Comprehensive device for measuring coal quantity of raw coal bunker and remotely calibrating coal feeder

By designing the integrated device for coal metering and remote calibration of coal feeders in the raw coal silo, and using the DCS control system and coal transportation system, the cumbersome problems of coal metering and coal feeders in the power plant are solved, and the accuracy of coal silo is achieved Accurate calibration of metering and coal feeder.

CN118877486APending Publication Date: 2024-11-01STATE POWER INVESTMENT CORP GUIZHOU JINYUAN SUIYANG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188170.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

At this stage, the coal metering and regular calibration of the belt scale of the power plant's raw coal silo and the coal feeder belt scale are cumbersome, time-consuming and labor-intensive, and have large errors, which affects the reliability of combustion guidance and coal consumption statistics.

Method used

A comprehensive device for coal metering and remote calibration of coal feeder in the raw coal silo is designed, including coal transportation system and DCS control system, which is composed of belt scale, plougher and tee baffle, and is logically configured and used for DCS control system. Signal processing realizes coal quantity calculation and automatic calibration of coal feeder.

Benefits of technology

The coal bin coal quantity measurement is realized without coal bin weighing and metering, and remote calibration correction is provided for coal feeders, ensuring the accuracy of coal bin coal quantity measurement and the accurate measurement of coal feeders.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118877486A_ABST
    Figure CN118877486A_ABST
Patent Text Reader

Abstract

The invention provides a comprehensive device for measuring the coal quantity of a raw coal bunker and remotely calibrating a coal feeder, and relates to the field of thermal power generation. The device comprises a coal conveying and feeding system and a DCS control system, coal feeding of the coal conveying system is composed of a 1A belt, a 1B belt, a 2A belt, a 2B belt, a 3A belt, a 3B belt, a 4A belt, a 4B belt and accessory equipment, signal processing operation is conducted through the control technology of the DCS control system, the states of all the equipment are combined during belt coal feeding, and coal feeding is achieved. The device can provide coal bunker coal quantity metering for a coal bunker under the condition of no coal bunker weighing metering, and can also provide remote calibration and correction for the weighing coal feeder, so that accurate metering of the weighing coal feeder is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of thermal power generation, and in particular to a comprehensive device for measuring the amount of coal in a raw coal bunker and for remotely calibrating a coal feeder. Background Art

[0002] The amount of coal entering the raw coal bunker of the power plant is estimated by the operating personnel based on the accumulated coal loading of the No. 3 belt scale and evenly distributed to each raw coal bunker. This measurement method is relatively cumbersome, time-consuming and labor-intensive, and has large errors. It does not provide a reliable basis for the combustion guidance of the unit and the coal consumption statistics. In addition, due to the removal of the gate door on the coal feeder during the anti-blocking transformation of the coal bunker, the regular calibration of the coal feeder belt scale of the power plant is difficult and time-consuming at this stage. Summary of the invention

[0003] 1. Technical issues to be resolved

[0004] In view of the shortcomings of the prior art, the present invention provides a comprehensive device for measuring coal quantity in raw coal bin and remotely calibrating coal feeder, which solves the problem that power plants currently have no raw coal bin coal quantity measurement and regular calibration of coal feeder belt scales is difficult, time-consuming and labor-intensive.

[0005] (II) Technical solution

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder, including a coal conveying system for coal loading and a DCS control system, wherein the coal conveying system for coal loading is composed of a 1A belt, a 1B belt, a 2A belt, a 2B belt, a 3A belt, a 3B belt, a 4A belt, a 4B belt and auxiliary equipment, wherein the upper side wall of the 4A belt is provided with a first A coal plow, a second A coal plow and a third A coal plow, and the upper side wall of the 4B belt is provided with a first B coal plow, a second B coal plow and a third B coal plow, and one side of the 4A belt is provided with a No. 1 bin, a No. 2 bin, a No. 3 bin and a No. 4 bin;

[0007] A three-way baffle plate of three A and a three-way baffle plate of three B are installed at one end of the 4A belt and the 4B belt, the feed end of the three-way baffle plate of three A cooperates with the discharge end of the 3B belt, the feed end of the three-way baffle plate of three B cooperates with the discharge end of the 3A belt, a 3B belt scale is installed inside the 3B belt, and a 3A belt scale is installed inside the 3A belt;

[0008] The DCS control system is composed of a HVAC system DCS cabinet, a coal transportation system DCS remote cabinet and a host DCS control system. The DCS control system is logically configured through the coal transportation logic description.

[0009] Preferably, the 4A belt is connected to the No. 1 bunker through the first A coal plow, the 4A belt is connected to the No. 2 bunker through the second A coal plow, the 4A belt is connected to the No. 3 bunker through the third A coal plow, and the discharge end of the 4A belt is connected to the No. 4 bunker. The coal flow on the 4A belt can be guided into each coal bunker through the above components.

[0010] Preferably, the 4B belt is connected to the No. 1 bunker through the first B coal plow, the 4B belt is connected to the No. 2 bunker through the second B coal plow, the 4B belt is connected to the No. 3 bunker through the third B coal plow, and the discharge end of the 4B belt is connected to the No. 4 bunker. Through the above components, the coal flow on the 4B belt can be introduced into each coal bunker.

[0011] Preferably, the outlet of the No. 1 bin is provided with a first A coal feeder, the outlet of the No. 2 bin is provided with a first B coal feeder, the outlet of the No. 3 bin is provided with a second A coal feeder, and the outlet of the No. 4 bin is provided with a second B coal feeder. The provision of multiple coal feeders can guide the coal in multiple coal bins into the receiving device.

[0012] Preferably, each of the first A coal feeder, the first B coal feeder, the second A coal feeder and the second B coal feeder is provided with a coal feeder belt scale.

[0013] Preferably, an AO card is added to the DCS cabinet of the coal transportation system, and 4 real-point AO channels are added to the database for sending signals, and 4 real-point AI channels are added to the database of the DCS remote cabinet of the coal transportation system for receiving signals.

[0014] Preferably, a computer shielded signal cable is installed on the DCS cabinet of the coal conveying system. The diameter of the computer shielded signal cable is set to be above 8*1.5mm, and is used to transmit the instantaneous coal quantity signal of the No. 1 and No. 2 coal feeder belt scales to the coal conveying system through the coal conveying system.

[0015] Working principle: The coal transportation system is logically configured according to the following logic description. The logic adds the calculation logic and screen measurement point display of the coal input quantity and coal storage quantity of 4 bins. The host DCS control system logic configuration is carried out when the standby unit is shut down.

[0016] The basic principle of DCS control system logic is: coal intake = q1 × t 1; Coal storage amount=q1×t1-q2×t2.

[0017] Among them: q1 is the sum of the instantaneous flow rates of 3A and 3B belt scales; q2 is the flow rate of the coal feeder; t1 is the time it takes for the coal flow to pass through No. 3 belt scale; t2 is the time it takes for the coal flow to pass through the coal feeder belt scale.

[0018] The logical configuration of each coal bunker in the DCS control system logic is as follows:

[0019] Coal intake in No. 1 bunker: If any of the following conditions are met, the instantaneous flow of No. 3 belt scale is used for cumulative calculation when entering the No. 1 coal intake. The system clock is obtained in the logic to calculate the coal intake of each shift. The coal storage volume is the coal intake minus the cumulative flow in the corresponding coal feeder time. When the 4A belt is running and the 3A belt is running, the delay is 1'04" and the electric three-way baffle A of the 3A belt is open, and the No. 4A1 coal plow falls. When the 4A belt is running and the 3B belt is running, the delay is 1'04" and the electric three-way baffle A of the 3B belt is open, and the No. 4A1 coal plow falls. When the 4B belt is running and the 3A belt is running, the delay is 1'04" and the electric three-way baffle B of the 3A belt is open, and the No. 4B1 coal plow falls. When the 4B belt is running and the 3B belt is running, the delay is 1'04" and the electric three-way baffle B of the 3B belt is open, and the No. 4B1 coal plow falls.

[0020] Coal intake into No.2 bunker: When any of the following conditions is met, the coal intake into No.2 bunker begins to be accumulated using the instantaneous flow of No.3 belt scale. The system clock is obtained in the logic to calculate the coal intake of each shift. The stored coal volume is the coal intake minus the accumulated flow during the corresponding coal feeder time. When the 4A belt is running and the 3A belt is running, there is a delay of 1′14″ and the electric three-way baffle A of the 3A belt is open, and the No.2 coal plow of 4A falls. When the 4A belt is running and the 3B belt is running, there is a delay of 1′14″ and the electric three-way baffle A of the 3B belt is open, and the No.2 coal plow of 4A falls. When the 4B belt is running and the 3A belt is running, there is a delay of 1′14″ and the electric three-way baffle B of the 3A belt is open, and the No.2 coal plow of 4B falls. When the 4B belt is running and the 3B belt is running, there is a delay of 1′14″ and the electric three-way baffle B of the 3B belt is open, and the No.2 coal plow of 4B falls.

[0021] Coal intake into No.3 bunker: When any of the following conditions is met, the coal intake into #1 bunker begins to be accumulated using the instantaneous flow of No.3 belt scale. The system clock is obtained in the logic to calculate the coal intake of each shift. The stored coal volume is the coal intake minus the accumulated flow during the corresponding coal feeder time. When the 4A belt is running and the 3A belt is running, there is a delay of 1′30″ and the electric three-way baffle A of the 3A belt is open, and the No.3 coal plow of 4A falls. When the 4A belt is running and the 3B belt is running, there is a delay of 1′30″ and the electric three-way baffle A of the 3B belt is open, and the No.3 coal plow of 4A falls. When the 4B belt is running and the 3A belt is running, there is a delay of 1′30″ and the electric three-way baffle B of the 3A belt is open, and the No.3 coal plow of 4B falls. When the 4B belt is running and the 3B belt is running, there is a delay of 1′30″ and the electric three-way baffle B of the 3B belt is open, and the No.3 coal plow of 4B falls.

[0022] Coal intake in No. 4 bin: When any of the following conditions is met, the coal intake in No. 4 bin starts to be accumulated using the instantaneous flow of No. 3 belt scale. The logic uses the system clock to calculate the coal intake in each shift. The coal storage amount is the coal intake minus the accumulated flow in the corresponding coal feeder time. When the 4A belt is running and the 3A belt is running, there is a delay of 1′40″ and no signal of any coal plow falling. When the 4A belt is running and the 3B belt is running, there is a delay of 1′40″ and no signal of any coal plow falling. When the 4B belt is running and the 3A belt is running, there is a delay of 1′40″ and no signal of any coal plow falling. When the 4B belt is running and the 3B belt is running, there is a delay of 1′40″ and no signal of any coal plow falling.

[0023] (III) Beneficial effects

[0024] The present invention provides a comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder. It has the following beneficial effects:

[0025] The device combines the states of various equipment when the belt is loading coal, and uses DCS control system control technology to perform signal processing operations to obtain the coal input amount and real-time coal storage amount of the raw coal bunker, and can provide an automatic calibration program for the coal feeder to carry out automatic calibration of the coal feeder. The implementation of this solution enables the device to provide coal bunker coal quantity measurement for the coal bunker without coal bunker weighing and measurement, and can also provide remote calibration correction for the weighing coal feeder to ensure accurate measurement of the weighing coal feeder. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the present invention;

[0027] Figure 2 Schematic diagram of the system of the present invention.

[0028] Among them, 11, No. 1 bin; 111, No. 1A coal feeder; 12, No. 2 bin; 121, No. 1B coal feeder; 13, No. 3 bin; 131, No. 2A coal feeder; 14, No. 4 bin; 141, No. 2B coal feeder; 21, No. 3A three-way baffle; 22, No. 3B three-way baffle; 31, 3A belt; 311, 3A belt scale; 32, 3B belt; 321, 3B belt scale; 41, 4A belt; 411, No. 1A coal plow; 412, No. 2A coal plow; 413, No. 3A coal plow; 42, 4B belt; 421, No. 1B coal plow; 422, No. 2B coal plow; 423, No. 3B coal plow. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Example:

[0031] like Figure 1-2 As shown, an embodiment of the present invention provides a comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder, including a coal conveying system for loading coal and a DCS control system. The coal conveying system for loading coal is composed of a 1A belt, a 1B belt, a 2A belt, a 2B belt, a 3A belt 31, a 3B belt 32, a 4A belt 41, a 4B belt 42 and auxiliary equipment. The upper side wall of the 4A belt 41 is installed with a first A coal plow 411, a second A coal plow 412 and a third A coal plow 413, the upper side wall of the 4B belt 42 is installed with a first B coal plow 421, a second B coal plow 422 and a third B coal plow 423, and one side of the 4A belt 41 is provided with a No. 1 bunker 11, a No. 2 bunker 12, a No. 3 bunker 13 and a No. 4 bunker 14. The 4A belt 41 passes through The first A coal plow 411 is connected to the No. 1 bunker 11, the 4A belt 41 is connected to the No. 2 bunker 12 through the second A coal plow 412, the 4A belt 41 is connected to the No. 3 bunker 13 through the third A coal plow 413, and the discharge end of the 4A belt 41 is connected to the No. 4 bunker 14. The coal flow on the 4A belt 41 can be introduced into each coal bunker through the above components, the 4B belt 42 is connected to the No. 1 bunker 11 through the first B coal plow 421, the 4B belt 42 is connected to the No. 2 bunker 12 through the second B coal plow 422, the 4B belt 42 is connected to the No. 3 bunker 13 through the third B coal plow 423, and the discharge end of the 4B belt 42 is connected to the No. 4 bunker 14. The coal flow on the 4B belt 42 can be introduced into each coal bunker through the above components.

[0032] A three-A three-way baffle 21 and a three-B three-way baffle 22 are installed at one end of the 4A belt 41 and the 4B belt 42. The feed end of the three-A three-way baffle 21 cooperates with the discharge end of the 3B belt 32, and the feed end of the three-B three-way baffle 22 cooperates with the discharge end of the 3A belt 31. A 3B belt scale 321 is installed inside the 3B belt 32, and a 3A belt scale 311 is installed inside the 3A belt 31. The models of the 3A belt scale 311 and the 3B belt scale 321 are: I CS-FH-4, the practical belt speed is 2.0m / s, the dynamic cumulative error is ≤±0.5%, and the instantaneous coal quantity data of the belt scale has entered the coal transportation DCS control system.

[0033] The outlet of the No. 1 bunker 11 is provided with a first A coal feeder 111, the outlet of the No. 2 bunker 12 is provided with a first B coal feeder 121, the outlet of the No. 3 bunker 13 is provided with a second A coal feeder 131, and the outlet of the No. 4 bunker 14 is provided with a second B coal feeder 141. The setting of multiple coal feeders can guide the coal in multiple coal bunkers into the receiving device. The first A coal feeder 111, the first B coal feeder 121, the second A coal feeder 131 and the second B coal feeder 141 are all provided with coal feeder belt scales. The model of the coal feeder belt scale is I CS-20-2, with a rated flow rate of 80t / h and a weighing accuracy of ±0.5%. There are 2 units for No. 1 furnace and 2 units for No. 2 furnace. The data of the coal feeder belt scales has entered the host DCS control system.

[0034] The DCS control system consists of a DCS remote cabinet for the coal transportation system and a host DCS control system. The DCS control system performs logical configuration through the coal transportation logic description. An AO card is added to the DCS remote cabinet for the coal transportation system, and 4 real-point AO channels are added to the database for sending signals. Four real-point AI channels are added to the DCS database of the host system for sending and receiving signals. A computer shielded signal cable is installed on the DCS cabinet of the coal transportation system. The diameter of the computer shielded signal cable is set to 8*1.5mm or more, which is used to send the coal quantity metering signal of the coal bunker to the host DCS control system for comparison.

[0035] Coal bunker level meters are installed inside the No. 1 bunker 11, the No. 2 bunker 12 and the No. 3 bunker 13 to measure the height of the coal in the bunker and estimate the amount of coal in the bunker.

[0036] The coal handling system is logically configured according to the following logic description. The logic adds the calculation logic and screen measurement point display of the coal input and storage volume of the four silos. The basic principle of the DCS control system logic is: coal input = q1 × t 1; Coal storage amount=q1×t1-q2×t2.

[0037] Among them: q1 is the sum of the instantaneous flow rates of 3A and 3B belt scales; q2 is the flow rate of the coal feeder; t1 is the time it takes for the coal flow to pass through No. 3 belt scale; t2 is the time it takes for the coal flow to pass through the coal feeder belt scale.

[0038] The signal and data requirements list of DCS control system logic is shown in Table 1:

[0039]

[0040]

[0041] Table 1 Signal and data requirements list

[0042] The DCS control system receives the data of the 3A belt scale 311 and the 3B belt scale 312, the status of the 3A belt 31 and the 3B belt 32, the status of the 4A belt 41 and the 4B belt 42, the status of the three-A three-way baffle 21 and the three-B three-way baffle 22, and the status of multiple coal plows through the coal transportation DCS control configuration, and receives the coal feeder belt scale data of multiple coal feeders, and displays it through the host computer. The display content is shown in Table 2.

[0043]

[0044] Table 2 Newly added table on DCS screen

[0045] A method for calibrating a belt scale, taking the No. 1 bin 11 as an example, first, use the calibrated belt scale to enter the coal bin to measure the original coal amount w in the No. 1 bin 11, lift the other coal plows except the first A coal plow 411 and the first B coal plow 421, and put down the first A coal plow 411 and the first B coal plow 421, so that all the coal flows conveyed by the 3A belt 31, the 3B belt 32, the 4A belt 41 and the 4B belt 42 enter the No. 1 bin 11, and the coal intake amount = q1×t1, then the coal in the No. 1 bin 11 is discharged through the first A coal feeder 111, and measured by the coal feeder belt scale, the coal taken out amount = q3×t3, the calculated and compared with the original weight w of the coal bin to produce an error ratio α=w / (q3×t3-q1×t1), finally, the instantaneous coal amount *α, can be used to obtain the calibrated coal amount.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder, including a coal conveying system for loading coal and a DCS control system. Features: The coal conveying system is composed of a 1A belt, a 1B belt, a 2A belt, a 2B belt, a 3A belt (31), a 3B belt (32), a 4A belt (41), a 4B belt (42) and auxiliary equipment. The upper side wall of the 4A belt (41) is equipped with a first A coal plow (411), a second A coal plow (412) and a third A coal plow (413). The upper side wall of the 4B belt (42) is equipped with a first B coal plow (421), a second B coal plow (422) and a third B coal plow (423). One side of the 4A belt (41) is provided with a No. 1 bin (11), a No. 2 bin (12), a No. 3 bin (13) and a No. 4 bin (14); A three-way baffle plate (21) and a three-way baffle plate (22) are installed at one end of the 4A belt (41) and the 4B belt (42); the feed end of the three-way baffle plate (21) cooperates with the discharge end of the 3B belt (32); the feed end of the three-way baffle plate (22) cooperates with the discharge end of the 3A belt (31); a 3B belt scale (321) is installed inside the 3B belt (32); and a 3A belt scale (311) is installed inside the 3A belt (31); The DCS control system is composed of a coal conveying system DCS cabinet, a coal conveying system DCS remote cabinet and a host DCS control system. The DCS control system is logically configured through a coal conveying logic description.

2. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder according to claim 1, Features: The 4A belt (41) is connected to the No. 1 bunker (11) via a first A coal plow (411), the 4A belt (41) is connected to the No. 2 bunker (12) via a second A coal plow (412), the 4A belt (41) is connected to the No. 3 bunker (13) via a third A coal plow (413), and the discharge end of the 4A belt (41) is connected to the No. 4 bunker (14).

3. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder according to claim 1, Features: The 4B belt (42) is connected to the No. 1 bin (11) through the first B coal plow (421), the 4B belt (42) is connected to the No. 2 bin (12) through the second B coal plow (422), the 4B belt (42) is connected to the No. 3 bin (13) through the third B coal plow (423), and the discharge end of the 4B belt (42) is connected to the No. 4 bin (14).

4. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder according to claim 1, Features: The outlet of the No. 1 bunker (11) is provided with a first A coal feeder (111), the outlet of the No. 2 bunker (12) is provided with a first B coal feeder (121), the outlet of the No. 3 bunker (13) is provided with a second A coal feeder (131), and the outlet of the No. 4 bunker (14) is provided with a second B coal feeder (141).

5. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder according to claim 4, Features: Coal feeder belt scales are provided inside the first A coal feeder (111), the first B coal feeder (121), the second A coal feeder (131) and the second B coal feeder (141).

6. A comprehensive device for measuring the amount of coal in a raw coal bunker and remotely calibrating a coal feeder according to claim 4, Features: An AO card is added to the DCS cabinet of the coal transportation system, and 4 real-point AO channels are added to the database, and 4 real-point AI channels are added to the database of the DCS remote cabinet of the coal transportation system.