Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

189results about How to "Convenient and efficient construction" patented technology

Precast lattice beam used for slope reinforcement, manufacturing method thereof and construction method for slope reinforcement adopting precast lattice beam

The invention provides a precast lattice beam used for slope reinforcement and a construction method for slope reinforcement adopting the precast lattice beam, as well as a slope structure reinforced by the precast lattice beam and a construction method thereof. The precast lattice beam comprises a plurality of precast cross-shaped beam units which are arranged and connected in a matrix manner; each of the cross-shaped beam units comprises a transverse beam and a longitudinal beam in intersection; an anchor head part is formed in the central interacting part of each of the cross-shaped beam units; each of the anchor head parts comprises a concrete groove and a backing plate placed on the concrete groove; an anchor hole is formed in each of the concrete grooves and the backing plates; the two end parts of the transverse beam and the two end parts of the longitudinal beam of each of the cross-shaped beam units extend respectively to form L-shaped hook parts reversed in directions; the transverse beam of each of the cross-shaped beam units is connected with that of the adjacent cross-shaped beam unit in a hooking manner through the corresponding L-shaped hook parts; the longitudinal beam of each of the cross-shaped beam units is connected with that of the adjacent cross-shaped beam unit in a hooking manner through the corresponding L-shaped hook parts; therefore the precast lattice beam is formed by splicing a plurality of structures taking the shapes of the Chinese character jing. According to the precast lattice beam used for slope reinforcement, the manufacturing method thereof and the construction method for slope reinforcement adopting the precast lattice beam, the following characteristics are achieved: on-the-spot construction steps are reduced, the construction period is shortened, the standardized management production is realized, the quality is ensured, and high efficiency and environment protection are realized.
Owner:SHENZHEN ROAD & BRIDGE CONSTR GRP

Mine MWD exploration system and measurement method thereof

The invention discloses a mine MWD (Measurement While Drilling) exploration system and a measurement method thereof. The mine MWD exploration system comprises a measurement module, a communication device and a handheld terminal, wherein the measurement module is mounted at the back of a drill bit, is propelled by a drill rod, directly utilizes vibration generated when the drill bit breaks rocks as a vibration source, and comprises a measurement probe tube as well as non-magnetic rods mounted at the front end and the back end of the measurement probe tube; the measurement probe tube is used for collecting signals in a hole, and meanwhile plays the transmission and water flowing functions; the non-magnetic rods are used for isolating the magnetic interference generated by the drill rod to the measurement probe tube, and also have the transmission and water flowing functions; the communication device is mounted in a drill site outside the hole to realize communication between the measurement probe tube and the handheld terminal. According to the mine MWD exploration system and the measurement method thereof, the occurrence of the drill hole and a rock dynamic action spectrum of the drill bit can be measured while drilling, a drilling space trajectory and the drilling meeting rock property are provided, meanwhile the purpose of exploration while drilling can be realized, and the fact that various conditions can be measured in one hole can be realized.
Owner:ANHUI HUIZHOU GEOLOGY SECURITY INST

Method for removing reinforced concrete chimney

The invention discloses a method for removing a reinforced concrete chimney. The method for removing the reinforced concrete chimney comprises the following steps of: I, performing buffer layer laying: laying a buffer layer at the toppling position of the reinforced concrete chimney; II, performing guide steel cable installation: laying a guide steel cable for guiding the chimney during a toppling process; III, performing chimney outer side packaging and water spray pipeline laying; IV, performing cutting area marking; V, performing temporary support member installation; VI, performing cutting area concrete chiseling away and steel bar cutting off; VII, performing water spraying; VIII, performing adjustment on the support height of a temporary support member until the chimney is toppled: gradually adjusting the support height of the temporary support member downwards until the chimney is unstable under the effect of the gravity of the chimney and is toppled onto the buffer layer; and IX, clearing a construction site. The method disclosed by the invention is simple in step, reasonable in design, convenient in implementation, high in removal speed and good in using effect. The chimney is entirely, slowly and directionally toppled by utilizing the temporary support effect of the support member, and the construction problem that the reinforced concrete chimney is entirely and rapidly removed under a non-blasting operation condition is solved.
Owner:CHINA RAILWAY FIRST GRP CO LTD

Mobile application constructing system and method

The invention provides a mobile application constructing system which comprises a mobile client, a mobile server and an application server, wherein the mobile client is used for constructing an application interface according to an interface model, receiving a service operation triggered by a user, sending a request of the service operation to a mobile server, receiving a feedback result from the mobile client, analyzes the interface model and completes interface display according to the feedback result; the mobile server analyzes an application service corresponding to the service operation, schedules the application server corresponding to the application service, receives the feedback result of the application server, constructs the feedback result into a format according with the model requirement according to the definition of the interface model and returns the feedback result to the mobile client; and the application server responds the request of the mobile server and sends the feedback server to the mobile server. Correspondingly, the invention also provides a mobile application constructing method. According to the technical scheme, code development can not be needed to be carried out according to each application and traditional services can not be needed to be regulated, thus an on-line application is efficiently converted into a mobile application.
Owner:YONYOU NETWORK TECH CO LTD

System and method of intelligent roadside parking management based on Wechat payment

The present invention discloses a system and method of intelligent roadside parking management based on Wechat payment. The system comprises a Wechat terminal, a background server and a parking stall controller corresponding to each roadside parking stall; the front end and the back end of each roadside parking stall are respectively provided with a first arresting gear and a second arresting gear, and one side, adjacent to a road, of each roadside parking stall is provided with a third arresting gear and a fourth arresting gear. The method comprises: the parking stall controller is configured to control the lifting of the third arresting gear and the fourth arresting gear; the parking stall controller controls the third arresting gear and the fourth arresting gear according to information sent by the Wechat terminal and feeds back the parking information to the background server; the background server generates parking induction information and transmits the parking induction information to the Wechat terminal; the Wechat terminal selects a parking mode, and a vehicle owner arrives distributed roadside parking stall according to the parking induction information; and the Wechat terminal performs payment, the payment success information is sent to the parking stall controller, and the parking controller starts timing charge. The system and method of intelligent roadside parking management based on Wechat payment improve the management efficiency of roadside parking and are helpful for drivers to understand roadside parking information at any time.
Owner:NANJING UNIV OF SCI & TECH

Prefabricated lattice beam for slope reinforcement, and manufacturing and construction method thereof

The invention provides a prefabricated lattice beam for slope reinforcement, and a manufacturing and construction method thereof. The prefabricated lattice beam is formed by a plurality of prefabricated cross beam body units in matrix arrangement, flat laying and lap joint modes; the prefabricated cross beam body units are formed by transverse beams and longitudinal beams in an intersecting mode;anchoring head parts are arranged at the cross positions of the transverse beams and the longitudinal beams; the corners of cross connectors at the junctions of the transverse beams and the longitudinal beams are each in a circular arc shape; the anchoring head parts comprise grooves and base plates placed at the grooves; and anchor holes for allowing anchor rods or anchor cables to penetrate in are formed in the grooves and the base plates correspondingly. The prefabricated lattice beam for slope reinforcement, and the manufacturing and construction method thereof have the characteristics ofsimplifying the construction steps, shortening the construction period, lowering the construction risk, realizing standardized production management, ensuring the product quality, and being economic,environment friendly and practical. The prefabricated lattice beam can replace an existing cast-in-place anchor rod (cable) lattice beam for slope reinforcement, has outstanding advantages in slope emergency rescue reinforcement, and is also suitable for quick slope reinforcement construction in a rebuilt and expanded highway.
Owner:BEIJING TIEKE SPECIAL ENG TECH CO LTD +3

Assembled annular rebar buckling anchoring-connection concrete shear wall structure

The invention discloses an assembled annular rebar buckling anchoring-connection concrete shear wall structure which is composed of an inner wallboard, an outer wallboard and a composite floor slab. Each of the inner wallboard and the outer wallboard is of a prefabricated annular reinforced concrete structure, horizontal annular rebars, vertical annular rebars and longitudinal rebars longitudinally connecting the horizontal annular rebars with the vertical annular rebars are prefabricated inside each prefabricated annular reinforced concrete structure, and two ends of the horizontal annular rebars extend outside left and right sides of the inner wallboard or the outer wallboard; when the inner wallboard and the outer wallboard are vertically connected with a wall, the horizontal annular rebars reserved on the left and right sides are matched with stirrups and vertical rebars and buckled in a hidden column area, and two ends of the vertical annular rebars extend outside upper and lower ends of the inner wallboard or the outer wallboard; when the inner wallboard and the outer wallboard on upper and lower layers are connected with the composite floor slab, the vertical annular rebars reserved at upper and lower ends are matched with stirrups and horizontal rebars and buckled in a hidden beam area, and then pouring is performed to form the whole shear wall structure.
Owner:黄坤坤

Anti-seismic face plate structure for rock-fill dam with concrete face plate and method for constructing face plate anti-seismic structure

The invention discloses an anti-seismic face plate structure for a rock-fill dam with a concrete face plate and a method for constructing the anti-seismic face plate structure. The method includes that a middle sandwich layer is laid along an area between the concrete face plate and a cushion of the rock-fill dam with the concrete face plate within the dam height range 0-H of a rock-fill dam body with the concrete face plate, and the H represents the dam height; the middle sandwich layer is an asphalt concrete face plate layer or a plastic concrete face plate layer, and perpendicular open seams are reserved in the plastic concrete face plate layer; when the middle sandwich layer is the plastic concrete face plate layer, the perpendicular open seams reserved in the plastic concrete face plate layer and perpendicular open seams reserved in the concrete face plate are staggered from one another, and a protective layer is coated on a surface layer of the middle sandwich layer. The anti-seismic face plate structure and the method have the advantages that the middle sandwich layer is laid between the original concrete face plate and the cushion, the anti-seismic face plate structure is in such a face plate structure form that stress conditions of the face plate in an operating period and an earthquake period are sufficiently improved by the aid of asphalt concrete and plastic concrete, and a project can be advantageously constructed efficiently, conveniently and quickly; the plastic concrete or the asphalt concrete is particularly laid, deformation among the original concrete face plate and cushion materials is coordinated, and leakage due to the fact that the face plate cracks in tension can be prevented.
Owner:DALIAN UNIV OF TECH

Telescopic climbing beam device and using method thereof

The invention provides a telescopic climbing beam device and a using method thereof, and relate to the technical field of super high-rise building construction. The problems that because an existing tower crane climbing beam needs to be welded and lengthened to deal with the interior wall of a core cylinder, the eccentric bending moment of a shear wall is large is solved. The telescopic climbing beam device comprises a pair of climbing main beams, four telescopic beams and a plurality of arc-shaped groove brackets, wherein the pair of climbing main beams are parallel and arranged at intervals,the four telescopic beams sleeve the two ends of the climbing main beams respectively, and the plurality of arc-shaped groove brackets are arranged in the climbing direction of a tower crane and arefixedly connected to the shear wall at the two sides; one ends of the telescopic beams are connected with bolts of the climbing main beams, the other ends of the telescopic beams are connected with pin shafts, and the telescopic beams are detachably connected with the arc groove brackets. The using method comprises the following steps that an embedded part is embedded in the shear wall, the arc groove brackets and the embedded part are welded and fixed; and the telescopic lengths of the telescopic beams are adjusted, so that limiting bolts in the same plane of the climbing main beams and the telescopic beams are corresponding to each other and are tightened and fixed, and are lifted to the upper parts of the arc-shaped groove brackets and placed in the arc-shaped grooves, the pin shafts ofthe telescopic beams are clamped in the arc-shaped grooves of the arc-shaped groove brackets, and clamping buckles on the upper parts of the brackets of the arc-shaped grooves are locked and fixed.
Owner:SHANGHAI NO 4 CONSTR

Lightweight autoclaved foam concrete block and production method thereof

InactiveCN103043967AReduce weightBlock heat transferAluminium saltsEnvironmental resistance
The invention provides a lightweight autoclaved foam concrete block and a production method thereof. The block comprises production raw materials of a dry material, water and foaming agent, wherein the dry material consists of the following components in percentage by mass: 9-15 percent of ordinary Portland cement, 20-30 percent of blast furnace slag micro-powder, 55-65 percent of aggregate and 0.2-1 percent of coagulating thickener; the coagulating thickener comprises aluminum sulfate and soda ash; the aluminum sulfate is 50 percent of the total mass of the coagulating thickener; the soda ash is 50 percent of the total mass of the coagulating thickener; the mass ratio of the water to the dry material is 0.4-0.6; and 0.8-1.6 kg foaming agent is used in each cubic meter of mixture of the water and the dry material. The block and the method have the benefit that the foaming agent of foam concrete is applied in the production technique of an aerated concrete block, so that the problems of weak strength, large air shrinkage, easiness in surface pulverization and the like in the foam concrete are solved. As the cement dosage of the foam concrete is reduced, the raw material cost is effectively reduced, and the social benefits of waste utilization and environmental friendliness are achieved.
Owner:天津市裕川微生物制品有限公司

Prefabricated prestressed concrete anchorage pier for slope strengthening and manufacturing and construction methods thereof

The invention provides a prefabricated prestressed concrete anchorage pier for slope strengthening and manufacturing and construction methods thereof. The prefabricated prestressed concrete anchoragepier comprises a prestressed concrete anchorage pier unit provided with a cross beam and a longitudinal beam which are crossed into a cross shape, concrete ribs located on the periphery of the prestressed concrete anchorage pier unit, and an anchorage head part located at the crossed position of the cross beam and the longitudinal beam; and prestressed reinforcements are arranged in the cross beamand the longitudinal beam. The prefabricated prestressed concrete anchorage pier adopts prestressed concrete lattice beams, the section property of the beams can be improved, larger anchorage force is borne, and the defect that when traditional cast-in-place reinforced concrete lattice beams are under large anchor cable anchorage force, the midspan positions of the reinforced concrete lattice beams can be pulled cracked possibly, and consequently the rigidity of components is lowered is overcome; and according to the prefabricated prestressed concrete anchorage pier, a manufacturing process can further be simplified, mounting is convenient, adjusting is easy during mounting, the construction period is shortened, and the construction cost is saved.
Owner:BEIJING TIEKE SPECIAL ENG TECH CO LTD +3
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products