Cold and arid area roadbed structure with foam light soil combined with geocell reinforcement and construction method
By using foam light soil combined with geogrid chamber reinforcement in roadbeds in cold and arid areas, the problems of unstable roadbed structure and uneven fiber doping are solved, and the strength improvement and insulation effect of roadbeds are achieved, which simplifies the Construction process.
Patent Information
- Application Number
- CN202411106359.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-05
AI Technical Summary
In the problem of unstable roadbed structure and uneven fiber doping in cold and arid areas, the single-filled geometries and fiber reinforcement methods in the prior art are not ideal in roadbeds in cold and arid areas.
By using the method of foam light soil combined with geogrid chamber reinforcement, by investigating geological conditions, trimming roadbeds, detecting and proportioning foam light soil raw materials, the fibers are uniformly doped in saline soil by mixing devices, and foam is formed A fiber light soil layer is laid on the geotextile chamber to form a double-layer roadbed structure.
The overall strength and insulation performance of the roadbed are improved, and the incorporation of fibers increases the overall strength of lightweight soil, achieves the cold-proof and thermal insulation effect of the roadbed, and reduces the construction difficulty.
Smart Images

Figure CN118895692A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of roadbed construction, and in particular to a roadbed structure in cold and arid areas reinforced with foam lightweight soil and geocell and a construction method. Background Art
[0002] The main function of the roadbed is to provide the necessary conditions for track or road paving and train or vehicle operation, and to bear the static and dynamic loads of the track and locomotive vehicles or road surface and traffic loads, while transferring and diffusing the loads deep into the foundation. In sections of roads in cold and arid areas, due to their saline soil structure, the roadbed is easily affected by temperature and becomes unstable. Therefore, when constructing roadbeds in sections of roads in cold and arid areas, it is necessary to make adaptive adjustments to the structure of the roadbed.
[0003] At present, a common method for strengthening the roadbed is to lay geocells and then fill in soil to form a roadbed, thereby improving the strength of the roadbed. However, for sections in cold and arid areas, the stabilization effect of the roadbed with a single geocell is still not ideal. Therefore, in the prior art, a certain amount of fiber is added to the soil to further enhance the strength of the roadbed. However, when adding the fiber, it takes a long time to evenly mix the fiber in the soil, and uneven mixing is prone to occur. Moreover, when the particle size of the gravel in the soil is large, it will also affect the uniformity of the fiber doping. For this reason, this scheme proposes a cold and arid area roadbed structure and construction method reinforced with foam lightweight soil combined with geocells. Summary of the invention
[0004] The invention provides a cold and arid region roadbed structure and construction method reinforced with foam lightweight soil and geocell, which solves the problems of unstable cold and arid region roadbed structure and uneven fiber mixing during raw material mixing in the prior art.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A cold and arid region roadbed structure and construction method reinforced with foam lightweight soil and geocells, comprising the following steps:
[0007] S1. Investigate the geological conditions of the construction section;
[0008] S2. Repair the cold and dry roadbed of the construction section;
[0009] S3. Use local excavated waste soil as foam lightweight soil, test its various performance indicators, and then determine the proportion of different admixture amounts;
[0010] S4, putting various raw materials into a mixing device according to a determined ratio and mixing them evenly to obtain foam fiber lightweight soil that meets the use conditions;
[0011] S5. Lay the geocell along the repaired cold and arid roadbed, and then spread the processed foam fiber lightweight soil on the geocell, and finally compact it, and ensure that the laying thickness after compaction is 0.3-0.4m, so as to form a double-layer roadbed structure with the cold and arid roadbed at the bottom and the foam fiber lightweight soil at the top.
[0012] A cold and arid area roadbed structure reinforced with foam lightweight soil and geocells comprises a cold and arid roadbed, a geocell and foam lightweight soil laid on the top surface of the cold and arid roadbed, wherein the foam lightweight soil is filled in the geocell, thereby forming a foam fiber lightweight soil layer on the top surface of the cold and arid roadbed, and the foam lightweight soil comprises saline soil, antifreeze agent, water reducer, quick setting agent, fiber, foaming agent and cement, wherein the amount of saline soil does not exceed 40%, the antifreeze agent and the water reducer account for 0.1% of the gel material, the quick setting agent accounts for 5% of the gel material, the fiber amount is 0.6%-0.1%, the water-to-material ratio is 0.45-0.55, ordinary silicate cement is selected for cement, a composite foaming agent is selected for the foaming agent, the dilution ratio selected in the test is 40 times, and the foaming ratio is 800-1000 times.
[0013] Through the above technical scheme, the porous structure of the foam lightweight soil is utilized to make it have good thermal insulation properties, and its thermal conductivity is about 1 / 6-1 / 10 of that of normal fill, which can effectively insulate the roadbed. The incorporation of fibers improves the overall strength of the lightweight soil, thereby improving the overall strength of the roadbed while achieving the effect of cold-proofing and heat-insulating the roadbed.
[0014] The mixing device comprises: a mixing mechanism and a feeding mechanism, wherein the mixing mechanism comprises a stirring component, a screening component and a fiber delivery component;
[0015] The stirring assembly comprises a mixing hopper and a stirring shaft rotatably connected to the center of the bottom of the mixing hopper, a plurality of stirring paddles are fixed to the outer periphery of the stirring shaft, a placement groove is provided on the top surface of the mixing hopper, a discharge port is provided on the bottom surface of the mixing hopper, and a baffle plate is installed at the bottom of the discharge port;
[0016] The screening assembly includes a mounting plate arranged above the mixing hopper, a screening hopper mounted on the outer wall of the mounting plate on the side opposite to the placement slot through an elastic member, a shaking member mounted on the outer wall of the mounting plate and a gear ring sleeved on the outer periphery of the stirring shaft. The screening hopper is provided with a notch at one end away from the mounting plate and extends through the placement slot to the outside of the mixing hopper. The screening hopper is inclined downward in a direction away from the mounting plate. The shaking member is transmission-connected to the gear ring for driving the screening hopper to shake back and forth when the gear ring rotates.
[0017] The fiber delivery assembly includes a storage hopper arranged above the mixing hopper, a discharge nozzle installed at the bottom of the storage hopper, and a material spreading member installed in the discharge nozzle, wherein the material spreading member is transmission-connected to the gear ring;
[0018] The feeding mechanism comprises a conveyor belt and a transmission motor for driving the conveyor belt to rotate, and one end of the conveyor belt extends to just above the screening hopper.
[0019] Through the above technical solution, not only can the unqualified parts in the saline soil be screened out while the materials are being stirred, but the fibers to be doped can also be laid layer by layer on the surface of the saline soil, so that the fibers can be evenly mixed with the saline soil during the subsequent stirring process.
[0020] As a further improvement of the above scheme, the mounting plate is provided with a mounting groove arranged along its length direction on one side facing the placement groove, and the elastic member includes a sleeve rod fixed inside the mounting groove along its length direction, two sliding sleeves movably sleeved on the outer periphery of the sleeve rod, and two springs, one end of the two sliding sleeves are fixedly connected to the outer wall of the screening hopper, the two springs are respectively located on the side of the two sliding sleeves away from each other, and one end of the spring is fixedly connected to the sliding sleeve, and the other end of the spring is fixedly connected to the inner wall of the mounting groove.
[0021] Through the above technical solution, the screening hopper can be swung left and right along the length direction of the sleeve rod on the mounting plate.
[0022] As a further improvement of the above solution, a screening hole is provided at the bottom of the screening hopper, and a screen is installed in the screening hole.
[0023] Through the above technical solution, the materials falling into the screening hopper can be screened.
[0024] As a further improvement of the above solution, a roller is installed on the bottom surface of the screening hopper, and the roller is rollingly connected to the bottom of the placement groove.
[0025] Through the above technical solution, the friction between the screening hopper and the placement slot is reduced, thereby reducing the wear of both.
[0026] As a further improvement of the above scheme, the rocking member includes a fixed plate fixed on the outer wall of the mounting plate, a rotating shaft rotatably connected to the fixed plate, a linkage gear fixed at one end of the rotating shaft, an abutment plate fixed at the other end of the rotating shaft, and an abutment column fixed on the outer wall of the screening hopper close to the stirring shaft, the linkage gear is meshed with the ring gear, the abutment plate is inclined, and the other end of the abutment column abuts against a circular surface on one side of the abutment plate.
[0027] Through the above technical solution, the linkage gear can be driven to rotate while the stirring shaft rotates, and then the screening hopper can be driven to swing back and forth, which helps to screen out the unqualified particle size in the saline soil.
[0028] As a further improvement of the above scheme, the spreading member includes a pressure roller arranged in the discharge nozzle and a fixed shaft fixed at both ends of the pressure roller, the fixed shaft is rotatably connected to the discharge nozzle, one end of the fixed shaft on the end of one of the pressure rollers close to the stirring shaft extends to the outside of the discharge nozzle and is fixed with a transmission gear meshing with the ring gear, and the fixed shafts on the ends of the two pressure rollers away from the stirring shaft extend to the outside of the discharge nozzle and are fixed with connecting gears, and the connecting gears mesh with each other.
[0029] Through the above technical solution, the spreading member can be driven to operate while the stirring shaft rotates, so that the fibers in the storage hopper are evenly sprinkled on the surface of the saline soil in the mixing hopper.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1. The porous structure of foamed lightweight soil makes it have good thermal insulation, and its thermal conductivity is about 1 / 6-1 / 10 of that of normal fill soil, which can effectively insulate the roadbed. The addition of fiber improves the overall strength of lightweight soil, thereby improving the overall strength of the roadbed and achieving the effect of cold-proofing and heat-insulating the roadbed.
[0032] 2. The setting of the mixing device can spread the fiber layer by layer on the saline soil, which can facilitate the subsequent mixing of the foam lightweight soil to ensure that the fiber can be more evenly mixed in the raw materials, and also greatly reduces the construction difficulty of the operator.
[0033] 3. Through the coordination among the stirring assembly, the screening assembly and the fiber delivery assembly, the screening assembly and the fiber delivery assembly can be driven to run simultaneously while the stirring shaft rotates, so that the screening assembly can be used to remove large particles such as gravel in the saline soil, and the fibers can be spread layer by layer on the surface of the saline soil in the mixing hopper. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a three-dimensional diagram of the mixing mechanism of the present invention;
[0035] Figure 2 for Figure 1 The enlarged view of point A in the middle;
[0036] Figure 3 This is the formal cross-sectional view of the mixing mechanism;
[0037] Figure 4 for Figure 1 Top view of the middle screen hopper and mounting plate;
[0038] Figure 5 It is a schematic diagram of the structure of the mixing mechanism and the conveyor belt;
[0039] Figure 6 The density of foam lightweight soil is 600kg / m3 Effect of different fiber content on compressive strength
[0040] Figure 7 The density of foam lightweight soil is 800kg / m 3 The influence of different fiber content on compressive strength;
[0041] Figure 8 The density of foam lightweight soil is 1000kg / m 3 The influence of different fiber content on compressive strength.
[0042] Description of main symbols:
[0043] 1. Mixing hopper; 2. Screen hopper; 3. Screen; 4. Mounting plate; 5. Abutment plate; 6. Agitation shaft; 7. Gear ring; 8. Discharge nozzle; 9. Transmission gear; 10. Storage hopper; 11. Placement trough; 12. Connecting gear; 13. Abutment column; 14. Rotating shaft; 15. Interlocking gear; 16. Fixed plate; 17. Agitation paddle; 18. Sleeve rod; 19. Discharge port; 20. Baffle plate; 21. Pressure roller; 22. Sliding sleeve; 23. Mounting trough; 24. Conveyor belt. DETAILED DESCRIPTION
[0044] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.
[0045] Embodiment 1:
[0046] Please combine Figure 1 A cold and arid area roadbed structure reinforced with foamed lightweight soil and geocells in this embodiment includes a cold and arid roadbed, a geocell and foamed lightweight soil laid on the top surface of the cold and arid roadbed, the foamed lightweight soil is filled in the geocell, so as to form a foamed fiber lightweight soil layer on the top surface of the cold and arid roadbed, the foamed lightweight soil includes saline soil, antifreeze agent, water reducer, quick-setting agent, fiber, foaming agent and cement, wherein the amount of saline soil does not exceed 40%, the antifreeze agent and water reducer account for 0.1% of the gel material, the quick-setting agent accounts for 5% of the gel material, and the fiber content is 0.6%-0.0 .1%, the water-to-material ratio is 0.45-0.55, ordinary Portland cement is used for cement, and a composite foaming agent is used for the foaming agent. The dilution ratio selected during the test is 40 times, and the foaming ratio is 800-1000 times. The porous structure of the foamed lightweight soil has good thermal insulation properties, and its thermal conductivity is about 1 / 6-1 / 10 of that of normal fill, which can effectively insulate the roadbed. The addition of fibers improves the overall strength of the lightweight soil, thereby improving the overall strength of the roadbed while achieving the effect of cold protection and heat preservation of the roadbed.
[0047] In this embodiment, the fiber reinforcement method includes polypropylene fiber, basalt fiber and straw fiber reinforcement, such as Figure 6 - Figure 8 As shown in the figure, different fiber yields have an effect on compressive strength under different foam lightweight soil densities. It can be seen that after adding different types of fibers, the flexural strength of the foam lightweight soil specimens is improved to varying degrees. When using, you can choose a reasonable fiber yield and density according to the figure.
[0048] Embodiment 2:
[0049] Combination Figure 1 - Figure 5 Based on Example 1, this embodiment is further improved in that: a construction method of a cold and arid area roadbed structure reinforced with foam lightweight soil and geocells comprises the following steps:
[0050] S1. Investigate the geological conditions of the construction section and determine the geological composition and structure of different sections;
[0051] S2. Repair the cold and dry roadbed of the construction section to meet the construction standards;
[0052] S3. Use local excavated waste soil as foam lightweight soil, test its various performance indicators, and then determine the proportion of different admixture amounts;
[0053] S4, putting various raw materials into a mixing device according to a determined ratio and mixing them evenly to obtain foam fiber lightweight soil that meets the use conditions;
[0054] S5. Lay the geocell along the repaired cold and arid roadbed, and then spread the processed foam fiber lightweight soil on the geocell, and finally compact it, and ensure that the laying thickness after compaction is 0.3-0.4m, so as to form a double-layer roadbed structure with the cold and arid roadbed at the bottom and the foam fiber lightweight soil at the top.
[0055] Embodiment 3:
[0056] Combination Figure 1 - Figure 5 , based on the embodiment 1-2, the present embodiment is further improved in that: a mixing device for raw materials of roadbed structure in cold and arid areas reinforced with foam lightweight soil and geocell, comprising a mixing mechanism and a feeding mechanism, wherein the mixing mechanism comprises a stirring component, a screening component and a fiber delivery component;
[0057] The stirring assembly includes a mixing hopper 1 and a stirring shaft 6 rotatably connected to the bottom center of the mixing hopper 1, a plurality of stirring paddles 17 are fixed to the periphery of the stirring shaft 6, a placement groove 11 is provided on the top surface of the mixing hopper 1, a discharge port 19 is provided on the bottom surface of the mixing hopper 1, a baffle plate 20 is installed at the bottom of the discharge port 19, the baffle plate 20 is hinged to the mixing hopper 1, and a handle for rotating the baffle plate 20 is installed on the mixing hopper 1. The baffle plate 20 is rotated by holding the handle so that the baffle plate 20 deviates from the discharge port 19. Under the rotation of the stirring paddle 17, the material in the mixing hopper 1 can be discharged from the discharge port 19.
[0058] The screening assembly includes a mounting plate 4 arranged above the mixing hopper 1, a screening hopper 2 mounted on the outer wall of the mounting plate 4 on the side opposite to the placement groove 11 through an elastic member, a shaking member mounted on the outer wall of the mounting plate 4 and a gear ring 7 sleeved on the outer periphery of the stirring shaft 6, a notch is arranged at one end of the screening hopper 2 away from the mounting plate 4, and the screening hopper 2 passes through the placement groove 11 and extends to the outside of the mixing hopper 1, a screening hole is arranged at the bottom of the screening hopper 2, a screen 3 is installed in the screening hole, the screening hopper 2 is tilted downward in a direction away from the mounting plate 4, the shaking member is connected to the gear ring 7 in a transmission manner, and is used to move the screen hopper 2 in the gear ring 7 drives the screening hopper 2 to rock back and forth when it rotates. A mounting groove 23 is provided along the length direction of the mounting plate 4 on the side facing the placement groove 11. The elastic member includes a sleeve rod 18 fixed inside the mounting groove 23 along the length direction, two sliding sleeves 22 movably sleeved on the outer periphery of the sleeve rod 18, and two springs. One end of the two sliding sleeves 22 is fixedly connected to the outer wall of the screening hopper 2. The two springs are respectively located on the sides of the two sliding sleeves 22 away from each other, and one end of the spring is fixedly connected to the sliding sleeve 22, and the other end of the spring is fixedly connected to the inner wall of the mounting groove 23. The rocking member includes a fixed A fixed plate 16 fixed on the outer wall of the mounting plate 4, a rotating shaft 14 rotatably connected to the fixed plate 16, a linkage gear 15 fixed on one end of the rotating shaft 14, an abutment plate 5 fixed on the other end of the rotating shaft 14 and an abutment column 13 fixed on the outer wall of the sieve hopper 2 close to the stirring shaft 6, the linkage gear 15 is meshed with the gear ring 7, the abutment plate 5 is tilted, and the other end of the abutment column 13 abuts against the circular surface of one side of the abutment plate 5. When the stirring shaft 6 rotates, the stirring paddle 17 and the gear ring 7 are driven to rotate at the same time. When the gear ring 7 rotates, it will drive the linkage gear 15 to rotate. After the linkage gear 15 rotates, it drives the abutment disk 5 to rotate at the same time. Since the abutment disk 5 is set at an angle, the abutment column 13 will be continuously pushed to the side away from the stirring shaft 6 during the rotation of the abutment disk 5, and then it will move back under the action of spring 1, and so on. Therefore, the screening hopper 2 can be driven to shake continuously while the stirring shaft 6 rotates. In this way, after the saline soil is transported to the screening hopper 2, the soil with a qualified particle size can fall into the mixing hopper 1, and the stones with larger particle sizes will be discharged from the gap of the screening hopper 2.
[0059] The fiber delivery assembly includes a storage hopper 10 arranged above the mixing hopper 1, a discharge nozzle 8 installed at the bottom of the storage hopper 10 and a spreading piece installed in the discharge nozzle 8, the spreading piece is transmission-connected with the ring gear 7, the spreading piece includes a pressure roller 21 arranged in the discharge nozzle 8 and a fixed shaft fixed at both ends of the pressure roller 21, the fixed shaft is rotationally connected with the discharge nozzle 8, one end of the fixed shaft on the end of one pressure roller 21 close to the stirring shaft 6 extends to the outside of the discharge nozzle 8 and is fixed with a transmission gear 9 meshed with the ring gear 7, the fixed shafts on the ends of the two pressure rollers 21 away from the stirring shaft 6 extend to the outside of the discharge nozzle 8 and are fixed with a connecting gear 12, the connecting gears 12 mesh with each other, and the type of fiber to be added is selected. After that, it is placed in the storage hopper 10, and the ring gear 7 will drive the transmission gear 9 to rotate at the same time when it rotates. After the transmission gear 9 rotates, it can drive one of the pressure rollers 21 to rotate. After the pressure roller 21 rotates, it drives the other pressure roller to rotate in the opposite direction, so that the limit in the storage hopper 9 can be gradually transported from the discharge nozzle 8 to the mixing hopper 1, and the fibers that fall into the mixing hopper 1 will be spread on the surface of the saline soil. During the rotation of the stirring shaft 6, they can be mixed in the saline soil by the stirring paddle 17, and then the antifreeze agent, water reducer, accelerator, fiber, foaming agent and cement are poured into the mixing hopper 2 in proportion for stirring. After stirring evenly, the baffle plate 20 is opened to discharge.
[0060] The feeding mechanism includes a conveyor belt 24 and a transmission motor for driving the conveyor belt 24 to rotate. One end of the conveyor belt 24 extends to the top of the screening hopper 2. When mixing, the saline soil is shoveled and poured onto the conveyor belt 24. Then, the saline soil can be transported to the screening hopper 2 under the rotation of the conveyor belt 24.
[0061] The above-mentioned embodiments are only preferred embodiments of the present invention and cannot be used to limit the scope of protection of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.
Claims
1. A construction method for a cold and arid region roadbed structure reinforced with foam lightweight soil and geocell, characterized in that: The following steps are involved: S1. Investigate the geological conditions of the construction section; S2. Repair the cold and dry roadbed of the construction section; S3. Use local excavated waste soil as foam lightweight soil, test its various performance indicators, and then determine the proportion of different admixture amounts; S4, putting various raw materials into a mixing device according to a determined ratio and mixing them evenly to obtain foam fiber lightweight soil that meets the use conditions; S5. Lay the geocell along the repaired cold and arid roadbed, and then lay the processed foam fiber lightweight soil on the geocell, and finally compact it, and ensure that the laying thickness after compaction is 0.3-0.4m, so as to form a double-layer roadbed structure with the cold and arid roadbed at the bottom and the foam fiber lightweight soil at the top; The foamed lightweight soil comprises saline soil, antifreeze agent, water reducer, accelerator, fiber, foaming agent and cement, wherein the amount of saline soil does not exceed 40%, the antifreeze agent and water reducer account for 0.1% of the gel material, the accelerator accounts for 5% of the gel material, the fiber amount is 0.6%-0.1%, and the water-to-cement ratio is 0.45-0.
55.
2. The construction method of a cold and arid area roadbed structure reinforced with foam lightweight soil and geocell according to claim 1 is characterized in that: The mixing device comprises: a mixing mechanism and a feeding mechanism, wherein the mixing mechanism comprises a stirring component, a screening component and a fiber delivery component; The stirring assembly comprises a mixing hopper and a stirring shaft rotatably connected to the center of the bottom of the mixing hopper, a plurality of stirring paddles are fixed to the outer periphery of the stirring shaft, a placement groove is provided on the top surface of the mixing hopper, a discharge port is provided on the bottom surface of the mixing hopper, and a baffle plate is installed at the bottom of the discharge port; The screening material assembly comprises a mounting plate arranged above the mixing hopper, a screening material hopper mounted on the outer wall of the mounting plate on the side opposite to the placement slot through an elastic member, a shaking member mounted on the outer wall of the mounting plate, and a gear ring sleeved on the outer periphery of the stirring shaft, a notch is arranged at one end of the screening material hopper away from the mounting plate, and the screening material hopper passes through the placement slot and extends to the outside of the mixing hopper, the screening material hopper is arranged obliquely downward in a direction away from the mounting plate, and the shaking member is in transmission connection with the gear ring, so as to drive the screening material hopper to shake back and forth when the gear ring rotates; The fiber delivery assembly includes a storage hopper arranged above the mixing hopper, a discharge nozzle installed at the bottom of the storage hopper, and a material spreading member installed in the discharge nozzle, wherein the material spreading member is transmission-connected to the gear ring; The feeding mechanism comprises a conveyor belt and a transmission motor for driving the conveyor belt to rotate, and one end of the conveyor belt extends to just above the screening hopper.
3. The construction method of a cold and arid area roadbed structure reinforced with foam lightweight soil and geocell according to claim 2 is characterized in that: The mounting plate is provided with a mounting groove arranged along its length direction on one side facing the placement groove, and the elastic member includes a sleeve rod fixed inside the mounting groove along its length direction, two sliding sleeves movably sleeved on the outer periphery of the sleeve rod, and two springs, one end of the two sliding sleeves are fixedly connected to the outer wall of the screening hopper, the two springs are respectively located on the side of the two sliding sleeves away from each other, and one end of the spring is fixedly connected to the sliding sleeve, and the other end of the spring is fixedly connected to the inner wall of the mounting groove.
4. The construction method of a cold and arid region roadbed structure reinforced with foam lightweight soil and geocell according to claim 2, characterized in that: A screening hole is provided at the bottom of the screening hopper, and a screen is installed in the screening hole.
5. The construction method of a cold and arid region roadbed structure reinforced with foam lightweight soil and geocell according to claim 2, characterized in that: The bottom surface of the screening hopper is provided with a roller, which is rollingly connected with the bottom of the placement groove.
6. The construction method of a cold and arid region roadbed structure reinforced with foamed lightweight soil and geocell according to claim 2, characterized in that: The shaking member includes a fixed plate fixed on the outer wall of the mounting plate, a rotating shaft rotatably connected to the fixed plate, a linkage gear fixed on one end of the rotating shaft, an abutment plate fixed on the other end of the rotating shaft, and an abutment column fixed on the outer wall of the screening hopper on one side close to the stirring shaft, the linkage gear is meshed with the gear ring, the abutment plate is tilted, and the other end of the abutment column abuts against a circular surface on one side of the abutment plate.
7. The construction method of a cold and arid region roadbed structure reinforced with foamed lightweight soil and geocell according to claim 2, characterized in that: The material spreading member includes a pressure roller arranged in the discharge nozzle and a fixed shaft fixed at both ends of the pressure roller, the fixed shaft is rotatably connected to the discharge nozzle, one end of the fixed shaft on the end of one of the pressure rollers close to the stirring shaft extends to the outside of the discharge nozzle and is fixed with a transmission gear meshing with the ring gear, and the fixed shafts on the ends of the two pressure rollers away from the stirring shaft extend to the outside of the discharge nozzle and are fixed with connecting gears, and the connecting gears mesh with each other.
8. The construction method of a cold and arid region roadbed structure reinforced with foam lightweight soil and geocell according to claim 1, characterized in that: The cement is ordinary Portland cement, the foaming agent is a composite foaming agent, the dilution ratio selected in the test is 40 times, and the foaming ratio is 800-1000 times.
Citation Information
Patent Citations
Earthwork standard room bar-adding cellular concrete light roadbed filling structure and method thereof
CN107165013A
Preparation process of hydraulic anti-crack low-shrinkage high-performance concrete and preparation device
CN113211642A
Polypropylene fiber foam light soil based on waste tire rubber powder as well as preparation method and application of polypropylene fiber foam light soil
CN113321473A
Mixing mill capable of realizing automatic feeding
CN113714086A
Pelletizing method of high titanium slag and rutile powder
CN116966824A
Cited By
Frozen soil highway subgrade structure, highway and construction method
CN121295574A
