A tower crane lifting limiter

By adopting a combined structure of bearing components and monitoring components in the tower crane lifting limiter, and using elastic parts and electrical feedback systems, the problems of wear and deterioration of monitoring accuracy of existing limiters are solved, achieving high accuracy and high safety lifting limiter.

CN118877779BActive Publication Date: 2024-12-06福建建工集团有限责任公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411392230.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-12-06
Estimated Expiration
2044-10-08

AI Technical Summary

Technical Problem

The existing lifting limiter is directly in contact with the rotor drive shaft, resulting in poor wear and monitoring accuracy, which may lead to an inability to issue an alarm or cut off the power source during overload and overload, causing safety accidents.

Method used

A tower crane lifting limiter is designed, adopting a combined structure of bearing components and monitoring components, through the elastic connection of the first and second elastic parts, avoiding direct contact, and an electrical feedback system with conductive ring and induction ring is set up to utilize elasticity. Rubber sealing gasket and a second elastic member in compressed state ensure monitoring accuracy and safety.

Benefits of technology

It effectively reduces the wear of the lifting limiter, maintains high monitoring accuracy and safety, ensures that the alarm can be issued in time or the power source can be cut off in an overload situation, and avoids safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118877779B_ABST
    Figure CN118877779B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of lifting weight limiters, and discloses a tower crane lifting limiter, including a base, a group of bearing components are fixedly installed on both sides of the top of the base, and a connecting shaft with a slewing wheel fixedly sleeved in the middle of the outer surface is movably sleeved between the two groups of bearing components, a group of monitoring components are fixedly sleeved on the outer end faces of the two groups of bearing components, and the two ends of the connecting shaft extend to the inside of the corresponding position monitoring components, and the bearing components include an outer sleeve with an outer surface fixedly installed on the top of the base. The tower crane lifting limiter provided by the present application, with respect to the arrangement of the bearing components, the monitoring components and the structures thereon, makes it possible for the monitoring feedback system formed by the conductive ring and the induction ring on the monitoring component to not directly contact the load on the tower crane wire rope, thereby effectively reducing the wear problem of the lifting weight limiter during use, so that it can maintain a high monitoring accuracy during long-term use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of lifting weight limiters, and in particular to a tower crane lifting limiter. Background Art

[0002] The lifting weight limiter is one of the important safety protection devices in lifting and hoisting equipment. It can effectively avoid equipment or personal accidents caused by overload of lifting and hoisting equipment. It is of great significance to the transportation and production safety of modern mechanized industries.

[0003] Among them, the existing lifting weight limiters are mostly realized by means of a pressure sensor fixedly sleeved on the slewing wheel drive shaft. However, since the pressure sensor is in direct contact with the slewing wheel drive shaft and rotates therewith, the outer surface of the pressure sensor on the lifting weight limiter will experience a certain degree of irregular wear during long-term use, and the unbalanced force on the outer surface of the pressure sensor will cause its monitoring accuracy for the lifting load to deteriorate. Especially in the case of overload lifting, if the monitoring accuracy of the lifting weight limiter deteriorates and the lifting and hoisting equipment cannot sound an alarm or cut off the power source, it is very easy to cause a major production safety accident, and the safety and reliability are poor.

[0004] Therefore, there is an urgent need for a lifting weight limiter used in lifting and hoisting equipment to solve the defects of the above-mentioned existing lifting weight limiters in actual use. Summary of the invention

[0005] The present application proposes a tower crane lifting limiter, which has the advantages of effectively reducing the wear of the lifting weight limiter during use, so that it can maintain high monitoring accuracy, safety and reliability during long-term use, and is used to solve the problem that the existing lifting weight limiter is mostly realized by a pressure sensor fixedly sleeved on the slewing wheel drive shaft, but because the pressure sensor is directly in contact with the slewing wheel drive shaft and rotates accordingly, the outer surface of the pressure sensor on the lifting weight limiter will experience a certain degree of irregular wear during long-term use, and the pressure sensor The outer surface of the pressure sensor is subjected to uneven force, resulting in a deterioration in its monitoring accuracy for the lifting load. Especially in the case of overload lifting, if the lifting and hoisting equipment cannot sound an alarm or cut off the power source due to the deterioration of the monitoring accuracy of the lifting weight limiter, it is very easy to cause a major production safety accident.

[0006] To achieve the above-mentioned purpose, the present application adopts the following technical scheme: a tower crane lifting limiter, comprising a base, a group of bearing components are fixedly installed on both sides of the top of the base, and a connecting shaft with a slewing wheel fixedly installed in the middle of the outer surface is movably sleeved between the two groups of bearing components. At the same time, a group of monitoring components are fixedly sleeved on the outer end faces of the two groups of bearing components, and the two ends of the connecting shaft extend to the interior of the corresponding position monitoring components respectively. The bearing component comprises an outer sleeve with an outer surface fixedly installed on the top of the base, an inner sleeve is provided inside the outer sleeve, and an annular groove is opened on the outer surface of the inner sleeve, and three groups of first elastic members arranged in a ring array are fixedly installed on the inner wall of the outer sleeve, and a support member that is in friction contact with the annular groove on the inner sleeve is movably connected in the middle of the inner side surface of the first elastic member.

[0007] Furthermore, the monitoring component includes a connecting frame fixedly connected to the side end face of the outer sleeve by a screw, the connecting frame is movably sleeved with a linkage sleeve inside, and the connecting frame and the linkage sleeve are elastically connected by a second elastic member movably sleeved on the outer surface of the linkage sleeve, the end of the connecting shaft extends to the interior of the linkage sleeve, and both ends of the connecting shaft are set to conical structures, and cooperate with conical grooves opened on the linkage sleeve.

[0008] Furthermore, an induction ring is fixedly sleeved on one side of the inner wall of the connecting frame, and a conductive ring is fixedly sleeved on one side of the outer surface of the linkage sleeve and located on the right side of the induction ring, and an electrical feedback connection is formed between the conductive ring, the induction ring and the control system of the tower crane.

[0009] Furthermore, different thresholds are set between the conductive ring and the inductive ring according to the degree of overlap between them, and when the overlap degree is within the threshold range with a lower degree, an alarm is issued, while when the overlap degree is within the threshold range with a higher degree, the power source of the tower crane equipment can be directly cut off, and the threshold range between the conductive ring and the inductive ring is set according to the specific usage of the tower crane.

[0010] Furthermore, the exterior of the first elastic member is configured as a "W"-shaped structure, and the support member is movably connected to a raised position in the middle of the "W"-shaped structure.

[0011] Furthermore, the inner and outer end surfaces of the two groups of bearing components are respectively provided with a group of sealing gaskets made of elastic rubber material.

[0012] Furthermore, the second elastic member is set to a compressed state in the initial state, thereby ensuring that the linkage sleeve can always maintain a tight fit with the end of the connecting shaft, so that the monitoring accuracy of the lifting weight limiter will not be reduced due to shaking during operation.

[0013] The present invention application has the following technical effects:

[0014] The present application provides a tower crane lifting limiter, in which the bearing component and the monitoring component are arranged so that the monitoring feedback system formed by the conductive ring and the induction ring on the monitoring component will not directly contact the load on the tower crane wire rope. At the same time, the arrangement of the first elastic part on the bearing component can effectively reduce the pressure on the monitoring component caused by the load on the tower crane wire rope, thereby effectively reducing the wear problem of the lifting weight limiter during use, so that it can maintain a high monitoring accuracy during long-term use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings, which constitute a part of the specification, illustrate embodiments disclosed in the present application and, together with the description, serve to explain the principles disclosed in the present application.

[0016] The present application can be more clearly understood from the following detailed description with reference to the accompanying drawings, in which:

[0017] Figure 1 It is a schematic diagram of the structure of the present invention;

[0018] Figure 2 It is a front view of the structure of the present invention;

[0019] Figure 3 It is a structural schematic diagram of the bearing component of the present invention;

[0020] Figure 4 The structure of the present invention Figure 2 A side cross-sectional view of

[0021] Figure 5 It is a schematic diagram of the front installation structure of the monitoring component of the present invention.

[0022] In the figure: 1. base; 2. bearing component; 3. connecting shaft; 4. rotating wheel; 5. sealing gasket; 6. monitoring component; 7. outer sleeve; 8. inner sleeve; 9. ring groove; 10. first elastic member; 11. supporting member; 12. connecting frame; 13. linkage sleeve; 14. second elastic member; 15. conductive ring; 16. induction ring. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0024] like Figure 1 , Figure 2As shown, a tower crane lifting limiter comprises a base 1 which can be fixedly mounted on a rotating tower body by bolts, a group of bearing components 2 are fixedly mounted on both sides of the top of the base 1, and a connecting shaft 3 with a rotating wheel 4 fixedly mounted in the middle of the outer surface is movably sleeved between the two groups of bearing components 2, and the outer surface of the rotating wheel 4 is wound and connected with a steel wire rope on the tower crane lifting equipment. At the same time, a group of monitoring components 6 are fixedly sleeved on the outer end surfaces of the two groups of bearing components 2, and the two ends of the connecting shaft 3 extend to the inside of the corresponding position monitoring components 6, as shown in FIG. Figure 3 As shown, the bearing component 2 includes an outer sleeve 7 whose outer surface is fixedly mounted on the top of the base 1, an inner sleeve 8 is arranged inside the outer sleeve 7, and an annular groove 9 is opened on the outer surface of the inner sleeve 8, and three groups of first elastic members 10 arranged in an annular array are fixedly mounted on the inner wall of the outer sleeve 7, and a support member 11 in friction contact with the annular groove 9 on the inner sleeve 8 is movably connected to the middle part of the inner side surface of the first elastic member 10:

[0025] Furthermore, under the elastic action of the three groups of first elastic members 10, when the external force applied to the inner sleeve 8 is smaller than the combined force of the three groups of first elastic members 10, the inner sleeve 8 can always be kept in the middle position of the outer sleeve 7;

[0026] When the external force exerted on the inner sleeve 8 is greater than the combined force of the three groups of first elastic members 10, the two groups of support members 11 in the moving direction are forced to move outward to provide space for the movement of the inner sleeve 8, and a corresponding feedback signal is generated through the monitoring component 6 to remind the corresponding operator or directly cut off the power source of the tower crane equipment.

[0027] like Figure 5 As shown, in the present technical solution, the monitoring component 6 includes a connecting frame 12 fixedly connected to the side end face of the outer sleeve 7 by a screw, a linkage sleeve 13 is movably sleeved inside the connecting frame 12, and the connecting frame 12 and the linkage sleeve 13 are elastically connected by a second elastic member 14 movably sleeved on the outer surface of the linkage sleeve 13, the end of the connecting shaft 3 extends to the interior of the linkage sleeve 13, and both ends of the connecting shaft 3 are set to conical structures, and cooperate with the conical grooves provided on the linkage sleeve 13, so that when the connecting shaft 3 is moved by an external force, the linkage sleeve 13 can be forced to move outward to form a feedback signal.

[0028] like Figure 5 As shown, in the present technical solution, an induction ring 16 is fixedly sleeved on one side of the inner wall of the connecting frame 12, and a conductive ring 15 is fixedly sleeved on one side of the outer surface of the linkage sleeve 13 and located on the right side of the induction ring 16, and an electrical feedback connection is formed between the conductive ring 15 and the induction ring 16 and the control system of the tower crane, which is further used to monitor the lifting load of the steel wire rope on the tower crane;

[0029] Furthermore, the arrangement of the bearing component 2 and the structure thereon ensures that the monitoring feedback system formed by the conductive ring 15 and the inductive ring 16 on the monitoring component 6 will not directly contact the load on the tower crane wire rope. At the same time, the arrangement of the first elastic member 10 on the bearing component 2 can effectively reduce the pressure on the monitoring component 6 caused by the load on the tower crane wire rope.

[0030] like Figure 5 As shown, in the present technical solution, different thresholds are set between the conductive ring 15 and the inductive ring 16 according to the degree of overlap therebetween, and when the overlap degree is within the threshold range with a lower degree, an alarm is issued, and when the overlap degree is within the threshold range with a higher degree, the power source of the tower crane equipment can be directly cut off, and the threshold range between the conductive ring 15 and the inductive ring 16 is set according to the specific usage of the tower crane.

[0031] like Figure 3 As shown, in the present technical solution, the outside of the first elastic member 10 is set as a "W" type structure, and the support member 11 is movably connected to the middle raised position of the "W" type structure, so that the elastic force of the support member 11 can force the inner sleeve 8 to automatically return to the middle position of the outer sleeve 7 to automatically calibrate the monitoring component 6, and make the monitoring accuracy of the lifting weight limiter higher.

[0032] like Figure 1 , Figure 2 As shown, in the present technical solution, the inner and outer end faces of the two groups of bearing components 2 are respectively provided with a group of sealing gaskets 5 made of elastic rubber material, and then under the action of the sealing gaskets 5, while providing sealing conditions for the bearing components 2 to prevent dust from entering therein, when the connecting shaft 3 is moved by the external force, the sealing gasket 5 can also be subjected to the force to undergo elastic deformation without adversely affecting the movement of the connecting shaft 3.

[0033] In the present technical solution, the second elastic member 14 is set to a compressed state in the initial state, thereby ensuring that the linkage sleeve 13 can always maintain a tight fit with the end of the connecting shaft 3, so that the monitoring accuracy of the lifting weight limiter will not be reduced due to shaking during operation.

Claims

1. A tower crane lifting limiter, comprising a base (1), a group of bearing components (2) are fixedly mounted on both sides of the top of the base (1), and a connecting shaft (3) is movably sleeved between the two groups of bearing components (2), the middle part of the outer surface of which is fixedly sleeved on a slewing wheel (4), and at the same time, a group of monitoring components (6) are fixedly sleeved on the outer end surfaces of the two groups of bearing components (2), and the two ends of the connecting shaft (3) extend to the inside of the corresponding position monitoring components (6), characterized in that: The bearing component (2) comprises an outer sleeve (7) whose outer surface is fixedly mounted on the top of the base (1); an inner sleeve (8) is arranged inside the outer sleeve (7); an annular groove (9) is provided on the outer surface of the inner sleeve (8); three groups of first elastic members (10) arranged in an annular array are fixedly mounted on the inner wall of the outer sleeve (7); a support member (11) is provided in the middle of the inner side surface of the first elastic member (10) for frictionally contacting the annular groove (9) on the inner sleeve (8); the outer portion of the first elastic member (10) is set as a "W"-shaped structure, and the support member (11) is movably connected to a raised position in the middle of the "W"-shaped structure; The monitoring component (6) comprises a connecting frame (12) fixedly connected to the side end surface of the outer sleeve (7) by a screw rod, a linkage sleeve (13) is movably sleeved inside the connecting frame (12), and the connecting frame (12) and the linkage sleeve (13) are elastically connected via a second elastic member (14) movably sleeved on the outer surface of the linkage sleeve (13), the end of the connecting shaft (3) extends into the interior of the linkage sleeve (13), and both ends of the connecting shaft (3) are configured as conical structures and cooperate with conical grooves provided on the linkage sleeve (13); an induction ring (16) is fixedly sleeved on one side of the inner wall of the connecting frame (12), and a conductive ring (15) is fixedly sleeved on one side of the outer surface of the linkage sleeve (13) and located on the right side of the induction ring (16), and an electrical feedback connection is formed between the conductive ring (15) and the induction ring (16) and a control system of the tower crane.

2. The tower crane lifting limiter according to claim 1, characterized in that: Different thresholds are set according to the degree of overlap between the conductive ring (15) and the inductive ring (16), and an alarm system and a tower crane power source cut-off system are set based on the threshold range of overlap between the conductive ring (15) and the inductive ring (16).

3. The tower crane lifting limiter according to claim 2, characterized in that: A group of sealing gaskets (5) made of elastic rubber material are respectively provided on the inner and outer end surfaces of the two groups of bearing components (2).

4. The tower crane lifting limiter according to claim 3, characterized in that: The second elastic member (14) is set to a compressed state in the initial state, thereby ensuring that the linkage sleeve (13) can always maintain a tight fit with the end of the connecting shaft (3).