Ore extracting device for large mine
By designing a large-scale mine ore extraction device and utilizing a two-track switching mechanism, the problem of production stoppage caused by accidents or other reasons in the mine ore extraction device was solved, and the continuous operation of the ore extraction system was realized.
Patent Information
- Application Number
- CN202411217071.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-05
AI Technical Summary
When existing mine ore extraction equipment malfunctions in the main roadway or for other reasons, it cannot extract ore normally, leading to production stoppage.
Design a large-scale mining ore hoisting device, including components such as rails, side rails, hoppers, unloading plates, and unloading wheels. By setting two sets of rails, if one rail is damaged, it can be moved to the other rail, ensuring the continuity of unloading operations.
It enables rapid switching to another track when one track is damaged, avoiding interruptions in unloading operations and ensuring the continuous operation of the mine's ore extraction system.
Smart Images

Figure CN118894329A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mines, and in particular to a large-scale mine ore extraction device. Background Art
[0002] A mine refers to an independent production and operation unit that mines ores with a certain mining boundary. A mine mainly includes one or more mining workshops (or pitheads, mine shafts, open pits, etc.) and some auxiliary workshops. Most mines also include ore dressing plants (coal washing plants) and containers for directly loading useful minerals, waste rocks or gangue. There are two types: for inclined shafts and for vertical shafts. The main shaft skip is divided into single-rope skip and multi-rope skip according to the type of hoist; it is divided into bottom unloading and flipping types for vertical shafts according to different unloading methods; and rear unloading and flipping types for inclined shafts.
[0003] After searching, a mining skip bucket anti-deformation device with publication number CN202222620070.X is found, including a supporting shaft arranged between two mother plates of the bucket box, a first flange is arranged on both sides of the supporting shaft, the two first flanges are respectively connected to the outer walls of the two mother plates, and also includes a resistance plate, the left and right sides of the resistance plate are respectively connected to the two mother plates, and the resistance plate blocks the supporting shaft, the resistance plate includes a vertical plate, an arc plate and a horizontal plate, the vertical plate and the horizontal plate are connected to form a whole through the arc plate, the vertical plate is located at the front side of the supporting shaft, the horizontal plate is located below the supporting shaft, and the rear side of the horizontal plate is connected to the back plate of the bucket box, further, the vertical plate and the horizontal plate are respectively provided with a first inspection hole and a second inspection hole near the supporting shaft, the support shaft is wrapped with the resistance plate formed by the vertical plate, the arc plate and the horizontal plate to strengthen the The support of the mother plates on both sides protects the support shaft, avoids direct damage to the support shaft under the impact of ore, enhances the anti-deformation performance of the skip bucket box, and extends the service life. By setting the first inspection hole and the second inspection hole, the support shaft and the bucket box can be easily inspected and repaired. By setting the unloading plate, the force of the elastic deformation of the mother plates on both sides cannot directly act on the right-angle connection between the mother plate and the back plate, which has a decomposition effect and makes the mother plate less likely to deform. By setting the second flange to cooperate with the first flange, the stability of the support shaft and the mother plates on both sides is enhanced, which further protects the support shaft and reduces the wear of the support shaft. If the existing mine cannot lift the ore normally due to accidents on the main road or other reasons, the rapid ore lifting system can be used to lift the ore without affecting normal production. Summary of the invention
[0004] The purpose of the present invention is to provide a large-scale mine lifting device to solve the problem that most of the existing mines, including ore dressing plants (coal washing plants), directly load containers with useful minerals, waste rocks or gangue. There are two types: for inclined shafts and for vertical shafts. The main shaft skip is divided into single-rope skip and multi-rope skip according to the type of hoist. It is divided into bottom unloading type and flip type for vertical shafts according to the unloading method; and rear unloading type and flip type for inclined shafts. If the mine fails to lift ore normally due to accidents on the main road or other reasons, the rapid ore lifting system can be used to lift ore without affecting normal production.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a large-scale mining ore lifting device, comprising a track, the side of the track is fixedly connected to the side rail by fixing bolts, and the top of the track is provided with a hopper, the bottom of the hopper is fixedly connected to a bottom plate, the sides of the bottom plate are respectively rotatably connected to main wheels and secondary wheels by rotating shafts, the rear side of the hopper is rotatably connected to a discharge plate by a rotating shaft, the side of the discharge plate is fixedly connected to a cross bar, and the front side of the hopper is movably connected to a lifting frame; the side of the track is fixedly connected to the side rail by fixing bolts, and a discharge rail is provided in the middle of the bottom of the track, the bottom of the hopper at the top of the track is provided with main wheels and secondary wheels, and the auxiliary wheels provided on the side of the secondary wheel are movably connected to the top of the side rail, and at the same time, the discharge wheel installed by the cross bar on the side of the discharge hopper on the side of the track slides to the inside of the discharge rail, so that the slag inside the hopper can be discharged.
[0006] To summarize, the side rails are fixedly connected through the sides of the rails by fixing bolts, and a discharge rail is provided in the middle of the bottom of the rail, and the bottom of the hopper at the top of the rail is provided with a main wheel and a secondary wheel, and the auxiliary wheel provided on the side of the secondary wheel is movably connected to the top of the side rail. At the same time, the discharge wheel installed on the side of the discharge hopper on the side of the rail slides to the inside of the discharge rail through the cross bar, so that the slag inside the hopper can be unloaded. The rails are arranged in two groups, which can be shifted to another rail when one rail is damaged to avoid the unloading operation from being stopped, so as to solve the problem that the existing mine cannot lift the ore normally due to accidents on the main road or other reasons, and the ore can be lifted by the rapid lifting system without affecting the normal production.
[0007] As a preferred technical solution of the present invention, a discharge rail is provided in the middle of the side of the rail and is located below the side rail; the rails are provided in two groups and can be shifted to another rail when one rail is damaged to avoid suspension of the unloading operation.
[0008] As a preferred technical solution of the present invention, the side of the secondary wheel is movably connected with an auxiliary wheel, and the auxiliary wheel is movably engaged with the side of the side rail.
[0009] As a preferred technical solution of the present invention, both ends of the cross bar are movably connected with discharge wheels, and the side surfaces of the discharge wheels are movably engaged with the side surfaces of the discharge rails.
[0010] As a preferred technical solution of the present invention, a reinforcing plate is provided on the outer side of the discharge plate, and the number of the reinforcing plates is four.
[0011] As a preferred technical solution of the present invention, a rotating rod is fixedly connected to the inner side of the lifting frame, the inner end of the rotating rod is movably connected to the side of the hopper, and a steel wire rope is provided on the front side of the lifting frame.
[0012] Compared with the prior art, the present invention has the following beneficial effects: The present invention fixes the side rails through the side of the rails by fixing bolts, and a discharge rail is provided in the middle of the bottom of the rail, a main wheel and a secondary wheel are provided at the bottom of the hopper at the top of the rail, and an auxiliary wheel is provided on the side of the secondary wheel and is movably connected to the top of the side rail. At the same time, the side of the discharge hopper on the side of the rail is slided to the inside of the discharge rail by a discharge wheel installed through a cross bar, so that the slag inside the hopper can be discharged.
[0013] The present invention arranges the rails into two groups, and when one rail is damaged, the rail can be shifted to another rail, thereby avoiding the unloading operation from being stopped. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural front view of the present invention; Figure 2 It is the structural hopper diagram of the present invention; Figure 3 It is the structural track diagram of the present invention.
[0015] In the figure: 1. track; 2. fixing bolt; 3. side rail; 4. discharge rail; 5. hopper; 6. discharge plate; 7. cross bar; 8. discharge wheel; 9. bottom plate; 10. main wheel; 11. secondary wheel; 12. auxiliary wheel; 13. rotating rod; 14. lifting frame; 15. reinforcement plate. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] See also Figure 1-3The present invention provides a large-scale mining ore lifting device, including a track 1, a side of the track 1 is fixedly connected with a side rail 3 by a fixing bolt 2, and a hopper 5 is arranged at the top of the track 1, a bottom of the hopper 5 is fixedly connected with a bottom plate 9, and the sides of the bottom plate 9 are respectively rotatably connected with a main wheel 10 and a secondary wheel 11 through a rotating shaft, a rear side of the hopper 5 is rotatably connected with a discharge plate 6 through a rotating shaft, a side of the discharge plate 6 is fixedly connected with a cross bar 7, and a front side of the hopper 5 is movably connected with a lifting frame 14; the side of the track 1 is fixedly connected with the side rail 3 by a fixing bolt 2, and a discharge rail 4 is arranged in the middle of the bottom of the track 1, a main wheel 10 and a secondary wheel 11 are arranged at the bottom of the hopper 5 at the top of the track 1, and an auxiliary wheel 12 is arranged on the side of the secondary wheel 11 and is movably connected with the top of the side rail 3, and at the same time, a discharge wheel 8 installed on the side of the discharge hopper 5 on the side of the track 1 through the cross bar 7 slides to the inner side of the discharge rail 4, so that the slag inside the hopper 5 can be discharged.
[0018] To summarize, the side rail 3 is fixedly connected to the side of the rail 1 by the fixing bolts 2, and a discharge rail 4 is provided in the middle of the bottom of the rail 1, and a main wheel 10 and a secondary wheel 11 are provided at the bottom of the hopper 5 at the top of the rail 1, and an auxiliary wheel 12 provided on the side of the secondary wheel 11 is movably connected to the top of the side rail 3. At the same time, the discharge wheel 8 installed on the side of the discharge hopper 5 on the side of the rail 1 through the cross bar 7 slides to the inside of the discharge rail 4, and the slag inside the hopper 5 can be unloaded. The rails 1 are set into two groups, which can be shifted to another rail 1 when one rail 1 is damaged to avoid the unloading operation from being stopped, so as to solve the problem that the existing mine cannot lift the ore normally due to accidents on the main road or other reasons, and the ore can be lifted by the rapid lifting system without affecting the normal production.
[0019] A discharge rail 4 located below the side rail 3 is provided in the middle of the side of the rail 1; the rail 1 is provided in two groups, and when one rail 1 is damaged, it can be shifted to another rail 1 to avoid the unloading operation from being stopped; the side of the secondary wheel 11 is movably connected with an auxiliary wheel 12, and the auxiliary wheel 12 is movably engaged with the side of the side rail 3.
[0020] The two ends of the cross bar 7 are movably connected with unloading wheels 8, and the sides of the unloading wheels 8 are movably engaged with the sides of the unloading rail 4. A reinforcing plate 15 is provided on the outer side of the unloading plate 6. There are four reinforcing plates 15. A rotating rod 13 is fixedly connected to the inner side of the lifting frame 14. The inner end of the rotating rod 13 is movably connected to the side of the hopper 5, and a steel wire rope is provided on the front side of the lifting frame 14.
[0021] During specific use, first, the side of the rail 1 is fixedly connected to the side rail 3 by the fixing bolts 2, and a discharge rail 4 is provided in the middle of the bottom of the rail 1, and a main wheel 10 and a secondary wheel 11 are provided at the bottom of the hopper 5 at the top of the rail 1, and an auxiliary wheel 12 provided on the side of the secondary wheel 11 is movably connected to the top of the side rail 3. At the same time, the discharge wheel 8 installed on the side of the discharge hopper 5 on the side of the rail 1 through the cross bar 7 slides to the inside of the discharge rail 4, and the slag inside the hopper 5 can be unloaded. The rail 1 is set into two groups, which can be shifted to another rail 1 when one rail 1 is damaged to avoid the unloading operation from being stopped.
[0022] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A large-scale mining ore extraction device, comprising a track (1), characterized in that: The side of the track (1) is fixedly connected to the side rail (3) via fixing bolts (2), and a hopper (5) is provided on the top of the track (1), the bottom of the hopper (5) is fixedly connected to a base plate (9), the sides of the base plate (9) are rotatably connected to a main wheel (10) and a secondary wheel (11) via a rotating shaft, the rear side of the hopper (5) is rotatably connected to a discharge plate (6) via a rotating shaft, the side of the discharge plate (6) is fixedly connected to a cross bar (7), and the front side of the hopper (5) is movably connected to a lifting frame (14).
2. A large-scale mining ore extraction device according to claim 1, characterized in that: A discharge rail (4) located below the side rail (3) is provided in the middle of the side of the track (1).
3. A large-scale mining ore extraction device according to claim 1, characterized in that: The side of the secondary wheel (11) is movably connected to an auxiliary wheel (12), and the auxiliary wheel (12) is movably engaged with the side of the side rail (3).
4. A large-scale mining ore extraction device according to claim 1, characterized in that: Discharge wheels (8) are movably connected to both ends of the cross bar (7), and the side surfaces of the discharge wheels (8) are movably engaged with the side surfaces of the discharge rail (4).
5. A large-scale mining ore extraction device according to claim 1, characterized in that: A reinforcing plate (15) is provided on the outer side of the discharge plate (6), and the number of the reinforcing plates (15) is four.
6. A large-scale mining ore extraction device according to claim 1, characterized in that: A rotating rod (13) is fixedly connected to the inner side of the lifting frame (14), the inner end of the rotating rod (13) is movably connected to the side of the hopper (5), and a steel wire rope is provided on the front side of the lifting frame (14).
Citation Information
Patent Citations
Design method of dump curved rails of front-dump-type inclined shaft skip with unloading wheels
CN111039134A
Forward turning type inclined shaft bucket with unloading door
CN204150906U
Rear-unloading skip of oblique well
CN2755057Y
Improvements relating to plant for the production of asphalt-coated stone
GB1260291A
