The invention relates to a modified
asphalt sizing material, which is prepared from the following components in percentage by weight: 35.5 to 38.5 percent of 70 #
asphalt, 6.5 to 9.5 percent of
base oil, 4.5 to 5.5 percent of aromatic oil, 3.5 to 4.5 percent of SBS (
Styrene Butadiene
Styrene), 5.5 to 6.5 percent of SIS (
Styrene Isoprene Styrene), 5.5 to 6.5 percent of SBR (
Styrene Butadiene Rubber)
powder, 1.9 to 2.1 percent of blocked
isocyanate, 0.06 to 0.08 percent of activating agent, 4.5 to 5.5 percent of
porous silicon dioxide and 24 to 30 percent of
powder. The modified
asphalt sizing material can trigger the activating agent to catalyze the deblocking of the blocked
isocyanate at the
processing temperature of 180 + / -2 DEG C to release-NCO groups, the-NCO groups can react with trace
moisture in an asphalt
system to generate CO2 gas, in the rubber layer forming process, CO2 is wrapped by the asphalt in a viscoelastic state to form a uniform closed-
cell foam structure, and in the forming process of a rubber layer, the modified asphalt
sizing material can be used for forming an asphalt layer. According to the structure,
liquid water permeation is blocked by utilizing the characteristic that the
surface tension of
liquid water is greater than that of a bubble wall, and an initial channel is constructed for vapor
diffusion; furthermore, closed-
cell foam is bridged by utilizing nano-pores of
porous silicon dioxide, a'nano-pore adsorption-micropore
diffusion 'three-dimensional vapor-permeable network is constructed,
diffusion and
discharge of
water vapor are accelerated,
liquid water is further blocked, and
dynamic balance of waterproofness and breathability is realized.