The utility model provides a novel ship lock cutoff wall structure suitable for
pebble foundation, which comprises a row
pile foundation structure and a cutoff wall structure which are arranged on the outer side of an approach channel, the cutoff wall structure is arranged at the top of the row
pile foundation structure, and the row
pile foundation structure comprises a plurality of row piles which are arranged side by side along the extension direction of a ship lock. The cutoff wall structure comprises a breast wall extending in the extending direction of the ship lock and a cutoff wall, the breast wall is connected to the tops of the row piles, and the cutoff wall is connected to the breast wall. Therefore, approach channel buildings can be conveniently arranged on a non-rock foundation, construction is convenient and efficient, a bearing platform structure does not need to be arranged at the bottom of an approach channel, the seepage prevention problem of a
pebble foundation in the bearing platform construction period does not need to be considered,
dry land construction conditions needed by a conventional gravity type structure can be avoided through the row piles, the
cofferdam construction cost can be greatly reduced, and the construction period is shortened. Meanwhile, if an anti-collision
fender can be arranged on the waterproof wall within the bridge
pier range, the anti-collision
fender also serves as an anti-collision structure, the number of anti-collision
pier structures needed for bridge anti-collision can be reduced, and the construction cost is saved.