Evaporation coating equipment and vacuumizing method and vacuum closing method thereof
By adopting a vacuum evaporation method controlled by multi-stage pump set and valve in the vacuum deposition equipment, the problem of air residue in the vacuum cavity is solved, and the evaporation efficiency and plating density are improved.
Patent Information
- Application Number
- CN202411014581.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-05
Smart Images

Figure CN118895482A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of vacuum coating, and in particular to an evaporation coating device and a vacuum pumping method and a vacuum closing method thereof. Background Art
[0002] Vacuum evaporation, referred to as evaporation, refers to a process in which a certain heating evaporation method is used under vacuum conditions to evaporate the coating material (or film material) and gasify it, and the particles fly to the surface of the substrate to condense into a film. Evaporation is an early and widely used vapor deposition technology with the advantages of simple film formation method, high film purity and density, and unique film structure and performance. At present, in order to perform vacuum evaporation under vacuum conditions, the vacuum chamber needs to be evacuated, but the current vacuuming method makes it difficult to eliminate the air in the vacuum chamber, which in turn affects the evaporation efficiency of the crucible or evaporation boat and the density of the coating formed on the film. Therefore, the existing technology needs to be improved and enhanced. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, an object of the present invention is to provide an evaporation coating device and a vacuum pumping method and a vacuum closing method thereof.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0005] The present invention provides an evaporation coating device, comprising a winding portion, an evaporation source and a vacuum chamber, wherein the winding portion and the evaporation source are arranged in the vacuum chamber, the winding portion is arranged at the upper part of the vacuum chamber and above the evaporation source, and the evaporation source is arranged at the lower part of the vacuum chamber and below the winding portion, and the vacuum chamber is provided with a first vacuum group for evacuating the evaporation source and a second vacuum group for evacuating the winding portion, the first vacuum group is arranged at the lower part of the vacuum chamber, and the second vacuum group is arranged at the upper part of the vacuum chamber, and the evaporation source is an evaporation boat or a vacuum crucible.
[0006] Furthermore, in the evaporation coating equipment, the second vacuum group includes a first screw pump, a first Roots pump and a second Roots pump, the first screw pump is connected to the first Roots pump, the first Roots pump is connected to the second Roots pump, and the second Roots pump is connected to the upper part of the vacuum chamber.
[0007] Furthermore, in the evaporation coating equipment, the second vacuum group also includes a third Roots pump, the first Roots pump is connected to the third Roots pump, and the third Roots pump is connected to the upper part of the vacuum chamber.
[0008] Furthermore, in the evaporation coating equipment, the first vacuum group includes a second screw pump, a fourth Roots pump and a first diffusion pump, the second screw pump is connected to the fourth Roots pump, the fourth Roots pump is connected to the first diffusion pump, and the first diffusion pump is connected to the lower part of the vacuum chamber.
[0009] Furthermore, in the evaporation coating equipment, the first vacuum group also includes a second diffusion pump, the fourth Roots pump is connected to the second diffusion pump, and the second diffusion pump is connected to the lower part of the vacuum chamber.
[0010] Furthermore, in the evaporation coating equipment, the first vacuum group also includes a maintenance pump, and the maintenance pump is connected to the pipeline between the fourth Roots pump and the first diffusion pump and the second diffusion pump.
[0011] Furthermore, in the evaporation coating equipment, the first vacuum group also includes a first molecular pump, the fourth Roots pump is connected to the first molecular pump, and the first molecular pump is connected to the lower part of the vacuum chamber; the second vacuum group also includes a second molecular pump, the fourth Roots pump is connected to the second molecular pump, and the second molecular pump is connected to the lower part of the vacuum chamber.
[0012] Furthermore, in the evaporation coating equipment and its vacuum pumping method and vacuum closing method, in the second vacuum group, a first valve is connected between the first Roots pump and the second Roots pump and the third Roots pump; in the first vacuum group, a second valve is connected between the fourth Roots pump and the maintenance pump, two diffusion pumps and the molecular pump; a third valve and a fourth valve are respectively connected between the second valve and the first molecular pump and the second molecular pump; a fifth valve and a sixth valve are respectively connected between the first molecular pump and the second molecular pump and the vacuum chamber; a seventh valve and an eighth valve are respectively connected between the first diffusion pump and the second diffusion pump and the vacuum chamber; a ninth valve is connected between the pipeline between the first Roots pump and the first valve and the pipeline between the fourth Roots pump and the second valve; and one or two ventilation valves are provided on the vacuum chamber.
[0013] The present invention provides a vacuuming method for the evaporation coating equipment as described above, comprising the steps of:
[0014] Turning on the first screw pump, the second screw pump and the maintenance pump;
[0015] After the vacuum is stabilized, the first diffusion pump and the second diffusion pump are turned on simultaneously;
[0016] After the vacuum is stabilized, the second valve is opened, and the third valve and the fourth valve are opened;
[0017] After the vacuum is stabilized, the seventh valve and the eighth valve are opened;
[0018] After the vacuum is stabilized, turning on the first molecular pump and the second molecular pump;
[0019] After the vacuum is stabilized, the fifth valve and the sixth valve are opened;
[0020] Open the first Roots pump and the fourth Roots pump, and after the vacuum is stabilized, close the second valve, and open the ninth valve and the first valve;
[0021] After the vacuum is stabilized, the second Roots pump and the third Roots pump are turned on, and the vacuum condition setting is completed.
[0022] The present invention also provides a vacuum closing method for the evaporation coating equipment as described above, comprising the steps of:
[0023] Open both vent valves;
[0024] Close the fifth valve and the sixth valve, close the seventh valve and the eighth valve, and then close the second Roots pump and the third Roots pump;
[0025] Turn off the first molecular pump and the second molecular pump, and turn off the first diffusion pump and the second diffusion pump;
[0026] Close the third valve and the fourth valve, close the second valve, and open the ninth valve;
[0027] Turn off the first Roots pump and the fourth Roots pump;
[0028] Turn off the first screw pump and the second screw pump;
[0029] Finally the maintenance pump is turned off.
[0030] Compared with the prior art, the present invention provides an evaporation coating device and a vacuum pumping method and a vacuum closing method thereof, wherein the evaporation coating device includes a winding part, an evaporation source and a vacuum chamber, wherein the winding part and the evaporation source are arranged in the vacuum chamber, wherein the winding part is arranged at the upper part of the vacuum chamber and located above the evaporation source, wherein the evaporation source is arranged at the lower part of the vacuum chamber and located below the winding part, wherein the vacuum chamber is provided with a first vacuum group for vacuuming the evaporation source and a second vacuum group for vacuuming the winding part, wherein the first vacuum group is arranged at the lower part of the vacuum chamber, wherein the second vacuum group is arranged at the upper part of the vacuum chamber, wherein the evaporation source is an evaporation boat or a vacuum crucible. In the present application, two sets of vacuum groups are connected to a vacuum chamber, wherein an evaporation source such as an evaporation boat or a crucible is arranged in the vacuum chamber, wherein the first vacuum group is mainly used to vacuum the vacuum crucible or the evaporation boat, wherein the second vacuum group is connected to the vacuum chamber and is mainly used to vacuum the winding part, and wherein the number of vacuum pump groups of the second vacuum group used to vacuum the winding part is greater than the number of vacuum pump groups of the first vacuum group. The winding part is mainly used for unwinding the film, and there is air inside the film. The present invention can completely extract the air in the film to prevent the residual air in the film from affecting the coating on the film and the evaporation efficiency of the evaporation boat or crucible. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0032] Figure 1 This is a schematic structural diagram of the evaporation coating equipment provided by the present invention.
[0033] Description of Figure Numbers:
[0034] First screw pump 1
[0035] Second screw pump 2
[0036] The first roots pump 3
[0037] Roots pump No.4
[0038] Second valve 5
[0039] Ninth Valve 6
[0040] First valve 7
[0041] Second Roots pump 8
[0042] The third roots pump 9
[0043] Vacuum chamber 10
[0044] Ventilation valve 11
[0045] Ventilation valve 12
[0046] Seventh Valve 13
[0047] The eighth valve 14
[0048] Fifth valve 15
[0049] Sixth valve 16
[0050] The first molecular pump 17
[0051] The second molecular pump 18
[0052] The third valve 19
[0053] Fourth valve 20
[0054] First diffusion pump 21
[0055] Second diffusion pump 22
[0056] Maintaining pump 23 DETAILED DESCRIPTION
[0057] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0058] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0059] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0060] like Figure 1 As shown, the present invention provides an evaporation coating device and a vacuum pumping method and a vacuum closing method, wherein the evaporation coating device includes a winding portion, an evaporation source and a vacuum chamber 10, the winding portion and the evaporation source are arranged in the vacuum chamber 10, the winding portion is arranged at the upper part of the vacuum chamber 10, above the evaporation source, the evaporation source is arranged at the lower part of the vacuum chamber 10, below the winding portion, a first vacuum group for vacuuming the evaporation source and a second vacuum group for vacuuming the winding portion are arranged on the vacuum chamber 10, the first vacuum group is arranged at the lower part of the vacuum chamber 10, the second vacuum group is arranged at the upper part of the vacuum chamber 10, and the evaporation source is an evaporation boat or a vacuum crucible. The present application connects two sets of vacuum groups to a vacuum chamber 10, in which an evaporation source such as an evaporation boat or a crucible is arranged. The first vacuum group is mainly used to evacuate the vacuum crucible or the evaporation boat, and the second vacuum group is connected to the vacuum chamber 10, and is mainly used to evacuate the location of the winding portion, and the number of vacuum pump groups in the second vacuum group used to evacuate the winding portion is greater than the number of vacuum pump groups in the first vacuum group. The winding portion is mainly used to unwind the film, and there is air inside the film. The present invention can completely evacuate the air in the film to prevent the residual air in the film from affecting the coating on the film and the evaporation efficiency of the evaporation boat or crucible.
[0061] The winding part and the evaporation source are both prior art. For example, the winding part, the patent with publication number CN117721434A discloses an evaporation winding mechanism and a vacuum coating machine, one of which is an evaporation winding mechanism, including: an electron beam evaporation source, used to evaporate the target film material to generate a coating gas; and a winding roller group, used to convey a flexible coating member with a coating surface, and arranged above the electron beam evaporation source; the winding roller group includes at least two coating rollers, each of which is distributed in sequence along the circumferential direction with the electron beam evaporation source as the center, and each coating roller can make the coating surface of the flexible coating member wound thereon face the electron beam evaporation source, so that during coating, the coating surface of the flexible coating member wound around each coating roller is at least partially exposed to the atmosphere formed by the coating gas.
[0062] Further, in the evaporation coating device provided by the present invention, the second vacuum group includes a first screw pump 1, a first Roots pump 3 and a second Roots pump 8, the first screw pump 1 is connected to the first Roots pump 3, the first Roots pump 3 is connected to the second Roots pump 8, and the second Roots pump 8 is connected to the upper part of the vacuum chamber 10. Further, in the evaporation coating device provided by the present invention, the second vacuum group also includes a third Roots pump 9, the first Roots pump 3 is connected to the third Roots pump 9, and the third Roots pump 9 is connected to the upper part of the vacuum chamber 10.
[0063] Further, in the evaporation coating device provided by the present invention, the first vacuum group includes a second screw pump 2, a fourth Roots pump 4 and a first diffusion pump 21, the second screw pump 2 is connected to the fourth Roots pump 4, the fourth Roots pump 4 is connected to the first diffusion pump 21, and the first diffusion pump 21 is connected to the lower part of the vacuum chamber 10. Further, in the evaporation coating device provided by the present invention, the first vacuum group also includes a second diffusion pump 22, the fourth Roots pump 4 is connected to the second diffusion pump 22, and the second diffusion pump 22 is connected to the lower part of the vacuum chamber 10. Further, in the evaporation coating device provided by the present invention, the first vacuum group also includes a maintenance pump 23, and the maintenance pump 23 is connected to the pipeline between the fourth Roots pump 4 and the first diffusion pump 21 and the second diffusion pump 22. Furthermore, in the evaporation coating equipment provided by the present invention, the first vacuum group also includes a first molecular pump 17, the fourth Roots pump 4 is connected to the first molecular pump 17, and the first molecular pump 17 is connected to the lower part of the vacuum chamber 10; the second vacuum group also includes a second molecular pump 18, the fourth Roots pump 4 is connected to the second molecular pump 18, and the second molecular pump 18 is connected to the lower part of the vacuum chamber 10.
[0064] Furthermore, in the evaporation coating equipment and its vacuum pumping method and vacuum closing method provided by the present invention, in the second vacuum group, a first valve 7 is connected between the first Roots pump 3 and the second Roots pump 8 and the third Roots pump 9; in the first vacuum group, a second valve 5 is connected between the fourth Roots pump 4 and the maintenance pump 23, two diffusion pumps and the molecular pump; a third valve 19 and a fourth valve 20 are respectively connected between the second valve 5 and the first molecular pump 17 and the second molecular pump 18; a fifth valve 15 and a sixth valve 16 are respectively connected between the first molecular pump 17 and the second molecular pump 18 and the vacuum chamber 10; a seventh valve 13 and an eighth valve 14 are respectively connected between the first diffusion pump 21 and the second diffusion pump 22 and the vacuum chamber 10; a ninth valve 6 is connected between the pipeline between the first Roots pump 3 and the first valve 7 and the pipeline between the fourth Roots pump 4 and the second valve 5; and one or two ventilation valves, ventilation valve 11 and ventilation valve 12, are provided on the vacuum chamber 10.
[0065] The present invention provides a vacuuming method for the evaporation coating equipment as described above, comprising the steps of:
[0066] Turn on the first screw pump 1, the second screw pump 2 and the maintenance pump 23;
[0067] After the vacuum is stabilized, the first diffusion pump 21 and the second diffusion pump 22 are turned on simultaneously;
[0068] After the vacuum is stabilized, the second valve 5 is opened, and the third valve 19 and the fourth valve 20 are opened;
[0069] After the vacuum is stabilized, the seventh valve 13 and the eighth valve 14 are opened;
[0070] After the vacuum is stabilized, the first molecular pump 17 and the second molecular pump 18 are turned on;
[0071] After the vacuum is stabilized, the fifth valve 15 and the sixth valve 16 are opened;
[0072] Open the first Roots pump 3 and the fourth Roots pump 4, and after the vacuum is stabilized, close the second valve 5, and open the ninth valve 6 and the first valve 7;
[0073] After the vacuum is stabilized, the second Roots pump 8 and the third Roots pump 9 are turned on, and the vacuum condition setting is completed.
[0074] When the present invention is turned on, first open the screw pumps 1 and 2 and the maintenance pump 23, after the vacuum is stable, open the diffusion pumps 21 and 22 at the same time, after the vacuum is stable, close the valve 5, then open the valves 19 and 20, after the vacuum is stable, open the valves 13 and 14, after the vacuum is stable, open the molecular pumps 17 and 18, after the vacuum is stable, open the valves 15 and 15, and thus complete the preliminary preparations. At this stage, since the vacuum requirements for the molecular pump to start working are relatively high, valves 13 and 14 are opened first. The molecular pump needs to be preheated and accelerated to start, so the molecular pump is opened before the Roots pump. The second stage is entered below. Then open the Roots pumps 3 and 4, after the vacuum is stable, close 5, open valves 7 and 6, after the vacuum is stable, open the secondary Roots pumps 8 and 9, and after completion, the vacuum condition setting is completed. In the above manner, the air in the film can be quickly extracted, the vacuum degree inside the evaporation cavity can be stabilized, and the coating effect can be better.
[0075] The present invention also provides a vacuum closing method for the evaporation coating equipment as described above, comprising the steps of:
[0076] Open two ventilation valves, ventilation valve 11 and ventilation valve 12;
[0077] Close the fifth valve 15 and the sixth valve 16, close the seventh valve 13 and the eighth valve 14, and then close the second Roots pump 8 and the third Roots pump 9;
[0078] Turn off the first molecular pump 17 and the second molecular pump 18, and turn off the first diffusion pump 21 and the second diffusion pump 22;
[0079] Close the third valve 19 and the fourth valve 20, close the second valve 5, and open the ninth valve 6;
[0080] Turn off the first Roots pump 3 and the fourth Roots pump 4;
[0081] Turn off the first screw pump 1 and the second screw pump 2;
[0082] Finally, the maintenance pump 23 is turned off.
[0083] The present invention opens the ventilation valves 11 and 12 first when closing, so that the vacuum in the vacuum chamber is reduced, and then closes the valves 15, 16, 13 and 14, and then closes the roots pumps 8 and 9. The advantage of doing so is that the vacuum pump behind can still have a strong vacuum, which is beneficial to the life of the vacuum pump, etc. At the same time, if it is only stopped for material replacement, it is also beneficial to the vacuum degree maintenance of the molecular pumps 17 and 18, because this pump group needs a certain vacuum to open, so it can also improve production efficiency. Then close the molecular pumps 17 and 18, and the diffusion pumps 21 and 22, so that the molecular pumps are decelerated and the diffusion pumps are cooled. During the cooling process, close the valves 19 and 10, close the valve 5, open the valve 6, and then close the roots pumps 3 and 4, and then the screw pumps 1 and 2 can also be closed. After the temperature of the diffusion pumps 21 and 22 drops, the maintenance pump 23 is finally closed. The present invention is closed backward from the side close to the vacuum chamber in sequence, so that a certain vacuum degree can be maintained in the vacuum pump, which is convenient for the next startup to quickly reach a predetermined vacuum degree, which is beneficial to improve efficiency. After the diffusion pump has cooled down, the maintenance pump is turned off mainly to prevent the oil in the diffusion pump from contaminating other pump bodies.
[0084] In summary, the present application connects two sets of vacuum groups to a vacuum chamber 10, in which an evaporation source such as an evaporation boat or a crucible is arranged, and the first vacuum group is mainly used to evacuate the vacuum crucible or the evaporation boat, and the second vacuum group is connected to the vacuum chamber 10, and is mainly used to evacuate the location of the winding portion, and the number of vacuum pump groups in the second vacuum group used to evacuate the winding portion is greater than the number of vacuum pump groups in the first vacuum group. The winding portion is mainly used to unwind the film, and there is air inside the film. The present invention can completely evacuate the air in the film to prevent the residual air in the film from affecting the coating on the film and the evaporation efficiency of the evaporation boat or the crucible.
[0085] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. An evaporation coating device, characterized in that: The invention comprises a winding portion, an evaporation source and a vacuum chamber, and is characterized in that the winding portion and the evaporation source are arranged in the vacuum chamber, the winding portion is arranged at the upper part of the vacuum chamber and above the evaporation source, the evaporation source is arranged at the lower part of the vacuum chamber and below the winding portion, a first vacuum group for evacuating the evaporation source and a second vacuum group for evacuating the winding portion are arranged on the vacuum chamber, the first vacuum group is arranged at the lower part of the vacuum chamber, the second vacuum group is arranged at the upper part of the vacuum chamber, and the evaporation source is an evaporation boat or a vacuum crucible.
2. The evaporation coating equipment according to claim 1, characterized in that: The second vacuum group includes a first screw pump, a first Roots pump and a second Roots pump, the first screw pump is communicated with the first Roots pump, the first Roots pump is communicated with the second Roots pump, and the second Roots pump is communicated with the upper part of the vacuum chamber.
3. The evaporation coating equipment according to claim 2, characterized in that: The second vacuum group further includes a third Roots pump, the first Roots pump is communicated with the third Roots pump, and the third Roots pump is communicated with the upper part of the vacuum chamber.
4. The evaporation coating equipment according to claim 3, characterized in that: The first vacuum group includes a second screw pump, a fourth Roots pump and a first diffusion pump, the second screw pump is communicated with the fourth Roots pump, the fourth Roots pump is communicated with the first diffusion pump, and the first diffusion pump is communicated with the lower part of the vacuum chamber.
5. The evaporation coating equipment according to claim 4, characterized in that: The first vacuum group further includes a second diffusion pump, the fourth Roots pump is communicated with the second diffusion pump, and the second diffusion pump is communicated with the lower part of the vacuum chamber.
6. The evaporation coating equipment according to claim 5, characterized in that: The first vacuum group further includes a maintenance pump, and the maintenance pump is connected to a pipeline between the fourth Roots pump and the first diffusion pump and the second diffusion pump.
7. The evaporation coating equipment according to claim 6, characterized in that: The first vacuum group also includes a first molecular pump, the fourth Roots pump is connected to the first molecular pump, and the first molecular pump is connected to the lower part of the vacuum chamber; the second vacuum group also includes a second molecular pump, the fourth Roots pump is connected to the second molecular pump, and the second molecular pump is connected to the lower part of the vacuum chamber.
8. The evaporation coating device and vacuum pumping method and vacuum closing method thereof according to claim 7, characterized in that: In the second vacuum group, a first valve is connected between the first Roots pump and the second Roots pump and the third Roots pump. In the first vacuum group, a second valve is connected between the fourth Roots pump and the maintenance pump, two diffusion pumps and the molecular pump. A third valve and a fourth valve are respectively connected between the second valve and the first molecular pump and the second molecular pump. A fifth valve and a sixth valve are respectively connected between the first molecular pump and the second molecular pump and the vacuum chamber. A seventh valve and an eighth valve are respectively connected between the first diffusion pump and the second diffusion pump and the vacuum chamber. A ninth valve is connected between the pipeline between the first Roots pump and the first valve and the pipeline between the fourth Roots pump and the second valve. One or two ventilation valves are arranged on the vacuum chamber.
9. A vacuuming method for evaporation coating equipment according to claim 8, characterized in that: Includes steps: Turning on the first screw pump, the second screw pump and the maintenance pump; After the vacuum is stabilized, the first diffusion pump and the second diffusion pump are turned on simultaneously; After the vacuum is stabilized, the second valve is opened, and the third valve and the fourth valve are opened; After the vacuum is stabilized, the seventh valve and the eighth valve are opened; After the vacuum is stabilized, turning on the first molecular pump and the second molecular pump; After the vacuum is stabilized, the fifth valve and the sixth valve are opened; Open the first Roots pump and the fourth Roots pump, and after the vacuum is stabilized, close the second valve, and open the ninth valve and the first valve; After the vacuum is stabilized, the second Roots pump and the third Roots pump are turned on, and the vacuum condition setting is completed.
10. The vacuum closing method of the evaporation coating equipment according to claim 8, characterized in that: Includes steps: Open both vent valves; Close the fifth valve and the sixth valve, close the seventh valve and the eighth valve, and then close the second Roots pump and the third Roots pump; Turn off the first molecular pump and the second molecular pump, and turn off the first diffusion pump and the second diffusion pump; Close the third valve and the fourth valve, close the second valve, and open the ninth valve; Turn off the first Roots pump and the fourth Roots pump; Turn off the first screw pump and the second screw pump; Finally the maintenance pump is turned off.
