Charge and discharge test device
By connecting multiple secondary batteries in series in the charge and discharge test system and using a common DC bus for testing, combined with the addition of batteries and auxiliary power generation units, the problems of power consumption and control complexity are solved, and efficient, low-cost power is achieved Supply and secondary battery life testing.
Patent Information
- Application Number
- CN202280091629.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-10
- Publication Date
- 2024-10-29
AI Technical Summary
When the existing charge and discharge test system tests multiple secondary batteries, it is difficult to reduce the power consumption and the control is complicated, which leads to increased costs and cannot effectively reduce the peak power of the AC regenerated power.
By connecting multiple secondary batteries in series as a test object, a common DC bus is used to perform charge and discharge tests, and power is repeatedly transmitted and received between the test object and the battery. The auxiliary power generation unit supplements the insufficient power and directly stores the DC regenerated power in the battery for supply. Charging prevents regenerative power from being converted into AC regenerative power and returned to commercial power.
It greatly reduces the power consumption of commercial AC power, improves power usage efficiency, reduces costs, achieves stable and reliable power supply, and avoids the loss of complex control and regenerative power conversion.
Smart Images

Figure CN118872178A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a charge and discharge test device capable of efficiently and centrally performing charge and discharge tests (life tests) on a plurality of secondary batteries such as lithium ion batteries with low power consumption. Background Art
[0002] In recent years, due to the development of IT equipment such as smart phones and the practical application of electric vehicles, the demand for secondary batteries (mainly lithium-ion batteries) has increased rapidly. In the final process of the mass production process of the secondary battery, the activation and quality inspection of the produced secondary batteries are carried out, and the batteries are shipped after being checked by charge and discharge tests to see whether they meet the specified performance and characteristics. However, with the popularization of electric vehicles, the capacity of secondary batteries has increased, and the power consumption in charge and discharge tests has increased. In addition, a large number of secondary batteries are used in electric vehicles, etc., so a charge and discharge device that can test more secondary batteries in parallel and effectively in a power-saving manner is required. Therefore, for example, in patent document 1, a charge and discharge test system is proposed, which comprises: a bidirectional AC / DC converter, wherein the AC side terminal of the bidirectional AC / DC converter is connected to an AC power supply, and the DC side terminal is connected to a DC bus; a bidirectional DC / DC converter, wherein one end of the bidirectional DC / DC converter is connected to the DC bus, and the other end is connected to a sample (secondary battery); and a control device, which controls the bidirectional DC / DC converter and thus controls the charging and discharging of the sample by the bidirectional DC / DC converter, wherein the number of bidirectional DC / DC converters connected to the DC bus is greater than the number of bidirectional AC / DC converters connected to the DC bus, and the control device controls the multiple bidirectional DC / DC converters according to the charge and discharge modes of the multiple samples respectively connected to the multiple bidirectional DC / DC converters, and schedules the charge and discharge modes of the multiple samples in a manner that minimizes the regenerative power provided from the multiple bidirectional DC / DC converters to the bidirectional AC / DC converter.
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: Japanese Patent Application Publication No. 2012-154793 Summary of the invention
[0006] Problems to be solved by the invention
[0007] In Patent Document 1, by setting a DC bus for exchanging current between multiple bidirectional DC / DC converters, the regenerative power returned to the AC bus from the bidirectional AC / DC converter is reduced, the AC conversion loss in the bidirectional AC / DC converter is reduced, and the power usage efficiency of the charge and discharge test system is improved. However, every time a new secondary battery is tested, it is necessary to provide power from the system power (commercial AC power supply) to charge the multiple secondary batteries as test objects, and the power consumption itself is difficult to reduce, and there is a limit to low cost, and it may be difficult to ensure power. In addition, in the control device, when controlling multiple bidirectional DC / DC converters according to the charge and discharge modes of multiple samples connected to the multiple bidirectional DC / DC converters, it is necessary to schedule in a manner that minimizes the regenerative power provided from the multiple bidirectional DC / DC converters to the bidirectional AC / DC converter, which requires complex control and may lead to cost increases. In addition, in Patent Document 1, it is recorded that by adding a storage battery to the DC bus, the peak power of the AC regenerative power supply (bidirectional AC / DC converter) is reduced, which helps to reduce the scale and cost of the AC regenerative power supply, but there is no specific record of how to use the storage battery, and the operation is unclear.
[0008] The present invention has been made in view of the above circumstances, and its object is to provide a charge and discharge test device that can charge and discharge a plurality of secondary batteries by repeatedly reusing the energy initially applied, thereby significantly reducing power consumption and enabling life evaluation at low cost without complicated control.
[0009] Means for solving problems
[0010] The charge and discharge test device of the present invention according to the above-mentioned purpose is used to use multiple secondary batteries connected in series as test bodies and simultaneously perform charge and discharge tests on multiple test bodies, wherein the charge and discharge test device comprises: an AC / DC converter, wherein the AC side terminal of the AC / DC converter is connected to a commercial AC power supply, and the DC side terminal is connected to a common DC bus; a plurality of bidirectional DC / DC converters, wherein each of the multiple bidirectional DC / DC converters has one end connected to the common DC bus and the other end connected to each of the test bodies; a storage battery connected to the common DC bus; an auxiliary power generation unit connected to the common DC bus; and a control unit, which controls each of the bidirectional DC / DC converters, and when each of the test bodies is charged and discharged, power is transferred between each of the test bodies and the storage battery, and the insufficient power of the storage battery is supplemented by the power generated by the auxiliary power generation unit.
[0011] In the charge and discharge test device of the present invention, the test body may be a battery module in which a plurality of the secondary batteries are connected in series and modularized, or a battery pack in which a plurality of the battery modules are connected in series.
[0012] In the charge and discharge test device of the present invention, it is preferable that the AC / DC converter is a bidirectional AC / DC converter.
[0013] In the charge and discharge test device of the present invention, it is preferred that the auxiliary power generation unit is a solar panel.
[0014] The charge and discharge test device of the present invention may include a voltage adjustment unit which is connected to each test body during the charge and discharge test and is controlled by the control unit to adjust the charge and discharge voltage of each secondary battery so that it falls within a preset tolerance range.
[0015] Effects of the Invention
[0016] The charge and discharge test device of the present invention can repeatedly charge and discharge between the test body (multiple secondary batteries connected in series) and the storage battery. After the storage battery is initially charged, it does not need to be supplied with power from a commercial AC power supply, which can greatly reduce power consumption, and can simultaneously perform life tests on multiple test bodies (multiple secondary batteries) with very little energy. Instead of converting the DC regenerative power (discharge energy) during the discharge of the test body into AC regenerative power and returning it to the commercial AC power supply, the DC regenerative power is directly stored in the storage battery and reused when the test body is charged. As a result, there is no conversion consumption of regenerative power, and the regenerative power can be effectively used efficiently. The discharge energy of the test body is stored in the storage battery and reused as charging energy, so that the peak power can be suppressed, and power can be stably and reliably provided during the test. There is no need to perform control to deal with power outages, and power can be continuously provided from the storage battery at a constant voltage without interruption, and the stability of the operation is excellent. The insufficient power of the storage battery is supplemented by the power generated by the auxiliary power generation unit, so the usage or electricity bill of the commercial AC power supply can be reduced as much as possible, and low cost can be achieved.
[0017] In the charge and discharge test device of the present invention, when the test body is a battery module obtained by connecting a plurality of secondary batteries in series and modularizing, or a battery pack obtained by connecting a plurality of battery modules in series, the charge and discharge test of each secondary battery can be performed simultaneously to carry out the charge and discharge test of one or more battery modules or battery packs. There is no need to carry out the charge and discharge test of each secondary battery and the charge and discharge test of the battery module or battery pack separately. Compared with the past, the effort and time spent on the charge and discharge test can be greatly reduced.
[0018] In the charge and discharge test device of the present invention, when the AC / DC converter is a bidirectional AC / DC converter, when the battery is fully charged and the DC regenerative power (discharge energy) of the test body cannot be consumed as charging energy, the remaining DC regenerative power can be converted into AC regenerative power and returned to the commercial AC power supply.
[0019] In the charge and discharge test device of the present invention, when the auxiliary power generation unit is a solar panel, insufficient power can be supplemented by solar power generation, and the emission of carbon dioxide can be reduced.
[0020] In the charge and discharge test device of the present invention, when there is a voltage adjustment unit (the voltage adjustment unit is connected to each test body during the charge and discharge test, and is controlled by the control unit to adjust the charge and discharge voltage of each secondary battery in a manner that is within a preset allowable deviation range), the influence of deviations in the characteristics of multiple secondary batteries connected in series (such as the internal resistance value of the battery) can be reduced, so that the charge and discharge tests of all secondary batteries are terminated at the same time, the efficiency is excellent, and overcharging, non-charging or non-discharging can be prevented, thereby achieving safe and precise testing and excellent reliability in life judgment. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is an explanatory diagram showing the structure of a charge and discharge test device according to one embodiment of the present invention. DETAILED DESCRIPTION
[0022] Next, embodiments embodying the present invention will be described with reference to the drawings for understanding of the present invention.
[0023] Figure 1 The charge and discharge test device 10 of one embodiment of the present invention is a charge and discharge test device for simultaneously performing charge and discharge tests on a plurality of test bodies 11 by using a plurality of secondary batteries connected in series as test bodies 11. The charge and discharge test device 10 is also used for activation and quality inspection of produced secondary batteries (e.g., lithium-ion batteries), and is particularly suitable for life tests (battery life prediction).
[0024] Hereinafter, the charge and discharge test device 10 will be described in detail.
[0025] like Figure 1As shown, the charge and discharge test device 10 includes: a bidirectional AC / DC converter (an example of an AC / DC converter) 14, the AC side terminal of which is connected to a commercial AC power source 12, and the DC side terminal is connected to a common DC bus 13; and a plurality of bidirectional DC / DC converters 15, each of which has one end connected to the common DC bus 13, and each of which has the other end connected to a test body 11 in which a plurality of secondary batteries are connected in series. In addition, the charge and discharge test device 10 includes: a storage battery 16 connected to the common DC bus 13; an auxiliary power generation unit 17 connected to the common DC bus 13; and a control unit 18 that controls each bidirectional DC / DC converter 15. The charge and discharge test device 10 controls the charge and discharge of each test body 11 (each secondary battery) by controlling each bidirectional DC / DC converter 15 by the control unit 18. The charge and discharge of each test body 11 is performed by transferring power between each test body 11 and the storage battery 16, but when the power of the storage battery 16 is insufficient, it is supplemented by the power generated by the auxiliary power generation unit 17.
[0026] Here, the bidirectional AC / DC converter 14 , the bidirectional DC / DC converter 15 , the storage battery 16 , and the auxiliary power generation unit 17 constitute a power supply unit 20 .
[0027] According to the above structure, the power supply from the commercial AC power supply 12 can be suppressed to a minimum while the charge and discharge test can be repeated, and the life evaluation can also be performed for large-capacity test bodies (secondary batteries) that were previously difficult to achieve. Therefore, if a new secondary battery used in an electric vehicle is used as a test body for a charge and discharge test and the result (charging curve and / or discharge curve) is saved, the life prediction of the second-hand secondary battery can be performed by comparing the result of the charge and discharge test with the second-hand secondary battery of the same model as the test body. In this way, it is possible to determine whether the sale (use) of the second-hand secondary battery is feasible and to determine the appropriate price for buying and selling, thereby promoting the expansion and rationalization of the second-hand market for secondary batteries (electric vehicles).
[0028] In the charge and discharge test device 10, by changing from the conventional AC bus to the common DC bus 13, it is no longer necessary to connect the bidirectional AC / DC converters to each bidirectional DC / DC converter 15, and the structure is simplified. In addition, in order to supply power from the commercial AC power supply 12 to the common DC bus 13, at least one AC / DC converter is required, but by using the bidirectional AC / DC converter 14, when the DC regenerative power (discharge energy) of the test body 11 (each secondary battery) cannot be consumed as charging energy even when the storage battery 16 is fully charged, the remaining DC regenerative power can be converted into AC regenerative power and returned to the commercial AC power supply 12. In addition, since the test body 11 and the storage battery 16 are respectively connected to the common DC bus 13, the DC regenerative power (discharge energy) when the test body 11 is discharged can be stored in the storage battery 16 instead of being converted into AC regenerative power, and can be reused when the test body 11 is charged. Therefore, the conversion loss of the regenerative power can be eliminated, the regenerative power can be used efficiently, and the charge and discharge test of the test body 11 can be reliably and continuously performed without being affected by power failure.
[0029] In addition, when the power of the storage battery 16 is insufficient, the charge and discharge test device 10 can be supplemented by the power generated by the auxiliary power generation unit 17, so that the usage of the commercial AC power supply 12 or the electricity fee can be reduced, and the cost can be reduced. At this time, the auxiliary power generation unit 17 can be one type, or multiple types can be used in combination. In addition, it is also possible to store electricity in the storage battery 16 by using midnight power instead of the auxiliary power generation unit 17, and it is also possible to combine the auxiliary power generation unit 17 with the midnight power and use both according to the weather and time period. However, it is also possible to store electricity in the storage battery 16 using the commercial AC power supply 12 as needed.
[0030] As the auxiliary power generation unit 17, a solar panel (solar power generation) is preferably used, but the invention is not limited thereto, and a power generation unit using other renewable energy such as wind power generation may be used.
[0031] Next, the operation of the charge and discharge test device 10 will be described.
[0032] First, a plurality of secondary batteries are connected in series to each bidirectional DC / DC converter 15 as test bodies 11. Initially, the test bodies 11 (each secondary battery) are in an uncharged state, and the storage battery 16 is charged in advance by the commercial AC power supply 12 (or by the power generated by the auxiliary power generation unit 17). When the control unit 18 instructs to charge each test body 11, power is supplied from the storage battery 16 to each test body 11 to charge each test body 11 (each secondary battery). Furthermore, when the control unit 18 instructs to discharge each test body 11 after the charging process is completed, power is supplied from each test body 11 to the storage battery 16 to discharge each test body 11 (each secondary battery). In this way, by transferring power between each test body 11 and the storage battery 16, the charging and discharging of each test body 11 are repeated. However, since each test body 11 has differences in characteristics (performance) (for example, variations in internal resistance or capacity, etc.), the charging time and the discharging time are different. Therefore, each test body 11 repeats charging and discharging with the storage battery 16 independently in an asynchronous state. The test body 11 that has completed the charge and discharge test by repeating the charging and discharging for a predetermined number of times is sent to the next process according to the instruction from the control unit 18, and the test of the newly transported test body 11 is carried out at any time. The insufficient power of the storage battery 16 is supplemented by the power generated by the auxiliary power generation unit 17, so the charge and discharge test can be continuously continued. As the storage battery 16, it is preferred to use a lithium-ion battery, and its capacity can be appropriately selected according to the total capacity of the test bodies 11 tested at the same time. In other words, the number of test bodies 11 or the number of secondary batteries constituting each test body 11 can be selected in such a way that the total capacity of the test bodies 11 tested at the same time is within the range of the capacity of the storage battery 16, and secondary batteries of different capacities and types can also be tested simultaneously.
[0033] The test body may be any test body in which a plurality of secondary batteries are connected in series, and may be a battery module in which a plurality of secondary batteries are connected in series and modularized, or may be a battery pack in which a plurality of battery modules are connected in series.
[0034] Here, the charge and discharge test device 10 can include a voltage adjustment unit 21 which is connected to each test body 11 during the charge and discharge test and is controlled by the control unit 18 to adjust the charge and discharge voltage of each secondary battery constituting each test body 11 so as to be within a preset tolerance range.
[0035] As the voltage adjustment unit 21, for example, a structure having a voltage measurement circuit and a bypass circuit with an on-off switch can be cited, and the voltage measurement circuit uses a voltage sensor electrically connected in parallel with each secondary battery constituting each test body 11 to measure the charge and discharge voltage of each secondary battery, and the bypass circuit is connected in parallel with each secondary battery. By controlling each voltage sensor and each bypass circuit (on-off switch) by the control unit 18, in the charge and discharge test, the charge and discharge voltage of each secondary battery is measured according to a pre-set measurement time interval, and the bypass circuit connected in parallel with the secondary battery whose measured charge and discharge voltage is higher than the reference voltage value is connected for a certain period of time, and a part of the charge and discharge current of the corresponding secondary battery is shunted to the bypass circuit. As a result, the charge and discharge current flowing to the secondary battery whose charge and discharge voltage is higher than the reference voltage value is reduced, the charge and discharge is suppressed, and the overall deviation of the charge and discharge voltage is reduced. At this time, the current shunted to the bypass circuit is discharged through the resistor connected in series with the on-off switch, and becomes heat energy and is consumed.
[0036] As mentioned above, although the embodiment of the present invention has been described, the present invention is not limited to the configuration described in any of the above-mentioned embodiments, and also includes other embodiments and modifications that can be considered within the scope of the matters described in the claims.
[0037] Examples of the secondary battery used as the test body include a nickel-hydrogen battery, a nickel-cadmium battery, and a lead storage battery in addition to a lithium-ion battery.
[0038] In the above embodiment, a bidirectional AC / DC converter is connected between the commercial AC power supply and the common DC bus, but it does not necessarily need to be a bidirectional AC / DC converter. In addition, the number of bidirectional DC / DC converters connected to the common DC bus can be appropriately selected.
[0039] Industrial Applicability
[0040] According to the charge and discharge test device of the present invention, by repeatedly reusing the energy initially imparted to charge and discharge multiple secondary batteries, power consumption can be significantly reduced, and life evaluation can be performed at low cost without complex control. This can especially contribute to the expansion and rationalization of the second-hand market for electric vehicles (large-capacity secondary batteries).
[0041] Description of symbols
[0042] 10: Charge and discharge test device; 11: Test body; 12: Commercial AC power supply; 13: Common DC bus; 14: Bidirectional AC / DC converter; 15: Bidirectional DC / DC converter; 16: Battery; 17: Auxiliary power generation unit; 18: Control unit; 20: Power supply unit; 21: Voltage adjustment unit.
Claims
1. A charge and discharge test device for simultaneously performing charge and discharge tests on a plurality of test bodies using a plurality of secondary batteries connected in series as test bodies, characterized in that: The charge and discharge test device has: An AC / DC converter, wherein an AC side terminal of the AC / DC converter is connected to a commercial AC power source, and a DC side terminal of the AC / DC converter is connected to a common DC bus; a plurality of bidirectional DC / DC converters, each of which has one end connected to the common DC bus and another end connected to each of the test bodies; a storage battery connected to the common DC bus; an auxiliary power generation unit connected to the common DC bus; as well as a control unit that controls each of the bidirectional DC / DC converters, When each of the test bodies is charged and discharged, electric power is transferred between each of the test bodies and the storage battery, and insufficient power of the storage battery is supplemented by the electric power generated by the auxiliary power generation unit.
2. The charge and discharge test device according to claim 1, characterized in that: The test body is a battery module in which a plurality of the secondary batteries are connected in series and modularized, or a battery pack in which a plurality of the battery modules are connected in series.
3. The charge and discharge test device according to claim 1 or 2, characterized in that: The AC / DC converter is a bidirectional AC / DC converter.
4. The charge and discharge test device according to any one of claims 1 to 3, characterized in that: The auxiliary power generation unit is a solar panel.
5. The charge and discharge test device according to any one of claims 1 to 4, characterized in that: The charge and discharge test device includes a voltage adjustment unit which is connected to each test body during the charge and discharge test and is controlled by the control unit to adjust the charge and discharge voltage of each secondary battery so that the charge and discharge voltage is within a preset tolerance range.
Citation Information
Patent Citations
Charge and discharge test system
JP2012154793A