Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

53results about How to "Convenient and efficient construction" patented technology

Formwork embedded type dam face permanent heat preservation protection module and prefabrication and construction method

The invention discloses a template embedded type dam face permanent heat preservation protection module and a prefabrication and construction method. Comprising a heat preservation core layer, a facing anti-seepage protection layer is arranged on the side, close to a concrete pouring formwork, of the heat preservation core layer, an internal pressure-bearing protection layer is arranged on the side, close to dam surface layer crack limiting steel bars, of the heat preservation core layer, and a thermal broken bridge supporting keel is arranged in the heat preservation core layer; an anchoring device is arranged in the area between the internal pressure-bearing protection layer and the dam surface layer crack limiting steel bars. The modular prefabrication and construction method is adopted, the prefabrication and installation method of a single module is simple and efficient, details such as anchoring protection measures are fully considered, the engineering construction operability is high, convenience and high efficiency are achieved, and the construction time of the heat preservation layer is greatly saved.
Owner:YICHANG TIANYU TECH CO LTD

High-voltage connector for new energy storage

The utility model provides a high-voltage connector for new energy storage, which comprises a plug shell, a conductive plug bush, a plug end assembly, a cable locking assembly and a lock catch assembly, the plug end assembly comprises an anti-contact finger element, a sealing gasket and a sealing pressing block, and the cable locking assembly comprises a locking ring, a plug and a locking nut. The connector is provided with the anti-contact finger element, so that fingers of an operator are prevented from being inserted into the conductive plug bush by mistake during assembly; a creepage groove is arranged, so that an enough electrical safety distance is ensured, and the voltage withstanding grade, the safety and the reliability of the connector are improved; a plurality of sealing, limiting and locking matching structures are arranged, so that the waterproof and dustproof performance and the assembly precision of the connector are improved, the assembly firmness is enhanced, and parts are prevented from falling off; the sealing pressing block is in damping fit with the first sleeve part, and when the plug and the socket are connected and are not locked, the sealing pressing block can still rotate, so that the direction of the connector is convenient to adjust, the assembly flexibility is improved, the construction process is more convenient and efficient, and the connector is suitable for more application scenes.
Owner:NIU POWER SUZHOU CORP

Steel-concrete column and prestressed steel-concrete beam large-span frame structure

The invention discloses a steel-concrete column and prestressed steel-concrete beam large-span frame structure which is characterized in that a prefabricated column is arranged, the prefabricated column is made of a steel pipe-steel reinforced concrete column, the prefabricated column is composed of a cross beam section and a vertical section, the cross beam section comprises a column framework and an outer flange, and concrete is poured for forming; the prefabricated prestressed beam comprises a beam framework and an inner flange, the prefabricated column and the prefabricated beam are connected through a flange plate and a high-strength bolt, a PVC corrugated pipe is arranged in the column beam, and the prestressed tendon has various structural forms. Connection is reliable and stable, and structural integrity is guaranteed; in a large-span building, the structure can effectively solve the problems of self weight and crack resistance of a traditional reinforced concrete structure and the problem of high cost of the traditional reinforced concrete structure, can meet the requirements of the large-span building for the space without stand columns and the beam column bearing capacity, and has wide application prospects.
Owner:NORTHEASTERN UNIV CHINA

Reinforcing structure for cracking of tower pile foundation

The utility model discloses a tower pile foundation cracking reinforcing structure which comprises a plurality of reinforcing hoops which are arranged at intervals from top to bottom along the outer surface of an original foundation. A steel sleeve is arranged on the periphery of the reinforcing hoop, and a steel reinforcement framework, a steel reinforcement mesh and shear keys are arranged between the inner surface of the steel sleeve and the outer surface of the original foundation. The reinforcing tower base plate is installed on the periphery of an original foundation tower base plate, a plurality of foundation bolt holes are formed in the edge of the upper surface of the reinforcing tower base plate at intervals, and foundation bolts penetrate through the foundation bolt holes to downwards stretch into the space between the inner surface of the steel sleeve and the outer surface of an original foundation. Concrete is filled between the inner surface of the steel sleeve and the outer surface of the original foundation; under the condition that an original foundation and an upper power transmission tower structure are not dismantled, risks and hidden dangers caused by foundation cracking are eliminated, the reinforcing structure can bear loads transmitted by the upper structure, the bearing capacity of the reinforced foundation is improved, meanwhile, construction is convenient, and cost is effectively saved.
Owner:CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP

Building external wall thermal insulation structure easy to disassemble and assemble

The invention discloses a building external wall heat preservation structure easy to disassemble and assemble, and belongs to the technical field of building external wall heat preservation, the building external wall heat preservation structure easy to disassemble and assemble comprises a mounting plate, a heat preservation plate is mounted in the mounting plate, a setting assembly is arranged in the mounting plate, a locking and adjusting assembly is arranged at one end of the mounting plate, and a disassembly assisting assembly is arranged in the mounting plate; the peripheral side faces of the heat preservation plate are tightly pressed through expansion of the setting assemblies, so that the heat preservation plate is rapidly installed in the installation plate, meanwhile, a gap between the heat preservation plate and the installation plate is blocked, the construction efficiency is improved, the requirement for the size precision of the heat preservation plate is effectively lowered, and the construction cost is reduced. The expansion state of the setting assembly is locked through the arranged locking and adjusting assembly, meanwhile, the expansion degree of the setting assembly can be adjusted through the arranged locking and adjusting assembly, a good expansion sealing effect can be achieved for heat preservation plates with different thicknesses, the heat preservation plates can be automatically disassembled through the arranged disassembly assisting assembly, and the disassembly efficiency is improved. And the insulation board is more convenient and labor-saving to disassemble.
Owner:YUN COUNTY JINGE ENG CONSTR CO LTD

Integrated anti-vibration pad track plate system

The utility model relates to the technical field of rail transit, and discloses an integrated anti-vibration pad rail plate system, which comprises a concrete base, a rail plate, an anti-vibration pad, an anti-vibration pad and an anti-vibration pad, vibration reduction mechanisms are further arranged in the gap between the track plate and the concrete base and the gap between the track plate and the boss. According to the integrated anti-vibration pad track board system, the integrated anti-vibration pad is prefabricated or cast on site, the procedures of anti-vibration pad pasting and laying, mortar adjusting layer pouring, boss resin pouring and the like are replaced, and construction is more convenient and efficient; the device can be designed according to different track plate structure types and heights, the structure is simple, and good line adaptability is achieved; compared with a traditional elastic pad, the integrated anti-vibration pad is good in integrality, accurate in positioning and good in autohension, the phenomenon that the integrated anti-vibration pad falls off from the track plate after being used for a high frequency is avoided, and the using effect is remarkably improved.
Owner:GUANGZHOU ZHENNING TRANSPORTATION TECH CO LTD +3

Hidden steel cover beam and hidden telescopic device combined structure

The utility model relates to a combined structure of an implicit steel cover beam and an implicit telescopic device structure. The combined structure comprises an implicit cover beam (10), a main beam bracket (20), a support system (30), a limiting device (40) and an implicit telescopic device (50). The longitudinal bridge direction of the hidden cover beam (10) is consistent with the line shape of the main beam, the main beam is slotted to form two symmetrical main beam brackets (20), and the main beam brackets (20) are lapped on the hidden cover beam (10). And the main beam bracket (20) is limited by a limiting device (40). And the brackets are connected through hidden telescopic devices (50). The device is suitable for urban steel structure bridges, and effectively solves the problems that an existing bent cap is poor in attractiveness and economical efficiency, and an existing expansion joint structure is exposed on a bridge floor and poor in comfort.
Owner:POWER CHINA KUNMING ENG CORP LTD

Stiff column type steel framework splicing structure

The utility model discloses a stiff column type steel framework splicing structure which comprises a lower section type steel framework fixed on a foundation plane and an upper section type steel framework installed above the lower section type steel framework, an installation groove is formed in the top of the lower section type steel framework, and a deviation rectifying connecting assembly is arranged in the installation groove. The upper section steel framework is fixedly connected with the lower section steel framework after being rectified and positioned by the rectifying connecting component; the deviation rectifying connecting assembly is arranged between the upper section steel framework and the lower section steel framework, the supporting height of the deviation rectifying connecting assembly is adjusted through a middle double-thread screw, deviation is adjusted through peripheral adjusting screws, and the upper section steel framework can be assembled and positioned through the embedded connection mode of a cross-shaped positioning groove and cross-shaped steel; the whole construction process does not need to be assisted by jack equipment, accurate fine adjustment can be achieved through thread screwing adjustment, construction is efficient, simple and convenient, and deviation rectifying operation is easy.
Owner:CSCEC STRAIT CONSTR & DEV

Foundation-fixing anti-seepage pad for railway ballast track, track bed structure and reinforcing and repairing method

The invention discloses a foundation fixing anti-seepage pad for reinforcing and repairing a railway ballast track, a ballast bed structure and a ballast bed reinforcing and repairing method. The foundation fixing anti-seepage pad is of a micro-arch structure with the middle higher than the two sides in the track direction and comprises a bottom surface anti-seepage layer, a middle grid layer and a surface protection layer, and the bottom surface anti-seepage layer and the surface protection layer are compounded on the lower surface and the upper surface of the middle grid layer through a binding agent. And the middle grid layer is a fiber reinforced composite material grid. The foundation-fixing anti-seepage pad provided by the invention is combined with the actual condition of a railway, integrates reinforcement and seepage prevention, has better mechanical properties, high elongation and excellent long-term corrosion resistance, fatigue resistance and seepage resistance, has a stronger horizontal constraint effect on ballast particles, can obviously enhance the bearing capacity of a ballast layer, effectively slows down settlement, reduces the problems of frost boiling and the like, and has a good application prospect. The repair frequency is reduced, and reliable guarantee is provided for the safety and the stability of a railway system.
Owner:JIANGSU LVCAIGU NEW MATERIAL TECH DEV CO LTD

Dividing wall framework for building

The utility model relates to the technical field of dividing walls, and discloses a dividing wall framework for a building, which comprises a keel framework, a plurality of assembly plates are arranged on the keel framework, a plurality of auxiliary fixing structures are arranged on the keel framework, each assembly plate is mounted on the keel framework through four auxiliary fixing structures, and the assembling plates are arranged on the keel framework. The auxiliary fixing structure comprises a fixing plate, an angle plate, a connecting block and two connecting structures, the fixing plate is fixed to the keel framework, the angle plate and the connecting block are both arranged on the keel framework in a sliding mode, the connecting block and the fixing plate are connected through one connecting structure, and the two connecting structures are connected through the other connecting structure. And the angle plate is connected with the connecting block through another connecting structure. Through structural fixation of the angle plates and the connecting blocks, the installation process is simplified, the assembly plate is directly fixed to the main structure through the bolts, complex installation steps are omitted, and construction time and labor intensity are greatly reduced.
Owner:HUBEI QIANCHI LABOR SERVICE CO LTD

Ribbed floor formwork

The invention relates to the technical field of dense rib floor assembly, and discloses a dense rib floor formwork which comprises two side formworks. The extension piece is arranged between the two side modules, and the side modules and the extension piece are spliced to form a hollow structure with a containing cavity; and the first clamping part and the second clamping part are arranged at the splicing position of the side module and the extension piece, are arranged on the inner surface facing the containing cavity, and are mutually clamped and fixed in the splicing direction parallel to and perpendicular to the side module and the extension piece at the same time. According to the multi-ribbed floor formwork, the first clamping part and the second clamping part are mutually clamped and fixed in the direction parallel to and perpendicular to the splicing direction, so that the overall structure of the formwork is firm, large pressure and impact force can be borne in the construction process, and the formwork is not prone to deformation and damage; the clamping fixing mode does not need to use complex connecting tools and tedious installation steps, and the construction efficiency is greatly improved.
Owner:CHINA CONSTR SCI & IND CORP LTD

A rainproof device for concrete roof air pipe

ActiveCN224692993Ukeep tidyImprove rain resistanceInsulation layerFloor slab
The utility model discloses a kind of concrete roofing air pipe rainproof devices, solve the problem of rain leakage of air pipe through concrete roofing.The device includes air pipe rainproof device, indoor air pipe, outdoor air pipe, air pipe support, concrete roofing air pipe hole, roofing floor, roofing insulation layer, roofing waterproof layer, roofing hole flanging and cement mortar;Air pipe rainproof device is composed of indoor and outdoor connecting air pipe and rain cover, indoor and outdoor connecting air pipe two ends are connected indoor, outdoor air pipe respectively through air pipe flange, and fixed by air pipe support and roofing hole flanging;Rain cover contains hem, skirt, vertical edge and middle support column, can be enclosed rainproof space and cover hole flanging, hole gap is blocked with non-combustible material.The device is adapted to rectangle / circle, heat preservation / cold preservation / non-heat preservation metal air pipe, rainproof effect is remarkable, structure is stable and durable, construction is convenient, can guarantee indoor environment and ventilation system safe operation.
Owner:JIANGSU CHINA NUCLEAR IND HUAWEI ENGDESIGN & RES

Simple air tightness inspection device

A simple air tightness inspection device belongs to the field of air tightness inspection devices and is characterized by comprising a support and a head cover. The head cover is hung on the bracket through a hanging rod; a control unit and a spraying unit are arranged on the head cover; the control unit comprises a control module, a power supply module, a voice broadcast module, an alarm module and a monitoring module; the distribution unit comprises a reagent bottle; a spraying and atomizing device is arranged at a bottle opening of the reagent bottle; the spray atomization device, the voice broadcast module, the alarm module and the monitoring module are all arranged in the head cover. The outdoor air tightness inspection device can be conveniently and efficiently built through the support and the head cover, meanwhile, the control unit and the distribution unit are arranged in the head cover, air tightness inspection agent spraying control is conducted, entering personnel are monitored, corresponding information such as voice broadcast and sound-light alarm is provided, the structure is simple, outdoor rapid building is facilitated, operation is easy, and the practicability is high. And the device is suitable for popularization and application.
Owner:CHINESE PEOPLES LIBERATION ARMY KET FORCE SERGEANT SCHOOL

Novel ship lock cutoff wall structure suitable for pebble foundation

The utility model provides a novel ship lock cutoff wall structure suitable for pebble foundation, which comprises a row pile foundation structure and a cutoff wall structure which are arranged on the outer side of an approach channel, the cutoff wall structure is arranged at the top of the row pile foundation structure, and the row pile foundation structure comprises a plurality of row piles which are arranged side by side along the extension direction of a ship lock. The cutoff wall structure comprises a breast wall extending in the extending direction of the ship lock and a cutoff wall, the breast wall is connected to the tops of the row piles, and the cutoff wall is connected to the breast wall. Therefore, approach channel buildings can be conveniently arranged on a non-rock foundation, construction is convenient and efficient, a bearing platform structure does not need to be arranged at the bottom of an approach channel, the seepage prevention problem of a pebble foundation in the bearing platform construction period does not need to be considered, dry land construction conditions needed by a conventional gravity type structure can be avoided through the row piles, the cofferdam construction cost can be greatly reduced, and the construction period is shortened. Meanwhile, if an anti-collision fender can be arranged on the waterproof wall within the bridge pier range, the anti-collision fender also serves as an anti-collision structure, the number of anti-collision pier structures needed for bridge anti-collision can be reduced, and the construction cost is saved.
Owner:HUNAN PROVINCIAL WATER TRANSPORTATION CONSTR & INVESTMENT GRP CO LTD +1

Prefabricated moulding bed split mounting type supporting system

The utility model discloses a prefabricated moulding bed assembling type supporting system, and belongs to the field of construction equipment. The device comprises a transverse batten, a vertical batten and an adjustable assembly. The transverse battens are fixed at different heights of the inner wall of the prefabricated moulding bed in the circumferential direction, the vertical battens are arranged on the two opposite side walls of the prefabricated moulding bed in pairs, and each pair of vertical battens abut against the transverse battens through an adjustable assembly so as to be fixed; the adjustable assembly is of a length-adjustable horizontal straight rod structure and comprises an adjustable top support, a supporting side rod and a supporting middle rod. The adjacent adjustable assemblies which are perpendicularly intersected are fixed through vertical connecting long bolts. The sizing device is researched and developed for prefabricated moulding bed construction of the bearing platform, the bearing platforms of different sizes can be mounted in an assembled mode through length adjustment of the adjustable assemblies, construction is simple and efficient, and the sizing device can be repeatedly used.
Owner:ZHONGTIAN CONSTR GROUP

Secondary anti-blocking drainage groove structure located below ceramic tile in toilet

The utility model discloses a secondary anti-blocking drainage channel structure below ceramic tiles in a toilet, which belongs to the technical field of buildings and is characterized in that a drainage channel is arranged on a backfill layer of the toilet, the cross section of the drainage channel is V-shaped, and one end of the drainage channel is communicated with a drainage pipe. The utility model is used for solving the problem of water accumulation on the floor surface ceramic tile layer and the backfill layer of the toilet, improving the drainage efficiency of the backfill layer of the toilet, and avoiding the problems of overflow of accumulated water on the backfill layer and ozone generated by the accumulated water.
Owner:HUNAN FUMINLE BUILDING MATERIALS TECH DEV CO LTD

Offshore wind turbine large-diameter steel pipe pile pumping solidified soil scouring protection construction method

The invention relates to an offshore wind turbine large-diameter steel pipe pile pumping solidified soil scouring protection construction method which is characterized in that flow state solidified soil can be pumped at different positions in a flushing pit through a flow state solidified soil symmetrical pumping device fixed to a steel pipe pile, intelligent construction of flow state solidified soil pumping is achieved, and the construction efficiency of flow state solidified soil pumping is improved; a layered flexible reinforcement sinking device is adopted, automatic unhooking of a lifting rope is achieved by controlling a telescopic rod of an oil cylinder, sinking construction of a geogrid is completed through net bag gravel, the layered flexible reinforcement effect of flow-state solidified soil is achieved, and meanwhile the erosion protection effect of the solidified soil is improved; according to the combined sand blowing bag-solidified soil retainer combined protection technology, the solidified soil retainer is formed in the mode that bagged solidified soil is thrown and filled in combination with solidified soil pumping, the good anti-scouring effect is achieved, and construction is convenient and efficient.
Owner:ZHEJIANG SHIRUN JIANCHUANG TECH DEV CO LTD +1

Net rack outer wrapping steel pipe welding type reinforcing structure

The utility model relates to the technical field of steel structure reinforcing, in particular to a welded reinforcing structure for a steel pipe wrapped outside a net rack, which comprises a newly added outer pipe formed by splicing two semicircular pipes, and the two semicircular pipes are welded and fixed into an integral structure; the newly-added outer pipe is arranged on the periphery of the existing steel pipe in a sleeved mode, a certain gap is reserved between the newly-added outer pipe and the existing steel pipe, and filling materials are poured into the gap. The steel pipe reinforcing device has the advantages that the existing steel pipe is effectively reinforced without damage, and the existing steel roof truss structure is not influenced; the structure is simple and reasonable, the prefabrication degree is high, construction is convenient and efficient, rapid construction can be achieved in the skylight operation period, uninterrupted operation is ensured, and the method is suitable for popularization.
Owner:CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD

Tunnel sleeve arch structure

The utility model provides a tunnel cover arch structure, including inside arch support structure, intermediate arch support subassembly, outside arch support structure and be used for the hole mouth pipe subassembly of setting up pipe shed, inside arch support structure erects in the outside of open cut lining structure, outside arch support structure erects in the outside of inside arch support structure, inside arch support structure and outside arch support structure are connected, the hole mouth pipe subassembly is connected in the outer wall of outside arch support structure, the outer wall of inside arch support structure forms has the first placement slot of the intermediate arch support subassembly placement, the inner wall of outside arch support structure forms has the second placement slot of the intermediate arch support subassembly placement, second placement slot and first placement slot one to one correspondence arrangement, the intermediate arch support subassembly places between first placement slot and second placement slot. The present application has the advantages of convenient and efficient construction, steel can be recycled, greatly reduces the loss.
Owner:HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD

Post-cast strip supporting device

The utility model discloses a post-cast strip supporting device, and mainly relates to the field of post-cast strip supporting. Comprising a plurality of supporting columns arranged below a poured layer, main cross beams and secondary cross beams are arranged at the bottom of the poured layer, supporting rods are arranged between the adjacent supporting columns, a supporting beam is arranged below the poured layer, the bottom of the supporting beam is connected with the supporting rods at the same time, and a plurality of supporting plates making contact with the bottom of the poured layer are arranged on the supporting beam. The supporting plates extend to the edge, close to the post-cast strip layer, of the cast layer, and reinforcing rib plates are arranged between the ends of the supporting plates and the supporting beams. The post-cast strip supporting structure has the advantages that the technical problem that an existing post-cast strip supporting structure needs to be dismantled in the closed pouring process, and consequently potential safety hazards are generated can be solved, the post-cast strip supporting structure does not need to be dismantled in the construction joint cleaning process, and excessive space at the bottom is not occupied; interference on transportation of vehicles or materials is avoided, and effective supporting on the post-cast strip is kept all the time.
Owner:SHANDONG SANJIAN CONSTR ENG +1

Inward-transmission capillary crystalline waterproof coating as well as preparation method and application thereof

ActiveCN118978821AEfficient fillingExcellent penetration and crystallization propertiesCement coatingsActive agentSuperplasticizer
The invention provides an internal transmission capillary crystalline waterproof coating as well as a preparation method and application thereof. The coating is prepared from a cement base material, quartz sand, an active chemical substance, a polymer emulsion, a crystallization accelerant, a polycarboxylate superplasticizer, a nano penetrant and an organic silicon defoaming agent. The crystallization accelerant is composed of polyelectrolyte emulsion, a surfactant and alkali metal salt according to a specific mass ratio, and the nano penetrant is a nano material with the particle size smaller than 100 nm. The preparation method of the coating comprises the steps of dry material mixing, premix preparation, defoaming treatment and homogenization, and uniformity and stability of the coating are ensured. By optimizing the components and the process, an effective crystal structure is more favorably formed, and the coating has excellent impermeability and durability, is suitable for waterproof layer construction of buildings, effectively improves the waterproof performance of the buildings and prolongs the service life of the buildings.
Owner:HUNAN CHENGYOUSHU QIANJING WATERPROOF MATERIALS CO LTD

Graphene anticorrosive coating for railway steel structure rain shed

The utility model relates to a graphene anticorrosive coating for a railway steel structure rain shed. The graphene anti-corrosion coating for the railway steel structure rain shed comprises a bottom layer and a surface layer, the bottom layer is used for being embedded with steel, the bottom layer comprises a middle layer, a plurality of first protrusions and second protrusions, the first protrusions and the second protrusions are used for being embedded with the steel, the first protrusions are located on the inner side face of the middle layer, and the second protrusions are located on the outer surface of the middle layer. The second protrusions are evenly filled with the surface layer so that the outer surface of the graphene anti-corrosion coating can be a smooth plane, and then the ultraviolet-proof capacity of the surface layer is improved. The bottom layer of the graphene anti-corrosion coating for the railway steel structure rain shed is provided with the plurality of bulges I, and the bulges I can be embedded with the surface of steel, so that the bonding strength of the graphene anti-corrosion coating and the surface of the steel is improved, and the graphene anti-corrosion coating is prevented from falling off, peeling, rusting and cracking.
Owner:URUMQI RAILWAY BUREAU +1

Steel-concrete composite beam section of hybrid beam cable-stayed bridge

The utility model provides a hybrid beam cable-stayed bridge steel-concrete combined beam section which comprises a bearing plate, a steel-concrete combined section and a steel beam transition section, and the steel-concrete combined section and the steel beam transition section are arranged on the two sides of the bearing plate respectively. The steel-concrete combined section comprises a first bottom plate, a first middle web plate and a first side web plate, the first bottom plate is connected between the first middle web plate and the first side web plate, and the first middle web plate, the first bottom plate and the first side web plate are connected to form a symmetric or asymmetric concave structure; each of the first bottom plate, the first middle web and the first side web comprises a plurality of steel grids and concrete bodies filled in the steel grids; the steel beam transition section comprises a second bottom plate, a second middle web plate and a second side web plate, and the outer contour of the cross section of the steel beam transition section is consistent with the outer contour of the cross section of the steel-concrete combined section. The steel-concrete combined section is simple in structure and convenient and efficient to construct, the stress performance of the steel-concrete combined section is optimized, and the steel-concrete combined section meets the structural requirements of the large-span cable-stayed bridge.
Owner:ROAD & BRIDGE SOUTH CHINA ENG CO LTD +1

Shaped descending plate structure construction device

The utility model discloses a shaped descending plate structure construction device which comprises a square steel pipe used for manufacturing a descending plate and further comprises a sectional type fixing screw rod, the sectional type fixing screw rod is used for fastening the main body portion of the square steel pipe to a preset position, and the sectional type fixing screw rod comprises a lower anchoring rod piece and an upper detachable fixing rod piece. The lower anchoring rod piece and the upper detachable fixing rod piece are detachably and movably connected, the upper detachable fixing rod piece is fixedly provided with the 3-shaped clamp, the 3-shaped clamp ascends or descends along with rotation of the upper detachable fixing rod piece, the square steel pipe is arranged below the 3-shaped clamp, and the square steel pipe is fixed to a floor through the 3-shaped clamp. Compared with traditional plate descending construction, the plate descending device is more scientific, reasonable, efficient and reliable, and the problem of secondary reworking in plate descending structure construction is solved.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU

Photovoltaic device for treating heavy metal soil pollution and application method thereof

The invention discloses a photovoltaic device for treating heavy metal soil pollution and an application method thereof, comprising a slope, wherein a solar array and a vegetation array are sequentially arranged on the slope surface of the slope, wherein the solar array is located above the vegetation array, and the solar array and the vegetation array are separated by a horizontally arranged pedestrian and horse path; the solar array comprises a plurality of evenly arranged solar panels, each of which is detachably fixedly matched with the slope through a hollow anchor rod, wherein a lifting anchor is arranged in the hollow anchor rod, and the hollow anchor rod is detachably fixedly matched with the slope through the lifting anchor rod, and the lifting anchor of the solar array is energizedly matched with the solar panel; the vegetation array comprises a plurality of evenly arranged vegetation boxes, and the vegetation boxes are detachably fixedly matched with the slope surface of the slope through anchoring thorns, so as to repair the soil, absorb heavy metals, save energy and protect the environment, and stabilize the slope.
Owner:CHINA THREE GORGES UNIV

Earthwork prevention process for anti-seismic and waterproof earthwork of railway track

PendingCN122684087AEnsure structural stabilityGuaranteed anti-seismic and shock-absorbing performance
The application relates to the technical field of railway engineering materials, in particular to an anti-seismic and waterproof earthwork cloth manufacturing process for a railway track.S1: material pretreatment, selecting nano-modified polyester filaments, elastic rubber, HDPE resin, self-healing adhesive and nano-silicon dioxide powder as core raw materials;S2: completing preparation of each layer;S3: composite process, closely combining the anti-aging surface layer, the anti-seismic and damping middle layer and the anti-corrosion bottom layer through an intelligent temperature control composite process in an embedding structure to form a gradient composite structure;S4: factory prefabrication;S5: on-site paving and sealing;S6: finished product detection and repair, and completing the manufacturing.The layered preparation, precise embedding and intelligent temperature control composite process are adopted, the layers are closely adhered, molecular-level fusion is realized, the problems of layering and degumming between the layers are effectively avoided, and the overall structural stability of the earthwork cloth is favorably ensured.
Owner:HEBEI JINLIU CHEM FIBER CO LTD

Integrated RJ45 plug crimping pliers

The utility model discloses an integrated RJ45 plug crimping clamp comprising a clamp body, the clamp body is provided with a fixed plate and a movable plate, the fixed plate is provided with an RJ45 female seat jaw, the movable plate is provided with a push block, and the push block is movably matched with the RJ45 female seat jaw; the end, opposite to the pushing block, of the movable plate is provided with a hinge column, the hinge column is connected with a rotatable first connecting rod and a rotatable second connecting rod, the other end of the first connecting rod is connected with a first grab handle, the first connecting rod is rotatably connected with the first grab handle, the other end of the second connecting rod is connected with a second grab handle, and the second connecting rod is rotatably connected with the second grab handle. A cutting blade is arranged at the end, facing the second grab handle, of the first grab handle, a wire groove is formed in the end, facing the first grab handle, of the second grab handle, and the wire groove is at least matched with part of the cutting blade. The wire stripping and crimping tool can be suitable for construction in a narrow space, realizes efficient and convenient construction of a crystal head, and solves the problems that wire cutting is difficult and crimping is inaccurate when a PE skin is cut during wire stripping.
Owner:GUANGDONG GAOHONGMEIXIAN INFORMATION TECH CO LTD

Underground water diversion method suitable for tunnel lining high-pressure leakage treatment

The invention discloses an underground water diversion method suitable for high-pressure leakage treatment of a tunnel lining, which comprises the following steps of: punching a radial drainage hole at the arch foot position of a side wall of a water accumulation section at the back of the tunnel lining, and arranging a stepped longitudinal drainage structure at the water outlet end of the radial drainage hole along the side wall of the tunnel; a drainage and pressure release structure is arranged in at least one stage of longitudinal drainage structure close to one side of the radial drainage hole; and the stepped longitudinal drainage structure is communicated with the transverse drainage ditches and the central drainage ditch of the tunnel. According to the method, damage to an existing tunnel structure is small, construction is convenient and efficient, water gushing out of the radial drainage holes can be effectively slowed down, the water is guided and drained to a tunnel center drainage ditch in a sheetflood mode, the sudden underground water gushing situation of an operating tunnel can be effectively handled, potential structural potential safety hazards caused by high-pressure water impact are avoided, and the service life of the tunnel is prolonged. And the safety and durability of the tunnel underground water drainage structure are greatly improved.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

Structure capable of being conveniently mounted on fabricated wall body

The utility model discloses an assembly type wall structure convenient to install, which is formed by splicing box unit bodies, each box unit body comprises at least two side walls and a top plate, the positions of the side walls are oppositely arranged, the top plate is arranged at the tops of the side walls, and a plurality of embedded steel bars extending out of the wall surfaces are arranged at the bottoms of the opposite sides of the side walls. The embedded steel bars of the two side walls are arranged in a one-to-one opposite mode, the embedded steel bars are connected through bottom plate steel bars to form a post-pouring steel bar belt, and the post-pouring steel bar belt is wrapped with bottom plate concrete. The box unit body is simple in structure and convenient and efficient to construct, the side walls and the top plate of the box unit body are prefabricated parts produced in a modularized mode in a factory and are spliced in an assembled mode, the side walls and the bottom plate of the box unit body are constructed through a post-pouring process, the number of constructed splicing points can be reduced, the splicing process is simplified, the splicing difficulty is optimized, and the construction efficiency is improved. The assembly precision and the assembly quality of the whole structure are greatly improved, the connection reliability of the side walls and the bottom plate is guaranteed, and then the stability and the safety of the whole structure of a follow-up assembly type house are improved.
Owner:HUIZHOU CABRET TECH CO LTD

Safe copper bar connector for energy storage system

The utility model provides a safe copper bar connector for an energy storage system, which comprises a base, a current-carrying support, a current-carrying copper bar and a protective cover, the upper end of the current-carrying copper bar is connected with the top of the current-carrying support, and the middle part of the current-carrying copper bar is arranged in a copper bar channel in a penetrating manner and is positioned between the base and the current-carrying support; the lower end of the current-carrying copper bar extends to the bottom side of the current-carrying support. Lock catches are arranged on the locking side plates on the two sides of the protective cover, only the two sides of the middle of each lock catch are connected with the locking side plates, lock catch holes are formed in the lower portions of the lock catches, and lock catch clamping hooks are correspondingly arranged on the base; the protective cover is buckled on the base, and the lock catch clamping hooks are clamped in the corresponding lock catch holes. The current-carrying copper bar is of an integrated structure, is convenient to assemble, and is high in current-carrying capability, low in contact resistance and small in temperature rise. A plurality of locking and limiting structures are arranged, so that the stability of the assembled product is guaranteed, mistaken opening is reduced, no assembling risk exists, the safety and reliability are improved, the device can be suitable for more application scenes, and construction is more convenient and efficient.
Owner:NIU POWER SUZHOU CORP