Four-way valve production process
By setting up multiple assembly departments and automation equipment on the four-way valve production line, automated assembly and testing are realized, which solves the problems of low efficiency and high cost caused by disordered processes and manual operations, and improves production efficiency and product quality.
Patent Information
- Application Number
- CN202411048356.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-29
AI Technical Summary
The four-way valve production process requires a large number of workers to operate manually, resulting in high production costs, low efficiency and low management efficiency, and the process is disorderly distributed, causing product quality problems.
Multiple assembly departments and automated equipment are used to divide work, and different processes are connected through robots and conveyor belts to realize automated assembly and inspection, reduce manual operations, integrate processes and arrange them in a straight line, and improve management efficiency.
Significantly reduces the number of staff, reduces production costs, improves production efficiency, improves product quality, and reduces appearance problems caused by product collisions.
Smart Images

Figure CN118848675A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of four-way valve production and manufacturing, and in particular to a four-way valve production process. Background Art
[0002] Four-way valves are mainly used in air-conditioning systems to switch the refrigerant flow path in the system, thereby realizing the cooling, heating and defrosting functions of the entire system. The four-way valve consists of a main valve, a pilot valve and a solenoid coil. The solenoid coil is fixed to the pilot valve by screws. The pilot valve switches direction by energizing and de-energizing the solenoid coil, thereby driving the main valve to switch direction and realize the switching between cooling and heating of the air conditioner. At present, the specific situation of the production process of the four-way valve is as follows: 1 person for pilot valve assembly, 1 person for pilot valve laser welding, 1 person for pilot valve internal leakage test, 1 person for pilot valve forming, 2 people for upper pilot valve, 2 people for bracket closing, 2 people for brazing, 2 people for upper slider, 2 people for upper piston, 1 person for internal leakage measurement, 2 people for end cover closing, 2 people for capillary insertion, 5 people for high-frequency welding, 1 person for weld inspection, 1 person for shaping, 4 people for helium inspection, 2 people for comprehensive testing, 1 person for appearance inspection, 1 person for pipe mouth inspection, 1 person for dust cap installation and 1 person for packaging. A four-way valve production line needs to be equipped with 36 workers, which leads to high production costs. Then, each process can work independently, and a turnover process needs to be set in the middle, resulting in low production efficiency. And because each process can work independently, a four-way valve production line is distributed in a disorderly manner in the workshop, resulting in low management efficiency. Summary of the invention
[0003] The purpose of the present invention is to provide a four-way valve production process in order to solve the above problems.
[0004] The present invention achieves the above-mentioned purpose through the following technical solutions:
[0005] A four-way valve production process comprises the following steps:
[0006] (1) The first assembly section is provided with an integrated pilot valve assembly device. A small valve body to be assembled is placed on one side of the first assembly section. The staff of the first assembly section takes the small valve body and places it on the fixture of the integrated pilot valve assembly device. The integrated pilot valve assembly device sequentially performs assembly, laser welding, internal leakage test and forming, removes unqualified pilot valves, and obtains finished pilot valves. Then the staff places the finished pilot valves on the first conveyor belt, and the first conveyor belt conveys the finished pilot valves to the second assembly section;
[0007] (2) The second assembly section is provided with a bracket closing device and a first high-frequency welding machine. The main valve and capillary to be assembled are placed on one side of the second assembly section. The staff of the second assembly section takes the finished pilot valve conveyed from the first assembly section on the first conveyor belt, and takes the main valve to be assembled, and then installs the two together by using modified needle-nosed pliers, and then places them on the bracket closing device. The bracket closing device completes the bracket closing to obtain a semi-finished four-way valve. The staff places the semi-finished four-way valve on the fixture of the first high-frequency welding machine, and then the staff takes the capillary and places it on the through holes of the S pipe and the D pipe respectively. The first high-frequency welding machine flame brazes the capillary at the through hole position of the S pipe and the D pipe respectively;
[0008] (3) The third assembly section is provided with a first automatic assembly device. A slider, a connecting rod assembly and a leaf spring are placed on one side of the third assembly section. The first manipulator grabs the semi-finished four-way valve welded by the capillary tube of the second assembly section to the fixture of the first assembly device. The slider is loaded by a clip loading mechanism, the connecting rod assembly is loaded by a servo loading mechanism, and the leaf spring is loaded by a vacuum suction servo shifting mechanism. Then, the first automatic assembly device sequentially completes the assembly of the slider and the leaf spring, and the assembly of the connecting rod assembly;
[0009] (4) The fourth assembly section is provided with a second automatic assembly device, a piston is placed on one side of the fourth assembly section, and the second manipulator grabs the semi-finished four-way valve assembled in the third assembly section to the fixture of the second assembly device. The piston is loaded by a clip loading mechanism, and then the second automatic assembly device sequentially completes the installation of the piston, pre-tightening the first screw, tightening the second screw and tightening the first screw to complete the assembly of the piston;
[0010] (5) The fifth assembly section is provided with an internal leakage test device. The third manipulator grabs the semi-finished four-way valve assembled by the fourth assembly section and places it on the fixture of the internal leakage test device. The internal leakage test device tests the internal leakage of the slider inside the main valve and the internal leakage of the pistons at both ends of the main valve. The mass flow sensor is used to achieve accurate testing and automatic determination. The internal leakage test device removes unqualified semi-finished four-way valves.
[0011] (6) The sixth assembly section is equipped with an automatic end cap closing device. The fourth manipulator grabs the semi-finished four-way valve that has passed the inspection of the fifth assembly section and places it on the fixture of the automatic end cap closing device. The end caps are automatically loaded using a vibration plate double-channel feeder. The automatic end cap closing device assembles the two end caps at both ends of the main valve, and then closes them to ensure the consistency of the closing gap.
[0012] (7) The seventh assembly department is provided with a third automatic assembly device. The staff of the seventh assembly department takes the semi-finished four-way valve assembled by the sixth assembly department, and then uses a pneumatic capillary bending tool to bend the capillary into shape and pre-insert it into the through hole of the end cover. Then, the semi-finished four-way valve is placed on the fixture of the third automatic assembly device. The third automatic assembly device sequentially completes the capillary press-fitting molding, dipping the power-off end in flux, installing the welding ring in the power-off end, welding the power-off end, cooling, reversing, dipping the power-on end in flux, installing the welding ring in the power-on end, welding the power-on end, cooling and ultrasonic cleaning. The welding is all high-frequency welding, and the four-way valve finished product is obtained.
[0013] (8) The eighth assembly section is provided with an infrared vacuum drying device. The fifth manipulator grabs the finished four-way valve after ultrasonic cleaning in the seventh assembly section and places it on the conveyor belt of the infrared vacuum drying device. The infrared vacuum drying device adopts a conveyor belt passing type and performs heating, vacuum drying, drying and cooling in sequence.
[0014] (9) The ninth assembly department is equipped with shaping equipment. The staff of the ninth assembly department takes the four-way valve products that have been dried and cooled in the eighth assembly department, and then checks the welds through a magnifying glass. They also check the weld quality of the flame brazing capillary in the second assembly department and the high-frequency welding in the seventh assembly department. Welding defects include pores, missing welds and burns. The staff places the four-way valve products that have passed the inspection on the fixture of the shaping equipment. The shaping equipment shapes the expanded ends of the E pipe, S pipe and C pipe on the main valve to ensure the roundness and size consistency of the pipe mouth, in preparation for subsequent processes.
[0015] (10) The tenth assembly section is provided with an automatic helium inspection device. The sixth manipulator grabs the finished four-way valve after shaping in the ninth assembly section and places it on the fixture of the automatic helium inspection device. The automatic helium inspection device performs a leakage test on the finished four-way valve and removes unqualified finished four-way valves. Then, the sixth manipulator places the finished four-way valve that has passed the leakage test on the second conveyor belt. The second conveyor belt conveys the finished four-way valve to the eleventh assembly section.
[0016] (11) The eleventh assembly section is provided with an automatic comprehensive testing device. The seventh manipulator clamps the four-way valve product conveyed from the tenth assembly section on the second conveyor belt and places it on the fixture of the automatic comprehensive testing device. The automatic comprehensive testing device performs high and low pressure reversing, internal leakage, noise testing, automatic label printing and labeling. Then, the seventh manipulator places the four-way valve product with labeling completed on the third conveyor belt. The third conveyor belt conveys the four-way valve product to the twelfth assembly section.
[0017] (12) The staff of the twelfth assembly department takes the four-way valve finished products conveyed from the eleventh assembly department on the third conveyor belt, installs dust caps on them, and then packages them. Finally, the packaged four-way valve finished products are placed in a collection box.
[0018] Preferably, the first assembly portion, the second assembly portion, the third assembly portion, the fourth assembly portion, the fifth assembly portion, the sixth assembly portion, the seventh assembly portion, the eighth assembly portion, the ninth assembly portion, the tenth assembly portion, the eleventh assembly portion and the twelfth assembly portion are adjacent to each other in sequence and arranged in a straight line.
[0019] Preferably, the first assembly department requires 1 worker, the second assembly department requires 1 worker, the seventh assembly department requires 1 worker, the ninth assembly department requires 1 worker, and the twelfth assembly department requires 1 worker.
[0020] Preferably, the first manipulator, the second manipulator, the third manipulator, the fourth manipulator, the fifth manipulator, the sixth manipulator and the seventh manipulator are all four-axis manipulators.
[0021] Preferably, the welding station of the first high-frequency welding machine in step (2) is a turntable type.
[0022] Preferably, in step (3), the first automatic assembly equipment is provided with a CCD visual detection device for detecting whether a leaf spring is assembled in the four-way valve semi-finished product, and the CCD visual detection device includes a CCD camera, a light source and a detection processor.
[0023] Preferably, the internal leakage testing equipment in step (5) is a double-station internal leakage testing equipment, and the two stations work alternately.
[0024] Preferably, in step (7), the welding station in the third automatic assembly equipment is linear and has double welding stations.
[0025] The beneficial effects of the present invention are as follows: (1) The present invention adopts mechanical automated assembly to reduce the number of staff on the four-way valve production line to 5 people. Compared with the original process, the reduction in staff is significant, the production cost is reduced, and the labor intensity of the staff is greatly reduced; (2) The present invention integrates the different processes of the four-way valve into different assembly parts, and the different assembly parts are connected by robots or conveyor belts, which reduces the time of intermediate turnover links and improves production efficiency; (3) The different assembly parts are arranged in a straight line in the workshop and are adjacent to each other in sequence, so that the different assembly parts are connected in an orderly manner, the management efficiency is improved, and it is convenient to promote mechanical automated production; (4) The entire four-way valve production line adopts a single-piece flow of products to reduce the problem of poor appearance caused by collisions between products and improve product quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the process flow of the present invention.
[0027] Among them: 1. The first assembly section; 2. The second assembly section; 3. The third assembly section; 4. The fourth assembly section; 5. The fifth assembly section; 6. The sixth assembly section; 7. The seventh assembly section; 8. The eighth assembly section; 9. The ninth assembly section; 10. The tenth assembly section; 11. The eleventh assembly section; 12. The twelfth assembly section. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings:
[0029] like Figure 1As shown, a four-way valve production process includes the following steps: (1) The first assembly part 1 is provided with an integrated pilot valve assembly device, and a small valve body to be assembled is placed on one side of the first assembly part 1. The staff of the first assembly part 1 takes the small valve body and places it on the fixture of the integrated pilot valve assembly device. The integrated pilot valve assembly device sequentially performs assembly, laser welding, internal leakage test and forming, removes unqualified pilot valves, and obtains a finished pilot valve. Then the staff places the finished pilot valve on the first conveyor belt, and the first conveyor belt conveys the finished pilot valve to the second assembly part 2. Among them, the laser welding machine for laser welding is composed of a laser head, a main machine and a chiller, and laser welding can ensure the quality of product welding. (2) The second assembly part 2 is provided with a bracket closing device and a first high-frequency welding machine, and a main valve to be assembled and a capillary are placed on one side of the second assembly part 2. The staff of the second assembly part 2 takes the finished pilot valve conveyed from the first assembly part 1 on the first conveyor belt, and takes the main valve to be assembled, and then installs the two together by modified needle-nosed pliers. Then place it on the bracket closing device. The bracket closing device completes the bracket closing and obtains the semi-finished four-way valve. The staff places the semi-finished four-way valve on the fixture of the first high-frequency welding machine, and then the staff takes the capillary and places it on the through holes of the S pipe and the D pipe respectively. The first high-frequency welding machine flame brazes the capillary at the through hole position of the S pipe and the D pipe respectively. Among them, the welding station of the first high-frequency welding machine is a turntable type. Compared with the traditional single station, this can improve the stability of the first high-frequency welding machine and improve the quality of the welded product. (3) The third assembly part 3 is provided with a first automatic assembly device, and a slider, a connecting rod assembly and a leaf spring are placed on one side of the third assembly part 3. The first manipulator grabs the semi-finished four-way valve welded by the capillary of the second assembly part 2 to the fixture of the first assembly device. The slider adopts the clip feeding mechanism to load the slider, the connecting rod assembly adopts the whole material rack servo grabbing and loading, and the leaf spring adopts the stringing mechanism vacuum suction servo displacement loading. Then the first automatic assembly equipment completes the assembly of the slider and the leaf spring and the assembly of the connecting rod assembly in sequence. Among them, the first automatic assembly equipment is provided with a CCD visual detection device for detecting whether a leaf spring is assembled in the semi-finished four-way valve, and the CCD visual detection device includes a CCD camera, a light source and a detection processor. (4) The fourth assembly part 4 is provided with a second automatic assembly equipment, and a piston is placed on one side of the fourth assembly part 4. The second manipulator grabs the semi-finished four-way valve assembled in the third assembly part 3 to the fixture of the second assembly equipment. The piston is loaded by a clip loading mechanism. Then the second automatic assembly equipment sequentially completes the piston loading, pre-tightening the first screw, tightening the second screw and tightening the first screw to complete the piston assembly. (5) The fifth assembly part 5 is provided with an internal leakage test device, and the third manipulator grabs the semi-finished four-way valve assembled in the fourth assembly part 4 to the fixture of the internal leakage test device. The internal leakage test device tests the internal leakage at the slider inside the main valve and the internal leakage at the pistons at both ends of the main valve, and realizes accurate testing and automatic judgment through the mass flow sensor, and the internal leakage test device rejects unqualified semi-finished four-way valves.Among them, the internal leakage test equipment is a double-station internal leakage test equipment, and the two stations work alternately. (6) The sixth assembly section 6 is provided with an automatic end cover closing device, and the fourth manipulator grabs the four-way valve semi-finished product that has passed the fifth assembly section 5 inspection to the fixture of the automatic end cover closing device. The end cover adopts a vibration plate double material channel for automatic feeding. The automatic end cover closing equipment assembles the two end covers at the two ends of the main valve respectively, and then closes them to ensure the consistency of the closing gap. (7) The seventh assembly section 7 is provided with a third automatic assembly equipment, and the staff of the seventh assembly section 7 takes the four-way valve semi-finished product assembled by the sixth assembly section 6. Then the capillary is bent into shape by a pneumatic capillary bending tool and pre-inserted into the through hole of the end cover. Then the four-way valve semi-finished product is placed on the fixture of the third automatic assembly equipment. The third automatic assembly equipment sequentially completes the capillary press molding, the off-power end dips in flux, the off-power end is loaded with a welding ring, the off-power end is welded, cooled, reversed, the power-on end dips in flux, the power-on end is loaded with a welding ring, the power-on end is welded, cooled and ultrasonically cleaned, and the welding is all high-frequency welding to obtain a finished four-way valve. Among them, the welding station in the third automatic assembly equipment is a linear type, which can reduce the influence of station differences on welding quality, and it is a double welding station, which can improve production efficiency. (8) The eighth assembly part 8 is provided with an infrared vacuum drying device, and the fifth manipulator grabs the finished four-way valve after ultrasonic cleaning of the seventh assembly part 7 to the conveyor belt of the infrared vacuum drying device. The infrared vacuum drying equipment adopts a conveyor belt passing type, and sequentially performs heating, vacuum drying, drying and cooling. (9) The ninth assembly part 9 is provided with a shaping device, and the staff of the ninth assembly part 9 takes the finished four-way valve after drying and cooling of the eighth assembly part 8. Then, the welds are inspected through a magnifying glass to check the weld quality of the flame brazing capillary in the second assembly section 2 and the high-frequency welding in the seventh assembly section 7. Poor welding problems include pores, missing welds and burns. The staff will place the finished four-way valve that has passed the inspection on the fixture of the shaping equipment. The shaping equipment shapes the expanded ends of the E pipe, S pipe and C pipe on the main valve to ensure the roundness and size consistency of the pipe mouth, in preparation for the subsequent process. (10) The tenth assembly section 10 is equipped with an automatic helium inspection device, and the sixth manipulator grabs the finished four-way valve that has been shaped in the ninth assembly section 9 onto the fixture of the automatic helium inspection device. The automatic helium inspection device performs external leakage detection on the finished four-way valve and removes unqualified finished four-way valves. Then the sixth manipulator places the finished four-way valve that has passed the external leakage detection on the second conveyor belt, and the second conveyor belt conveys the finished four-way valve to the eleventh assembly section 11. (11) The eleventh assembly section 11 is equipped with an automatic comprehensive testing device. The seventh manipulator grabs the finished four-way valve delivered from the tenth assembly section 10 on the second conveyor belt and places it on the fixture of the automatic comprehensive testing equipment. The automatic comprehensive testing equipment performs high and low pressure reversing, internal leakage, noise testing, automatic label printing and labeling. Then the seventh manipulator places the finished four-way valve with labeling on the third conveyor belt, and the third conveyor belt transports the finished four-way valve to the twelfth assembly section 12.(12) The staff of the twelfth assembly section 12 takes the four-way valve finished product conveyed from the eleventh assembly section 11 on the third conveyor belt, installs the dust cap, and then packs it, and finally puts the packaged four-way valve finished product into the collection box.
[0030] like Figure 1 As shown, on the basis of the above embodiment, further, the first assembly part 1, the second assembly part 2, the third assembly part 3, the fourth assembly part 4, the fifth assembly part 5, the sixth assembly part 6, the seventh assembly part 7, the eighth assembly part 8, the ninth assembly part 9, the tenth assembly part 10, the eleventh assembly part 11 and the twelfth assembly part 12 are adjacent to each other in sequence and arranged in a straight line. Different assembly parts are arranged in a straight line in the workshop and are adjacent to each other in sequence, so that different assembly parts are connected in an orderly manner, management efficiency is improved, and it is convenient to promote mechanical automation production.
[0031] like Figure 1 As shown, based on the above embodiment, further, the first assembly section 1 requires 1 staff member, the second assembly section 2 requires 1 staff member, the seventh assembly section 7 requires 1 staff member, the ninth assembly section 9 requires 1 staff member, and the twelfth assembly section 12 requires 1 staff member. In this way, a four-way valve production line requires a total of 5 staff members, and a circle on the side of the assembly section in the figure represents 1 staff member.
[0032] like Figure 1 As shown, on the basis of the above embodiments, further, the first manipulator, the second manipulator, the third manipulator, the fourth manipulator, the fifth manipulator, the sixth manipulator and the seventh manipulator are all four-axis manipulators.
[0033] The above are only preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. It will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and purposes of the present invention. The scope of the present invention is defined by the claims and their equivalents.
Claims
1. A four-way valve production process, characterized in that: The following steps are involved: (1) The first assembly section is provided with an integrated pilot valve assembly device. A small valve body to be assembled is placed on one side of the first assembly section. The staff of the first assembly section takes the small valve body and places it on the fixture of the integrated pilot valve assembly device. The integrated pilot valve assembly device sequentially performs assembly, laser welding, internal leakage test and forming, removes unqualified pilot valves, and obtains finished pilot valves. Then the staff places the finished pilot valves on the first conveyor belt, and the first conveyor belt conveys the finished pilot valves to the second assembly section; (2) The second assembly section is provided with a bracket closing device and a first high-frequency welding machine. The main valve and capillary to be assembled are placed on one side of the second assembly section. The staff of the second assembly section takes the finished pilot valve conveyed from the first assembly section on the first conveyor belt, and takes the main valve to be assembled, and then installs the two together by using modified needle-nosed pliers, and then places them on the bracket closing device. The bracket closing device completes the bracket closing to obtain a semi-finished four-way valve. The staff places the semi-finished four-way valve on the fixture of the first high-frequency welding machine, and then the staff takes the capillary and places it on the through holes of the S pipe and the D pipe respectively. The first high-frequency welding machine flame brazes the capillary at the through hole position of the S pipe and the D pipe respectively; (3) The third assembly section is provided with a first automatic assembly device. A slider, a connecting rod assembly and a leaf spring are placed on one side of the third assembly section. The first manipulator grabs the semi-finished four-way valve welded by the capillary tube of the second assembly section to the fixture of the first assembly device. The slider is loaded by a clip loading mechanism, the connecting rod assembly is loaded by a servo loading mechanism, and the leaf spring is loaded by a vacuum suction servo shifting mechanism. Then, the first automatic assembly device sequentially completes the assembly of the slider and the leaf spring, and the assembly of the connecting rod assembly; (4) The fourth assembly section is provided with a second automatic assembly device, a piston is placed on one side of the fourth assembly section, and the second manipulator grabs the semi-finished four-way valve assembled in the third assembly section to the fixture of the second assembly device. The piston is loaded by a clip loading mechanism, and then the second automatic assembly device sequentially completes the installation of the piston, pre-tightening the first screw, tightening the second screw and tightening the first screw to complete the assembly of the piston; (5) The fifth assembly section is provided with an internal leakage test device. The third manipulator grabs the semi-finished four-way valve assembled by the fourth assembly section and places it on the fixture of the internal leakage test device. The internal leakage test device tests the internal leakage of the slider inside the main valve and the internal leakage of the pistons at both ends of the main valve. The mass flow sensor is used to achieve accurate testing and automatic determination. The internal leakage test device removes unqualified semi-finished four-way valves. (6) The sixth assembly section is equipped with an automatic end cap closing device. The fourth manipulator grabs the semi-finished four-way valve that has passed the inspection of the fifth assembly section and places it on the fixture of the automatic end cap closing device. The end caps are automatically loaded using a vibration plate double-channel feeder. The automatic end cap closing device assembles the two end caps at both ends of the main valve, and then closes them to ensure the consistency of the closing gap. (7) The seventh assembly department is provided with a third automatic assembly device. The staff of the seventh assembly department takes the semi-finished four-way valve assembled by the sixth assembly department, and then uses a pneumatic capillary bending tool to bend the capillary into shape and pre-insert it into the through hole of the end cover. Then, the semi-finished four-way valve is placed on the fixture of the third automatic assembly device. The third automatic assembly device sequentially completes the capillary press-fitting molding, dipping the power-off end in flux, installing the welding ring in the power-off end, welding the power-off end, cooling, reversing, dipping the power-on end in flux, installing the welding ring in the power-on end, welding the power-on end, cooling and ultrasonic cleaning. The welding is all high-frequency welding, and the four-way valve finished product is obtained. (8) The eighth assembly section is provided with an infrared vacuum drying device. The fifth manipulator grabs the finished four-way valve after ultrasonic cleaning in the seventh assembly section and places it on the conveyor belt of the infrared vacuum drying device. The infrared vacuum drying device adopts a conveyor belt passing type and performs heating, vacuum drying, drying and cooling in sequence. (9) The ninth assembly department is equipped with shaping equipment. The staff of the ninth assembly department takes the four-way valve products that have been dried and cooled in the eighth assembly department, and then checks the welds through a magnifying glass. They also check the weld quality of the flame brazing capillary in the second assembly department and the high-frequency welding in the seventh assembly department. Welding defects include pores, missing welds and burns. The staff places the four-way valve products that have passed the inspection on the fixture of the shaping equipment. The shaping equipment shapes the expanded ends of the E pipe, S pipe and C pipe on the main valve to ensure the roundness and size consistency of the pipe mouth, in preparation for subsequent processes. (10) The tenth assembly section is provided with an automatic helium inspection device. The sixth manipulator grabs the finished four-way valve after shaping in the ninth assembly section and places it on the fixture of the automatic helium inspection device. The automatic helium inspection device performs a leakage test on the finished four-way valve and removes unqualified finished four-way valves. Then, the sixth manipulator places the finished four-way valve that has passed the leakage test on the second conveyor belt. The second conveyor belt conveys the finished four-way valve to the eleventh assembly section. (11) The eleventh assembly section is provided with an automatic comprehensive testing device. The seventh manipulator clamps the four-way valve product conveyed from the tenth assembly section on the second conveyor belt and places it on the fixture of the automatic comprehensive testing device. The automatic comprehensive testing device performs high and low pressure reversing, internal leakage, noise testing, automatic label printing and labeling. Then, the seventh manipulator places the four-way valve product with labeling completed on the third conveyor belt. The third conveyor belt conveys the four-way valve product to the twelfth assembly section. (12) The staff of the twelfth assembly department takes the four-way valve finished products conveyed from the eleventh assembly department on the third conveyor belt, installs dust caps on them, and then packages them. Finally, the packaged four-way valve finished products are placed in a collection box.
2. A four-way valve production process according to claim 1, characterized in that: The first assembly portion, the second assembly portion, the third assembly portion, the fourth assembly portion, the fifth assembly portion, the sixth assembly portion, the seventh assembly portion, the eighth assembly portion, the ninth assembly portion, the tenth assembly portion, the eleventh assembly portion and the twelfth assembly portion are adjacent to each other and arranged in a straight line.
3. A four-way valve production process according to claim 1, characterized in that: The first assembly department needs 1 staff member, the second assembly department needs 1 staff member, the seventh assembly department needs 1 staff member, the ninth assembly department needs 1 staff member, and the twelfth assembly department needs 1 staff member.
4. A four-way valve production process according to claim 1, characterized in that: The first manipulator, the second manipulator, the third manipulator, the fourth manipulator, the fifth manipulator, the sixth manipulator and the seventh manipulator are all four-axis manipulators.
5. A four-way valve production process according to claim 1, characterized in that: In step (2), the welding station of the first high-frequency welding machine is a turntable type.
6. A four-way valve production process according to claim 1, characterized in that: In step (3), the first automatic assembly equipment is provided with a CCD visual detection device for detecting whether a leaf spring is assembled in the semi-finished four-way valve. The CCD visual detection device includes a CCD camera, a light source and a detection processor.
7. A four-way valve production process according to claim 1, characterized in that: The internal leakage test equipment in step (5) is a double-station internal leakage test equipment, and the two stations work alternately.
8. A four-way valve production process according to claim 1, characterized in that: In step (7), the welding station in the third automatic assembly equipment is linear and has two welding stations.
Citation Information
Patent Citations
Four-way reversing valve connecting rod device and method for assembling bolts of the device
CN104747797A
End cover closing processing technology of four-way reversing valve
CN104786020A
Automatic production line used for assembling PCB onboard power surge protector
CN107009146A
Automatic welding device for four-way valve end cap
CN108890057A
Air conditioner stop valve assembly process
CN116604514A