Multi-section suspension anchor rod for extremely-broken surrounding rock support

By designing the grouting and support structure of the multi-section suspension anchor, the problem of difficulty in penetrating the grouting liquid in the extremely broken surrounding rock is solved, the contact area and bonding strength between the anchor and the surrounding rock are increased, and the stability of the anchoring is enhanced. durability and pullout resistance, adapting to irregular rock formation conditions.

CN118836028APending Publication Date: 2024-10-25HUAIBEI MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410956628.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The existing support anchor grouting solution used for extremely broken surrounding rock is difficult to effectively penetrate into the rock mass, affecting the anchoring quality. Moreover, the contact area and bonding strength between the anchor rod and the surrounding rock are insufficient, resulting in unstable support.

Method used

A multi-section suspension anchor is designed. The second grouting pipe is squeezed upward through the first grouting pipe. When it moves into place, it releases the slurry with the middle of the anchor rod, and uses the expansion and blocking of the supporting foot structure to transfer the rock formation. Pressure, enhance the contact area and bonding strength between the anchor rod and the surrounding rock, and adapt to extremely broken rock conditions.

Benefits of technology

It effectively fills rock mass cracks, improves the integrity and stability of anchoring, enhances pullout resistance and load-bearing capacity, is suitable for huge vertical load environments, and improves the versatility and adaptability of the support scheme.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118836028A_ABST
    Figure CN118836028A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of anchor rod supporting, in particular to a multi-section suspension anchor rod for extremely-broken surrounding rock supporting. The invention provides the multi-section suspension anchor rod for extremely broken surrounding rock support, which can effectively fill rock mass cracks and improve the contact area and bonding strength between the anchor rod and surrounding rock, thereby enhancing the integrity and stability of anchoring. A multi-section suspension anchor rod for extremely-broken surrounding rock supporting comprises a first anchor rod, an anchor rod tray, a fastening nut and the like, the anchor rod tray is arranged on the lower portion of the first anchor rod, and the fastening nut is arranged below the anchor rod tray. The first grouting pipe extrudes the second grouting pipe upwards to enable the second grouting pipe to move upwards, when the second grouting pipe moves upwards in place, the grouting hole is aligned with the butt joint hole, grout is released from the middle of the anchor rod, and the supporting foot is synchronously released by utilizing the stroke of hole position alignment, so that rock cracks can be effectively filled; the contact area and the bonding strength of the anchor rod and surrounding rock are improved, so that the integrity and the stability of anchoring are enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of anchor rod support, and in particular to a multi-section suspension anchor rod for extremely broken surrounding rock support. Background Art

[0002] The support of extremely fractured surrounding rock is a very challenging engineering task because it involves unstable and easily collapsed rock structures, which places higher demands on support technology and materials.

[0003] The existing support anchor structure for extremely broken surrounding rocks is usually designed in sections. The section suspension anchor is divided into several sections, and each section is connected by a specific structure. This design allows the anchor to adapt to different stress conditions and degree of crushing in the surrounding rock at different depths, thereby improving the overall adaptability and support efficiency. When the anchor is anchored, the filling between the anchor and the anchor borehole is usually done by grouting and anchor filling, etc. However, when the existing anchor is grouted, the slurry flows out through the end of the anchor. Due to the slurry solidification time and fluidity requirements, the injected slurry is difficult to penetrate into the extremely broken surrounding rock, and it is difficult to effectively fill the rock cracks, which affects the anchoring quality.

[0004] Therefore, a multi-segment suspension anchor for extremely broken surrounding rock support has been developed, which can effectively fill rock cracks, increase the contact area and bonding strength between the anchor and the surrounding rock, thereby enhancing the integrity and stability of the anchor. Summary of the invention

[0005] In order to overcome the shortcomings of the prior art in the above-mentioned background technology, the present invention provides a multi-segment suspended anchor for supporting extremely broken surrounding rocks, which can effectively fill rock cracks, increase the contact area and bonding strength between the anchor and the surrounding rock, thereby enhancing the integrity and stability of the anchoring.

[0006] Technical solution: A multi-section suspended anchor for extremely broken surrounding rock support, including a first anchor, an anchor tray, a fastening nut, a reinforcement mechanism, a crushing mechanism and a release mechanism. The anchor tray is arranged at the lower part of the first anchor, a fastening nut is arranged below the anchor tray, the fastening nut is threadedly connected to the lower part of the first anchor, a reinforcement mechanism is arranged on the connecting piece on the first anchor, a crushing mechanism is arranged above the reinforcement mechanism, and a release mechanism is arranged inside the crushing mechanism.

[0007] Optionally, the first anchor rod includes a first grouting pipe, a connecting piece and a screw block. The first anchor rod is slidably and rotatably connected to the first grouting pipe, the upper part of the first anchor rod is connected to the connecting piece, the inner side of the upper part of the first anchor rod is connected to the screw block, and the upper part of the first grouting pipe is threadedly connected to the screw block.

[0008] Optionally, the reinforcement mechanism includes a second anchor rod, a second grouting pipe, a mounting block, a support leg, a sliding block, a connecting frame, a spring and an extrusion block, the second anchor rod is clamped on the connecting piece, the top of the second anchor rod is also connected to the connecting piece, the second anchor rod can be spliced ​​using the connecting piece, a plurality of grouting holes are opened in the middle of the Z-axis of the second anchor rod, a second grouting pipe is slidably connected to the inside of the second anchor rod, the top of the second grouting pipe is inserted into the connecting piece, the bottom of the second grouting pipe contacts the top of the first grouting pipe, a plurality of docking holes are opened in the middle of the Z-axis of the second grouting pipe, the inner sides of the upper and lower parts of the second anchor rod are connected to the mounting blocks, a group of support legs are rotatably connected to the mounting blocks, each group consists of four support legs, the support legs are slidably connected to the sliding blocks, the sliding blocks on the same group of support legs are rotatably connected to the connecting frame, the second grouting pipe passes through the connecting frame, the upper and lower parts of the second grouting pipe are connected to the extrusion blocks, and a spring is connected between the extrusion block and the adjacent connecting frame.

[0009] Optionally, the crushing mechanism includes a mounting head, a fixed block and a stirring frame. The mounting head is clamped on the connecting piece at the top of the second anchor rod, and multiple release holes are opened on the side wall of the mounting head. The upper part of the mounting head is rotatably connected to the fixed block, and the bottom of the fixed block is connected to the stirring frame.

[0010] Optionally, the installation head is a cone-shaped structure, which facilitates the placement of the second anchor rod into the anchor rod drill hole.

[0011] Optionally, the release mechanism includes an intercepting frame, a docking column and a push rod. The intercepting frame is rotatably connected inside the installation head. A plurality of rotation grooves are opened on the inner side of the intercepting frame. A plurality of release grooves are opened on the intercepting frame. A docking column is clamped on the top of the second grouting pipe. A plurality of push rods are connected to the upper part of the docking column. The push rods are respectively located in the corresponding rotation grooves.

[0012] The present invention has the following advantages: 1. The present invention squeezes the second grouting pipe upward through the first grouting pipe to move the second grouting pipe upward. When the second grouting pipe moves upward into place, the grouting hole is aligned with the docking hole, and the slurry is released from the middle of the anchor rod. In addition, the operation of synchronously releasing the support legs by utilizing the stroke of hole alignment can effectively fill the rock cracks, increase the contact area and bonding strength between the anchor rod and the surrounding rock, and thus enhance the integrity and stability of the anchoring.

[0013] 2. The present invention drives the extrusion block to move upward through the movement of the second grouting pipe, and controls the operation of rotating and unfolding the support legs, which can effectively transmit the rock pressure, reduce the risk of bending or breaking of the anchor rod due to uneven force, and significantly improve the pull-out resistance and bearing capacity of the anchor rod, and is particularly suitable for environments with huge vertical loads.

[0014] 3. The support leg structure of the present invention can also better adapt to irregular and extremely broken rock conditions. By unfolding and locking the support legs, the effective fixation of the anchor rods can be ensured even when the rock mass is severely broken, thereby improving the versatility and adaptability of the support scheme. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.

[0016] Figure 2 It is a structural cross-sectional view of the present invention.

[0017] Figure 3 It is a schematic diagram of the three-dimensional structure of the present invention.

[0018] Figure 4 It is a sectional view of the three-dimensional structure of the present invention.

[0019] Figure 5 It is a three-dimensional structural cross-sectional view of the reinforcement mechanism of the present invention.

[0020] Figure 6 It is a schematic diagram of the three-dimensional structure of the reinforcement mechanism of the present invention.

[0021] Figure 7 It is a schematic diagram of the three-dimensional structure of the second anchor rod, grouting hole and support leg of the present invention.

[0022] Figure 8 It is a schematic diagram of the three-dimensional structure of the second anchor rod and the grouting hole of the present invention.

[0023] Fig. 9 It is a partial three-dimensional structural cross-sectional view of the reinforcement mechanism of the present invention.

[0024] Fig.10 It is a three-dimensional structural cross-sectional view of the crushing mechanism and the releasing mechanism of the present invention.

[0025] Fig.11 It is a three-dimensional structural schematic diagram of the crushing mechanism of the present invention.

[0026] Fig.12 It is a schematic diagram of the three-dimensional structure of the release mechanism of the present invention.

[0027] In the above drawings: 1-first anchor rod, 11-anchor rod tray, 12-fastening nut, 13-first grouting pipe, 14-connecting piece, 15-screw block, 2-reinforcement mechanism, 20-second anchor rod, 2001-grouting hole, 21-second grouting pipe, 2101-docking hole, 22-mounting block, 23-support foot, 24-sliding block, 25-connecting frame, 26-spring, 27-extrusion block, 3-crushing mechanism, 30-mounting head, 3001-release hole, 31-fixed block, 32-mixing frame, 4-release mechanism, 40-interception frame, 4001-rotating groove, 4002-release groove, 41-docking column, 42-push rod. DETAILED DESCRIPTION

[0028] Hereinafter, embodiments of the present invention will be described with reference to the drawings.

[0029] A multi-section suspension anchor for extremely broken surrounding rock support, such as Figure 1-Figure 12 As shown, it includes a first anchor rod 1, an anchor rod tray 11, a fastening nut 12, a first grouting pipe 13, a connecting piece 14, a screw block 15, a reinforcement mechanism 2, a crushing mechanism 3 and a release mechanism 4, the anchor rod tray 11 is arranged at the lower part of the first anchor rod 1, a fastening nut 12 is arranged below the anchor rod tray 11, the fastening nut 12 is threadedly connected to the lower part of the first anchor rod 1, the first grouting pipe 13 is slidably and rotatably connected inside the first anchor rod 1, the upper part of the first anchor rod 1 is connected to the connecting piece 14, the inner side of the upper part of the first anchor rod 1 is connected to the screw block 15, the upper part of the first grouting pipe 13 is threadedly connected to the screw block 15, the connecting piece 14 on the first anchor rod 1 is provided with a reinforcement mechanism 2, the crushing mechanism 3 is arranged above the reinforcement mechanism 2, and the release mechanism 4 is arranged inside the crushing mechanism 3;

[0030] The reinforcement mechanism 2 includes a second anchor rod 20, a second grouting pipe 21, a mounting block 22, a support leg 23, a sliding block 24, a connecting frame 25, a spring 26 and an extrusion block 27. The second anchor rod 20 is clamped on the connecting piece 14, and the top of the second anchor rod 20 is also connected to the connecting piece 14. The second anchor rod 20 can be spliced ​​using the connecting piece 14. A plurality of grouting holes 2001 are opened in the middle of the Z axis of the second anchor rod 20. The second grouting pipe 21 is slidably connected inside the second anchor rod 20. The top of the second grouting pipe 21 is inserted into the connecting piece 14, and the bottom of the second grouting pipe 21 contacts the top of the first grouting pipe 13. A plurality of docking holes 2101 are opened in the middle of the Z axis of the second grouting pipe 21. The inner sides of the upper and lower parts of the second anchor rod 20 are connected with mounting blocks 22. A group of supporting legs 23 are rotatably connected to the mounting blocks 22. Each group consists of four supporting legs 23. The supporting legs 23 are slidably connected with sliding blocks 24. The sliding blocks 24 on the same group of supporting legs 23 are rotatably connected to each other. The connecting frame 25, the second grouting pipe 21 passes through the connecting frame 25, the second grouting pipe 21 is connected with an extrusion block 27 at the upper and lower parts, and a spring 26 is connected between the extrusion block 27 and the adjacent connecting frame 25, the first grouting pipe 13 squeezes the second grouting pipe 21 upward, so that the second grouting pipe 21 moves upward, and when the second grouting pipe 21 moves upward into position, the grouting hole 2001 is aligned with the docking hole 2101, and the slurry flows into the second grouting pipe 21 through the first grouting pipe 13, and flows out through the docking hole 2101 and the grouting hole 2001, the second grouting pipe 21 moves upward to drive the extrusion block 27 to move upward, and the extrusion block 27 moves upward to indirectly push the connecting frame 25 to move upward through the spring 26, and the connecting frame 25 moves upward to control the slider to move upward on the support leg 23, and gradually approach the rotation point of the support leg 23, so that the support leg 23 gradually rotates and expands to embed into the surrounding rock of the support area to increase the tightness of the contact between the first anchor rod 1 and the second anchor rod 20 and the surrounding rock of the support area;

[0031] The crushing mechanism 3 includes an installation head 30, a fixing block 31 and a stirring frame 32. The installation head 30 is clamped on the connecting piece 14 at the top of the second anchor rod 20. The installation head 30 is a conical structure, which is convenient for the second anchor rod 20 to be placed in the anchor rod drilling hole. A plurality of release holes 3001 are opened on the side wall of the installation head 30. The upper part of the installation head 30 is rotatably connected to the fixing block 31, and the bottom of the fixing block 31 is connected to the stirring frame 32. The installation head 30 is located at the bottom of the anchor rod drilling hole and is squeezed by the first anchor rod 1 and the second anchor rod 20. It is in close contact with the bottom of the hole, and an anchoring agent is filled between the installation head 30 and the connecting piece 14. The anchoring agent is tightly attached to the stirring frame 32. The rotation of the first anchor rod 1 drives the second anchor rod 20 to rotate. Since the fixing block 31 on the installation head 30 is now unable to rotate due to the bottom of the hole, the anchoring agent inside the second anchor rod 20 rotates, and is stirred and crushed because it is tightly attached to the stirring frame 32.

[0032] The release mechanism 4 includes an interception frame 40, a docking column 41 and a push rod 42. The interception frame 40 is rotatably connected inside the installation head 30. A plurality of rotation grooves 4001 are opened on the inner side of the interception frame 40. A plurality of release grooves 4002 are opened on the interception frame 40. The docking column 41 is clamped on the top of the second grouting pipe 21. A plurality of push rods 42 are connected to the upper part of the docking column 41. The push rods 42 are respectively located in the corresponding rotation grooves 4001. The second grouting pipe 21 moves upward and drives the push rods 42 to move upward through the docking column 41. The push rods 42 move upward and use the rotation grooves 4001 to control the rotation of the interception frame 40, so that the release grooves 4002 on the interception frame 40 are aligned with the release holes 3001, so that the crushed anchoring agent inside the installation head 30 can be discharged.

[0033] When the present invention is used, taking the extremely broken surrounding rock support area at the top plate position in the tunnel as an example, anchor holes are first constructed in the extremely broken surrounding rock support area at the top plate, and the drilling points and the number of holes are determined according to the specific support construction requirements. Then, the first anchor rod 1 and the second anchor rod 20 are spliced ​​by using the connecting piece 14, so that the length of the first anchor rod 1 and the second anchor rod 20 after splicing can adapt to the depth of the anchor rod drilling hole, and the installation head 30 is docked on the second anchor rod 20 facing the direction inside the anchor rod drilling hole, and the installation head 30 is docked on the second anchor rod 20 facing the direction inside the anchor rod drilling hole. During installation, an anchoring agent is filled between the installation head 30 and the butted connector 14, and the second anchor rod 20 is placed into the anchor rod borehole using the installation head 30. After the first anchor rod 1 and the second anchor rod 20 are installed, the first grouting pipe 13 is rotated. At this time, the first grouting pipe 13 uses the thread between the first grouting pipe 13 and the screw block 15 to move in the direction indicated by the Z-axis arrow (upward). At this time, the first grouting pipe 13 moves upward to lift the second grouting pipe 21, so that the second grouting pipe 21 moves upward. The upward movement of the slurry pipe 21 drives the extrusion block 27 to move upward. The upward movement of the extrusion block 27 indirectly pushes the connecting frame 25 to move upward through the spring 26. The upward movement of the connecting frame 25 controls the sliding block to move upward on the support leg 23 and gradually approaches the rotation point of the support leg 23, so that the support leg 23 gradually rotates and expands to embed into the surrounding rock of the support area, increasing the degree of contact between the first anchor rod 1 and the second anchor rod 20 and the surrounding rock of the support area, and using the support leg 23 to fix the first anchor rod 1 and the second anchor rod 20 in the borehole, and when the first anchor rod 1 and the second anchor rod 20 are in the borehole, the first anchor rod 1 and the second anchor rod 20 are in the borehole. When the second grouting pipe 21 moves upward into position, the grouting hole 2001 is aligned with the docking hole 2101, and then the end of the first grouting pipe 13 exposed from the drilled hole is docked with the pipeline of the grouting equipment, and concrete slurry (slurry for short) is injected into the first grouting pipe 13 through the grouting equipment. The slurry flows into the second grouting pipe 21 through the first grouting pipe 13, and flows out through the docking hole 2101 and the grouting hole 2001, gradually permeating into the extremely broken surrounding rock support area, and after the slurry is solidified, it can increase the integrity of the extremely broken surrounding rock support area;Before grouting, the installation head 30 is located at the bottom of the anchor hole, and is squeezed by the first anchor 1 and the second anchor 20, and is in close contact with the bottom of the hole. Anchoring agent is filled between the installation head 30 and the connecting piece 14, and the anchoring agent is in close contact with the stirring frame 32. The first anchor 1 is rotated to drive the second anchor 20 to rotate (operated before grouting and when the support legs 23 are not unfolded), so that the first anchor 1 and the second anchor 20 rotate as a whole. Since the fixing block 31 on the installation head 30 is now unable to rotate due to the bottom of the hole, the anchoring agent inside the second anchor 20 rotates, and is in close contact with the stirring frame 32, it is stirred and crushed, and the first grouting pipe 13 lifts the second grouting upward, and the second grouting pipe 21 moves upward to control the docking column 41 to move upward, and the docking column 41 The upward movement drives the push rod 42 and the bottom of the top anchor, so that the anchor also moves upward, and cooperates with the stirring frame 32 to completely crush the anchor. When the push rod 42 moves upward, the rotating groove 4001 is used to control the rotation of the interception frame 40, so that the release groove 4002 on the interception frame 40 is aligned with the release hole 3001, so that the anchor crushed inside the installation head 30 can be discharged. When the anchor is released and crushed, the support leg 23 completes the expansion action to increase the stability of the anchor support. The anchor tray 11 is placed on the position where the first anchor 1 is exposed from the drill hole, and the fastening nut 12 is rotated to make the anchor tray 11 contact with the rock wall surface of the support area. This is the most basic anchor support principle, which will not be described in detail here. ;

[0034] While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.The scope of the following claims is to be accorded the broadest interpretation so as to encompass all such modifications and equivalent structures and functions.

Claims

1. A multi-section suspension anchor for extremely broken surrounding rock support, comprising a first anchor (1), an anchor tray (11), a fastening nut (12), a reinforcement mechanism (2), a breaking mechanism (3) and a release mechanism (4), wherein the anchor tray (11) is arranged at the lower part of the first anchor (1), a fastening nut (12) is arranged below the anchor tray (11), and the fastening nut (12) is threadedly connected to the lower part of the first anchor (1), It is characterized in that A reinforcing mechanism (2) is provided on the connecting piece (14) on the first anchor rod (1), a crushing mechanism (3) is provided above the reinforcing mechanism (2), and a releasing mechanism (4) is provided inside the crushing mechanism (3).

2. A multi-section suspension anchor for extremely broken surrounding rock support as claimed in claim 1, It is characterized in that The first anchor rod (1) comprises a first grouting pipe (13), a connecting piece (14) and a screw block (15); the first anchor rod (1) is slidably and rotatably connected to the first grouting pipe (13); the upper part of the first anchor rod (1) is connected to the connecting piece (14); the inner side of the upper part of the first anchor rod (1) is connected to the screw block (15); and the upper part of the first grouting pipe (13) is threadedly connected to the screw block (15).

3. A multi-section suspension anchor for extremely broken surrounding rock support as claimed in claim 1, It is characterized in that The reinforcement mechanism (2) comprises a second anchor rod (20), a second grouting pipe (21), a mounting block (22), a support leg (23), a sliding block (24), a connecting frame (25), a spring (26) and an extrusion block (27); the second anchor rod (20) is clamped on the connecting piece (14); the top of the second anchor rod (20) is also connected to the connecting piece (14); the second anchor rod (20) can be spliced ​​using the connecting piece (14); a plurality of grouting holes (2001) are opened in the middle of the Z axis of the second anchor rod (20); the second grouting pipe (21) is slidably connected inside the second anchor rod (20); the top of the second grouting pipe (21) is inserted into the connecting piece (14); the bottom of the second grouting pipe (21) is connected to the first grouting pipe (21); The second grouting pipe (21) is provided with a plurality of docking holes (2101) in the middle of the Z axis, the inner sides of the upper and lower parts of the second anchor rod (20) are connected with mounting blocks (22), a group of supporting legs (23) are rotatably connected to the mounting blocks (22), each group is composed of four supporting legs (23), a sliding block (24) is slidably connected to the supporting legs (23), a connecting frame (25) is rotatably connected between the sliding blocks (24) on the same group of supporting legs (23), the second grouting pipe (21) passes through the connecting frame (25), the upper and lower parts of the second grouting pipe (21) are connected with extrusion blocks (27), and a spring (26) is connected between the extrusion block (27) and the adjacent connecting frame (25).

4. A multi-section suspension anchor for extremely broken surrounding rock support as claimed in claim 1, It is characterized in that The crushing mechanism (3) comprises a mounting head (30), a fixing block (31) and a stirring frame (32); the mounting head (30) is clamped on the connecting piece (14) at the top of the second anchor rod (20); a plurality of release holes (3001) are opened on the side wall of the mounting head (30); the upper part of the mounting head (30) is rotatably connected to the fixing block (31); and the bottom of the fixing block (31) is connected to the stirring frame (32).

5. A multi-section suspension anchor for extremely broken surrounding rock support as claimed in claim 4, It is characterized in that The installation head (30) is a cone-shaped structure, which facilitates the placement of the second anchor rod (20) into the anchor rod drill hole.

6. A multi-section suspension anchor for extremely broken surrounding rock support as claimed in claim 1, It is characterized in that The release mechanism (4) comprises an interception frame (40), a docking column (41) and a push rod (42); the interception frame (40) is rotatably connected inside the installation head (30); a plurality of rotation grooves (4001) are formed inside the interception frame (40); a plurality of release grooves (4002) are formed on the interception frame (40); a docking column (41) is clamped on the top of the second grouting pipe (21); a plurality of push rods (42) are connected to the upper part of the docking column (41); and the push rods (42) are respectively located in corresponding rotation grooves (4001).