Flood prevention box for water conservancy project
By introducing expansion boxes and movable components into the flood control box, the problems of unstable structure and inconvenient transportation of the flood control box under high water levels are solved, and flexible use and convenient transportation under different water level conditions are achieved.
Patent Information
- Application Number
- CN202411153325.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing flood control boxes have a fixed capacity, which results in an unstable stacking structure under high water levels, and large-capacity flood control boxes are inconvenient to store, carry, and transport.
A flood control box is designed that includes a fixed box, an expansion box and a fixed component. The height of the flood control box is changed by pulling the expansion box, and the fixed box is moved by the moving component, which is convenient for use under different water level conditions and can be stored when stored. and reduce volume during transportation.
It realizes the flexible adjustment of the height of the flood control box under different water level conditions, improves the structural stability, and simplifies the storage and transportation process of the flood control box.
Smart Images

Figure CN118854841A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water conservancy projects, and in particular relates to a flood prevention box for water conservancy projects. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Flood control is an important project in water conservancy projects. In order to prevent or reduce flood disasters, various flood control systems are dispatched and used during the flood season to prevent floods and protect people's lives and property. Flood control boxes, also known as flood control sand boxes, are important flood control facilities. Sandbags are usually filled in the box to increase the weight of the box, thereby blocking and preventing floods.
[0003] The existing flood control boxes have a fixed capacity. When the small-capacity flood control boxes meet the need for flood control at high water levels, the flood control boxes need to be stacked together, resulting in an unstable structure. The large-capacity flood control boxes make storage, carrying and transportation extremely inconvenient. Therefore, a new type of water conservancy engineering flood control box is urgently needed to solve the above problems. Summary of the invention
[0004] In order to solve the above-mentioned existing problems, the present invention provides a flood control box that can change the height of the flood control box by pulling the expansion box. The flood control box is suitable for flood control work at different water levels and is also convenient for storing and transporting the flood control box. The mobile assembly drives the fixed box to move.
[0005] The technical solution adopted by the present invention is as follows: the flood prevention box of a water conservancy project of the present invention comprises a fixed box body, an expansion box body and a fixed component, the upper and lower ends of the fixed box body are respectively a storage cavity and a receiving cavity, the storage cavity is arranged as a hollow cavity with an upper end opening, the receiving cavity is arranged as a hollow cavity with a lower end opening, a movable component is arranged in the receiving cavity, the expansion box body is sleeved on the outer side of the upper end of the fixed box body, the fixed component is arranged on the outer side of the fixed box body, the fixed component comprises a fixed card slot, a fixed receiving slot, a fixed rod and a fixed card block, a plurality of fixed card slots are provided, and a plurality of the fixed card slots are arranged on the outer side wall of one end of the fixed box body, the fixed receiving slot is arranged on the inner side wall of the expansion box body, the fixed rod is arranged on the outer side of the expansion box body, one end of the fixed rod passes through the side wall of the expansion box body, and the fixed card block is arranged at one end of the fixed rod and in the fixed receiving slot.
[0006] Furthermore, a limit block is fixedly provided at one end of the fixing rod away from the fixing block, the limit block is arranged outside the expansion box, a fixing spring is sleeved outside the fixing rod, and both ends of the fixing spring are fixedly connected to the limit block and the expansion box respectively.
[0007] Furthermore, a plurality of convex strips are provided on both sides of the expansion box, a groove is provided between two adjacent convex strips, and the convex strips on one side of the expansion box are symmetrically arranged with the grooves on the other side.
[0008] Furthermore, the moving component includes a moving base plate, a moving roller and a telescopic component. The moving base plate is slidably arranged in the lower end of the storage cavity. There are multiple moving rollers, and the multiple moving rollers are fixedly arranged under the moving base plate. The telescopic component is arranged in the storage cavity and above the moving base plate.
[0009] Furthermore, the telescopic assembly includes a driving screw, a fixed partition, a movable slider and a telescopic push rod. The driving screw is rotatably disposed in the upper end of the storage chamber. The driving screw is arranged as a double-threaded screw. The fixed partition is fixed to the top wall of the storage chamber. The driving screw passes through the fixed partition. The movable slider is symmetrically disposed on both sides of the fixed partition. The movable slider is threadedly connected to the driving screw. The telescopic push rod is disposed below the movable slider. The two ends of the telescopic push rod are respectively hinged to the movable slider and the movable bottom plate.
[0010] Furthermore, a fixed bearing is fixedly provided on an inner side wall of one side of the storage cavity, and one end of the driving screw is arranged in the fixed bearing.
[0011] Furthermore, an operating groove is provided on the outer side wall of the fixed box body, and the end of the telescopic screw away from the fixed bearing passes through the side wall of the storage cavity and is arranged in the operating groove. A driving handle is provided in the operating groove, and the driving handle is fixedly connected to one end of the telescopic screw.
[0012] Furthermore, a box cover is provided above the capacity expansion box body, one end of the box cover is hinged to the capacity expansion box body, and a handle is fixedly provided above the box cover.
[0013] The beneficial effects achieved by the present invention using the above structure are as follows:
[0014] 1. By pulling the expansion box, the height of the flood prevention box is increased, which is suitable for flood prevention work at different water levels. When the height of the flood prevention box is reduced, it is convenient to store and transport the flood prevention box.
[0015] 2. The telescopic assembly drives the mobile bottom plate to extend and retract, and the extended mobile rollers facilitate the movement of the fixed box, and the retracted mobile rollers facilitate the fixed placement of the flood prevention box. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A three-dimensional diagram of the flood control box for the water conservancy project proposed for this plan;
[0017] Figure 2 A three-dimensional diagram of the splicing status of the flood control box of the water conservancy project proposed in this plan;
[0018] Figure 3This is the main structural diagram of the water conservancy project flood prevention box proposed in this plan;
[0019] Figure 4 This is a side structural diagram of the water conservancy project flood prevention box proposed in this plan.
[0020] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: 1. Fixed box, 2. Expansion box, 3. Fixed assembly, 4. Storage chamber, 5. Storage chamber, 6. Moving assembly, 7. Fixed card slot, 8. Fixed storage slot, 9. Fixed rod, 10. Fixed card block, 11. Limit block, 12. Fixed spring, 13. Raised strip, 14. Moving bottom plate, 15. Moving roller, 16. Telescopic assembly, 17. Driving screw, 18. Fixed partition, 19. Moving slider, 20. Telescopic push rod, 21. Fixed bearing, 22. Operating groove, 23. Driving handle, 24. Box cover, 25. Handle. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0022] like Figure 1 to Figure 4 As shown, the flood prevention box for water conservancy projects proposed in this scheme includes a fixed box body 1, an expansion box body 2 and a fixed component 3, the upper and lower ends of the fixed box body 1 are respectively a storage chamber 4 and a receiving chamber 5, the storage chamber 4 is a hollow chamber with an upper opening, and the receiving chamber 5 is a hollow chamber with a lower opening, a moving component 6 is arranged in the receiving chamber 5, the expansion box body 2 is sleeved on the outer side of the upper end of the fixed box body 1, and the fixed component 3 is arranged on the outer side of the fixed box body 1, and the fixed component 3 includes a fixed card slot 7, a fixed receiving slot 8, a fixed rod 9 and a fixed card block 10, and the fixed card slot 7 is provided with a plurality of them, and the plurality of fixed card slots 7 are arranged on the outer side wall of one end of the fixed box body 1, and the fixed receiving slot 8 is arranged on the inner side wall of the expansion box body 2, the fixed rod 9 is arranged on the outer side of the expansion box body 2, and one end of the fixed rod 9 passes through the side wall of the expansion box body 2, and the fixed card block 10 is arranged at one end of the fixed rod 9 and is arranged in the fixed receiving slot 8.
[0023] like Figure 2 and Figure 4As shown, a limit block 11 is fixedly provided at one end of the fixing rod 9 away from the fixing block 10, and the limit block 11 is arranged on the outside of the expansion box 2. A fixing spring 12 is sleeved on the outside of the fixing rod 9, and both ends of the fixing spring 12 are fixedly connected to the limit block 11 and the expansion box 2 respectively.
[0024] like Figure 1 to Figure 3 As shown, a plurality of ridges 13 are provided on both sides of the expansion box 2, and a groove is provided between two adjacent ridges 13, and the ridges 13 on one side of the expansion box 2 are symmetrically arranged with the grooves on the other side.
[0025] like Figure 1 and Figure 3 As shown, the moving assembly 6 includes a moving base plate 14, a moving roller 15 and a telescopic assembly 16. The moving base plate 14 is slidably arranged in the lower end of the storage chamber 5. There are multiple moving rollers 15, and the multiple moving rollers 15 are fixedly arranged below the moving base plate 14. The telescopic assembly 16 is arranged in the storage chamber 5 and above the moving base plate 14. The telescopic assembly 16 includes a driving screw 17, a fixed partition 18, a moving slider 19 and a telescopic push rod 20. The driving screw 17 is rotatably arranged in the upper end of the storage chamber 5. The driving screw 17 is a double-threaded screw arrangement. The fixed partition 18 is fixed to the top wall of the storage chamber 5. The driving screw 17 passes through the fixed partition 18. The moving slider 19 is symmetrically arranged on both sides of the fixed partition 18. The moving slider 19 is threadedly connected to the driving screw 17. The telescopic push rod 20 is arranged below the moving slider 19. The two ends of the telescopic push rod 20 are respectively hinged to the moving slider 19 and the moving base plate 14.
[0026] like Figure 1 and Figure 3 As shown, a fixed bearing 21 is fixedly provided on the inner wall of one side of the storage chamber 5, one end of the driving screw 17 is arranged in the fixed bearing 21, an operating groove 22 is provided on the outer wall of the fixed box body 1, and one end of the telescopic screw away from the fixed bearing 21 passes through the side wall of the storage chamber 5 and is arranged in the operating groove 22, a driving handle 23 is provided in the operating groove 22, and the driving handle 23 is fixedly connected to one end of the telescopic screw.
[0027] A box cover 24 is provided above the capacity expansion box 2 , one end of the box cover 24 is hinged to the capacity expansion box 2 , and a handle 25 is fixedly provided above the box cover 24 .
[0028] When in use, the flood prevention box is moved to the designated flood prevention position. At this time, the driving handle 23 is rotated to rotate the driving screw 17. The rotating driving screw 17 drives the two moving sliders 19 to approach the moving fixed partition 18. The moving slider 19 drives the telescopic push rod 20 to deform. The deformed telescopic push rod 20 pushes the moving bottom plate 14 out of the storage chamber 5. At this time, the flood prevention box is pushed, and the moving roller 15 drives the flood prevention box to move to the designated position. After the flood prevention box moves to the designated position, the driving handle 23 is rotated in the opposite direction to make the two moving sliders 19 away from the fixed partition 18. At this time, the deformed telescopic push rod 20 pulls the moving bottom plate 14 back into the storage chamber 5 to prevent the moving roller 15 from rolling and causing the displacement of the flood prevention box.
[0029] Open the box cover 24 and put sandbags into the storage chamber 5 of the fixed box 1. Pull the expansion box 2 according to the flood prevention needs to change the height of the flood prevention box. While pulling the expansion box, pull the fixing rod 9 outward to retract the fixed card block 10 into the fixed storage groove 8. At this time, the expansion box 2 slides flexibly on the outside of the fixed box 1. After adjusting to a suitable height, release the fixing rod 9. The fixing spring 12 pulls the fixing rod 9 to reset, so that the fixed card block 10 at one end of the fixing rod 9 is stuck in the fixed card slot 7 to prevent the expansion box 2 from falling due to gravity, thereby increasing the height of the flood prevention box, which is suitable for flood prevention work at different water levels. When the height of the flood prevention box is reduced, it is convenient to store and transport the flood prevention box.
[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A flood control box for a water conservancy project, characterized in that: It includes a fixed box, an expansion box and a fixed component, the upper and lower ends of the fixed box are respectively a storage cavity and a receiving cavity, the storage cavity is a hollow cavity with an opening at the upper end, and the receiving cavity is a hollow cavity with an opening at the lower end, a movable component is arranged in the receiving cavity, the expansion box is sleeved on the outer side of the upper end of the fixed box, the fixed component is arranged on the outer side of the fixed box, the fixed component includes a fixed card slot, a fixed receiving slot, a fixed rod and a fixed card block, a plurality of fixed card slots are provided, and a plurality of the fixed card slots are arranged on the outer side wall of one end of the fixed box, the fixed receiving slot is arranged on the inner side wall of the expansion box, the fixed rod is arranged on the outside of the expansion box, one end of the fixed rod passes through the side wall of the expansion box, and the fixed card block is arranged at one end of the fixed rod and in the fixed receiving slot.
2. A flood control box for water conservancy projects according to claim 1, characterized in that: A limit block is fixedly arranged at one end of the fixing rod away from the fixing block, and the limit block is arranged outside the expansion box. A fixing spring is sleeved outside the fixing rod, and both ends of the fixing spring are fixedly connected to the limit block and the expansion box respectively.
3. A flood control box for water conservancy projects according to claim 1, characterized in that: A plurality of convex strips are arranged on both sides of the expansion box, and a groove is provided between two adjacent convex strips. The convex strips on one side of the expansion box are symmetrically arranged with the grooves on the other side.
4. A flood control box for water conservancy projects according to claim 1, characterized in that: The moving assembly includes a moving base plate, a moving roller and a telescopic assembly. The moving base plate is slidably arranged in the lower end of the storage cavity. There are multiple moving rollers, and the multiple moving rollers are fixedly arranged below the moving base plate. The telescopic assembly is arranged in the storage cavity and above the moving base plate.
5. A flood control box for water conservancy projects according to claim 4, characterized in that: The telescopic assembly includes a driving screw, a fixed partition, a movable slider and a telescopic push rod. The driving screw is rotatably arranged in the upper end of the storage chamber. The driving screw is arranged in a double-threaded screw. The fixed partition is fixed to the top wall of the storage chamber. The driving screw passes through the fixed partition. The movable slider is symmetrically arranged on both sides of the fixed partition. The movable slider is threadedly connected to the driving screw. The telescopic push rod is arranged below the movable slider. The two ends of the telescopic push rod are respectively hinged to the movable slider and the movable bottom plate.
6. A flood control box for water conservancy projects according to claim 5, characterized in that: A fixed bearing is fixedly arranged on the inner side wall of one side of the storage cavity, and one end of the driving screw is arranged in the fixed bearing.
7. A flood control box for water conservancy projects according to claim 6, characterized in that: An operating groove is provided on the outer side wall of the fixed box body, and one end of the telescopic screw away from the fixed bearing passes through the side wall of the storage cavity and is arranged in the operating groove. A driving handle is provided in the operating groove, and the driving handle is fixedly connected to one end of the telescopic screw.
8. A flood control box for water conservancy projects according to claim 1, characterized in that: A box cover is arranged above the capacity expansion box body, one end of the box cover is hinged to the capacity expansion box body, and a handle is fixedly arranged above the box cover.
