water stop, and ensuring the safety of the chute 200 and the dam;

[0077] The plastic filler 111 can effectively absorb and adapt to the deformation of the bottom plate assembly 270, and can effectively reduce the vibration of the anti-erosion panel under the action of high-speed water flow, thereby improving the durability and safety of the structure.

[0078] like Figure 2-Figure 3 As shown, in one embodiment,

[0079] The mounting assembly 130 includes:

[0080] Anchor plate 114, anchor plate 114 is arranged on the steel frame 201 of the bottom plate assembly 270, and water stop assembly 120 is arranged in the bottom plate assembly 270;

[0081] A vertical plate 112, a portion of which is connected to the anchor plate 114, and another portion of which extends to the outside of the bottom plate assembly 270 and is connected to the anti-corrosion panel 113;

[0082] Countersunk rivets 115 are provided at the connection between the vertical plate 112 and the anti-corrosion panel 113 .

[0083] In this embodiment, the anchor plate 114 is welded to the steel support of the bottom plate assembly 270, and the vertical plate 112 is vertically fixedly connected to the anchor plate 114. The anchor plate 114 and the vertical plate 112 are pre-arranged on the steel frame 201 of the bottom plate assembly 270 before the bottom plate assembly 270 is cast. The anti-corrosion panel 113 and the vertical plate 112 are connected by countersunk rivets 115. The anchor plate 114 and the vertical plate 112 are made of anti-corrosion and anti-rust metal materials, such as stainless steel.

[0084] When the water retaining height of the dam body changes, the water pressure in the reservoir will cause the dam body to deform, thereby causing the bottom plate assembly 270 to deform. When the bottom plate assembly 270 is deformed and the chute 200 is discharging water again, the anchor plate 114 and the vertical plate 112 form a height difference with the misalignment of the bottom plate assembly 270, and the anti-corrosion panel 113 and the plastic filler 111 are deformed to a certain extent, so that the anti-corrosion cover 110 fills the misalignment between the bottom plate assembly 270 and the enlarged longitudinal seam 230, thereby avoiding damage to the bottom plate assembly 270 and the water stop assembly 120, and ensuring the safety of the chute 200 and the dam;

[0085] Furthermore, countersunk rivets 115 are used at the connection between the vertical plate 112 and the anti-corrosion panel 113, which can reduce the roughness of the flow surface, improve the smoothness and flatness of the flow surface, reduce cavitation damage under the action of high-speed water flow, and increase the durability of the rivets and the anti-corrosion panel 113.

[0086] like Figure 1 and Figure 4 As shown, in one embodiment,

[0087] The base plate assembly 270 includes:

[0088] Two side bottom plates 220, the two side bottom plates 220 are spliced, and a longitudinal seam 230 is formed at the splicing of the two side bottom plates 220;

[0089] And side walls 240, the number of side walls 240 corresponds to the number of side bottom plates 220, the corresponding side walls 240 are connected to the side bottom plates 220, and the side bottom plates 220 and the side walls 240 are both embedded in the wall.

[0090] In this embodiment, the bottom plate assembly 270 is in the form of two side bottom plates 220 being spliced ​​together. When the spillway discharges water, the high-speed water flow generates a large lateral water pressure and acts on the side wall 240, so that the side wall 240 and the side bottom plate 220 tend to deform to both sides. At this time, the longitudinal seam 230 between the two side bottom plates 220 generates a gap under the action of the water flow or the two side bottom plates 220 are misaligned. At this time, the misalignment generated at the longitudinal seam 230 is filled by the cooperation of the anti-corrosion panel 113 and the plastic filling material 111, so that the longitudinal seam 230 under the misalignment is isolated from the water flow;

[0091] The two side bottom plates 220 are both provided with reserved holes 260. When the two side bottom plates 220 are spliced, the anchoring assembly 250 is passed through the reserved holes 260 so that the anchoring assembly 250 locks the two side bottom plates 220.

[0092] When the two side bottom plates 220 are spliced, a longitudinal seam 230 is formed at the joint of the two side bottom plates 220. At this time, the anti-corrosion cover 110 is located above the longitudinal seam 230 at the joint of the two side bottom plates 220. First, the reserved position of the chute 200 on the panel dam is leveled and compacted; then, a 0.05m-0.3m thick plain concrete cushion layer 202 is laid along the slope through the reserved position to facilitate the bottom plate formwork and steel bar erection (the 0.05m-0.3m thick plain concrete cushion layer 202 is thin in thickness and is not equipped with steel bars, so its bending and tensile strengths are very weak, and its influence on the internal force of the bottom plate of the chute 200 is not considered, and it only provides a flat construction condition for pouring the bottom plate assembly 270);

[0093] Cast the two side bottom plates 220 in sequence or simultaneously, and embed the steel bars of the side wall 240 on the side bottom plates 220; then cast the side wall 240 of the chute 200 on the side bottom plates 220 in sequence or simultaneously (the side bottom plates 220 and the side wall 240 are cast together, and the weight is large, and the deformation caused by their own weight on the dam surface is also large. Casting the side bottom plates 220 first is conducive to reducing the secondary displacement and secondary stress of the middle bottom plate 210);

[0094] The height of the side wall 240 can be adjusted according to the depth of the discharge. When the overflow water depth is constant, the maximum discharge flow of the spillway at the top of the panel rockfill dam can be increased by increasing the overflow width, so as to improve the flood control capacity of the panel dam.

[0095] A longitudinal seam 230 is provided between the side bottom plates 220, and the longitudinal seam 230 can be arranged parallel to the water flow direction or form an acute angle with the water flow direction;

[0096] When the spillway discharges water, the high-speed water flow generates a large lateral water pressure, which acts on the side wall 240, causing the side wall 240 and the side bottom plate 220 to tend to deform toward both sides;

[0097] The dam body is filled with granular material, and the friction between the dam body and the side bottom plate 220 is limited, which makes it difficult to meet the stability requirements of the side bottom plate 220 and the side wall 240 deforming to both sides. The side bottom plate 220 is locked together by the anchoring assembly 250, which effectively limits the side bottom plate 220 and the side wall 240 from excessive sliding or overturning under the action of water pressure, thereby improving the stability of the side wall 240 and the side bottom plate 220, avoiding damage to the water stop assembly 120, and thus preventing the leakage of water from scouring the dam body and causing a dam breach accident;

[0098] The number of anchoring assemblies 250 may be determined according to the lateral pressure of water during water flow.

[0099] like Figure 1 and Figure 4 As shown, in one embodiment,

[0100] The base plate assembly 270 also includes:

[0101] A plurality of midsole plates 210 are spliced ​​from one side bottom plate 220 to another side bottom plate 220 , and a longitudinal seam 230 is formed between adjacent midsole plates 210 after splicing, and a longitudinal seam 230 is also formed at the splicing point between the midsole plate 210 and the side bottom plate 220 .

[0102] In this embodiment, the chute 200 formed by the splicing of the middle bottom plate 210, the side bottom plate 220 and the side wall 240 is a spillway, and the discharge flow of the spillway has the following relationship:

[0103] Q=B×h×v=q×B, q=h×v=Q / B;

[0104] Among them, Q is the maximum flow rate of the spillway, reflecting the flow capacity of the spillway;

[0105] B is the flow width, i.e. the width of the chute 200;

[0106] h is the depth of flowing water;

[0107] v is the velocity of the overflow water. The size of v is positively correlated with the total drop z of the spillway discharge. The larger the drop z, the larger v.

[0108] q is the flow rate per single width, that is, the flow rate per 1m width of the chute 200, which can comprehensively reflect the influence of the water flow on the chute 200, that is, when the flow depth is large and the flow velocity is large, the effect and influence on the chute 200 is large;

[0109] It should be noted that the number and thickness of the side bottom plates 220 and the middle bottom plate 210 can be set as needed. When the drainage width is ≤15m, only two side bottom plates 220 can be provided without the middle bottom plate 210; when the drainage width is ≥15m, one or more middle bottom plates 210 can be provided at the same time as the side bottom plates 220; the thickness of the side bottom plates 220 and the middle bottom plate 210 is 0.6m to 4m, and the optimal width of the side bottom plates 220 and the middle bottom plate 210 is 15m;

[0110] When the chute 200 is provided with a middle bottom plate 210, a longitudinal seam 230 is formed at the joint of the middle bottom plates 210 and the joint of the middle bottom plates 210 and the side bottom plates 220. At this time, the longitudinal seam 230 between the middle bottom plates 210 and the longitudinal seam 230 formed by the side bottom plates 220 and the middle bottom plates 210 are both provided with a water stop assembly 120. The middle bottom plate 210 can be provided according to the required width of the chute 200, or the middle bottom plate 210 can be omitted and the two side bottom plates 220 can be directly spliced. When the middle bottom plate 210 is provided, the two side bottom plates 220 are cast in sequence or simultaneously, and the water stop assembly 120 is pre-cast on the bottom plate. The steel bars of the side wall 240 are buried; then the side wall 240 of the chute 200 is cast on the side bottom plate 220 in sequence or at the same time (the side bottom plate 220 and the side wall 240 are cast together, and the weight is large, and the deformation caused by the deadweight on the dam surface is also large. Casting the side bottom plate 220 first is conducive to reducing the secondary displacement and secondary stress of the middle bottom plate 210); then the middle bottom plate 210 is cast from one side bottom plate 220 to the other side bottom plate 220 in sequence or at intervals (casting in two sequences at intervals can make the deadweight load of the chute 200 evenly applied to the dam surface, reduce the uneven settlement of the dam surface, and also reduce the secondary displacement and secondary stress of the bottom plate);

[0111] When the maximum discharge flow is constant, the number of the middle bottom plates 210 can be increased to increase the flow width of the chute 200, so as to reduce the maximum flow depth of the spillway control section (crisscross), thereby reducing the maximum water level of the reservoir, thereby reducing the dam crest elevation and the dam height. Increasing the width of the chute 200 will slightly increase the engineering workload of the chute 200 bottom plate, but at the same time it can reduce the dam height and save a lot of engineering costs, and can also reduce the flooding loss and land occupation caused by the maximum water level, generating huge economic benefits.

[0112] When the flow width of the chute 200 is constant, the present invention significantly reduces the maximum span of the single structure of the chute 200, thereby significantly reducing the secondary stress of the bottom plate, greatly reducing the thickness requirement of the bottom plate of the chute 200, reducing the thickness of the bottom plate of the chute 200, thereby greatly saving engineering investment and improving the safety of the bottom plate structure;

[0113] By setting the chute 200 in the form of splicing the side bottom plate 220 and the middle bottom plate 210, the chute 200 can not only adapt to the deformation of the dam body and control the stress of the chute 200, but also adapt to floods of different widths, breaking through the limitation of the chute 200 width on the top spillway of the panel rockfill dam, and expanding the application scenarios of the top spillway of the panel dam;

[0114] By setting the chute 200 in the form of splicing the side bottom plate 220 and the middle bottom plate 210, and setting the longitudinal seam 230 at the splicing place of each middle bottom plate 210 and the side bottom plate 220, the longitudinal seam 230 is parallel to the water flow direction or forms a certain angle with the water flow direction, and all the side bottom plates 220 and the middle bottom plates 210 are locked together by the anchor assembly 250, the side bottom plates 220 and the side walls 240 are effectively restricted from excessive sliding or overturning under the action of water pressure, so as to improve the stability of the side walls 240 and the side bottom plates 220, avoid water stop damage, and thus prevent the leakage of water from scouring the dam body and causing a dam breach accident;

[0115] It should be noted that the anchor assembly 250 includes: an anchor bar 251 and an anchor member 252;

[0116] The anchor reinforcement 251 passes through the reserved hole 260;

[0117] The anchors 252 are arranged at both ends of the anchor reinforcement 251, and the anchors 252 at both ends of the anchor reinforcement 251 are respectively fixed on the two side bottom plates 220. When the anchor reinforcement 251 is cross-arranged, the anchors 252 need to be staggered in height.

[0118] After the side bottom plate 220 and the middle bottom plate 210 are spliced, the reserved holes 260 on the middle bottom plate 210 and the side bottom plate 220 are interconnected, and the anchor tie rods 251 pass through the reserved holes 260 of the side bottom plate 220 and the middle bottom plate 210, and all the side bottom plates 220 and the middle bottom plate 210 are locked to a suitable tightness through the anchor pieces 252, which can not only meet the requirements of the displacement or rotation between the bottom plates in the vertical plane, but also meet the requirements of the side bottom sliding too much under the action of water pressure and separation or overturning when the chute 200 passes water;

[0119] When only two side bottom plates 220 are connected, the reserved holes 260 on the two side bottom plates 220 are interconnected, and the anchor bars 251 pass through the reserved holes 260 on the two side bottom plates 220. The two side bottom plates 220 are locked to a suitable tightness through the anchors 252, which not only meets the requirements that the bottom plates can be displaced or rotated in the vertical plane, but also meets the requirements that the side bottoms can be separated or overturned due to excessive slippage under the action of water pressure when the chute 200 flows through water;

[0120] The anchor reinforcement 251 has good deformation performance, so that the side bottom plate 220 and the middle bottom plate 210 can well adapt to the deformation of the face rockfill dam, and can greatly reduce the stress of the middle bottom plate 210, the side bottom plate 220 and the side wall 240, thereby protecting the chute 200 structure from being destroyed, and preventing damage to the water stop assembly 120 and the corrosion cover 110, thereby improving the safety of the chute 200 and the dam;

[0121] The water stop assembly 120 is located above the mortise structure 212 and below the corrosion protection cover 110;

[0122] The water stop assembly 120 is a common water stop strip on the market;

[0123] The anchor reinforcement 251 is arranged in the reserved hole 260, and the anchor reinforcement 251 is perpendicular to the water flow direction;

[0124] And / or, the anchor bar 251 is disposed in the reserved hole 260, and the anchor bar 251 forms an acute angle with the water flow direction;

[0125] Anchor bars 251 perpendicular to the water flow direction and anchor bars 251 at a certain angle to the water flow direction may be provided at the same time, or anchor bars 251 perpendicular to the water flow direction or anchor bars 251 at a certain angle to the water flow direction may be provided separately. The provision of anchor bars 251 enables the side bottom plate 220 and the middle bottom plate 210 to adapt well to the deformation of the face rockfill dam, and can greatly reduce the stress of the middle bottom plate 210, the side bottom plate 220 and the side wall 240, thereby protecting the chute 200 structure from being damaged;

[0126] Furthermore, in this solution, anchor bars 251 perpendicular to the water flow direction and anchor bars 251 at a certain angle to the water flow direction are simultaneously provided. By combining the two anchor bar 251 provision schemes, the side bottom plate 220, the middle bottom plate 210 and the side wall 240 can well adapt to the deformation of the face rockfill dam.

[0127] It should be noted that when the anchor reinforcement 251 is arranged at a certain angle to the water flow direction, the angle formed by the anchor reinforcement 251 and the water flow is between 30° and 60°, and one anchor reinforcement 251 or two "X"-shaped anchor reinforcements 251 may be arranged;

[0128] The position of the reserved hole 260 can be reserved according to the arrangement scheme of the anchor reinforcement 251 .

[0129] like Figure 1-Figure 4 As shown, in one embodiment,

[0130] The adjacent sides of the two side bottom plates 220 have a tenon structure 211 and a mortise structure 212 respectively. When the two side bottom plates 220 are spliced ​​together, the tenon structure 211 and the mortise structure 212 are spliced ​​together correspondingly.

[0131] In this embodiment, the tenon structure 211 and the mortise structure 212 are spliced ​​to form a mortise and tenon structure, and the anchor reinforcement 251 has good deformation performance. When the two side bottom plates 220 are spliced, the longitudinal seam 230 and the mortise and tenon structure also allow the side bottom plates 220 to have limited displacement and twisting in the vertical plane, which enables the side bottom plates 220 to adapt to the deformation of the panel rockfill dam, thereby reducing the stress of the side bottom plates 220 and further protecting the spliced ​​middle bottom plates 210 and side bottom plates 220 from damage.

[0132] In one embodiment,

[0133] One end of the middle bottom plate 210 is a tenon structure 211 , and the other end is a mortise structure 212 . When adjacent middle bottom plates 210 are spliced ​​or the middle bottom plate 210 and the side bottom plate 220 are spliced, the tenon structure 211 and the mortise structure 212 are spliced ​​correspondingly.

[0134] In this embodiment, the tenon structure 211 and the mortise structure 212 are spliced ​​to form a mortise and tenon structure, and the anchor reinforcement 251 has good deformation performance. When the middle bottom plate 210 and the side bottom plate 220 are spliced, the longitudinal seam 230 and the mortise and tenon structure also allow the middle bottom plate 210 and the side bottom plate 220 to have limited displacement and twisting in the vertical plane, so that the middle bottom plate 210 and the side bottom plate 220 can adapt to the deformation of the panel rockfill dam, thereby reducing the stress of the middle bottom plate 210 and the side bottom plate 220, and further protecting the spliced ​​middle bottom plate 210 and the side bottom plate 220 from being damaged;

[0135] The tenon structure 211 has a length of 2 cm to 30 cm and a thickness of 20 cm to 100 cm.

[0136] like Figure 1-Figure 4 As shown, in one embodiment, it also includes:

[0137] The flexible pad layer 213 is located at the longitudinal seam 230 , and the flexible pad layer 213 is located between the tenon structure 211 and the mortise structure 212 .

[0138] In this embodiment, the flexible cushion layer 213 can be set with materials such as asphalt and foam board. The thickness of the flexible cushion layer 213 is 0.5 cm to 10 cm. The flexible cushion layer 213 provides a certain deformation space between the tenon structure 211 and the mortise structure 212 to allow the side bottom plate 220 and the middle bottom plate 210 to have a proper amount of displacement and rotation in the vertical plane to adapt to the deformation of the dam body, reduce the risk of stress concentration and damage to the side bottom plate 220 and the middle bottom plate 210, and also reduce the risk of stress and damage to the mortise and tenon structure; on the other hand, the limited thickness of the flexible cushion layer 213 can prevent excessive displacement between the bottom plates, so as to avoid damage to the water-stop assembly 120 and the anti-corrosion cover 110 between the bottom plates, thereby preventing the leakage of water from scouring the dam body and causing a dam breach accident;

[0139] Through the mortise and tenon structure and the flexible cushion layer 213 combined with the arrangement of the anchor reinforcement 251 and the anchoring piece 252, each base plate is constrained and restricted to ensure the integrity and earthquake resistance of each base plate after splicing.

[0140] Figure 1-Figure 4 FIG. 2 shows a structural diagram of a combined spillway chute 200 of a panel dam top spillway according to an embodiment of the present invention. Figure 1-Figure 4 As shown, the chute 200 may include:

[0141] A panel dam spillway anti-erosion slotted structure 100 as described in any one of the above embodiments.

[0142] The functions of the modules in the devices in the embodiments of the present invention can be found in the corresponding descriptions of the above methods, which will not be described in detail here.

[0143] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0144] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0145] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A slit structure for preventing erosion of spillway on top of a panel dam, characterized in that: include: A bottom plate assembly, the bottom plate assembly is arranged on a plain concrete cushion layer of a spillway trough of a panel dam, the bottom plate assembly has a longitudinal seam, and the longitudinal seam extends along a thickness direction of the bottom plate assembly; An anti-corrosion shield, the anti-corrosion shield being arranged on the bottom plate assembly and covering the longitudinal seam; A mounting assembly, wherein the mounting assembly is arranged on the base plate assembly, and the corrosion hood is arranged on the base plate assembly through the mounting assembly; A water-stop assembly is provided in the base plate assembly and is located at the longitudinal seam.

2. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 1, characterized in that: The anti-corrosion cover comprises: An anti-corrosion panel, the anti-corrosion panel cover is arranged on the surface of the bottom plate assembly, and the anti-corrosion panel is arranged on the bottom plate assembly through the mounting assembly; A plastic filler is filled between the anti-corrosion panel and the bottom plate assembly.

3. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 2, characterized in that: The installation assembly includes: An anchor plate, the anchor plate is arranged on the steel frame of the base plate assembly, and the water stop assembly is arranged in the base plate assembly; A vertical plate, a portion of which is connected to the anchor plate, and another portion of which extends to the outside of the bottom plate assembly and is connected to the anti-corrosion panel; Countersunk rivets are arranged at the connection between the vertical plate and the anti-corrosion panel.

4. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 3, characterized in that: The base plate assembly comprises: Two side bottom plates, the two side bottom plates are spliced ​​together, and the longitudinal seam is formed at the splicing position of the two side bottom plates; And side walls, the number of the side walls corresponds to the number of the side bottom plates, the corresponding side walls are connected to the side bottom plates, and the side bottom plates and the side walls are both embedded in the wall body.

5. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 4, characterized in that: The base plate assembly also includes: A plurality of middle bottom plates are spliced ​​along the direction of one of the side bottom plates toward another side bottom plate, and the longitudinal seam is formed between adjacent middle bottom plates after splicing, and the longitudinal seam is also formed at the splicing point between the middle bottom plate and the side bottom plate.

6. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 4, characterized in that: The adjacent sides of the two side bottom plates respectively have a tenon structure and a mortise structure. When the two side bottom plates are spliced ​​together, the tenon structure and the mortise structure are spliced ​​together correspondingly.

7. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 5, characterized in that: One end of the middle bottom plate is a tenon structure, and the other end is a mortise structure. When adjacent middle bottom plates are spliced ​​or the middle bottom plate is spliced ​​with the side bottom plate, the tenon structure and the mortise structure are spliced ​​correspondingly.

8. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 6 or 7, characterized in that: Also includes: A flexible pad layer is located at the longitudinal seam, and the flexible pad layer is located between the tenon structure and the mortise structure.

9. The anti-erosion split structure of the spillway on the top of a panel dam according to claim 6 or 7, characterized in that: The water stop assembly is located above the mortise structure and below the anchor plate.

10. A combined spillway chute on the top of a panel dam, characterized in that: include: A panel dam spillway anti-erosion joint structure as described in any one of claims 1 to 9.