Hoisting platform-based operation method for lap joint of drainage wire in hot-line work
Through the live operation overlap drain line method based on the lifting platform, the lifting and drain line installation is completed by using the lifting and connecting device, which solves the problem that the live operation restrictions are not considered in the power grid construction, and efficient and safe live operation is achieved, reducing the The cost and risks of insulated boom trucks.
Patent Information
- Application Number
- CN202411015570.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-26
AI Technical Summary
In the prior art, since the power grid construction does not consider the limitations of live operations, some operating areas have a small environment and cannot use insulated boom trucks, resulting in high-risk rod climbing operations for live operations, affecting power supply reliability and safety.
Design a working method for live-operated lap drainage line based on lifting platform, using lifting and connecting device, including lifting and pulling boom, working module, jaw mechanism, telescopic robot arm and control terminal, to complete the peeling and peeling of the conductor through remote operation and Installation of drainage lines to avoid dependence on insulated boom trucks.
It realizes live operations without relying on insulated boom trucks, reduces personnel safety risks and costs, improves operation reliability and flexibility, and avoids unnecessary personnel accidents.
Smart Images

Figure CN118889249A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of live working, and in particular relates to a live working overlapping drainage line operation method based on a hoisting platform. Background Art
[0002] Live working has also gradually shifted from conventional manpower work to robot and human work. A relatively high proportion of work in live working is live splicing of drainage lines. When live working personnel perform splicing operations, they need to conduct surveys and other work on the operations, confirm the operation plan, confirm the operation of boom trucks or personnel climbing poles according to the on-site conditions, and make work arrangements. The main reason is that the on-site environment is limited due to different working environments. Due to the short development time of the domestic power grid, the early construction of the power grid did not take into account the restrictions on live working in the later period, resulting in a small environment in some working areas, and insulated boom trucks could not enter the site to carry out operations. In addition, due to the high cost of boom trucks and the small number of boom trucks in some areas, they could not supply the working needs at any time. Therefore, they could only carry out pole climbing operations, which would place high demands on the operating personnel, hinder the development and application of live working, have a high impact on maintenance work, and reduce the reliability of power supply.
[0003] Therefore, there is an urgent need for a live working method for overlapping drainage lines based on a hoisting platform to solve the above problems. Summary of the invention
[0004] In view of the above problems existing in the prior art, the purpose of the present invention is to design and provide a method for overlapping drainage lines during live working based on a hoisting platform to solve the above technical problems.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a method for overlapping drainage lines during live working based on a hoisting platform, the method is applied to a hoisting and guiding device, and the hoisting and guiding device completes the drainage line installation operation on the conductor; the hoisting and guiding device includes a lifting boom, an operation module, a clamping mechanism, a telescopic mechanical arm, a control terminal and a drainage line clamp; the lifting boom is connected to an external lifting device, and an operation module and a clamping mechanism are connected to the lifting boom; a clamping device is installed in the middle and lower part of the lifting boom, and the lifting boom includes a lifting rod and a lifting module, and the lifting module wraps the lifting rod; the operation module includes an operation platform, a stripper, a wire clamp installation tool and a drainage line traction device, and the stripper and the wire clamp installation tool are respectively installed on both sides of the operation platform; an insulating shielding cover is placed on the conductors in the area to be operated and the porcelain bottles provided by the conductors; A method for connecting a drainage line during live working based on a hoisting platform comprises the following steps: S1, install the lifting and guiding device on the external lifting device; send the lifting and guiding device in the hook of the external lifting device to the working area, and fix the boom; S2, using the control terminal to control the winch mechanism in the hoisting device, and placing the device above the wire, across the wire, and placing the hoisting device on the ground; wherein the cable in the winch mechanism is an insulated silk rope; S3, determine the complexity of the shielding environment. When the environment is complex, use the pole climbing method to use the insulating operating rod to complete the insulation shielding installation; when the environment is not complex, place the hoisting and guiding device on the ground, install the insulating shielding cover to the clamping mechanism in the device, and then the winch mechanism in the hoisting device works to recover the insulating silk rope and lift the hoisting and guiding device to the waiting operation area; then place the insulating shielding cover on the conductor and the porcelain bottle through the winch mechanism; S4, controlling the clamping device to fix the wire; S5, the working platform is lowered by the lifting module, so that the stripper on it is clamped into the main conductor, the stripper clamps the conductor, automatically cuts and self-adaptively strips the insulation layer; S6, install the drainage wire clamp to the drainage wire in advance. When the stripper is working, control the telescopic insulating manipulator so that the insulating hook at the end of the manipulator is hooked to the hanging ring in the drainage wire clamp at the end of the drainage wire; then the drainage wire traction device pulls the drainage wire clamp and the wire into the groove of the drainage wire traction device; after the stripper strips the insulation layer of the wire, the working platform rotates 180 degrees, and the wire clamp installation tool is rotated above the drainage wire clamp; S7, the working platform descends, and the wire clamp installation tool is aligned with the drainage wire clamp fastening bolt in the groove of the drainage wire traction device, and then the wire clamp installation tool starts working, and the conductor is installed; S8, after completing the single-phase operation, move the lifting device arm to another phase conductor, repeat the above steps S4 to S7 until the installation of the three-phase conductor drainage line is completed and the live lifting and connection operation is completed.
[0006] The lifting rod comprises bakelite and a rack, the bakelite and the rack are arranged in a sandwich structure, the bakelite is located on the outside of the rack, and the bakelite and the rack are arranged in a staggered manner.
[0007] The lifting module includes nylon, gears and a motor. The motor is fixed to one side of the lifting module, and the motor and the gear are connected. The gear is meshed with a rack in the lifting rod. Starting the motor can drive the gear to rotate, so that it can move up and down along the lifting rod.
[0008] The drainage line traction device is arranged at the lower end of the lifting rod, and comprises a motor, a wire take-up device, a traction rope, a wire clamp limiter, and is supported by nylon material, wherein the traction rope is an insulated silk rope.
[0009] The telescopic mechanical arm is connected to the bottom end of the lifting rod. The telescopic mechanical arm includes a motor, an epoxy resin insulating rod, and nylon, and is used to transport the insulating silk rope and the hook to the drainage line, so that the end of the telescopic mechanical arm is hooked on the drainage line clamp in the drainage line.
[0010] The hoisting device has an aerial work vehicle with a hoisting function such as a crane that hoists the lifting boom and the working module to the working area, and moves the device to the working area without insulation requirements.
[0011] The work platform is provided with a rotary module, and different types of installation tools are selected to perform work at the same location according to the work project.
[0012] Compared with the prior art, the present invention has the following beneficial effects: The present invention analyzes the current live overlapping drainage lines and provides a new type of live overlapping drainage line operation method, which can be independent of the use of insulating boom trucks. Conventional vehicles or devices with lifting devices can complete the operation, and the operation process adopts a mode of remote operation by personnel, which reduces personnel safety risks and the use cost of insulating boom trucks, so that the live overlapping drainage line operation with higher risks no longer relies on insulating boom trucks, reduces the requirements for operators, and can avoid unnecessary personnel accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a flow chart of a method for connecting a drainage line during live working based on a hoisting platform; Figure 2 A flowchart for the preparation work; Figure 3 is a schematic diagram of a lifting rod; Figure 4 is a schematic diagram of a lifting boom; Figure 5 A working diagram of a method for connecting a drainage line during live work based on a hoisting platform Figure 1 ; Figure 6 A working diagram of a method for connecting a drainage line during live work based on a hoisting platform Figure 2 ; Figure 7 A working diagram of a method for connecting a drainage line during live work based on a hoisting platform Figure 3 ; In the figure: 1-bakelite, 2-rack, 3-gear, 4-motor, 5-clamping device, 6-lifting rod, 7-lifting module, 8-stripper, 9-wire clamp installation tool, 10-insulating shielding cover, 11-drainage wire traction device, 12-telescopic mechanical arm, 13-drainage wire clamp. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] See also Figure 1-7 The present invention provides a technical solution: a method for overlapping drainage lines during live working based on a lifting platform, the method is applied to a lifting and guiding device, the lifting and guiding device completes the drainage line installation operation on the conductor; the lifting and guiding device includes a lifting boom, an operation module, a clamping mechanism, a telescopic mechanical arm 12, a control terminal and a drainage line clamp 13; the lifting boom is connected to an external lifting device, and an operation module and a clamping mechanism are connected to the lifting boom; a clamping device 5 is installed in the middle and lower part of the lifting boom, the lifting boom includes a lifting rod 6 and a lifting module 7, and the lifting module 7 is arranged to wrap the lifting rod 6; the operation module includes a working platform, a stripper 8, a wire clamp installation tool 9 and a drainage line traction device 11, and the stripper 8 and the wire clamp installation tool 9 are respectively installed on both sides of the working platform.
[0016] Specifically, the clamping device 5 is mainly used to fix the lifting rod 6 and the conductor to prevent the lifting rod 6 from shaking in the air, thereby causing a phase-to-phase short circuit.
[0017] Specifically, the lifting device mainly includes an aerial work vehicle with a lifting function such as a crane that lifts the lifting boom and the working module to the working area. The main function is to move the device to the working area, and no insulation is required.
[0018] The lifting rod comprises bakelite 1 and rack 2, the bakelite 1 and rack 2 are arranged in a sandwich structure, the bakelite 1 is located outside the rack 2, and the bakelite 1 and rack 2 are arranged in a staggered manner. The lifting rod adopts bakelite 1 as the main material so that it has high insulation performance, and adopts a modular splicing method to control the length, so that it is suitable for various overhead line conditions.
[0019] Specifically, the lifting rod is mainly used to connect the working platform and the lifting device. The main materials are epoxy resin insulation tube and nylon rack. A nylon material clamp is installed at the bottom to fix the working platform and the wire.
[0020] Specifically, the control terminal is mainly used to control the electric stripper 8 and the wire clamp installation tool 9 to perform stripping and wire clamp installation operations.
[0021] Specifically, the stripper 8 and the wire clamp installation tool 9 are installed in the rotating turntable of the working platform. The rack 2 in the lifting rod can be used to make the working platform move up and down in the lifting rod. There are gears in the rotating turntable, and the tools can be selected and operated by rotating the turntable.
[0022] The lifting module includes nylon, gear 3 and motor 4. Motor 4 is fixed to one side of the lifting module, and motor 4 is connected to gear 3. Gear 3 is meshed with rack 2 in the lifting rod. Starting motor 4 can drive gear 3 to rotate, so that gear 3 can move up and down along the lifting rod.
[0023] Specifically, when in use, the operation module is installed on the lifting module 7, so that the stripper 8 and the wire clamp installation tool 9 can move up and down along the lifting rod along with the lifting module 7.
[0024] Specifically, Figure 5 As shown, the work platform is provided with a rotary module, and different types of installation tools can be selected to perform work at the same location according to the work project.
[0025] The operation method of the present invention acts on the conductor. When in use, an insulating shielding cover 10 needs to be placed on the conductor in the area to be operated and the porcelain bottle of the conductor.
[0026] Specifically, the clamping mechanism is used to install the clamping jaws of the insulation shielding cover 10 during operation.
[0027] The drainage wire traction device 11 is arranged at the lower end of the lifting rod 6. When in use, the drainage wire traction device 11 is located below the wire. The drainage wire traction device 11 is mainly composed of a motor, a wire take-up device, a traction rope, and a wire clamp limiter, and is mainly supported by nylon material, wherein the traction rope is an insulated silk rope.
[0028] The telescopic mechanical arm 12 is connected to the bottom end of the lifting rod 6, and is composed of a motor, an epoxy resin insulating rod, and nylon. It is used to transport the insulating silk rope and the hook to the drainage line, so that the end of the telescopic mechanical arm 12 is hooked and connected to the drainage line clamp 13 in the drainage line.
[0029] The drainage wire clamp 13 can automatically install the drainage wire.
[0030] The above-mentioned operating platforms and various operating devices are all independently powered and remotely controlled by the main control computer to avoid hidden dangers to the power grid due to the communication lines between the devices.
[0031] A method for connecting a drainage line during live working based on a hoisting platform comprises the following steps: S1, install the lifting and guiding device on the external lifting device; send the lifting and guiding device in the hook of the external lifting device to the working area, and fix the boom; S2, using the control terminal to control the winch mechanism in the hoisting device, and placing the device above the wire, across the wire, and placing the hoisting device on the ground; wherein the cable in the winch mechanism is an insulated silk rope; S3, determine the complexity of the shielding environment. When the environment is complex, use the pole climbing method to use the insulating operating rod to complete the insulation shielding installation; when the environment is not complex, place the hoisting and guiding device on the ground, install the insulating shielding cover 10 to the clamping mechanism in the device, and then the winch mechanism in the hoisting device works to recover the insulating silk rope and hoist the hoisting and guiding device to the waiting operation area; then place the insulating shielding cover 10 on the wire and the porcelain bottle through the winch mechanism; S4, controlling the clamping device 5 to fix the conductor to prevent shaking during operation; S5, the working platform is lowered by the lifting module 7, so that the stripper 8 on it is clamped into the main conductor, the stripper 8 clamps the conductor, automatically cuts and self-adaptively strips the insulation layer; S6, install the drainage wire clamp 13 to the drainage wire in advance. When the stripper 8 is working, control the telescopic insulating manipulator so that the insulating hook at the end of the manipulator is hooked to the hanging ring in the drainage wire clamp at the end of the drainage wire; then the drainage wire traction device 11 pulls the drainage wire clamp 13 and the wire into the groove of the drainage wire traction device 11; after the stripper 8 strips the insulation layer of the wire, the working platform rotates 180 degrees, and the wire clamp installation tool 9 is rotated above the drainage wire clamp 13; S7, the working platform descends, the wire clamp installation tool 9 is aligned with the drain wire clamp 13 tightening bolt in the groove of the drain wire traction device 11, and then the wire clamp installation tool 9 starts working, and the wire is installed; S8, after completing the single-phase operation, move the lifting device arm to another phase conductor, repeat the above steps S4 to S7 until the installation of the three-phase conductor drainage line is completed and the live lifting and connection operation is completed.
[0032] Before the operation method of the present invention begins, preparation work needs to be done first. Figure 2As shown, first you need to explore the work site, choose the working method according to the situation, and see whether the on-site situation meets the working conditions of the bucket truck; when it meets the working conditions of the bucket truck, you can use the bucket truck to work; when it does not meet the working conditions of the bucket truck, survey the working environment to see whether it meets the requirements of the conventional crane for lifting operations; when it does not meet the lifting operation conditions, you can use the conventional pole climbing operation method; when it meets the lifting operation conditions, you can use the lifting operation method. Due to the high cost of the bucket truck, the number of bucket trucks in some areas is small, and the operation needs cannot be supplied at any time, so only pole climbing operations can be performed. The present invention is mainly aimed at using a vehicle or device with a lifting device to complete the operation when the bucket truck cannot be used, and the operation process adopts a mode of remote operation by personnel, which reduces the safety risks of personnel and reduces the use cost of the insulated bucket truck, not just limited to the pole climbing operation method.
[0033] The preparation work in this embodiment is ready, that is, preparing the crane mechanism; installing the hoisting and guiding device to the crane mechanism, the crane sends the hoisting and guiding device in the hook to the working area, and fixes the boom.
[0034] In this embodiment, the clamping device 5 is configured as an electric clamp. The electric wire clamp is used to tighten the wire to prevent the device from shaking and falling off the wire during operation.
[0035] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art may make various modifications or variations within the scope of the claims, which do not affect the essence of the present invention.
Claims
1. A method for live working and connecting drainage lines based on a hoisting platform, characterized in that: The method is applied to a hoisting and guiding device, which completes the drainage line installation operation on the conductor; the hoisting and guiding device comprises a lifting boom, an operation module, a clamping mechanism, a telescopic mechanical arm (12), a control terminal and a drainage line clamp (13); the lifting boom is connected to an external lifting device, and the lifting boom is connected to the operation module and the clamping mechanism; a clamping device (5) is installed at the lower middle part of the lifting boom, and the lifting boom comprises a lifting rod (6) and a lifting module (7), and the lifting module (7) is arranged to wrap the lifting rod (6); the operation module comprises an operation platform, a stripper (8), a wire clamp installation tool (9) and a drainage line traction device (11), and the stripper (8) and the wire clamp installation tool (9) are respectively installed on both sides of the operation platform; an insulating shielding cover (10) is placed on the wire in the operation area and the porcelain bottle of the wire; A method for connecting a drainage line during live working based on a hoisting platform comprises the following steps: S1, install the lifting and guiding device on the external lifting device; send the lifting and guiding device in the hook of the external lifting device to the working area, and fix the boom; S2, using the control terminal to control the winch mechanism in the hoisting device, and placing the device above the wire, across the wire, and placing the hoisting device on the ground; wherein the cable in the winch mechanism is an insulated silk rope; S3, determining whether the shielding environment is complex. When the environment is complex, the insulating shielding installation is completed by climbing a pole and using an insulating operating rod. When the environment is not complex, the lifting and guiding device is placed on the ground, and the insulating shielding cover (10) is installed on the clamping mechanism in the device. Then the winch mechanism in the lifting device is operated to recover the insulating silk rope and lift the lifting and guiding device to the work area. Then the insulating shielding cover (10) is placed on the conductor and the porcelain bottle by the winch mechanism. S4, controlling the clamping device (5) to fix the wire; S5, the working platform is lowered via the lifting module (7), so that the stripper (8) on it is clamped into the main conductor, the stripper (8) clamps the conductor, automatically cuts and self-adaptively strips the insulation layer; S6, the drainage wire clamp (13) is installed on the drainage wire in advance, and when the stripper (8) is in operation, the telescopic insulating manipulator is controlled so that the insulating hook at the end of the manipulator is hooked to the hanging ring in the drainage wire clamp at the end of the drainage wire; then the drainage wire traction device (11) pulls the drainage wire clamp (13) and the wire into the groove of the drainage wire traction device (11); after the stripper (8) strips the insulation layer of the wire, the working platform is rotated 180 degrees, and the wire clamp installation tool (9) is rotated to the top of the drainage wire clamp (13); S7, the working platform descends, so that the wire clamp installation tool (9) is aligned with the drain wire clamp (13) fastening bolt in the groove of the drain wire pulling device (11), and then the wire clamp installation tool (9) starts working, and the conductor is installed; S8, after completing the single-phase operation, move the lifting device arm to another phase conductor, repeat the above steps S4 to S7 until the installation of the three-phase conductor drainage line is completed and the live lifting and connection operation is completed.
2. A method for connecting drainage lines during live working based on a hoisting platform as claimed in claim 1, characterized in that: The lifting rod comprises bakelite (1) and a rack (2); the bakelite (1) and the rack (2) are arranged in a sandwich structure; the bakelite (1) is located outside the rack (2); and the bakelite (1) and the rack (2) are arranged in a staggered manner.
3. The method for connecting the drainage line during live working based on a hoisting platform according to claim 1, characterized in that: The lifting module comprises nylon, a gear (3) and a motor (4); the motor (4) is fixed to one side of the lifting module, and the motor (4) and the gear (3) are connected; the gear (3) is meshed with a rack (2) in the lifting rod, and starting the motor (4) can drive the gear (3) to rotate, so that the gear (3) can move up and down along the lifting rod.
4. The method for connecting the drainage line during live working based on a hoisting platform according to claim 1, characterized in that: The drainage line traction device (11) is arranged at the lower end of the lifting rod (6), and comprises a motor, a wire take-up device, a traction rope, and a wire clamp limiter, and is supported by nylon material, wherein the traction rope is an insulated silk rope.
5. The method for connecting the drainage line during live working based on a hoisting platform according to claim 1, characterized in that: The telescopic mechanical arm (12) is connected to the bottom end of the lifting rod (6), and comprises a motor, an epoxy resin insulating rod, and nylon, and is used to transport the insulating silk rope and the hook to the drainage line, so that the end of the telescopic mechanical arm (12) is hooked on the drainage line clamp (13) in the drainage line.
6. The method for connecting the drainage line during live working based on a hoisting platform according to claim 1, characterized in that: The hoisting device has an aerial work vehicle with a hoisting function such as a crane that hoists the lifting boom and the working module to the working area, and moves the device to the working area without insulation requirements.
7. The method for connecting the drainage line during live working based on a hoisting platform according to claim 1, characterized in that: The work platform is provided with a rotary module, and different types of installation tools are selected to perform work at the same location according to the work project.
Citation Information
Patent Citations
Method for shearing and reconnecting 10kV overhead bare conductor on load
CN114465153A
Live-line working method for changing double-circuit line triangularly-arranged straight pole into strain pole
CN114725829A
Automatic flaw detection device for power transmission line
CN221100561U
Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same
KR102240478B1
Insulation insulator clip for indirect live wire and LP insulator, suspension insulator, Cut Out Switch, Lightning Arrester replacement indirect live wire method using the same
KR102249164B1