Prefabricated fixed foot hoisting method
Through the prefabricated solid foot lifting method and combined with the use of safety components, the problem of difficult to control the drop speed of prefabricated solid foot during the lifting process during the river embankment construction is solved, and a stable and safe lifting process is achieved, ensuring the construction safety of the embankment. and river channel flood control safety.
Patent Information
- Application Number
- CN202411197810.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During river embankment construction, the volume and weight of the pre-installed solid feet are large, which makes it difficult to control the drop speed during lifting, which may lead to safety risks and unstable construction.
The prefabricated solid foot lifting method is adopted, including excavation and leveling the foundation groove, installation of the lifting platform, positioning and measuring the prefabricated solid foot, selecting the lifting equipment, determining the lifting point position, trial lifting and formal lifting, and using safety components to maintain the prefabricated solid foot Decrease speed to ensure stability and safety of the lifting process.
Through the use of safety components, the preset firming feet are avoided rapidly when the lifting equipment loses power, ensuring the stability and safety of the lifting process, reducing the risk of rolling, and ensuring the smooth installation of the preset firming feet.
Smart Images

Figure CN118894443A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of embankment construction, in particular to a prefabricated fixed foot hoisting method. Background Art
[0002] The river channel is a channel for discharging flood water, and the embankment is a barrier against floods. The river channel is a natural slope. Under the influence of multiple factors such as water flow, sediment, geology and human factors, the bank slope often becomes unstable and suffers erosion damage. In severe cases, the bank slope collapses and forms dangerous works, endangering the river channel embankment and flood control safety. According to the law of river sediment movement, taking effective bank protection engineering measures is an important guarantee for the safety of river channel embankment and flood control.
[0003] However, for rivers, there are high tides and low tides. For example, the northern shore of Lingshan Island and the right bank of Jiaomen waterway in the starting area of Pearl Bay Area in Nansha New District, Guangzhou, belong to irregular semi-diurnal tidal sections of inland rivers. According to data from the surrounding Nansha Shuiniutou tidal monitoring station, the average low tide level for many years is 4.34m, and the average high tide level for many years is 5.67m. The bottom elevation of the concrete structure of the newly built embankment is 4.90m, and the top elevation is 6.60m.
[0004] For the maintenance work on the above-mentioned river channel, it is necessary to cooperate with the tidal changes of the river channel. The construction period is short, and pre-installed fixed feet are needed to meet the requirement of short construction period. However, due to the large size and weight of the pre-installed fixed feet, it is necessary to maintain a slower descent speed of the pre-installed fixed feet during the lifting process to ensure lifting safety. Summary of the invention
[0005] The invention provides a prefabricated fixed foot hoisting method to solve the problem raised in the background technology.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] A method for hoisting a prefabricated fixed foot comprises the following steps:
[0008] S1: Excavation and leveling of foundation trench;
[0009] S2: Level the lifting platform;
[0010] S3: Positioning and measuring the installation position of the prefabricated fixed foot;
[0011] S4: Select lifting equipment;
[0012] S5: Determine the position of the hanging point;
[0013] S6: Test lifting is carried out by lifting equipment. After the test lifting is completed without any problems, the formal lifting operation is carried out by lifting equipment;
[0014] S7: After the lifting is completed, fill the structural joints between the prefabricated fixing feet;
[0015] In step S6, a safety component is provided in the lifting equipment, and the safety component is used to maintain the descending speed of the preset fixed feet to prevent them from falling off.
[0016] Preferably, in step S1, the following steps are included:
[0017] S11: Excavation of foundation trench: lay out the foundation trench control boundary line according to the design drawings, use wooden stakes as boundary control points, and nail iron nails on the wooden stakes as elevation control points, and use an excavator for excavation construction;
[0018] After the bottom surface of the underwater foundation pit is excavated to the designed elevation, it should be checked and the foundation pit acceptance should be carried out after no problems are found;
[0019] S12: Leveling of the foundation bed, using layered water flow step-by-step filling and leveling of the foundation trench, and paving of block stones on the surface;
[0020] S13: Pad construction: After the subgrade has settled and stabilized, the pad construction is carried out. The pad material is divided into two layers. The bottom layer is leveled with crushed stone and the top surface should reach the fine flatness standard. The surface layer is leveled with concrete and the top surface should reach the extremely fine flatness requirement.
[0021] S14: Clean up the debris on the cushion layer. When the tide recedes, remove the garbage, mud, etc. on the installation base.
[0022] Preferably, in step S2, before the prefabricated fixed foot is hoisted, gravel soil or coarse-grained soil is used to backfill and compact the local potholes on the top of the old embankment in layers to ensure that the compaction degree is not less than 95% to ensure the safe passage of the hoisting machinery;
[0023] The construction waste and scattered mechanical equipment in the construction site will be cleared away.
[0024] Preferably, in step S3, the surveying personnel use a total station to perform point layout according to the prefabricated fixed foot installation drawing. According to the design drawing, a prefabricated fixed foot control point is laid out every 20m and connected as a boundary control line with a thin red nylon line. The layout deviation does not exceed 2mm.
[0025] Preferably, in step S6, the trial lifting includes the following steps:
[0026] S611: The crane drops the hook, fixes the hook to the lifting point of the pre-set fixed foot, and then slowly lifts the hook;
[0027] S612: When the prefabricated fixed feet are raised by 5 to 10 cm, pause for 3 to 5 minutes. When there are no problems, continue the lifting operation.
[0028] Preferably, in step S6, the hoisting operation includes the following steps:
[0029] S621: The hoisting operation can only be started after the tidal level is observed to be lower than 4.75m and the concrete cushion is completely exposed. The hoisting operation must be carried out during the day when the tide is low;
[0030] S622: transport the prefabricated fixed feet to the designated location;
[0031] S623: The single crane lifts the prefabricated fixed foot and gently raises the prefabricated fixed foot to the top of the concrete cushion layer;
[0032] S624: The crane slowly lowers the hook and stops when the prefabricated foot is 30 cm away from the cushion layer. The outer boundary of the prefabricated foot is aligned with the red thin thread reserved for the line setting, and then the crane slowly drops down so that the outer boundary line of the prefabricated foot is aligned with the reserved red thin thread.
[0033] S625: Check whether the four corners of the prefabricated fixed feet are in close contact with the cushion layer and whether they are stable;
[0034] S626: The wire rope can be removed only when the predetermined position is reached and the reserved structural joint width meets the requirements. The surveyor follows the composite plane position and elevation. The crane can be evacuated only if the deviation is within the allowable range. If it exceeds the allowable deviation, the crane will be lifted again. Only after the accurate position is met can the prefabricated fixed foot be lowered again.
[0035] Preferably, in step S7, a 2 cm structural gap is reserved between the two prefabricated fixing feet, the structural gap is filled with BW closed-cell foam board, and the surface layer of 5 cm is filled with BW200 polysulfide sealant.
[0036] Preferably, in step S6, the safety component includes a housing, the housing is fixedly connected to the lifting equipment, a trigger shaft is arranged in the housing, one end of the trigger shaft passes through the housing, and one end of the trigger shaft located outside the housing is fixedly connected to a force-bearing wheel, and the force-bearing wheel moves synchronously with the lifting rope of the lifting equipment;
[0037] A first bearing is arranged between the trigger shaft and the housing.
[0038] Preferably, the part of the trigger shaft located in the housing is provided with a fixing ear, the fixing ear is provided with a rotation hole, one end of the rotating shaft is rotatably connected in the rotation hole, the other end of the rotating shaft is fixedly connected with a trigger block, the trigger block is crescent-shaped, and two groups of the trigger blocks are symmetrically distributed on the periphery of the trigger shaft;
[0039] The trigger shaft is provided with a balancing hole, and the trigger block is provided with a balancing tension hole, the balancing tension hole is provided corresponding to the balancing hole, the balancing tension holes of the two groups of trigger blocks are fixedly connected with connecting columns, and a tension elastic member is provided between the two groups of connecting columns, and the two ends of the tension elastic member are respectively fixedly connected with different connecting columns, and the tension elastic member is located in the balancing tension hole and the balancing hole;
[0040] The outer periphery of the trigger block is provided with a locking step;
[0041] A trigger sleeve is arranged outside the trigger block, and the trigger sleeve is rotatably connected to the trigger shaft;
[0042] The inner wall of the trigger sleeve is provided with a locking groove, and the locking groove is arranged corresponding to the locking step;
[0043] A second bearing is arranged between the trigger shaft and the trigger sleeve.
[0044] Preferably, a positioning connection hole is provided on the trigger sleeve, a positioning pin is fixedly connected in the positioning connection hole, the positioning pin is fixedly connected to the follower disk, one end of a reset elastic member is connected to the outer periphery of the follower disk, the other end of the reset elastic member is fixedly connected to a fixed column, and the fixed column is fixedly connected to the housing;
[0045] The follower plate is fixedly connected with a connecting shaft, a positioning groove is provided on the connecting shaft, a deceleration friction plate is sleeved on the connecting shaft, and the deceleration friction plate is fixedly connected with the connecting shaft through the positioning groove and a pin;
[0046] The outer edge of the deceleration friction disk is in a spiral shape, and the deceleration friction disk can contact the inner wall of the housing.
[0047] Compared with the prior art, the present invention has at least the following beneficial effects:
[0048] The present application cooperates with the safety component to hoist the pre-set fixed foot during the hoisting process, and the safety component maintains the descending speed of the pre-set fixed foot to prevent it from falling off. When the hoisting equipment loses power, the slow descending speed of the pre-set fixed foot can still be guaranteed to avoid the danger caused by the rapid descent of the pre-set fixed foot;
[0049] Among them, leveling the hoisting platform ensures the stability of the hoisting equipment during operation;
[0050] Among them, the use of 4-hanging-point balanced horizontal lifting ensures the stability of the pre-installed fixed feet during the lifting process and reduces the possibility of the pre-installed fixed feet tilting. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a flow chart of the steps of the present invention;
[0052] Figure 2 This is a schematic diagram of the explosion structure of the safety component of the present invention;
[0053] Figure 3 It is a schematic diagram of the trigger sleeve structure of the present invention;
[0054] Figure 4 It is a schematic diagram of the connection structure of the trigger block of the present invention.
[0055] In the figure: 1. force wheel; 2. first bearing; 3. trigger block; 4. balance tension hole; 5. connecting column; 6. tension elastic member; 7. trigger shaft; 8. balance hole; 9. fixing ear; 10. rotating hole; 11. second bearing; 12. trigger sleeve; 13. positioning groove; 14. follower plate; 15. positioning pin; 16. fixing column; 17. reset elastic member; 18. connecting shaft; 19. positioning groove; 20. deceleration friction plate; 21. positioning connecting hole; 22. rotating shaft; 23. positioning step. DETAILED DESCRIPTION
[0056] In the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish the protective components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions and technical features between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0057] Example 1
[0058] See also Figure 1 , an embodiment of the present invention provides: a method for hoisting a prefabricated fixed foot, comprising the following steps:
[0059] S1: Excavation and leveling of foundation trench;
[0060] S2: Level the lifting platform;
[0061] S3: Positioning and measuring the installation position of the prefabricated fixed foot;
[0062] S4: Select the lifting equipment. The rated lifting weight of the lifting equipment should be greater than the weight of the pre-set fixed feet, and the operating radius of the lifting equipment should be greater than the straight-line distance from the lifting platform to the foundation trench;
[0063] S5: Determine the position of the lifting point. The prefabricated fixed foot lifting adopts 4-lifting point balanced horizontal lifting, and 4 lifting rings are evenly arranged at the 4 prefabricated corner points;
[0064] S6: Test lifting is carried out by lifting equipment. After the test lifting is completed without any problems, the formal lifting operation is carried out by lifting equipment;
[0065] S7: After the lifting is completed, fill the structural joints between the prefabricated fixing feet;
[0066] In step S6, a safety component is provided in the lifting equipment, and the safety component is used to maintain the descending speed of the preset fixed feet to prevent them from falling off.
[0067] The working principle and beneficial effects of the above scheme:
[0068] The present application cooperates with the safety component to hoist the pre-set fixed foot during the hoisting process, and the safety component maintains the descending speed of the pre-set fixed foot to prevent it from falling off. When the hoisting equipment loses power, the slow descending speed of the pre-set fixed foot can still be guaranteed to avoid the danger caused by the rapid descent of the pre-set fixed foot;
[0069] Among them, leveling the hoisting platform ensures the stability of the hoisting equipment during operation;
[0070] Among them, the use of 4-hanging-point balanced horizontal lifting ensures the stability of the pre-installed fixed feet during the lifting process and reduces the possibility of the pre-installed fixed feet tilting.
[0071] Example 2
[0072] On the basis of Example 1, in step S1, the following steps are included:
[0073] S11: Excavation of the foundation pit. According to the design drawings, the foundation pit control boundary line is laid out. Wooden piles are used as boundary control points, and iron nails are nailed on the wooden piles as elevation control points. Excavation construction is carried out using an excavator. After the bottom surface of the underwater foundation pit is excavated to the design elevation, it should be checked. After the check is completed, the supervision engineer is notified to conduct foundation pit acceptance;
[0074] S12: The base bed is leveled, and the PC200 excavator is used for digging and loading, and the 8t dump truck is used for transportation. The blocks are directly transported to the dumping site. The dump truck end-in method is used to extend the vertical dumping forward. During the vertical dumping, the layered water flow step-by-step dumping is adopted. The excavator cooperates with the leveling, and the block stones are manually arranged on the surface. The construction is carried out according to the design requirements of the dumping section size, and the leveling elevation is 4.6m. After the dumping is completed, the settlement observation (third-class leveling measurement) should be carried out, and the settlement rate should not exceed 0.5mm / d;
[0075] S13: Pad construction: After the subgrade has settled and stabilized, the pad construction is carried out. The pad material is divided into two layers. The bottom layer is made of 20cm thick crushed stone and the top surface should reach the fine flatness standard after manual leveling. The surface layer is made of 10cm thick C20 plain concrete and the top surface should reach the extremely fine flatness requirement after leveling.
[0076]
[0077] S14: Cleaning up debris on the cushion layer. The prefabricated fixed foot installation bottom elevation is +4.75m, which is a construction during high tide. Due to the short construction time, a full-time tide level observer is arranged on site to promptly notify the construction personnel to remove garbage, mud, etc. on the installation base (plain concrete cushion layer) when the tide recedes.
[0078] Example 3
[0079] On the basis of Example 1-2, in step S2, before the prefabricated fixed foot is hoisted, gravel soil or coarse-grained soil is used to backfill and compact the local potholes on the top of the old embankment in layers to ensure that the compaction degree is not less than 95% to ensure the safe passage of the hoisting machinery;
[0080] The construction waste and scattered mechanical equipment in the construction site will be cleared away.
[0081] The working principle and beneficial effects of the above scheme:
[0082] Leveling the lifting platform ensures the stability of the lifting equipment during operation and avoids the lifting equipment from tilting due to the influence of the lifting platform during the lifting operation, which may cause danger.
[0083] Example 4
[0084] On the basis of Examples 1-3, in step S3, the surveying personnel use a total station to lay out points according to the prefabricated fixed foot installation drawing. According to the design drawing, a prefabricated fixed foot control point is laid out every 20 meters and connected to form a boundary control line with a thin red nylon line. The layout deviation does not exceed 2 mm.
[0085] The working principle and beneficial effects of the above scheme:
[0086] Setting the boundary control line of red thin nylon wire at the placement position of the preset fixed feet in advance can more clearly determine the position of the preset fixed feet during the lifting process, thereby increasing the lifting speed. Setting the boundary control line in advance is conducive to ensuring the firmness of the river embankment.
[0087] Example 5
[0088] On the basis of Embodiments 1-4, in step S6, the trial lifting includes the following steps:
[0089] S611: The crane drops the hook, fixes the hook to the lifting point of the pre-set fixed foot, and then slowly lifts the hook;
[0090] S612: When the prefabricated fixed feet are raised by 5 to 10 cm, pause for 3 to 5 minutes. When there are no problems, continue the lifting operation.
[0091] The working principle and beneficial effects of the above scheme:
[0092] A trial lift at a low height in advance can help avoid risks. Even if an accident occurs during the trial lift, it is less likely to cause major losses due to the low height.
[0093] Example 6
[0094] On the basis of Embodiment 1-5, in step S6, the hoisting operation includes the following steps:
[0095] S621: The hoisting operation can only be started after the tidal level is observed to be lower than 4.75m and the concrete cushion is completely exposed. The hoisting operation must be carried out during the day when the tide is low;
[0096] S622: transport the prefabricated fixed feet to the designated location;
[0097] S623: The single crane lifts the prefabricated fixed foot and gently raises the prefabricated fixed foot to the top of the concrete cushion layer.
[0098] S624: The crane slowly loosens the hook and stops when the prefabricated foot is 30 cm away from the cushion layer. The outer boundary of the prefabricated foot is aligned with the red thin thread reserved for laying out the line, and then the crane slowly falls down so that the outer boundary line of the prefabricated foot corresponds to the reserved red thin thread.
[0099] S625: Check whether the four corners of the prefabricated fixed feet are in close contact with the cushion layer and whether they are stable;
[0100] S626: The wire rope can be removed only when the predetermined position is reached and the reserved structural joint width meets the requirements. The surveyor follows the composite plane position and elevation. The crane can be evacuated only if the deviation is within the allowable range. If it exceeds the allowable deviation, the crane will be lifted again. Only after the accurate position is met can the prefabricated fixed foot be lowered again.
[0101] Example 7
[0102] On the basis of Examples 1-6, in step S7, a 2 cm structural gap is reserved between two prefabricated fixing feet, the structural gap is filled with BW closed-cell foam board, and the surface layer of 5 cm is filled with BW200 polysulfide sealant.
[0103] The working principle and beneficial effects of the above scheme:
[0104] As a part of the river embankment, the pre-installed fixing feet are filled after the lifting is completed, which helps to improve the strength of the river embankment.
[0105] Example 8
[0106] See also Figure 2-4 On the basis of Embodiment 2-4, in step S6, the safety component includes a housing, the housing is fixedly connected to the hoisting equipment, a trigger shaft 7 is arranged in the housing, one end of the trigger shaft 7 passes through the housing, and one end of the trigger shaft 7 outside the housing is fixedly connected to a force wheel 1, and the force wheel 1 moves synchronously with the hoisting rope of the hoisting equipment;
[0107] A first bearing 2 is arranged between the trigger shaft 7 and the housing.
[0108] The part of the trigger shaft 7 located in the housing is provided with a fixing ear 9, and the fixing ear 9 is provided with a rotation hole 10, and one end of a rotating shaft 22 is rotatably connected in the rotation hole 10, and the other end of the rotating shaft 22 is fixedly connected to a trigger block 3, and the trigger block 3 is crescent-shaped, and two groups of the trigger blocks 3 are symmetrically distributed on the periphery of the trigger shaft 7;
[0109] The trigger shaft 7 is provided with a balancing hole 8, and the trigger block 3 is provided with a balancing tension hole 4, and the balancing tension hole 4 is provided corresponding to the balancing tension hole 8. The balancing tension holes 4 of the two groups of trigger blocks 3 are fixedly connected with connecting columns 5, and a tension elastic member 6 is provided between the two groups of connecting columns 5. The two ends of the tension elastic member 6 are respectively fixedly connected to different connecting columns 5, and the tension elastic member 6 is located in the balancing tension hole 4 and the balancing hole 8;
[0110] The outer periphery of the trigger block 3 is provided with a locking step 23;
[0111] A trigger sleeve 12 is disposed outside the trigger block 3, and the trigger sleeve 12 is rotatably connected to the trigger shaft 7;
[0112] The inner wall of the trigger sleeve 12 is provided with a locking groove 13, and the locking groove 13 is arranged corresponding to the locking step 23;
[0113] A second bearing 11 is provided between the trigger shaft 7 and the trigger sleeve 12 .
[0114] The trigger sleeve 12 is provided with a positioning connection hole 21, a positioning pin 15 is fixedly connected in the positioning connection hole 21, the positioning pin 15 is fixedly connected to the follower plate 14, one end of a reset elastic member 17 is connected to the outer periphery of the follower plate 14, the other end of the reset elastic member 17 is fixedly connected to a fixing column 16, and the fixing column 16 is fixedly connected to the housing;
[0115] The follower plate 14 is fixedly connected with a connecting shaft 18, a positioning groove 19 is provided on the connecting shaft 18, a deceleration friction plate 20 is sleeved on the connecting shaft 18, and the deceleration friction plate 20 is fixedly connected with the connecting shaft 18 through the positioning groove 19 and a pin;
[0116] The outer edge of the deceleration friction disk 20 is spiral-shaped, and the deceleration friction disk 20 can contact the inner wall of the housing.
[0117] The working principle and beneficial effects of the above scheme:
[0118] Since the pre-installed fixed feet are large in size and weight, when power failure occurs during the lifting process, the pre-installed fixed feet will drop rapidly under the action of their own gravity, causing great damage to the bottom, which does not meet the requirements of safe operation;
[0119] After the safety components are set, when power failure occurs, at the beginning stage, the preset fixed feet hoisted at the lower side of the lifting equipment are accelerated to descend due to gravity, and the lifting rope of the lifting equipment moves faster, driving the rotation speed of the force-bearing wheel 1 to increase, driving the rotation speed of the trigger shaft 7 to increase, and the two groups of trigger blocks 3 set on the trigger shaft 7 are subjected to a large centrifugal force at this time. When the centrifugal force overcomes the elastic force of the tension elastic member 6, the trigger block 3 rotates around the rotating shaft 22, and the locking step 23 on the trigger block 3 and the locking groove 1 in the trigger sleeve 12 are engaged. 3 is engaged, driving the trigger sleeve 12 to rotate, and driving the deceleration friction disc 20 to rotate through the follower disc 14 and the connecting shaft 18, so that the deceleration friction disc 20 contacts and rubs with the inner wall of the housing, slowing down the rotation speed of the deceleration friction disc 20, and then the deceleration force on the deceleration friction disc 20 acts on the force-bearing wheel 1 through the follower disc 14, the trigger sleeve 12, the trigger block 3, and the trigger shaft 7, so that the force-bearing wheel 1 is decelerated, and then the hoisting rope of the hoisting equipment is decelerated, reducing the falling speed of the preset fixed foot, and ensuring the safety of the hoisting process;
[0120] When the falling speed of the preset fixed foot slows down to a certain extent, the locking step 23 is separated from the locking groove 13, and under the action of the reset elastic member 17, the sleeve 12 and the follower plate 14 are triggered to reset;
[0121] The balancing hole 8 arranged at the center of the trigger shaft 7 and the balancing tension hole 4 arranged on the trigger block 3 together ensure the balance of the rotation of the trigger shaft 7 while ensuring the balance of the tightening function of the trigger block 3.
[0122] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A method for hoisting a prefabricated fixed foot, characterized in that: The following steps are involved: S1: Excavation and leveling of foundation trench; S2: Level the lifting platform; S3: Positioning and measuring the installation position of the prefabricated fixed foot; S4: Select lifting equipment; S5: Determine the position of the hanging point; S6: Test lifting is carried out by means of lifting equipment. After the test lifting is completed without any problems, the formal lifting operation is carried out by means of lifting equipment; S7: After the lifting is completed, fill the structural joints between the prefabricated fixing feet; In step S6, a safety component is provided in the lifting equipment, and the safety component is used to maintain the descending speed of the preset fixed feet to prevent them from falling off.
2. A method for hoisting a prefabricated fixed foot according to claim 1, characterized in that: In step S1, the following steps are included: S11: Excavation of foundation trench: lay out the foundation trench control boundary line according to the design drawings, use wooden stakes as boundary control points, and nail iron nails on the wooden stakes as elevation control points, and use an excavator for excavation construction; After the bottom surface of the underwater foundation pit is excavated to the designed elevation, it should be checked and the foundation pit acceptance should be carried out after no problems are found; S12: Leveling of the foundation bed, using layered water flow step-by-step filling and leveling of the foundation trench, and paving of block stones on the surface; S13: Pad construction: After the subgrade has settled and stabilized, the pad construction is carried out. The pad material is divided into two layers. The bottom layer is leveled with crushed stone and the top surface should reach the fine flatness standard. The surface layer is leveled with concrete and the top surface should reach the extremely fine flatness requirement. S14: Clean up the debris on the cushion layer. When the tide recedes, remove the garbage, mud, etc. on the installation base.
3. A method for hoisting prefabricated fixed feet according to claim 1, characterized in that: In step S2, before the prefabricated fixed foot is hoisted, gravel soil or coarse-grained soil is used to backfill and compact the local potholes on the old embankment top walkway in layers to ensure that the compaction degree is not less than 95% to ensure the safe passage of the hoisting machinery; The construction waste and scattered mechanical equipment in the construction site will be cleared away.
4. A method for hoisting prefabricated fixed feet according to claim 1, characterized in that: In step S3, the surveyor uses a total station to lay out points according to the prefabricated fixed foot installation drawing. According to the design drawing, a prefabricated fixed foot control point is laid out every 20 meters and connected as a boundary control line with a thin red nylon line. The layout deviation does not exceed 2 mm.
5. A method for hoisting prefabricated fixed feet according to claim 1, characterized in that: In step S6, the trial lifting includes the following steps: S611: The crane drops the hook, fixes the hook to the lifting point of the pre-set fixed foot, and then slowly lifts the hook; S612: When the prefabricated fixed feet are raised by 5 to 10 cm, pause for 3 to 5 minutes. When there are no problems, continue the lifting operation.
6. A method for hoisting a prefabricated fixed foot according to claim 1, characterized in that: In step S6, the hoisting operation includes the following steps: S621: The hoisting operation can only be started after the tidal level is observed to be lower than 4.75m and the concrete cushion is completely exposed. The hoisting operation must be carried out during the day when the tide is low; S622: transport the prefabricated fixed feet to the designated location; S623: The single crane lifts the prefabricated fixed foot and gently raises the prefabricated fixed foot to the top of the concrete cushion layer; S624: The crane slowly lowers the hook and stops when the prefabricated foot is 30 cm away from the cushion layer. The outer boundary of the prefabricated foot is aligned with the red thin thread reserved for the line setting, and then the crane slowly drops down so that the outer boundary line of the prefabricated foot is aligned with the reserved red thin thread. S625: Check whether the four corners of the prefabricated fixed feet are in close contact with the cushion layer and whether they are stable; S626: The wire rope can be removed only when the predetermined position is reached and the reserved structural joint width meets the requirements. The surveyor follows the composite plane position and elevation. The crane can be evacuated only if the deviation is within the allowable range. If it exceeds the allowable deviation, the crane will be lifted again. Only after the accurate position is met can the prefabricated fixed foot be lowered again.
7. A method for hoisting prefabricated fixed feet according to claim 1, characterized in that: In step S7, a 2 cm structural gap is reserved between the two prefabricated fixing feet, the structural gap is filled with BW closed-cell foam board, and the surface layer of 5 cm is filled with BW200 polysulfide sealant.
8. A method for hoisting prefabricated fixed feet according to claim 1, characterized in that: In step S6, the safety component comprises a housing, the housing is fixedly connected to the lifting equipment, a trigger shaft (7) is arranged in the housing, one end of the trigger shaft (7) passes through the housing, and one end of the trigger shaft (7) located outside the housing is fixedly connected to a force-bearing wheel (1), and the force-bearing wheel (1) moves synchronously with the lifting rope of the lifting equipment; A first bearing (2) is arranged between the trigger shaft (7) and the housing.
9. A method for hoisting prefabricated fixed feet according to claim 8, characterized in that: The part of the trigger shaft (7) located in the housing is provided with a fixing ear (9), the fixing ear (9) is provided with a rotation hole (10), one end of a rotation shaft (22) is rotationally connected in the rotation hole (10), the other end of the rotation shaft (22) is fixedly connected with a trigger block (3), the trigger block (3) is crescent-shaped, and two groups of the trigger blocks (3) are symmetrically distributed on the periphery of the trigger shaft (7); The trigger shaft (7) is provided with a balancing hole (8), the trigger block (3) is provided with a balancing tension hole (4), the balancing tension hole (4) and the balancing hole (8) are arranged correspondingly, the balancing tension holes (4) of the two groups of trigger blocks (3) are fixedly connected with connecting columns (5), a tension elastic member (6) is arranged between the two groups of connecting columns (5), the two ends of the tension elastic member (6) are respectively fixedly connected to different connecting columns (5), and the tension elastic member (6) is located in the balancing tension hole (4) and the balancing hole (8); The outer periphery of the trigger block (3) is provided with a locking step (23); A trigger sleeve (12) is arranged outside the trigger block (3), and the trigger sleeve (12) is rotatably connected to the trigger shaft (7); The inner wall of the trigger sleeve (12) is provided with a locking groove (13), and the locking groove (13) is arranged corresponding to the locking step (23); A second bearing (11) is arranged between the trigger shaft (7) and the trigger sleeve (12).
10. A method for hoisting prefabricated fixed feet according to claim 9, characterized in that: The trigger sleeve (12) is provided with a positioning connection hole (21), a positioning pin (15) is fixedly connected in the positioning connection hole (21), the positioning pin (15) is fixedly connected to the follower disk (14), one end of a reset elastic member (17) is connected to the outer periphery of the follower disk (14), the other end of the reset elastic member (17) is fixedly connected to a fixed column (16), and the fixed column (16) is fixedly connected to the housing; The follower plate (14) is fixedly connected to a connecting shaft (18), a positioning groove (19) is provided on the connecting shaft (18), a deceleration friction plate (20) is sleeved on the connecting shaft (18), and the deceleration friction plate (20) is fixedly connected to the connecting shaft (18) via the positioning groove (19) and a pin; The outer edge of the deceleration friction disk (20) is in a spiral shape, and the deceleration friction disk (20) can contact the inner wall of the housing.
Citation Information
Patent Citations
Hoisting construction method for prefabricated assembly-type frame structure members
CN104032967A
Steel structure lifting device for road bridge and building construction and construction method
CN116239033A
Rapid construction equipment and construction method for full-fabricated concrete drainage pipeline
CN116608323A
Assembled building prefabricated part hoisting device and hoisting method
CN117864934A
Offshore laying method for steel sewage discharging pipeline
CN118499575A