Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

215results about How to "Realize standardized management" patented technology

P2P financing platform fund bank storage management method based on block chain

The invention provides a P2P financial platform fund bank storage management method based on a block chain, a P2P fund storage management system of a first participant, a P2P financial platform application of a second participant, a government platform and an insurance platform of a third participant and the like need to be provided, and all the participants are mutually connected through the block chain network. The block chain network comprises an intelligent contract block chain network and a certificate storage block chain network; after the P2P financing platform application executes thepoint-to-point network borrowing and loan service, the P2P fund storage and management system performs storage and management; and the insurance platform provides insurance service, performs service scheduling and storage through the P2P fund storage and management platform, inquires and analyzes storage data through the government platform, and audits and supervises P2P services. According to theinvention, the whole-process legal management of P2P fund bank storage and management is realized, the data storage difficulty of P2P transaction is reduced, the system performance based on the blockchain technology is improved, the approval process and business transaction complexity of multiple participants in fund hosting are simplified, and the information transparency and the supervision strength are improved.
Owner:FUJIAN RURAL CREDIT UNION

Precast lattice beam used for slope reinforcement, manufacturing method thereof and construction method for slope reinforcement adopting precast lattice beam

The invention provides a precast lattice beam used for slope reinforcement and a construction method for slope reinforcement adopting the precast lattice beam, as well as a slope structure reinforced by the precast lattice beam and a construction method thereof. The precast lattice beam comprises a plurality of precast cross-shaped beam units which are arranged and connected in a matrix manner; each of the cross-shaped beam units comprises a transverse beam and a longitudinal beam in intersection; an anchor head part is formed in the central interacting part of each of the cross-shaped beam units; each of the anchor head parts comprises a concrete groove and a backing plate placed on the concrete groove; an anchor hole is formed in each of the concrete grooves and the backing plates; the two end parts of the transverse beam and the two end parts of the longitudinal beam of each of the cross-shaped beam units extend respectively to form L-shaped hook parts reversed in directions; the transverse beam of each of the cross-shaped beam units is connected with that of the adjacent cross-shaped beam unit in a hooking manner through the corresponding L-shaped hook parts; the longitudinal beam of each of the cross-shaped beam units is connected with that of the adjacent cross-shaped beam unit in a hooking manner through the corresponding L-shaped hook parts; therefore the precast lattice beam is formed by splicing a plurality of structures taking the shapes of the Chinese character jing. According to the precast lattice beam used for slope reinforcement, the manufacturing method thereof and the construction method for slope reinforcement adopting the precast lattice beam, the following characteristics are achieved: on-the-spot construction steps are reduced, the construction period is shortened, the standardized management production is realized, the quality is ensured, and high efficiency and environment protection are realized.
Owner:SHENZHEN ROAD & BRIDGE CONSTR GRP

Operating management system of thermal power plant and task execution method thereof

The invention provides an operating management system of a thermal power plant and a task execution method thereof. The system includes an equipment and technology machine account standardization management module and an operation management standardization module. The equipment and technology machine account standardization management module includes an equipment/part management module. The equipment/part management module includes an equipment/part information library and an equipment/part classification management module. The equipment/part classification management module adopts multi-level classifications, and each lower-level classification is contained in an upper-level classification corresponding thereto. The equipment/part information library is associated with the equipment/partclassification management module, and thus class information of all equipment/parts in the equipment/part information library is determined. The standardization management modules define standardization operation information for operating of the thermal power plant. A specific record document and/or task instruction is generated through associating information in the equipment and technology machine account standardization management module.
Owner:HUANENG POWER INTERNATIONAL

Electric power engineering project review system

InactiveCN109858751AReduce compliance and internal control risksAchieve normalizationOffice automationResourcesManagement researchWork task
The invention relates to an engineering project review system, and belongs to the technical and economic review management research field of the whole process of an electric power engineering construction project. The system is composed of a user layer, an application layer, a platform layer and a data layer, and comprises a work task module, a project review module and a system management module.The work task module is mainly used for displaying an automatic push message reminder for reviewing a work state of a project in the system. The project review module is used for realizing scientificdecision making, investment control and online review evaluation of benchmarking management of each stage of electric power engineering project construction. The system management module is used forsystem flow design, monitoring, historical data management and the like. The system solves the problems of unclear review work flow, unknown responsibility, data loss, incomplete content, insufficientmanagement benchmarking data and the like in the construction process of the electric power engineering project, realizes standardized, normalized and informationized management of project review work, improves the work quality and efficiency, and promotes improvement of the fine management level of engineering project construction.
Owner:中国大唐集团科学技术研究总院有限公司

Roadside area-variable parking space management system with advertising function and operation method thereof

The invention provides a roadside area-variable parking space management system with an advertising function and an operation method thereof. The system comprises a parking area, an on-site sensing execution end, a network communication layer and a background management center; the on-site sensing execution end comprises an MCU, a power source module, an earth induction coil, an earth induction device, a smart camera, a laser ranging module, a laser scanning module, a voice speaker, an LED display screen, an LED beam lamp strip, a fee charging module, a signal transmit-receive antenna and an advertising module; the network communication layer communicates based on an NB-IoT network; and the background management center is provided with an Internet of Things service system. According to theroadside area-variable parking space management system with the advertising function and the operation method thereof of the invention, a parking area is automatically planned according to the size of a vehicle, and the number of parked vehicles can be increased; fee charging is based on two modes, namely, reservation locking and model size, so that the fee charging is fair and reasonable; an advertising projection lamp is used to project an advertisement to the body of a vehicle or the ground, so that urban roadside parking spaces can be managed automatically in a standardized manner, and the system meets the management requirements of smart cities in the new era.
Owner:罗永平

Safety control device for building hoisting machinery

A safety control device for building hoisting machinery is disclosed. The safety control device is characterized in that: the safety control device comprises a face recognition machine, a relay and an elevator jerk button; the face recognition machine is connected to an AC 220V power supply through a 12 V stabilized voltage supply; the coil end of the relay is in tandem connection with PIN4 and PIN5 ports of the face recognition machine and is then connected to a 12V DC power supply; and the contact switch end of the relay is in tandem connection with the elevator jerk button and is then connected to an AC power supply. According to the safety control device, starting of the building hoisting machinery is controlled by utilization of the face recognition machine; and workers for special operation in a wide area network environment begin to work after "face recognition", thus avoiding the phenomena of working without a license, and preventing random starting of the building hosting machinery. Remote supervision of the control device can be achieved. Supervision departments of different levels can check face on-site recognition records in real time through the network. Standard management of the special operation of the building hoisting machinery is achieved. Safety operation of the special operation of the building hoisting machinery is ensured. The quality security control level in a building construction site is increased.
Owner:CHINA MCC17 GRP

Cold-chain logistics monitoring system on basis of Beidou satellite/GPS (Global Position System) navigation and positioning

The invention discloses a cold-chain logistics monitoring system on the basis of Beidou satellite/GPS (Global Position System) navigation and positioning, which adopts the following steps of A1, setting working modes of a Beidou satellite and a GPS, preferentially using the GPS to position in the positioning process, carrying out correction and modification on positioning information of the GPS by positioning information of the Beidou satellite, when the positioning information of the GPS and the positioning information of the Beidou satellite always have a large difference in a set time range, determining that the GPS has a blind zone or a fault, and at this time, adopting the positioning information of the Beidou satellite; A2, packing the positioning information and monitoring information and transmitting the packed information to a monitoring center; and A3, acquiring a temperature signal by adopting a PT100 platinum resistor, receiving time service information of the GPS, respectively transmitting the time service information of the GPS to an embedded monitoring display module based on an Android system by an I/O (Input/Output) port and a serial port, and selecting an E-TTI (Electronic-Transmission Time Interval) model of a corresponding shelf life according to forecasting of the E-TTI model on the shelf life and shelf life models of various articles.
Owner:UNIV OF SHANGHAI FOR SCI & TECH

Field construction material intelligent management method based on BIM

The invention discloses a field construction material intelligent management method based on BIM. A system according to the method comprises a construction field material information unit, a monitoring unit, a BIM standard data unit, an enterprise server and an intelligent terminal. The construction field material information unit comprises a field entering material information acquisition moduleand a planned material module. The field entering material information acquisition module uploads the actual number and the actual quality information of the material which enters the construction field to the enterprise server. The planned material module uploads the planned number and the planned quality which are required by the construction field to the enterprise server. According to the field construction material intelligent management method, BIM technology is combined with other technology, construction engineering management factors such as information acquisition, information transmission and information processing, engineering factor management system, monitoring identification system, automatic counting system, Internet technology and Internet-of-things technology are combined. Finally accurate, in-time and reasonable purchasing, field entering and management of main materials are finally realized. Furthermore dynamic adjustment is performed according to the actual requirement, thereby realizing refinement of main materials of the project.
Owner:CHINA CONSTR SENVENTH ENG BUREAU INSTALLATION ENG

A whole-process management and control method of power network monitoring information

The invention provides a whole-process management and control method of power network monitoring information, which comprises the following steps: a whole process flow management and control: in the early stage of reconstruction and expansion of a new investment substation or an old substation, sequentially arranging and standardizing the examination and approval processes of relevant personnel ofvarious departments involved in management, examination and approval according to the project implementation rules; monitoring information point table management: in the early stage of monitoring information transmission, collecting monitoring information point tables generated by each manufacturer or station, and storing the monitoring information point tables in Excel or E file mode; Each timethe data acquisition module collects the modified information, the host computer automatically saves the modified time, the modified content and the modifier in the database. Automatic transmission acceptance is performed. The invention derives the non-standard signal in the transmission process through the one-key type, improves the signal processing efficiency and reduces the rectification time;The transmission progress is visually recorded so that the operator or manager can view the transmission details in real time.
Owner:PUYANG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER +1

Method for realizing power grid data asset management platform based on SOA

The invention discloses a method for realizing a power grid data asset management platform based on SOA and provides the power grid data asset management platform based on SOA. The system comprises a data storage layer, a data lasting layer, a technical component layer, an application component layer and a displaying layer which are connected with each other in turn, wherein the application component layer comprises a basic information management module, an overall view management module, a daily monitoring management module, a traceable management module, a value assessment management module and a process management module. According to the method provided by the invention, the enterprise data is regarded as core asset management; in the manner of effectively managing and reasonably applying the whole process of the operation data, the data value is continuously excavated and the conversion from data to information is realized, so that a service value is formed and the core business capacity promotion, information value chain extension and enterprise operation mode optimization can be realized; meanwhile, an effective method is supplied for deeply treating the data, increasing the data quality and timely and quickly monitoring the healthy condition of the business operation by an enterprise.
Owner:CHINA REALTIME DATABASE

Driving school intelligent management and intelligent vehicle learning integrated system

PendingCN109785206AUnderstand the common problems of practiceEasy to manageReservationsTeaching apparatusPersonalizationPersonalized learning
The invention discloses a driving school intelligent management and intelligent vehicle learning integrated system. The system comprises a vehicle information acquisition system, a high-precision differential evaluation system, a vehicle-mounted intelligent terminal system and an intelligent driving training management system. The high-precision differential evaluation system comprises a site high-precision base station and a vehicle-mounted data mobile receiver. The vehicle-mounted data mobile receiver can receive and transmit vehicle operation dynamic conditions and driving tracks between the site high-precision base station and the vehicle-mounted intelligent terminal system; The vehicle-mounted intelligent terminal system comprises a data operation arrangement module, an in-vehicle information collection module used for collecting trainee training information and an information display module used for displaying the information. The data operation arrangement module is connected with a vehicle information acquisition system, a vehicle-mounted mobile receiver of a high-precision differential evaluation system, an in-vehicle information acquisition module, an information displaymodule and an intelligent driving training management system. The data operation arrangement module can generate a personalized learning file of each student, and the personalized learning files can be transmitted to the intelligent driving training management system.
Owner:广州驾悦信息科技有限公司

Attendance management method and system

The present invention provides an attendance management method and system. The method comprises that a. a scheduling table is set, staff attendance information is collected, and the attendance information is uploaded to a server, wherein the attendance information comprises identity information, fingerprint information and scheduling information; b. according to the attendance information, the server collects statistics of the actual work record of staff, and dynamically assigns experimental test tasks through the fingerprint attendance condition of the test staff and the experiment workload; and c. the actual salary of the staff is automatically obtained by matching a pre-established salary system with the actual work record. According to the attendance management method and system provided by the present invention, a digital experiment and digital management platform is established, so that on one hand, assignment of experimental test tasks can be facilitated, efficiency in the experiment process can be improved, and the progress and result of the overall experiment can be ensured, and one the other hand, standardized management to the staff can be facilitated, and the salary system is combined, so that the cost of manual accounting is reduced, and the efficiency of the enterprise is improved.
Owner:LONCIN MOTOR

Internet-based enterprise and personal interaction system and application method thereof

InactiveCN108320139AImprove technological innovation capabilitiesMeet development needsOffice automationTransmissionInteraction systemsPersonal cloud
The invention discloses an Internet-based enterprise and personal interaction system and an application method thereof; the system comprises enterprise cloud platforms, an operation management cloud platform and personal terminals in interconnection; the enterprise cloud platform comprises an enterprise organization framework module and an enterprise internal file data module; the operation management cloud platform receives registration from enterprises and individuals, and processes service requests of the personal terminal and the enterprise cloud platform. The method enables the enterprisecloud platform and the personal terminal to resister on the operation management cloud platform; the personal terminal receives a message notification sent by the enterprise cloud platform, browses or invokes the internal file data, and adds friends, groups or makes conversations in the enterprise organization framework; non-registered users can browse or invoke open information data of the enterprise cloud platform; sharing and conversion of open information data can be realized between personal terminals. The system and method can fuse the operation management cloud platform, the enterprisecloud platform and personal terminals, and personal cloud spaces via the internet, thus sharing and inheriting enterprise knowledge, and realizing standardization managements.
Owner:吉志勇

Converting station standardization inspection and acceptance auxiliary method based on workflow engine

The invention discloses a converting station standardization inspection and acceptance auxiliary method based on a workflow engine. The method comprises the following steps: (1) inspection and acceptance applications are submitted to a system end through a client end after construction is completed by a construction unit, and according to predetermined rules and procedures of a computer, the system end automatically delivers inspection and acceptance documents and enables the inspection and acceptance documents to be stored in a data base; (2) according to prefabricated templates customized by different majors and different departments, the system end inspects and accepts the inspection and acceptance applications in advance one by one; (3) related experts are organized to further professionally inspect and accept the inspection and acceptance applications, to record problems and to put forward expert advices, wherein if the expert advices are negative, improvement programs are put forward, and applicants rectify and reform, and then reapply; and if the expert advices are positive and defects still exist, final inspection and acceptance reports are made out and filed after the defects are eliminated. By means of the converting station standardization inspection and acceptance auxiliary method based on the workflow engine, the standardized management of converting station inspection and acceptance can be achieved, an auxiliary decision making means is offered for the work of the converting station inspection and acceptance, the working quality and efficiency of the converting station inspection and acceptance are improved, and the information leakage of the converting station inspection and acceptance caused by human factors is avoided.
Owner:XUCHANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER +1

Health physical examination management system and method for enterprise client

InactiveCN107301616AEfficient health check-up serviceRealize informatization and standardized managementDigital data protectionOffice automationBarcodeManagement system
The invention provides a health physical examination management system and method for an enterprise client. The method comprises the steps of creating a physical examination directory and a physical examination archive of the enterprise client according to an enterprise organization institution code, and inputting enterprise information to the physical examination archive; adding enterprise staffs to the physical examination directory for the enterprise client and inputting information of each enterprise staff to the physical examination archive; generating a physical examination code for each enterprise staff; allocating corresponding physical examination service items to each enterprise staff; receiving a physical examination result input by a doctor from a doctor end of each physical examination department, and generating the physical examination report for each enterprise staff; encrypting the staff information to generate key information, and converting the key information into two-dimensional barcodes; and embedding the two-dimensional barcode of each enterprise staff into the physical examination report of each enterprise staff by adopting a watermarking technology to perform read-only locking. According to the system and the method, informationized and standardized management of health physical examination of the enterprise client is realized, and the security and reliability of an examination result of the enterprise client are improved.
Owner:ANYCHECK INFORMATION TECH

Multi-meter position electric energy metering device

InactiveCN101329368AReduce manufacturing costReduce metering equipment costsSpecial tariff metersModularityEngineering
The invention discloses a multi-epi position electric energy measuring device, comprising a box body and a module centralization-typed measuring device which is arranged inside the box body; the multi-epi position electric energy measuring device is characterized in that the module centralization-typed measuring device comprises a separation panel and at least two measuring modules; the separation panel is connected with a power supply; each output terminal of the separation panel is respectively connected directly with the input terminal of the power supply of each measuring module; each measuring module is provided with a signal output terminal and a power output terminal; the power input terminal and the power output terminal on the measuring module are metal conductive parts. All parts of the invention realize modularization, require no complex conductive wire connection, and shorten the volume to the utmost extent. The multi-epi position electric energy measuring device facilitates the product to unify the standard, and realizes large-scale production and standardized management, thus reducing the cost of the production enterprises and the cost of the power supply departments. The multi-epi position electric energy measuring device can realize the separate display of a single-measuring module and the centralized display and remote management of multi-measuring modules, realize the functions of displaying, measuring, pre-paying and querying, etc., can conveniently replace the modules so as to update, and realize the centralized and scientific management of the power supply.
Owner:HUBEI SHENGJIA ELECTRIC EQUIP +1

Wolf pack algorithm-based multi-target disassembly line setting method under spatial constraint

The invention discloses a wolf pack algorithm-based multi-target disassembly line setting method under spatial constraint. The method comprises the following steps of: (1) establishing a mathematicalmodel taking minimization of the number of workstations, an idle time balance index, disassembly cost and a positive difference value of an actual use surface of the workstations as targets; (2) generating an initial population, comparing objective function values of the initial population through Pareto to obtain a Pareto optimal solution, and storing the Pareto optimal solution in an external file; (3) calculating to obtain a new population by adopting a multi-target discrete wolf pack optimization algorithm; (4) comparing the target function value of the mixed population composed of the newpopulation calculated in the step (3) and the external archives by adopting Pareto, and further updating the external archives; (5) comparing the target function value of the new population calculated in the step (3) by adopting Pareto, and further updating the population; (6) repeating the steps (3)-(5) according to the set number of times; and (7) outputting a Pareto optimal solution in the external file as a disassembly task allocation scheme. The method provided by the invention has stronger search capability and robustness.
Owner:SOUTHWEST JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products