Casting construction method for A-type tower column of cable-stayed bridge
Through the method of combining climbing molds and guide rails and the position exchange of bending steel molds, the problem of operation difficulty and time-consuming in bending tower column construction is solved, efficient segmented casting and tangled construction of tower columns is achieved, and the construction is improved efficiency.
Patent Information
- Application Number
- CN202411143830.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-07-29
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-05
AI Technical Summary
In the prior art, the casting and construction operation of curved tower columns is difficult and takes a long time, which affects the overall construction efficiency and fails to effectively solve the construction problem of curved tower columns.
Using the method of combining climbing molds and guide rails, the hydraulic cylinder and motor-driven climbing mold systems realize segmented casting of tower columns, and the positions of bending steel molds and templates are exchanged to quickly adapt to the different shapes of tower columns and improve construction. Efficiency, and conduct tangled construction on the closing parts of the two limbs of the tower column to avoid interference.
It realizes efficient construction of curved tower columns, simplifies the formwork conversion process, improves construction efficiency, reduces construction time, and ensures that all surfaces of tower columns quickly complete the conversion and casting of applicable formwork.
Smart Images

Figure CN118895718A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and more specifically, to a method for casting and constructing an A-type tower column of a cable-stayed bridge. Background Art
[0002] A cable-stayed bridge is a type of bridge in which the main beam is directly pulled on the tower column by many cables. It can be regarded as a multi-span elastically supported continuous beam with cables replacing piers. It has the advantages of small bending moment in the beam body, light structure weight, and material saving. The tower column has many types, such as A-type, inverted Y-type, and H-type. Because the tower column has a huge height and is difficult to prefabricate and transport, it is usually cast on site. The tower column is not always a regular straight structure. Some tower columns are designed to have a curved structure to obtain better mechanical properties. The inside and outside of the tower column have curved surfaces. For the casting construction of such tower columns, the existing technology usually solves it by replacing the template. However, replacing the template in the air is difficult to operate and time-consuming, which affects the overall construction efficiency. The invention patent with publication number CN101029472A discloses the tower column of a cable-stayed bridge and its construction method, but the invention does not provide a solution for the casting construction of curved tower columns. Summary of the invention
[0003] The existing method for the casting construction of curved tower columns is difficult to operate, time-consuming, and affects the overall construction efficiency. In order to overcome these defects, the present invention provides a method for casting the A-type tower column of a cable-stayed bridge, which can more conveniently and efficiently implement the casting construction of the curved tower column.
[0004] The technical solution of the present invention is: a method for pouring and constructing a type A tower column of a cable-stayed bridge, comprising the following steps: A. Cast the first section of concrete structure at the base of the tower column; B. The climbing formwork is installed with the first section of concrete structure as support, and a translation device, a formwork and a bending steel formwork that can be replaced with the formwork are provided on the climbing formwork; C. Install the guide rail on the solidified concrete structure; D. The load-bearing frame and the guide rail support each other and climb alternately, and the subsequent concrete structure is poured in sections from bottom to top. During pouring, the translation device pushes the template to close the mold, and the template is demoulded after the concrete structure is solidified; E. Remove all equipment on the concrete structure.
[0005] Through the above steps, the climbing formwork can gradually climb up with the formwork, so as to complete the pouring of the tower column in sections and better cope with the construction of the curved tower column.
[0006] Preferably, the climbing formwork includes a load-bearing frame and a main platform, the main platform is located on the top of the load-bearing frame, a hydraulic cylinder is provided on the load-bearing frame, the piston rod of the hydraulic cylinder is connected to the load-bearing frame, the cylinder body of the hydraulic cylinder is connected to the guide rail, and the load-bearing frame and the guide rail are alternately fixed to the solidified concrete structure. The load-bearing frame is the carrier of the main platform, and the load-bearing frame and the guide rail are alternately fixed to the solidified concrete structure, so that as the hydraulic cylinder is extended and retracted, the load-bearing frame and the guide rail provide each other with ascending support, thereby realizing the gradual climbing of the climbing formwork.
[0007] Preferably, in step B, a bending steel mold is also installed on the main platform, and the bending steel mold and the template are respectively installed at both ends of a turntable, and the center of the bottom of the turntable is connected to the output end of a motor, and the motor is fixed on the translation device. When the straight surface of the tower column is cast, the template is activated to cast the concrete structure; when the curved surface of the tower column is cast, the turntable is rotated, the position of the bending steel mold and the template is interchanged, and the bending steel mold is activated to cast the concrete structure. When the climbing formwork climbs to the curved position of the tower column, the motor starts, the turntable is rotated, and the bending steel mold is converted to the casting position to complete the casting of the curved section of the tower column; when the tower column is in the straight position, the turntable converts the template to the casting position. The present invention can quickly complete the conversion of applicable templates for different surfaces of the tower column, thereby improving construction efficiency.
[0008] Preferably, the motor is a hydraulic motor.
[0009] As a preferred embodiment, a load-bearing frame and a main platform are installed on each side of the tower column, and a translation device and a template are installed on the main platform. Concrete can be poured on each side of the tower column at the same time, thereby improving the overall construction efficiency.
[0010] As a preferred embodiment, when approaching the closing part of the two limbs of the tower column, the pouring of the inner side of the two limbs of the tower column is staggered. When approaching the closing part of the two limbs of the tower column, the inner space of the two limbs of the tower column is narrow, and the staggered construction of the two limbs can avoid mutual interference.
[0011] As a preferred method, the template should be cleaned and a release agent should be applied before closing the mold, so that the template or the curved steel mold can be smoothly demoulded after the concrete structure is solidified.
[0012] Preferably, a temporary support is set up when implementing step A. The pouring of the tower column base is basically completed on the ground, and there is no necessary working space for installing the climbing formwork. Therefore, there is no need to install the climbing formwork here, and a temporary support can be set up.
[0013] Preferably, a flap is provided at the gap between the main platform and the hanging platform and the concrete structure wall, and the flap is turned up when the load-bearing frame is lifted, and the flap is lowered after the load-bearing frame is lifted into place. The flap can be provided to block the gap to prevent objects from falling from high altitude.
[0014] Preferably, the main platform and the hanging platform are provided with perforated steel mesh on their peripheries, which ensures the impact resistance, safety, durability and lighting requirements of the outer enclosure, as well as the safety of construction workers during high-altitude operations, while making the facade beautiful and neat.
[0015] The beneficial effects of the present invention are: The construction of the curved tower column can be carried out more conveniently and efficiently. The invention can quickly complete the conversion of the applicable template according to the different profiles of the tower column, thereby improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A structural schematic diagram of the climbing formwork used in the present invention.
[0017] Figure 2 It is a schematic diagram of a state when pouring the first section of the tower column in the present invention.
[0018] Figure 3 It is a schematic diagram of a state when the climbing formwork is installed on the first section of the tower column in the present invention.
[0019] Figure 4 It is a schematic diagram of a state after the third section of the tower column and the first cross beam are completed in the present invention.
[0020] Figure 5 It is a schematic diagram of a state when pouring the fourth section of the tower column in the present invention.
[0021] Figure 6 It is a schematic diagram of a state when the climbing formwork in the present invention climbs to the fifth section of the tower column.
[0022] Figure 7 It is a schematic diagram of a construction state in the present invention.
[0023] Figure 8 It is a schematic diagram of a state during staggered construction in the present invention.
[0024] Fig. 9 It is a schematic diagram of a state when pouring the sixteenth section of the tower column in the present invention.
[0025] In the figure, 1-tower column, 2-crossbeam, 3-load-bearing frame, 301-upper beam of load-bearing frame, 302-vertical pole of load-bearing frame, 303-slanting brace of load-bearing frame, 4-hanging platform, 5-main platform, 501-translational support beam, 502-translational back rib, 503-translational diagonal brace, 504-motor, 505-turntable, 6-hydraulic cylinder, 7-guide rail, 8-bending steel mold, 9-formwork, 10-wall attachment device, 11-embedded parts of concrete structure, 12-reversing box. DETAILED DESCRIPTION
[0026] The present invention will be further described below with reference to specific embodiments of the accompanying drawings.
[0027] Embodiment 1: like Figures 1 to 9 As shown, a method for casting a type A tower column of a cable-stayed bridge is shown, wherein the tower column 1 has two limbs, which gradually approach each other from bottom to top and close together at the top to form a tower spire, and the two limbs are provided with a curved portion near the base, and two cross beams 2 are connected between the two limbs, one cross beam 2 is located slightly above the curved portion, and the other cross beam 2 is located in the middle and upper part of the tower column 1. The construction equipment used in the method for casting a type A tower column of a cable-stayed bridge includes a climbing formwork and a guide rail 7, and the climbing formwork includes a load-bearing frame 3 and a main platform 5. The load-bearing frame 3 is a frame composed of a pair of tripods, a pair of load-bearing frame lower beams and a pair of load-bearing frame longitudinal connecting rods, and the tripod is composed of a load-bearing frame upper beam 301, a load-bearing frame upright 302 and a load-bearing frame diagonal brace 303. The main platform 5 includes a bottom frame, a translation joist 501, a translation back rib 502 and a translation diagonal brace 503. The bottom frame is fixed to the top of the upper beam 301 of the load-bearing frame through a connecting column, and a gap is left between the bottom frame and the upper beam 301 of the load-bearing frame. The bottom end of the translation back rib 502 is fixed to the translation joist 501, one end of the translation diagonal brace 503 is connected to the translation joist 501, and the other end is connected to the translation back rib 502. The translation back rib 502 is connected to a template 9 through a support, and the working surface of the template 9 is a plane. There are two translation joists 501, two translation back ribs 502 and two translation diagonal braces 503, forming two parallel tripods similar to the load-bearing frame 3, and the two tripods are connected by multiple connecting rods to form a template support. A translation device that can push the template support to translate is provided in the gap between the bottom frame and the upper beam 301 of the load-bearing frame. The translation device includes a device support, a gear, a rack and a driving motor. The device support is connected between the two upper beams 301 of the load-bearing frame. The gear is rotatably connected to the device support and driven by the driving motor. The rack is fixed on a slide. The slide is slidably connected to the device support through a slide rail. The rack meshes with the gear. The template support is driven by the slide. A hydraulic cylinder 6 is provided on the load-bearing frame 3. The piston rod of the hydraulic cylinder 6 is connected to the upper beam 301 of the load-bearing frame 3. The structural composition of the above-mentioned climbing formwork belongs to the prior art. On this basis, a motor 504 is installed on the slide. The motor 504 is a hydraulic motor. The output end of the motor 504 is connected to a turntable 505. The bottom center of the turntable 505 is provided with a central shaft keyed to the output end of the motor. A sleeve is provided outside the central shaft. The central shaft is rotatably connected in the sleeve. A slide groove is provided on the bottom frame. The sleeve is adapted to slide and connect in the slide groove. A template support is provided at each end of the turntable. A template 9 is installed on one template support, and a bending steel mold 8 is installed on the other template support. The bending steel mold 8 has a curved surface matching the curved portion of the tower column 1.
[0028] At a lower height, the climbing formwork is hoisted by a crane to rise to a higher height. When the tower column 1 is cast to a higher height, the guide rail 7 is introduced. The cylinder body of the hydraulic cylinder 6 is connected to the guide rail 7 through the reversing box 8. The load-bearing frame 3 and the guide rail 7 are alternately fixed to the solidified concrete structure. In this way, as the hydraulic cylinder 6 is extended and retracted, the load-bearing frame 3 and the guide rail 7 provide each other with ascending support, so that the climbing formwork can be gradually climbed. While the concrete structure is being formed, the concrete structure embedded parts 11 are transferred from the template 9. After the concrete structure is solidified, the wall attachment device 10 is installed on the exposed concrete structure embedded parts 11 to form a combination. The load-bearing frame 3 and the guide rail 7 are hung with the combination of the concrete structure embedded parts 11 and the wall attachment device 10 through the self-carrying hanging structure, so as to achieve the fixation of the load-bearing frame 3, the guide rail 7 and the solidified concrete structure. The climbing of the climbing formwork is controlled by the electric control hydraulic system. When the piston rod of the hydraulic cylinder 6 is extended, the guide rail 7 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the guide rail 7 provides support from below to ensure that the extended piston rod of the hydraulic cylinder 6 pushes the climbing formwork away from the original wall attachment device 10 and lifts it to the wall attachment device 10 of the upper layer. When the piston rod of the hydraulic cylinder 6 is retracted by the electric control hydraulic system, the load-bearing frame 3 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the load-bearing frame 3 provides support from above to ensure that the retracted hydraulic cylinder 6 pulls up the guide rail 7, away from the original wall attachment device 10, and reaches the wall attachment device 10 of the upper layer. The reversing box 8, the embedded concrete structure parts 11, and the wall attachment device 10 are all prior art. A climbing formwork is provided on each face of each limb of the tower column 1, and the size of each climbing formwork varies according to the size of the corresponding faces of the tower column 1. Only the climbing formwork on the outer face of the tower column 1 is equipped with a bent steel formwork 8, and the climbing formwork on the other faces is only equipped with a template 9 because the corresponding faces are flat.
[0029] The construction method for pouring the A-type tower column of the cable-stayed bridge includes the following steps: Formulate a construction plan, divide the tower column into 19 sections and perform casting construction section by section, the curved portion and the cross beam 2 on the lower position of the tower column 1 are both located in the third section, and the cross beam 2 on the upper position of the tower column 1 is located in the tenth section; Set up temporary supports and pour the first section of concrete structure at the tower column base; C. Using the first concrete structure as support to install the climbing formwork, and using the climbing formwork and the formwork 9 thereon to cast the second concrete structure; D. Remove the climbing formwork and hoist the climbing formwork as a whole onto the solidified second section concrete structure with a crane and install and fix it, start the climbing formwork motor 504 on the outer side of the tower column 1, rotate the turntable 505, exchange the positions of the bending steel formwork 8 and the formwork 9, activate the bending steel formwork 8, and cooperate with the climbing formworks on the other surfaces to implement the pouring of the third section concrete structure; E. Complete the pouring construction of the upper beam 2 of the third section concrete structure; F. Set up a temporary support again on the beam 2 for pouring the inner side of the fourth section of the tower column 1; remove the climbing formwork on the other surfaces and lift it to the solidified third section concrete structure and fix it; swap the positions of the bent steel formwork 8 and the formwork 9 again to pour the fourth section concrete structure; add an upper truss on the top of the main platform 5; G. After the climbing formwork is removed, it is hoisted onto the solidified fourth section concrete structure and fixed, and the fifth section concrete structure is poured; the climbing formwork is also installed on the inner side of the fourth section of the tower column 1; the guide rail 7 is installed, and the hanging platform 4 slidably connected to the guide rail 7 is installed at the bottom of the load-bearing frame 3; H. Driven by the hydraulic cylinder 6, the load-bearing frame 3 and the guide rail 7 support each other and climb alternately, and the subsequent sixth to tenth sections of concrete structure are poured in sections from bottom to top. During pouring, the translation device 5 pushes the template 9 to close the mold, and the template 9 is demolded after the concrete structure is solidified; before closing the mold, the template is cleaned and a release agent is applied; I. Complete the pouring construction of the upper beam 2 of the tenth section concrete structure; J. Starting from the eleventh section, the two limbs are cast in staggered sections; starting from the sixteenth section, the climbing formwork on the inner side of the tower column 1 is removed, and the construction of the inner side of the tower column 1 is completed with the help of the climbing formwork on the adjacent surface; K. After the overall pouring of tower column 1 is completed, all equipment installed on the concrete structure is removed.
[0030] When implementing the above steps, from the first section to the tenth section of the tower column 1, the casting of each surface of the two limbs of the tower column is carried out simultaneously; starting from the eleventh section, since the inner space of the two limbs of the tower column 1 becomes smaller as it approaches the closing part of the two limbs of the tower column 1, the casting of the two limbs is staggered; starting from the sixteenth section, after removing the climbing formwork on the inner side surface of the tower column 1, an inner formwork and a matching force-adding device are added on the adjacent surface, that is, between the climbing formworks on the front and rear end surfaces of the tower column 1, to complete the construction of the inner side surface of the tower column 1.
[0031] A flap is provided at the gap between the main platform 5 and the hanging platform 4 and the concrete structure wall. When the load-bearing frame 3 is lifted, the flap is turned up, and when the load-bearing frame 3 is lifted into place, the flap is lowered. The periphery of the main platform 5 and the hanging platform 4 is provided with a perforated steel plate mesh.
[0032] Embodiment 2: like Figures 1 to 9As shown, a method for casting a type A tower column of a cable-stayed bridge is shown. The tower column 1 has two limbs, which gradually approach each other from bottom to top and close together at the top to form a tower spire. The two limbs are provided with a curved portion near the base. Different from the embodiment 1, in this embodiment, only one crossbeam 2 is connected between the two limbs, and the crossbeam 2 is located in the middle and upper part of the tower column 1. The construction equipment used in the casting construction method of the type A tower column of a cable-stayed bridge includes a climbing formwork and a guide rail 7. The climbing formwork includes a load-bearing frame 3 and a main platform 5. The load-bearing frame 3 is a frame composed of a pair of tripods, a pair of load-bearing frame lower beams and a pair of load-bearing frame longitudinal connecting rods. The tripod is composed of a load-bearing frame upper beam 301, a load-bearing frame upright 302 and a load-bearing frame diagonal brace 303. The main platform 5 includes a bottom frame, a translation support beam 501, a translation back rib 502 and a translation diagonal brace 503. The bottom frame is fixed to the top of the load-bearing frame upper beam 301 through a connecting column, and a gap is left between the bottom frame and the load-bearing frame upper beam 301. The bottom end of the translation back rib 502 is fixed on the translation support beam 501, one end of the translation diagonal brace 503 is connected to the translation support beam 501, and the other end is connected to the translation back rib 502. The translation back rib 502 is connected to the template 9 through a support, and the working surface of the template 9 is a plane. There are two translation support beams 501, two translation back ribs 502 and two translation diagonal braces 503, forming two parallel tripods similar to the load-bearing frame 3, and the two tripods are connected by multiple connecting rods to form a template support. A translation device that can push the template support to translate is provided in the gap between the bottom frame and the upper beam 301 of the load-bearing frame. The translation device includes a device support, a gear, a rack and a driving motor. The device support is connected between the two upper beams 301 of the load-bearing frame, the gear is rotatably connected to the device support and driven by the driving motor, the rack is fixed on a slide, the slide is slidably connected to the device support through a slide rail, the rack is meshed with the gear, and the template support is driven by the slide. The load-bearing frame 3 is provided with a hydraulic cylinder 6, and the piston rod of the hydraulic cylinder 6 is connected to the load-bearing frame upper beam 301 of the load-bearing frame 3. The structural composition of the above-mentioned climbing formwork belongs to the prior art. On this basis, a motor 504 is installed on the slide plate. The motor 504 is a hydraulic motor. The output end of the motor 504 is connected to a turntable 505. The bottom center of the turntable 505 is provided with a central shaft key-connected to the output end of the motor. The central shaft is provided with a sleeve outside. The central shaft is rotatably connected in the sleeve. The bottom frame is provided with a slide groove. The sleeve is adapted to be slidably connected in the slide groove. A template support is provided at each end of the turntable. A template 9 is installed on one template support, and a bending steel mold 8 is installed on the other template support. The bending steel mold 8 has a curved surface matching the curved part of the tower column 1.
[0033] At a lower height, the climbing formwork is hoisted by a crane to rise to a higher height. When the tower column 1 is cast to a higher height, the guide rail 7 is introduced. The cylinder body of the hydraulic cylinder 6 is connected to the guide rail 7 through the reversing box 8. The load-bearing frame 3 and the guide rail 7 are alternately fixed to the solidified concrete structure. In this way, as the hydraulic cylinder 6 is extended and retracted, the load-bearing frame 3 and the guide rail 7 provide each other with ascending support, so that the climbing formwork can be gradually climbed. While the concrete structure is being formed, the concrete structure embedded parts 11 are transferred from the template 9. After the concrete structure is solidified, the wall attachment device 10 is installed on the exposed concrete structure embedded parts 11 to form a combination. The load-bearing frame 3 and the guide rail 7 are hung with the combination of the concrete structure embedded parts 11 and the wall attachment device 10 through the self-carrying hanging structure, so as to achieve the fixation of the load-bearing frame 3, the guide rail 7 and the solidified concrete structure. The climbing of the climbing formwork is controlled by the electric control hydraulic system. When the piston rod of the hydraulic cylinder 6 is extended, the guide rail 7 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the guide rail 7 provides support from below to ensure that the extended piston rod of the hydraulic cylinder 6 pushes the climbing formwork away from the original wall attachment device 10 and lifts it to the wall attachment device 10 of the upper layer. When the piston rod of the hydraulic cylinder 6 is retracted by the electric control hydraulic system, the load-bearing frame 3 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the load-bearing frame 3 provides support from above to ensure that the retracted hydraulic cylinder 6 pulls up the guide rail 7, away from the original wall attachment device 10, and reaches the wall attachment device 10 of the upper layer. The reversing box 8, the embedded concrete structure parts 11, and the wall attachment device 10 are all prior art. A climbing formwork is provided on each face of each limb of the tower column 1, and the size of each climbing formwork varies according to the size of the corresponding face of the tower column 1. Different from the embodiment 1, the climbing formworks on the inner and outer faces of the tower column 1 in this embodiment are all equipped with curved steel formworks 8, and the climbing formworks on the other faces are only equipped with templates 9 because the corresponding faces are planes.
[0034] The construction method for pouring the A-type tower column of the cable-stayed bridge includes the following steps: Formulate a construction plan, divide the tower column into 19 sections and perform casting construction section by section, wherein the bending part is located at the third section, and the cross beam 2 of the tower column 1 is located at the tenth section; Set up temporary supports and pour the first section of concrete structure at the tower column base; C. Using the first concrete structure as support to install the climbing formwork, and using the climbing formwork and the formwork 9 thereon to cast the second concrete structure; D. Remove the climbing formwork and hoist it as a whole onto the solidified second section concrete structure with a crane and install it, start the climbing formwork motor 504 on the inner and outer sides of the tower column 1, rotate the turntable 505, exchange the positions of the bending steel formwork 8 and the template 9, activate the bending steel formwork 8, and cooperate with the climbing formworks on the other sides to implement the pouring of the third section concrete structure; E. After the climbing formwork on each surface is removed, it is hoisted to the solidified third section concrete structure and fixed, the bending steel formwork 8 and the template 9 are interchanged again, and the fourth section concrete structure is poured; an upper truss is added on the top of the main platform 5; F. After the climbing formwork is removed, it is hoisted onto the solidified fourth section concrete structure and fixed, and the fifth section concrete structure is poured; the climbing formwork is also installed on the inner side of the fourth section of the tower column 1; the guide rail 7 is installed, and the hanging platform 4 slidably connected to the guide rail 7 is installed at the bottom of the load-bearing frame 3; G. Driven by the hydraulic cylinder 6, the load-bearing frame 3 and the guide rail 7 support each other and climb alternately, and the subsequent sixth to tenth sections of concrete structure are poured in sections from bottom to top. During pouring, the translation device 5 pushes the template 9 to close the mold, and the template 9 is demolded after the concrete structure is solidified; before closing the mold, the template is cleaned and a release agent is applied; H. Complete the pouring construction of the upper beam 2 of the tenth section concrete structure; I. Starting from the eleventh section, the two limbs are cast in staggered sections; starting from the sixteenth section, the climbing formwork on the inner side of the tower column 1 is removed, and the construction of the inner side of the tower column 1 is completed with the help of the climbing formwork on the adjacent surface; J. After completing the overall construction of tower column 1, remove all equipment installed on the concrete structure.
[0035] When implementing the above steps, from the first section to the tenth section of the tower column 1, the casting of each surface of the two limbs of the tower column is carried out simultaneously; starting from the eleventh section, since the inner space of the two limbs of the tower column 1 becomes smaller as it approaches the closing part of the two limbs of the tower column 1, the casting of the two limbs is staggered; starting from the sixteenth section, after removing the climbing formwork on the inner side surface of the tower column 1, an inner formwork and a matching force-adding device are added on the adjacent surface, that is, between the climbing formworks on the front and rear end surfaces of the tower column 1, to complete the construction of the inner side surface of the tower column 1.
[0036] A flap is provided at the gap between the main platform 5 and the hanging platform 4 and the concrete structure wall. When the load-bearing frame 3 is lifted, the flap is turned up, and when the load-bearing frame 3 is lifted into place, the flap is lowered. The periphery of the main platform 5 and the hanging platform 4 is provided with a perforated steel plate mesh.
[0037] Embodiment 3: like Figures 1 to 9As shown, a method for casting a type A tower column of a cable-stayed bridge is shown, wherein the tower column 1 has two limbs, which gradually approach each other from bottom to top and close together at the top to form a tower spire, and the two limbs are provided with a curved portion near the base, and two cross beams 2 are connected between the two limbs, one cross beam 2 is located slightly above the curved portion, and the other cross beam 2 is located in the middle and upper part of the tower column 1. The construction equipment used in the method for casting a type A tower column of a cable-stayed bridge includes a climbing formwork and a guide rail 7, and the climbing formwork includes a load-bearing frame 3 and a main platform 5. The load-bearing frame 3 is a frame composed of a pair of tripods, a pair of load-bearing frame lower beams and a pair of load-bearing frame longitudinal connecting rods, and the tripod is composed of a load-bearing frame upper beam 301, a load-bearing frame upright 302 and a load-bearing frame diagonal brace 303. The main platform 5 includes a bottom frame, a translation joist 501, a translation back rib 502 and a translation diagonal brace 503. The bottom frame is fixed to the top of the upper beam 301 of the load-bearing frame through a connecting column, and a gap is left between the bottom frame and the upper beam 301 of the load-bearing frame. The bottom end of the translation back rib 502 is fixed to the translation joist 501, one end of the translation diagonal brace 503 is connected to the translation joist 501, and the other end is connected to the translation back rib 502. The translation back rib 502 is connected to a template 9 through a support, and the working surface of the template 9 is a plane. There are two translation joists 501, two translation back ribs 502 and two translation diagonal braces 503, forming two parallel tripods similar to the load-bearing frame 3, and the two tripods are connected by multiple connecting rods to form a template support. A translation device that can push the template support to translate is provided in the gap between the bottom frame and the upper beam 301 of the load-bearing frame. The translation device includes a device support, a gear, a rack and a driving motor. The device support is connected between the two upper beams 301 of the load-bearing frame. The gear is rotatably connected to the device support and driven by the driving motor. The rack is fixed on a slide. The slide is slidably connected to the device support through a slide rail. The rack meshes with the gear. The template support is driven by the slide. A hydraulic cylinder 6 is provided on the load-bearing frame 3. The piston rod of the hydraulic cylinder 6 is connected to the upper beam 301 of the load-bearing frame 3. The structural composition of the above-mentioned climbing formwork belongs to the prior art. On this basis, a motor 504 is installed on the slide. The motor 504 is a hydraulic motor. The output end of the motor 504 is connected to a turntable 505. The bottom center of the turntable 505 is provided with a central shaft keyed to the output end of the motor. A sleeve is provided outside the central shaft. The central shaft is rotatably connected in the sleeve. A slide groove is provided on the bottom frame. The sleeve is adapted to slide and connect in the slide groove. A template support is provided at each end of the turntable. A template 9 is installed on one template support, and a bending steel mold 8 is installed on the other template support. The bending steel mold 8 has a curved surface matching the curved portion of the tower column 1.
[0038] At a lower height, the climbing formwork is hoisted by a crane to rise to a higher height. When the tower column 1 is cast to a higher height, the guide rail 7 is introduced. The cylinder body of the hydraulic cylinder 6 is connected to the guide rail 7 through the reversing box 8. The load-bearing frame 3 and the guide rail 7 are alternately fixed to the solidified concrete structure. In this way, as the hydraulic cylinder 6 is extended and retracted, the load-bearing frame 3 and the guide rail 7 provide each other with ascending support, so that the climbing formwork can be gradually climbed. While the concrete structure is being formed, the concrete structure embedded parts 11 are transferred from the template 9. After the concrete structure is solidified, the wall attachment device 10 is installed on the exposed concrete structure embedded parts 11 to form a combination. The load-bearing frame 3 and the guide rail 7 are hung with the combination of the concrete structure embedded parts 11 and the wall attachment device 10 through the self-carrying hanging structure, so as to achieve the fixation of the load-bearing frame 3, the guide rail 7 and the solidified concrete structure. The climbing of the climbing formwork is controlled by the electric control hydraulic system. When the piston rod of the hydraulic cylinder 6 is extended, the guide rail 7 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the guide rail 7 provides support from below to ensure that the extended piston rod of the hydraulic cylinder 6 pushes the climbing formwork away from the original wall attachment device 10 and lifts it to the wall attachment device 10 of the upper layer. When the piston rod of the hydraulic cylinder 6 is retracted by the electric control hydraulic system, the load-bearing frame 3 remains connected to the wall attachment device 10 on the solidified concrete structure. At this time, the load-bearing frame 3 provides support from above to ensure that the retracted hydraulic cylinder 6 pulls up the guide rail 7, away from the original wall attachment device 10, and reaches the wall attachment device 10 of the upper layer. The reversing box 8, the embedded concrete structure parts 11, and the wall attachment device 10 are all prior art. A climbing formwork is provided on each face of each limb of the tower column 1, and the size of each climbing formwork varies according to the size of the corresponding faces of the tower column 1. Only the climbing formwork on the outer face of the tower column 1 is equipped with a bent steel formwork 8, and the climbing formwork on the other faces is only equipped with a template 9 because the corresponding faces are flat.
[0039] The construction method for pouring the A-type tower column of the cable-stayed bridge includes the following steps: Formulate a construction plan, divide the tower column into 19 sections and perform casting construction section by section, the curved portion and the cross beam 2 on the lower position of the tower column 1 are both located in the third section, and the cross beam 2 on the upper position of the tower column 1 is located in the tenth section; Set up temporary supports and pour the first section of concrete structure at the tower column base; C. Using the first concrete structure as support to install the climbing formwork, and using the climbing formwork and the formwork 9 thereon to cast the second concrete structure; D. Remove the climbing formwork and hoist the climbing formwork as a whole onto the solidified second section concrete structure with a crane and install and fix it, start the climbing formwork motor 504 on the outer side of the tower column 1, rotate the turntable 505, exchange the positions of the bending steel formwork 8 and the formwork 9, activate the bending steel formwork 8, and cooperate with the climbing formworks on the other surfaces to implement the pouring of the third section concrete structure; E. Complete the pouring construction of the upper beam 2 of the third section concrete structure; F. Set up a temporary support again on the beam 2 for pouring the inner side of the fourth section of the tower column 1; remove the climbing formwork on the other surfaces and lift it to the solidified third section concrete structure and fix it; swap the positions of the bent steel formwork 8 and the formwork 9 again to pour the fourth section concrete structure; add an upper truss on the top of the main platform 5; G. After the climbing formwork is removed, it is hoisted onto the solidified fourth section concrete structure and fixed, and the fifth section concrete structure is poured; the climbing formwork is also installed on the inner side of the fourth section of the tower column 1; the guide rail 7 is installed, and the hanging platform 4 slidably connected to the guide rail 7 is installed at the bottom of the load-bearing frame 3; H. Driven by the hydraulic cylinder 6, the load-bearing frame 3 and the guide rail 7 support each other and climb alternately, and the subsequent sixth to tenth sections of concrete structure are poured in sections from bottom to top. During pouring, the translation device 5 pushes the template 9 to close the mold, and the template 9 is demolded after the concrete structure is solidified; before closing the mold, the template is cleaned and a release agent is applied; I. Complete the pouring construction of the upper beam 2 of the tenth section concrete structure; J. Starting from the eleventh section, the two limbs are cast in staggered sections; different from Example 1, starting from the sixteenth section, the construction of one limb is suspended, and after the construction of the other limb is completed, the climbing formwork on the inner side of the two limbs is first removed, and a temporary bracket is installed on the inner side of the completed limb to be used for casting the inner side of the unfinished limb; the construction of the unfinished limb is continued; K. After the overall pouring of tower column 1 is completed, all equipment installed on the concrete structure is removed.
[0040] When implementing the above steps, from the first section to the tenth section of the tower column 1, the casting of each surface of the two limbs of the tower column is carried out simultaneously; starting from the eleventh section, since the inner space of the two limbs of the tower column 1 becomes smaller as it approaches the closing part of the two limbs of the tower column 1, the casting of the two limbs is staggered; starting from the sixteenth section, after removing the climbing formwork on the inner side surface of the tower column 1, an inner formwork and a matching force-adding device are added on the adjacent surface, that is, between the climbing formworks on the front and rear end surfaces of the tower column 1, to complete the construction of the inner side surface of the tower column 1.
[0041] A flap is provided at the gap between the main platform 5 and the hanging platform 4 and the concrete structure wall. When the load-bearing frame 3 is lifted, the flap is turned up, and when the load-bearing frame 3 is lifted into place, the flap is lowered. The periphery of the main platform 5 and the hanging platform 4 is provided with a perforated steel plate mesh.
Claims
1. A method for casting a type A tower column of a cable-stayed bridge, characterized in that: The following steps are involved: A. Cast the first section of concrete structure at the base of the tower column; B. The climbing formwork is installed with the first section of concrete structure as support, and a translation device, a formwork and a bending steel formwork that can be replaced with the formwork are provided on the climbing formwork; C. Install the guide rail on the solidified concrete structure; D. The load-bearing frame and the guide rail support each other and climb alternately, and the subsequent concrete structure is poured in sections from bottom to top. During pouring, the translation device pushes the template to close the mold, and the template is demoulded after the concrete structure is solidified; E. Remove all equipment on the concrete structure.
2. The method for casting a type A tower column of a cable-stayed bridge according to claim 1 is characterized in that: The climbing formwork includes a load-bearing frame and a main platform. The main platform is located on the top of the load-bearing frame. A hydraulic cylinder is provided on the load-bearing frame. The piston rod of the hydraulic cylinder is connected to the load-bearing frame. The cylinder body of the hydraulic cylinder is connected to the guide rail. The load-bearing frame and the guide rail are alternately fixed to the solidified concrete structure.
3. The method for casting a type A tower column of a cable-stayed bridge according to claim 1 is characterized in that: In step B, the bending steel mold and the template are respectively installed at the two ends of a turntable, and the center of the bottom of the turntable is connected to the output end of a motor. The motor is fixed on the translation device. When pouring the straight surface of the tower column, the template is activated to cast the concrete structure; when pouring the curved surface of the tower column, the turntable is rotated, the position of the bending steel mold and the template is exchanged, and the bending steel mold is activated to cast the concrete structure.
4. The method for casting the A-type tower column of a cable-stayed bridge according to claim 3 is characterized in that: The motor is a hydraulic motor.
5. The method for casting and constructing a cable-stayed bridge A-type tower according to claim 1 is characterized in that: The tower column is provided with a load-bearing frame and a main platform on each side, and a translation device and a template are installed on the main platform.
6. The method for casting and constructing a cable-stayed bridge A-type tower according to claim 5 is characterized in that: When approaching the part where the two limbs of the tower column are joined, the pouring of the inner side of the two limbs of the tower column is staggered.
7. The method for casting and constructing a cable-stayed bridge A-type tower according to claim 1, characterized in that: Clean the template before closing the mold and apply mold release agent.
8. The method for casting and constructing a cable-stayed bridge A-type tower according to claim 1, characterized in that: When implementing step A, set up temporary scaffolding.
9. The method for casting a type A tower column of a cable-stayed bridge according to any one of claims 1 to 8, characterized in that A flap is provided at the gap between the main platform and the hanging platform and the concrete structure wall. When the load-bearing frame is lifted, the flap is flipped up, and when the load-bearing frame is lifted into place, the flap is put down.
10. The method for casting and constructing a type A tower column of a cable-stayed bridge according to any one of claims 1 to 8, characterized in that: The peripheries of the main platform and the hanging platform are provided with perforated steel plate meshes.