Urban rail transit risk management method based on hierarchical cycle control
Through the hierarchical cyclic control method, the urban rail transit risk management system is constructed, which solves the problem of complexity and interrelation of risk nodes in the system, achieves effective risk assessment and control, and improves the safety and stability of the system. .
Patent Information
- Application Number
- CN202310422493.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The complexity and interconnectedness of risk nodes in the urban rail transit system make it difficult for existing technologies to effectively prevent and control risks and ensure the overall safety of the system.
A method based on hierarchical cyclic control is adopted to determine system risk nodes through historical operational accident data, build a model framework for the decision-making layer, coordination layer and execution layer, and formulate information management rules. The entropy value calculation method is used to build a cyclic feedback mechanism to Assess and control risks.
It effectively improves the safety and stability of the urban rail transit system and provides technical support to help future system development and safety management.
Smart Images

Figure CN118863503A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information management, and in particular to a method for managing urban rail transit risks based on hierarchical cyclic control. Background Art
[0002] The safe operation of urban rail transit is a complex state formed by the joint action of various facilities and equipment. Among various urban rail transit facilities and equipment, the smallest structure that can be controlled by humans is called a risk node. There are a large number of risk nodes in the complex system of urban rail transit. Different risk nodes have different attribute information, and there are complex and mutual correlations between the attribute information. Therefore, among the massive risk nodes, the change of a certain factor will have an unpredictable impact on the system. Similarly, the result of human control of a single factor will deviate from the control target due to complex interactions.
[0003] Urban rail transit safety management has always adopted a management technology that combines historical experience with operation and maintenance. By building a matrix management system, a complete matrix of risk nodes of people, machines, environment, management, governance, control, and rescue is obtained. For risk nodes, by moving the safety gate forward, the risk chain is cut off before the accident occurs. However, when the development of the risk chain is not effectively controlled and the risk breaks through the safety gate and develops into an accident, it is worth thinking about how to effectively prevent risks, control risks, cut off risk chains, and ensure the overall safety of the system. Therefore, it is necessary to propose a method that not only makes decisions from a global perspective, but also coordinates the interactions between the various levels of the system to obtain the optimal control results and achieve system safety. Summary of the invention
[0004] The main purpose of the present invention is to provide a method for managing urban rail transit risks based on hierarchical cyclic control, so as to solve the technical problem of relatively low reliability of urban rail transit risk management in the prior art.
[0005] In order to achieve the above-mentioned purpose, the present invention provides a management method for urban rail transit risks based on hierarchical cyclic control, characterized in that the management method includes: S10: determining system risk nodes based on historical operation accident data of urban rail transit; S20: constructing a hierarchical cyclic control model framework based on system risk nodes and management process nodes, and the hierarchical cyclic control model framework includes three top-down levels: decision-making level, coordination level and execution level; S30: allocating layer functions to each level in the hierarchical cyclic control model framework in turn; S40: formulating information management rules between each level to form an entropy value calculation method; S50: constructing a circular feedback mechanism of the urban rail transit safety management system based on the minimum entropy value.
[0006] In one embodiment, the coordination layer includes a distributor and a plurality of coordinators corresponding to the distributor, two coordinators are communicatively connected via a supervisor, and the distributor is also communicatively connected to the supervisor, and the execution layer includes executors corresponding to the coordinators.
[0007] In one embodiment, the execution layer further includes a communicator, and the coordinator and the executor are communicatively connected via the communicator.
[0008] In one embodiment, the management method further includes: in S10, after determining the system risk nodes, obtaining a set P of system risk nodes arranged in order n ={p1,p2,p3...}, the set is the accident handling node sequence; in S40, the information management rules between each level are formulated, including: the first control capability matrix of multiple coordinators from the coordination layer to the execution layer is CP(n,R), the second control capability matrix from the transmitter to the actuator is CP m (n,R), then the constraint of the second control capability matrix is CP m (n,R)∈{CP(0,0),CP(n max ,R)}, the entropy value calculation method includes: Where m represents the control unit, and n represents the risk node number managed in the control unit; It indicates the degree of decrease in the key attribute value of n nodes caused by the risk p within the control unit; It represents the accident impact range of n nodes caused by risk p in m control units; ρ represents the failure threshold of risk node.
[0009] In one embodiment, in S40, formulating information management rules between various levels further includes: the coordinator feeds back the processing result to the supervisor The supervisor sends the processing result to the coordinator The corresponding degree of deviation
[0010] In one embodiment, the decision layer includes a decision maker, which is communicatively connected to the allocator.
[0011] By applying the technical solution of the present invention, the management method also includes the method of formulating information management rules between various levels and calculating entropy values. The information management rules include a first control capability matrix of multiple coordinators from the coordination layer to the execution layer and a second control capability matrix from the communicator to the actuator. The method for calculating the entropy value adopts the minimum entropy principle, which can effectively evaluate the failure of risk nodes. In addition, when formulating the information management rules between various levels, it also includes the consideration of the degree of deviation corresponding to the coordinator's feedback of the disposal results to the supervisor and the supervisor's response to the coordinator's sending of the disposal results. This method can effectively control the risks of the urban rail transit system and improve the safety and stability of the system. At the same time, this method can also provide technical support for the management of the urban rail transit system, which is conducive to the development and safety management of the urban rail transit system in the future.
[0012] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0014] Figure 1 A schematic diagram of the overall process of an embodiment of a method for managing urban rail transit risks based on hierarchical cyclic control according to the present invention is shown;
[0015] Figure 2 Shows Figure 1 Schematic diagram of the specific application of the management method. DETAILED DESCRIPTION
[0016] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0017] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0018] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so as to describe the embodiments of the present invention described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0019] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0020] Based on the urban rail transit risk management method based on hierarchical hierarchical cyclic control provided by the present invention, the risk management of the urban rail transit system can be achieved. First, through the analysis of historical operational accident data, the system risk nodes can be determined, and then the system risk management is performed using the hierarchical hierarchical cyclic control model framework. This management method adopts three top-down levels: decision-making layer, coordination layer and execution layer. In the coordination layer, the structure of distributor and coordinator is adopted, and the information exchange between coordinators is realized through the communication connection of the supervisor. In the execution layer, the actuator is connected to the coordinator through the transmitter to realize the transmission and management of information. Through this hierarchical hierarchical cyclic control model framework, the risks of the urban rail transit system can be effectively controlled.
[0021] At the same time, during the implementation process, the management method also includes the formulation of information management rules between various levels and the method of calculating entropy values. The information management rules include the first control capability matrix of multiple coordinators from the coordination layer to the execution layer and the second control capability matrix from the communicator to the actuator. The entropy value calculation method adopts the minimum entropy value principle, which can effectively evaluate the failure of risk nodes. In addition, when formulating information management rules between various levels, it also includes the consideration of the degree of deviation corresponding to the coordinator's feedback of the supervisor's disposal results and the supervisor's response to the coordinator's disposal results.
[0022] The above method can effectively control the risks of urban rail transit system and improve the safety and stability of the system. At the same time, this method can also provide technical support for the management of urban rail transit system, which is conducive to the development and safety management of urban rail transit system in the future.
[0023] Specifically, the present invention provides a method for managing urban rail transit risks based on hierarchical cyclic control, the management method comprising:
[0024] S10: Determine system risk nodes based on historical operation accident data of urban rail transit;
[0025] S20: constructing a hierarchical cyclic control model framework based on the system risk nodes and management process nodes, wherein the hierarchical cyclic control model framework includes three top-down levels: a decision layer (CC), a coordination layer (PLS)
[0026] and the executive layer (OC);
[0027] S30: allocating layer functions to each layer in the hierarchical cyclic control model framework in sequence;
[0028] S40: Formulate information management rules between various levels and form a calculation method for entropy value;
[0029] S50: Based on the minimum entropy value, a circular feedback mechanism for the urban rail transit safety management system is constructed.
[0030] Optionally, based on the hierarchical recursive control theory, layer functions may be sequentially allocated to each level in the hierarchical recursive control model framework according to “Increasing Precision Decreases with Intelligence (IPDI)”.
[0031] As a preferred embodiment, the coordination layer (PLS) includes a distributor and a plurality of coordinators corresponding to the distributor, two coordinators are connected in communication via a supervisor, the distributor is also connected in communication with the supervisor, and the execution layer (OC) includes an executor corresponding to the coordinator. Optionally, the decision layer includes a decision maker, which is connected in communication with the distributor.
[0032] As an optional implementation, the execution layer (OC) further includes a communicator, and the coordinator and the executor are communicatively connected via the communicator.
[0033] like Figure 1 As shown, as a preferred implementation, the management method further includes:
[0034] In S10, after the system risk nodes are determined, a set P of system risk nodes arranged in order is obtained. n={p1,p2,p3…}, this set is the accident handling node sequence;
[0035] In S40, formulating information management rules between various levels includes: a first control capability matrix of multiple coordinators from the coordination layer (PLS) to the execution layer (OC) is CP(n,R), a second control capability matrix from the communicator to the executor is CP m (n,R), then the constraint of the second control capability matrix is CP m (n,R)∈{CP(0,0),CP(n max ,R)},
[0036] The entropy calculation method includes: in,
[0037] m represents the control unit, and n represents the risk node number managed in the control unit;
[0038] It indicates the degree of decrease in the key attribute value of n nodes caused by the risk p within the control unit;
[0039] It represents the scope of the accident impact on n nodes caused by risk p in m control units;
[0040] ρ represents the risk node failure threshold.
[0041] The solution of optimal control requires the determination of other conditional constraints. The decision-making layer determines the possible path of risk propagation through the prior knowledge of the expert knowledge base, and cuts off the risk propagation link or eliminates the hidden danger attributes of the risk node. CP (n, R) represents the control target instruction, which is the matrix of the number of control nodes and control attribute values issued by the decision-making layer. The control unit m has a maximum control limit, and the control capacity does not exceed the node number control threshold number and the single node control threshold R.
[0042] As a preferred embodiment, Figure 1 As shown, in S40, formulating information management rules between various levels also includes: the coordinator feeds back the processing result to the supervisor The supervisor sends the processing result to the coordinator The corresponding degree of deviation
[0043] The present invention provides a specific implementation method, in which, based on analyzing people, machines, environment, and managing urban rail transit subsystems, a risk node p is determined, and a set of risk nodes P is arranged in an orderly manner. n= {p1, p2, p3…} is defined as the accident handling node sequence, which describes the node order of the accident occurrence and development. Each node corresponds to the objective entity of the corresponding urban rail transit, preparing for machine planning and machine decision-making. A three-layer model framework is constructed according to the personnel management level of the subway company. The framework of the model is as follows Figure 2 As shown in the figure, the middle decision-making layer (CC) is the command level that memorizes and learns expert decision information. It commands emergency dispatch personnel to obtain accident information through screen display and report generation, ensures that the accident consequences of decisions are minimized through reasoning and planning, and feedbacks information to subordinates. The coordination layer (PLS) is equipped with a coordinator and a supervisor. The coordinator coordinates the decision-making layer to subdivide the accident handling instructions, and determines the execution object and execution value of the execution layer through machine planning and machine decision. The supervisor supervises and coordinates the distribution of commands, receives feedback information to obtain the execution status and feeds it back to the decision-making layer. The execution layer (OC) performs operations within the control range of the accident handling terminal by transmitting and processing information.
[0044] After that, the logical relationship of information transmission between levels and the principle of information transmission within the level are formulated. The information transmission between levels is bidirectional, and the information transmitted includes command information from top to bottom and feedback information from bottom to top. The decision-making layer changes the command through feedback information, thus forming a closed-loop feedback. The overall goal of system control is to ensure the highest level of system safety, that is, the global operational safety of the urban rail transit system.
[0045] In this specific embodiment, the decision maker is the operation command center, the distributor is the dispatching center / safety supervision room, the coordinator is the transportation branch company, the transmitter is the station / line segment, and the executor is the staff risk point.
[0046] In this specific embodiment, the fire accident of the fan electric control cabinet at Shaoyaoju Station on Beijing Subway Line 10 is taken as an example. On January 29, 2017, an electrical fire and smoke occurred in the electric control cabinet of the main exhaust fan in the environmental control room of Shaoyaoju Station on Subway Line 10. The smoke spread to the auxiliary rooms at the east end of the station hall and the public area on the east side of the station hall. The accident caused 7 trains to pass through, Shaoyaoju Station was closed, and the transfer passage was closed.
[0047] Accident handling process:
[0048] At 22:47, the FAS host in the integrated control room of Shaoyaoju Station sounded an alarm. The station integrated control operator and the stationmaster on duty confirmed through the FAS graphic workstation that the alarm room was the environmental control and electrical control room in the ancillary room area on the east side of the station concourse level.
[0049] At 22:48, the stationmaster on duty and two integrated control personnel rushed to the scene with fire extinguishers, fire emergency kits, handheld radios, emergency lights, room keys, etc., and found that there was smoke and fire in the electrical cabinet. The integrated control personnel used three fire extinguishers to put out the fire. The initial fire was under control, but there was a lot of smoke at the scene. The stationmaster on duty used the handheld radio to contact the integrated control room and activated the emergency plan. At the same time, the indoor integrated control personnel reported to the environmental control and electromechanical departments.
[0050] At 22:52, the remaining three personnel from the micro fire station rushed to the scene with fire extinguishers to put out the fire. They used the fire extinguishers to control the remaining fire under the cabinet, but there was a large amount of smoke at the scene and the status of the fire point could not be clearly seen.
[0051] At 22:58, the integrated control operator reported the fire to 119 at the same time in the station area, started the smoke exhaust fan, contacted the traffic dispatch and transportation dispatch room 3 and reported the above contents.
[0052] At 23:02, after the mechanical and electrical staff arrived, they were unable to enter the room to shut down the power of the fan electrical control cabinet due to heavy smoke and high temperature at the scene. They requested the power supply to cut off the power in the environmental control room. After the integrated controller contacted the power supply duty room, the power was cut off.
[0053] At 23:07, 119 firefighters arrived at the scene. The stationmaster on duty applied to the traffic dispatcher for the passage of up and down trains. After receiving the order from the traffic dispatcher, the inner and outer ring trains of Shaoyaoju passed. At the same time, the transfer of Line 13 at Shaoyaoju was stopped.
[0054] At 23:30, the fire brigade notified that the fire had been put out.
[0055] Accident analysis:
[0056] The RS485 interface power supply device in the main exhaust fan control cabinet was overheated due to long-term power supply. The material is non-flame retardant and lacks body protection function. In addition, the product is not an industrial-grade product. The equipment does not meet the requirements for industrial use and lacks the corresponding flame retardant material protection. The accident occurred in winter when the weather was cold, windy and dry. In addition, the fault repair operation and maintenance mode ignored the life of components and the probability of natural damage. Risk points caused by management reasons and the properties of facilities and equipment themselves were not included in the management system.
[0057] After the accident occurred, control units at different levels adopted their own emergency plans, but the effects were limited. As the fire grew, the control capabilities were insufficient to cut off the spread of risks, and a small-scale fire developed into a large-scale shutdown. Finally, the fire was brought under control only after a fire truck was called to the scene.
[0058] First, according to the expert knowledge base, the first measure to deal with electrical fire accidents is to cut off the power supply; secondly, after an electrical fire occurs, the fire can burn along the wires and spread quickly, so it should be reported immediately; electrical fires burn violently and are very easy to ignite combustibles. The insulation layer of most wires is easy to burn and produces toxic gases when burning, so the exhaust facilities should be opened in time to evacuate passengers in the station in time.
[0059] According to the expert decision information, the basic risk chain is constructed. Based on the historical electrical fire accidents and the expert knowledge base, the accident handling node sequence P is obtained. suj ={p1,p2,p3,p4,p5,p6,p7,p8}
[0060] In order to ensure the safe handling of fire and global system safety, the system control objectives are:
[0061]
[0062] Due to the fire, the system safety accident threshold constraint is not satisfied:
[0063]
[0064] There are three control units, the integrated control room, the fire station, and the bus station, numbered 1, 2, and 3, and the control capacity constraints are:
[0065] CP m (n,R)∈{CP(0,0),CP(n max , R max )}
[0066] Therefore, the order for handling the accident should be:
[0067] Eliminate accident risk sources Cut off the risk links p4→p5, p2→p5→p8; prevent the risk links from spreading to p5→p6, p5→p1; and deal with new risks p8 generated by risk disposal.
[0068] Through the coordination layer, tasks CP are assigned according to the properties of different control units. 1 (4,R max ),CP 1 (2,R max ),CP 2 (5,R max ),CP 3 (5,R max ),CP 3 (7,R),CP 3 (6, R). Tasks are executed in parallel, and the accident consequence deviation is fed back The control degree R is adjusted and controlled.
[0069] Through MATLAB simulation, the system accident risk value before and after control was reduced from 145 to 93, a decrease of 39%. Two risk links were cut off and one new accident was prevented, achieving the expected target.
[0070] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, numerical expressions and numerical values do not limit the scope of the present invention. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
[0071] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0072] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention. The directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0073] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for managing urban rail transit risks based on hierarchical cyclic control, characterized in that: The management method comprises: S10: Determine system risk nodes based on historical operation accident data of urban rail transit; S20: constructing a hierarchical cyclic control model framework based on the system risk nodes and the management process nodes, wherein the hierarchical cyclic control model framework includes three top-down levels: a decision layer (CC), a coordination layer (PLS), and an execution layer (OC); S30: allocating layer functions to each layer in the hierarchical cyclic control model framework in sequence; S40: Formulate information management rules between various levels and form a calculation method for entropy value; S50: Based on the minimum entropy value, a circular feedback mechanism for the urban rail transit safety management system is constructed.
2. The management method according to claim 1, characterized in that: The coordination layer (PLS) includes a distributor and multiple coordinators corresponding to the distributor. Two coordinators are communicatively connected via a supervisor, and the distributor is also communicatively connected to the supervisor. The execution layer (OC) includes executors corresponding to the coordinators.
3. The management method according to claim 2, characterized in that: The execution layer (OC) further includes a communicator, and the coordinator is communicatively connected with the executor via the communicator.
4. The management method according to claim 3, characterized in that: The management method also includes: In S10, after the system risk nodes are determined, a set P of system risk nodes arranged in order is obtained. n ={p1,p2,p3…}, this set is the accident handling node sequence; In S40, formulating information management rules between various levels includes: a first control capability matrix of multiple coordinators from the coordination layer (PLS) to the execution layer (OC) is CP(n,R), a second control capability matrix from the communicator to the executor is CP m (n,R), then the constraint of the second control capability matrix is CP m (n,R)∈{CP(0,0),CP(n max ,R)}, The entropy calculation method includes: in, m represents the control unit, and n represents the risk node number managed in the control unit; It indicates the degree of decrease in the key attribute value of n nodes caused by the risk p within the control unit; It represents the scope of the accident impact on n nodes caused by risk p in m control units; ρ represents the risk node failure threshold.
5. The management method according to claim 4, characterized in that: In S40, formulating information management rules between various levels also includes: the coordinator feeds back the processing result to the supervisor The supervisor sends the processing result to the coordinator The corresponding degree of deviation 6. The management method according to claim 1, characterized in that: The decision layer includes a decision maker, and the decision maker is communicatively connected with the distributor.