Anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction
By designing anchor structure and support ring with strong bending resistance in soft rock tunnel construction, the problem of anchor stress concentration and monitoring is solved, the stability of anchor body and the accuracy of monitoring data is achieved, and the tunnel is improved safety and support effect.
Patent Information
- Application Number
- CN202411322884.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-09-23
AI Technical Summary
During the construction of existing tunnels, rock formation extrusion during soft rock tunnels leads to concentrated stress around the anchor body, and the anchor rods are prone to bend or damaged, so it is impossible to effectively monitor the deformation of the surrounding rock in the tunnel. The existing monitoring methods are expensive, complex in installation, and have large interference. , difficult to apply in large quantities.
Design a soft rock tunnel construction extruded rock formation deformation monitoring anchor rod, by increasing the bending resistance and stability of the anchor body, use a combined structure of sliding disk, barrier disk, pressure sensor and spring to monitor the pressure condition of the anchor body, and Disperse stress through the support ring to reduce the risk of anchor bending.
It effectively improves the anchoring force and stability of the anchor body, ensures the continuity and accuracy of monitoring data, reduces the impact of stress concentration on the anchor rod, and improves the safety performance and support effect of the tunnel.
Smart Images

Figure CN118836030B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering for tunnel construction, in particular to an anchor rod for monitoring deformation of squeezed rock layers in soft rock tunnel construction. Background Art
[0002] Before tunnel excavation, the rock mass is in a three-way high confining pressure environment, which is mutually constrained and in a stable equilibrium state. After tunnel excavation, stress is redistributed twice, and the tangential stress near the tunnel wall increases while the radial stress decreases (approaches zero). At this time, the rock mass environment of the tunnel wall changes from a high confining pressure state to a low confining pressure state. The confining pressure is in a plastic state in a large range of the stress increase area. When the support structure is not enough to resist the deformation of the surrounding rock, a significant plastic state is generated. When the tangential stress is larger, the plastic radius of the surrounding rock will also increase after tunnel excavation. This deformation is a significant plastic deformation generated under high ground stress conditions, and has two main characteristics:
[0003] 1. The deformation is large. Generally, the deformation of soft rock tunnels can reach more than 10 cm, while the deformation of squeezing soft rock tunnels can reach more than 30 cm, or even more than 100 cm. It is often manifested as cracking of initial support sprayed concrete, distortion of steel frames, deformation intrusion, and even cracking of the secondary lining.
[0004] 2. Deformation lasts for a long time. Since the weak surrounding rock has high rheology and low strength, the stress redistribution after excavation lasts for a long time, resulting in a long deformation convergence time. The shortest time is tens of days, hundreds of days, and the longest time is several years.
[0005] For the problem of large deformation, the pressure-yielding anchor rod is usually used for anchoring. The anchor rod adapts to the large deformation of the rock and soil in the stratum to achieve the pressure-yielding effect. The deformed geological body will release the harmful deformation appropriately during the anchoring, maintain the anchoring effect, ensure the reliability of the anchoring, and provide protection for the safety of the project. However, the existing pressure-yielding anchor rod cannot monitor the deformation of the surrounding rock inside the tunnel, and cannot effectively judge the pressure-yielding condition of the anchor rod.
[0006] As for the problem of long-lasting deformation, it is necessary to carry out long-term and continuous monitoring of the weak surrounding rock of the tunnel after excavation. At present, the monitoring of surrounding rock pressure between surrounding rock and initial support is mainly carried out by pre-buried soil pressure box method. This method is expensive, complex to install, and has great interference to construction, so it is difficult to apply it in large quantities in tunnel engineering.
[0007] The existing patent (publication number CN118327648A) discloses a tunnel soft rock large deformation monitoring anchor rod, which relates to the field of underground engineering of tunnel construction, including an anchor rod assembly and a measuring device. The anchor rod assembly includes a pressure-yielding device, a hollow anchor rod and an anchor head. The two ends of the pressure-yielding device are detachably connected to the hollow anchor rod and the anchor head respectively. The pressure-yielding device includes a sleeve and a movable body and a resistance body located in the sleeve. The movable body is slidably connected to the sleeve, and the resistance body is clamped with the sleeve. The movable body abuts against the resistance body to provide working resistance for the anchor rod assembly; the measuring device includes a pressure element, a data line and a host. The pressure element is located in the resistance body. The invention provides multiple resistance bodies to improve the anchoring effect of the anchor rod assembly; at the same time, when the pressure element is pressurized, the pressure signal will be transmitted to the external host, so as to monitor the deformation of the soft rock and the tension of the anchor body in real time, effectively judge the pressure-yielding condition of the anchor rod, and improve the safety of tunnel support.
[0008] Although the invention can monitor the deformation of soft rock and the tension of the anchor body in real time, the following problems still exist during the monitoring process:
[0009] 1. During the construction of soft rock tunnels, rock compression may lead to stress concentration around the anchor body, causing the anchor rod to bear stress beyond the design range. In this case, the anchor rod may bend, deform or be damaged, thus affecting the continuity and accuracy of the monitoring data;
[0010] 2. This invention only connects anchor rods and drill holes by grouting, resulting in low connection strength. In soft rock tunnels, due to the poor self-stabilizing ability of the surrounding rock, the supporting structure is easily damaged, which will lead to the deformation of the surrounding rock cannot be effectively controlled, thereby affecting the stability and safety of the tunnel. Summary of the invention
[0011] The invention provides an anchor rod for monitoring deformation of squeezed rock layers during construction of soft rock tunnels, which solves the problems of stress concentration around the anchor body and easy damage of the anchor body in the background technology by increasing the bending resistance, supporting capacity and stability of the anchor body.
[0012] The technical solution of the present invention is as follows:
[0013] An anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction, comprising: an anchor body, a sleeve, an anchor head, and a mounting assembly, wherein the anchor body is slidably connected to the sleeve, and the inner diameter of the sleeve is larger than the outer diameter of the anchor body, and the anchor head is threadedly connected to one end of the anchor body;
[0014] The anchor body is a hollow cylindrical shape, a circular groove is provided in the outer wall of the anchor body, and a plurality of blocking discs are fixedly connected in the circular groove, two symmetrical empty grooves are provided in the axial direction of the outer wall of the anchor body, a sliding disc is provided between every two blocking discs, the sliding disc is slidably connected in the circular groove, the sliding disc is fixedly connected with protrusions through the empty grooves on both sides, a pressure sensor is installed on one side of the blocking disc, and a spring is fixedly connected on the anchor body and located between the pressure sensor and the sliding disc;
[0015] A plurality of symmetrical push blocks are fixedly connected to the inner wall of the sleeve in the axial direction. The push blocks are located on the side of the sliding disk not connected to the spring one, and the number of the push blocks is the same as that of the protrusions.
[0016] Preferably, the anchor head comprises a hollow tube, a flow port 1 is provided on the hollow tube, one end of the hollow tube is threadedly connected to one end of the anchor body, the other end of the hollow tube is fixedly connected to a chassis, a plurality of threaded cones are rotatably connected to the chassis, the heads of the threaded cones face one side of the anchor body, a chuck is fixedly connected to the hollow tube and located on a side of the flow port 1 away from the chassis, and a flow port 2 is provided on the chuck.
[0017] Preferably, the installation assembly includes a slurry stop plug, a threaded barrel, a gasket and a nut, the slurry stop plug, the gasket and the nut are sequentially arranged at the end of the sleeve away from the anchor head, and the nut is close to the sleeve port, the slurry stop plug is threadedly connected to the sleeve, the threaded barrel is rotatably connected to one end of the anchor body, and the other end of the threaded barrel extends out of the sleeve, only one end of the threaded barrel is provided with a thread, the sleeve is provided with thread teeth, and is threadedly connected to the threaded barrel through the thread teeth, the gasket is sleeved on the sleeve, and the nut is threadedly connected to the sleeve.
[0018] Preferably, a plurality of support rings are fixedly connected inside the sleeve, each of the support rings is located between two push blocks, and inclined grooves are provided on both sides of the support rings.
[0019] Preferably, two symmetrical empty grooves 2 are opened on the outer wall of the anchor body and located in the axial direction, an arc block is fixedly connected to the sliding plate, the arc block is slidably connected to the empty groove 2, a slider 1 and a slider 2 are slidably connected to the arc block, the sliding direction of the slider 1 is perpendicular to the cross-section of the support ring, and the sliding direction of the slider 2 is perpendicular to the sliding direction of the slider 1.
[0020] Preferably, a block 1 is fixedly connected to one side of the slider 1 close to the slider 2, the slider 1, block 1 and slider 2 form a group and are arranged in groups on both sides of the support ring, the slider 1 is a right-angled trapezoid, and the hypotenuse facing the inclined groove is adapted to the angle of the inclined groove, the block 1 is a right-angled trapezoid, the slider 2 is an isosceles trapezoid, and the hypotenuse on one side is adapted to the trapezoidal hypotenuse of the block 1.
[0021] Preferably, racks 1 are provided on both sides of the second empty slot, and the racks 1 are fixedly connected to the anchor body.
[0022] Preferably, a square groove is provided on the anchor body, and the square groove is located directly below the support ring, a slider five is slidably connected in the square groove, a spring two is fixedly connected between the slider five and the square groove, a pressure sensor two is installed in the square groove, and the pressure sensor two is located between the square groove and the spring two.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1. The present invention pushes the sliding plate to move in the circular groove through the push block, and makes the sliding plate squeeze the spring 1, thereby increasing the anchoring force of the anchor body through the resistance of the spring 1, and monitoring the deformation of the tunnel and the pressure generated by the deformation through the pressure sensor 1 on the blocking plate, thereby effectively judging the pressure release of the anchor body, facilitating the staff to deal with it in time and improving the safety performance of the tunnel. At the same time, a number of push blocks and sliding plates are arranged, so that the entire section of the anchor body can effectively resist the stress generated by the deformation of the tunnel, thereby improving the pressure release effect of the anchor body and preventing the monitoring failure due to damage to a certain component.
[0025] 2. The present invention provides a plurality of support rings so that the concentrated stress generated by tunnel deformation is dispersed through the plurality of support rings, thereby reducing the influence of stress concentration on the anchor rod.
[0026] 3. The present invention slows down the movement of slider 1 and the bending speed of the support ring by pushing slider 2 through block 1, thereby achieving circumferential pressure relief of the sleeve; the bottom edge of slider 2 fits with the right-angle edge of the teeth of rack 1, thereby applying a certain resistance to rack 1 through slider 2, thereby preventing the bending of the sleeve from causing the anchor body to move.
[0027] 4. In the present invention, the slider 2 on the arc block is blocked by the rack 1 and slides toward the block 1, and pushes the block 1 and the slider 1 to approach the support ring, thereby correcting the bending of the support ring and preventing the support effect from being reduced due to excessive bending; at the same time, the resistance between the slider 2 on the arc block and the rack 1 increases the sliding resistance of the sliding disk, thereby improving the anchoring ability and pressure-releasing effect of the anchor body. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a stereogram of the structure of the present invention;
[0029] Figure 2 The present invention Figure 1 A partial enlarged view of middle A;
[0030] Figure 3 The present invention Figure 1 A partial enlarged view of B in the middle;
[0031] Figure 4 is a cross-sectional view of the structure of the present invention;
[0032] Figure 5 The present invention Figure 4 A partial enlarged view of middle C;
[0033] Figure 6 It is a three-dimensional diagram of the empty slot and upper structure on the anchor body of the present invention;
[0034] Figure 7 is a cross-sectional perspective view of the structure of the present invention;
[0035] Figure 8 It is a three-dimensional diagram of the structure of the second upper slot on the anchor body of the present invention;
[0036] Fig. 9 The present invention Figure 8 A partial enlarged view of D in the middle;
[0037] Fig.10 is a cross-sectional view of the upper structure of the anchor body of the present invention;
[0038] Fig.11 The present invention Fig.10 A partial enlarged view of E.
[0039] In the figure:
[0040] 1. Anchor body; 11. Circular groove; 12. Blocking plate; 13. Empty groove one; 14. Sliding plate; 15. Bump; 16. Spring one; 17. Pressure sensor one; 18. Empty groove two; 19. Arc block; 110. Slider one; 111. Block one; 112. Slider two; 113. Rack one; 114. Square groove; 115. Slider five; 116. Spring two; 117. Pressure sensor two; 2. Sleeve; 21. Push block; 22. Support ring; 23. Inclined groove; 24. Threaded teeth; 3. Anchor head; 31. Hollow tube; 32. Flow port one; 33. Chassis; 34. Threaded cone; 35. Chuck; 36. Flow port two; 4. Mounting assembly; 41. Stop plug; 42. Threaded barrel; 43. Pad; 44. Nut; 45. Main engine. DETAILED DESCRIPTION
[0041] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention. Embodiment 1:
[0042] like Figure 1 As shown, an anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction comprises: an anchor body 1, a sleeve 2, an anchor head 3, and a mounting assembly 4. The anchor body 1 is slidably connected to the sleeve 2, and the inner diameter of the sleeve 2 is larger than the outer diameter of the anchor body 1. The anchor head 3 is threadedly connected to one end of the anchor body 1.
[0043] The anchor body 1 is a hollow cylindrical shape, a circular groove 11 is provided in the outer wall of the anchor body 1, and a plurality of blocking discs 12 are fixedly connected in the circular groove 11, two symmetrical empty grooves 13 are provided in the axial direction of the outer wall of the anchor body 1, a sliding disc 14 is provided between every two blocking discs 12, the sliding disc 14 is slidably connected in the circular groove 11, and the sliding disc 14 is fixedly connected with a bump 15 through the empty grooves 13 on both sides, a pressure sensor 17 is installed on one side of the blocking disc 12, and a spring 16 is fixedly connected on the anchor body 1 and located between the pressure sensor 17 and the sliding disc 14;
[0044] A plurality of symmetrical push blocks 21 are fixedly connected to the inner wall of the sleeve 2 in the axial direction. The push blocks 21 are located on the side of the sliding plate 14 that is not connected to the spring 16 . The number of the push blocks 21 is the same as that of the protrusions 15 .
[0045] The anchor head 3 includes a hollow tube 31, which is provided with a flow port 1 32. One end of the hollow tube 31 is threadedly connected to one end of the anchor body 1, and the other end of the hollow tube 31 is fixedly connected to a chassis 33. A plurality of threaded cones 34 are rotatably connected to the chassis 33, and the heads of the threaded cones 34 face one side of the anchor body 1. A chuck 35 is fixedly connected to the hollow tube 31 and is located on the side of the flow port 1 away from the chassis 33, and a flow port 2 36 is provided on the chuck 35.
[0046] The mounting assembly 4 includes a slurry stop plug 41, a threaded barrel 42, a gasket 43, and a nut 44. The slurry stop plug 41, the gasket 43, and the nut 44 are sequentially arranged at the end of the sleeve 2 away from the anchor head 3, and the nut 44 is close to the end of the sleeve 2. The slurry stop plug 41 is threadedly connected to the sleeve 2, the threaded barrel 42 is rotatably connected to one end of the anchor body 1, and the other end of the threaded barrel 42 extends out of the sleeve 2. Only one end of the threaded barrel 42 is provided with a thread, and the sleeve 2 is provided with thread teeth 24, and is threadedly connected to the threaded barrel 42 through the thread teeth 24. The gasket 43 is sleeved on the sleeve 2, and the nut 44 is threadedly connected to the sleeve 2.
[0047] like Figure 1-4As shown, during installation, a hole is first drilled in the tunnel, and then the anchor body 1, sleeve 2, and anchor head 3 are connected in sequence and sent into the borehole, so that the bottom plate 33 contacts the bottom of the borehole, and then the anchor body 1 is pulled backward for a distance. Since a plurality of threaded cones 34 are connected to the bottom plate 33 by rotation through a torsion spring, when the anchor head 3 enters the borehole, the threaded cones 34 are blocked by the borehole and shrink, and when the anchor head 3 moves outward, the head of the threaded cone 34 is blocked by the borehole and inserted into the tunnel, forming a preliminary fixation; then the threaded cylinder 42 is rotated, and since the threads on the threaded cylinder 42 are meshed with the threaded teeth 24 on the sleeve 2, the sleeve 2 is slidably connected to the anchor body 1 and can only move in the axial direction of the anchor body 1, the rotation of the threaded cylinder 42 drives the sleeve 2 to move outward, so that the push block 21 pushes the sliding disk 14, compresses the spring 16 to cause it to shrink a little, and transmits the elastic force to the sleeve 2 through the sliding disk 14 and the push block 21, so that The sleeve 2 tends to move toward the anchor head 3, so that the pad 43 applies pressure to the tunnel. When the tunnel is deformed, the pad 43 can resist the initial deformation, thereby providing a certain preload and initial anchoring for the tunnel. The stop plug 41 is then installed on the sleeve 2, and grouting is performed through the anchor body 1, so that the mud flows from the anchor body 1 into the hollow tube 31 and flows out from the flow port 1 32, so that the mud fills the bottom of the borehole. The mud then flows out from the flow port 2 36 on the chuck 35 to fill the entire borehole. Finally, the pad 43 and the nut 44 are installed to fix the sleeve 2. Since the chuck 35 has the same inner diameter as the borehole, the mud fixes the two sides of the chuck 35 after solidification, so that the anchor head 3 remains stable, and the anchor body 1, the anchor head 3 and the borehole form a whole, further improving the stability and connection strength of the anchor head 3 and the anchor body 1. At the same time, the mud flowing from the flow port 2 36 forms the sleeve 2 and the borehole into a whole.
[0048] It should be noted that the threaded barrel 42 is rotated until the threads on the threaded barrel 42 are separated from the threaded teeth 24 on the sleeve 2, and the sleeve 2 has a rebound tendency under the influence of the contracted spring 16, and the threads on the threaded barrel 42 and the threaded teeth 24 on the sleeve 2 limit the rebound of the sleeve 2.
[0049] like Figure 4-7As shown, when the tunnel expands due to water contact with rock minerals or the surrounding rock is loosened or the rock strata are cracked due to construction, the tunnel will be deformed, and the volume of the tunnel rock and voids will increase, thereby squeezing the pad 43 outward. Since the anchor body 1 and the anchor head 3 are fixed to the bottom layer of the tunnel by mud, they provide support for the tunnel rock strata, and the pad 43 and the sleeve 2 are connected to each other, the pad 43 drives the sleeve 2 and the anchor body 1 to produce relative displacement when it moves outward; the movement of the sleeve 2 causes the push block 21 to push the protrusion 15, and the sliding plate 14 to move in the circular groove 11, and at the same time the sliding plate 14 squeezes the spring 16, and the sleeve 2 releases the pressure of the tunnel through the resistance of the spring 16, and the pressure sensor 17 on the blocking plate 12 monitors the pressure of the push block 21 on the protrusion 15 and the sliding plate 14, thereby indirectly obtaining the pressure generated by the deformation of the tunnel, effectively judging the pressure release of the anchor body 1, facilitating the staff to take timely measures, and improving the safety performance of the tunnel.
[0050] By setting a plurality of push blocks 21, the concentrated stress generated by the deformation of the tunnel on the sleeve 2 is transmitted to the spring 16 through the push blocks 21, so that the stress is absorbed by the compressive deformation of the spring 16. At the same time, the elastic potential energy stored in the spring 16 increases the resistance of the anchor body 1 to the sleeve 2. The spring 16 can absorb the stress more evenly and reduce the damage to the anchor body 1 caused by the stress, so that the entire anchor body 1 can effectively resist the stress generated by the deformation of the tunnel, thereby improving the pressure-relieving effect of the anchor body 1, preventing the monitoring failure caused by damage to one of the components, and improving the support effect of the anchor body 1 and the sleeve 2. Embodiment 2:
[0051] like Figure 8-11 As shown, a plurality of support rings 22 are fixedly connected inside the sleeve 2. The support rings 22 can provide a certain support force for the sleeve 2. Each support ring 22 is located between two push blocks 21, and inclined grooves 23 are provided on both sides of the support ring 22.
[0052] Two symmetrical empty grooves 18 are opened on the outer wall of the anchor body 1 and located in the axial direction. The empty groove 18 is perpendicular to the empty groove 13. An arc block 19 is fixedly connected to the sliding plate 14. The arc block 19 is slidably connected to the empty groove 18. A slider 110 and a slider 2 112 are slidably connected to the arc block 19. The sliding direction of the slider 1 110 is perpendicular to the cross-section of the support ring 22, and the sliding direction of the slider 2 112 is perpendicular to the sliding direction of the slider 1 110.
[0053] A stopper 111 is fixedly connected to one side of the slider 110 close to the slider 2 112. The slider 110, the stopper 111 and the slider 2 112 form a group and are arranged in groups on both sides of the support ring 22. The slider 110 is a right-angled trapezoid, and the hypotenuse facing the inclined groove 23 is adapted to the angle of the inclined groove 23. The stopper 111 is a right-angled trapezoid, and the slider 2 112 is an isosceles trapezoid, and the hypotenuse on one side is adapted to the trapezoidal hypotenuse of the stopper 111. When the support ring 22 tilts to one side, the support ring 22 pushes the slider 110 to move axially along the arc block 19 through the inclined groove 23, so that the trapezoidal inclined surface of the stopper 111 on the slider 110 contacts the trapezoidal inclined surface of the slider 2 112, and pushes the slider 2 112 until it is stuck between the teeth of the rack 1 113.
[0054] Racks 113 are provided on both sides of the empty slot 18, and the racks 113 are fixedly connected to the anchor body 1. When the arc block 19 moves, the sliders 112 on both sides of the support ring 22 are blocked by the racks 113 on both sides and move.
[0055] By providing a plurality of retaining rings 22, the concentrated stress generated by tunnel deformation is dispersed through the plurality of retaining rings 22, thereby reducing the influence of the stress concentration on the anchor rod.
[0056] When the sleeve 2 is subjected to multi-point pressure, it is easy for the sleeve 2 to bend. When the pressure acts on the support ring 22, the support ring 22 presses down the slider 5 115, and the pressure is buffered by the spring 2 116. Figure 10-11 As shown, a square groove 114 is opened on the anchor body 1, and the square groove 114 is located directly below the support ring 22, a slider 5 115 is slidably connected in the square groove 114, a spring 2 116 is fixedly connected between the slider 5 115 and the square groove 114, a pressure sensor 2 117 is installed in the square groove 114, and the pressure sensor 2 117 is located between the square groove 114 and the spring 2 116.
[0057] When the sleeve 2 is under pressure, the support ring 22 presses down the slider 5 115, and at the same time compresses the spring 2 116, and monitors the pressure on the sleeve 2 through the pressure sensor 2 117 in the square groove 114. When the support ring 22 is tilted, the pressure can also be monitored through the pressure sensor 2 117, thereby monitoring the deformation of the tunnel and the pressure generated by the deformation.
[0058] like Figure 8-9As shown, when pressure acts between the two support rings 22, the support ring 22 will tilt to one side. When the support ring 22 tilts, it will push the slider 110 to move axially, thereby pushing the slider 2 112 to move through the stopper 111. The stopper 111 pushes the slider 2 112 to slow down the movement of the slider 110, slow down the bending speed of the support ring 22, and achieve the pressure release of the sleeve 2; at the same time, when the slider 2 112 is inserted into the teeth of the rack 113, the bottom edge of the slider 2 112 fits with the right-angled edge of the teeth of the rack 113, thereby giving a certain resistance to the rack 113 through the slider 2 112, thereby reducing the bending of the sleeve 2 and causing the anchor body 1 to be unstable.
[0059] When the sliding plate 14 moves, it drives the arc block 19 to move. The slider 2 112 on the arc block 19 is blocked by the rack 113 and slides toward the block 111, and pushes the block 111 and the slider 110 to approach the support ring 22, thereby preventing the support ring 22 from further bending, and preventing the support effect from being reduced due to excessive bending; at the same time, the resistance between the slider 2 112 on the arc block 19 and the rack 113 increases the sliding resistance of the sliding plate 14, thereby improving the anchoring ability and pressure-releasing effect of the anchor body 1.
[0060] It should be noted that when the support ring 22 is not bent and the oblique sides of the slider 2 112 and the block 111 are completely in contact, the slider 2 112 is not in contact with the rack 113, so the movement of the arc block 19 and the sliding plate 14 is not affected by the rack 113; when the support ring 22 is bent, the support ring 22 bends to push the block 111 to move, and the slider 2 112 blocks the movement of the block 111, preventing the support ring 22 from further bending, thereby preventing the pressure relief effect from being reduced due to excessive bending.
[0061] It should be noted that the pressure sensor 1 17 and the pressure sensor 2 117 are electrically connected to the external host 45, and the pressure information is displayed through the host 45, so as to judge the deformation of the tunnel.
[0062] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. An anchor rod for monitoring deformation of squeezed rock formations during construction of soft rock tunnels, comprising: An anchor body (1), a sleeve (2), an anchor head (3), and a mounting assembly (4), characterized in that: the anchor body (1) is slidably connected to the sleeve (2), the inner diameter of the sleeve (2) is larger than the outer diameter of the anchor body (1), and the anchor head (3) is threadedly connected to one end of the anchor body (1); The anchor body (1) is in the shape of a hollow cylinder. A circular groove (11) is provided in the outer wall of the anchor body (1), and a plurality of blocking discs (12) are fixedly connected in the circular groove (11). Two symmetrical empty grooves (13) are provided in the outer wall of the anchor body (1) in the axial direction. A sliding disc (14) is provided between every two blocking discs (12). The sliding disc (14) is slidably connected in the circular groove (11). The sliding disc (14) is fixedly connected with protrusions (15) through the empty grooves (13) on both sides. A pressure sensor (17) is installed on one side of the blocking disc (12). A spring (16) is fixedly connected on the anchor body (1) and located between the pressure sensor (17) and the sliding disc (14). A plurality of symmetrical push blocks (21) are fixedly connected to the inner wall of the sleeve (2) in the axial direction, the push blocks (21) are located on the side of the sliding plate (14) not connected to the spring 1 (16), and the number of the push blocks (21) is the same as that of the protrusions (15); A plurality of support rings (22) are fixedly connected inside the sleeve (2), each of the support rings (22) is located between two push blocks (21), and inclined grooves (23) are provided on both sides of the support ring (22); Two symmetrical empty grooves (18) are provided on the outer wall of the anchor body (1) and are located in the axial direction. An arc block (19) is fixedly connected to the sliding plate (14). The arc block (19) is slidably connected to the empty groove (18). A slider (110) and a slider (112) are slidably connected to the arc block (19). The sliding direction of the slider (110) is perpendicular to the cross section of the support ring (22), and the sliding direction of the slider (112) is perpendicular to the sliding direction of the slider (110). A stopper block 1 (111) is fixedly connected to one side of the slider 1 (110) close to the slider 2 (112); the slider 1 (110), the stopper block 1 (111) and the slider 2 (112) form a group and are arranged in a group on both sides of the support ring (22); the slider 1 (110) is a right-angled trapezoid, and the hypotenuse facing the inclined groove (23) matches the angle of the inclined groove (23); the stopper block 1 (111) is a right-angled trapezoid, and the slider 2 (112) is an isosceles trapezoid, and the hypotenuse on one side matches the hypotenuse of the trapezoid of the stopper block 1 (111).
2. The anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction according to claim 1, characterized in that: The anchor head (3) comprises a hollow tube (31), a first flow opening (32) is provided on the hollow tube (31), one end of the hollow tube (31) is threadedly connected to one end of the anchor body (1), the other end of the hollow tube (31) is fixedly connected to a chassis (33), a plurality of threaded cones (34) are rotatably connected to the chassis (33), the heads of the threaded cones (34) face one side of the anchor body (1), a chuck (35) is fixedly connected to the hollow tube (31) and located on a side of the first flow opening (32) away from the chassis (33), and a second flow opening (36) is provided on the chuck (35).
3. The anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction according to claim 1, characterized in that: The mounting assembly (4) comprises a slurry stop plug (41), a threaded barrel (42), a gasket (43), and a nut (44). The slurry stop plug (41), the gasket (43), and the nut (44) are sequentially arranged at an end of the sleeve (2) away from the anchor head (3), and the nut (44) is close to a port of the sleeve (2). The slurry stop plug (41) is threadedly connected to the sleeve (2). The threaded barrel (42) is rotatably connected to one end of the anchor body (1), and the other end of the threaded barrel (42) extends out of the sleeve (2). Only one end of the threaded barrel (42) is provided with a thread. The sleeve (2) is provided with thread teeth (24) and is threadedly connected to the threaded barrel (42) via the thread teeth (24). The gasket (43) is sleeved on the sleeve (2), and the nut (44) is threadedly connected to the sleeve (2).
4. The anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction according to claim 1, characterized in that: Rack one (113) is provided on both sides of the second empty slot (18), and the rack one (113) is fixedly connected to the anchor body (1).
5. The anchor rod for monitoring deformation of squeezed rock formations in soft rock tunnel construction according to claim 1, characterized in that: The anchor body (1) is provided with a square groove (114), and the square groove (114) is located directly below the support ring (22); a slider five (115) is slidably connected in the square groove (114); a spring two (116) is fixedly connected between the slider five (115) and the square groove (114); a pressure sensor two (117) is installed in the square groove (114), and the pressure sensor two (117) is located between the square groove (114) and the spring two (116).
Citation Information
Patent Citations
Tunnel soft rock large deformation monitoring anchor rod
CN118327648A
Anti-dropping constant-resistance yielding anchor rod device and using method thereof
CN116220772A
It hinders stock to let press to increase
CN205225302U
Resistance-increasing yielding anchor rod and tunnel anchor rod supporting structure
CN220101312U
Segmented modular large deformation-resistant and impact-resistant combined anchor bolt and method for assembling same
WO2017190397A1