Vortex type fishway

By designing a vortex structure in the fishway and using baffles and turbulence barriers to form a vortex channel, the problem of poor fish entry effect under different flow field changes was solved, and the fish upstream effect under complex water flow conditions was improved.

CN118895737APending Publication Date: 2024-11-05CHANGSHA HETONG ECOLOGICAL ENVIRONMENT TECHNOLOGY CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410928201.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing fishway cannot adapt to changes in the flow field under different power generation conditions and discharge conditions, resulting in poor fish entry and poor fish traversing effect.

Method used

Design a vortex-type fishway, including a main fishway section, a fishway fish-attracting section, and a fish-attracting device. A vortex fish-attracting channel is formed by using baffles and turbulence-disrupting piers. By arranging baffles and turbulence-disrupting piers on the sloping section, a vortex is formed to guide fish into the main inlet of the fishway, reducing the impact of water flow and creating a suitable water flow environment in the channel.

Benefits of technology

Under different water flow conditions, vortex-type fishways can effectively guide fish into the main inlet of the fishway, reduce the impact of water flow, provide a suitable upstream environment, and improve the success rate of fish upstream.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895737A_ABST
    Figure CN118895737A_ABST
Patent Text Reader

Abstract

The invention discloses a vortex type fishway, and relates to the technical field of water conservancy and hydropower, the vortex type fishway comprises a main fishway section and a fishway fish guiding section which is communicated with a main inlet of the main fishway section and is located at the downstream, the fishway fish guiding section comprises a fish luring device and a slope lane section which inclines downwards and extends, and the slope lane section is located at the outer side of the main fishway section; the fish luring device is arranged on the slope ramp and protrudes out of the surface of the slope ramp section, the fish luring device comprises a partition plate and turbulent flow piers, the partition plate is arranged on the slope top face of the slope ramp section close to a main inlet of the main fishway section, and the multiple turbulent flow piers are arranged on the downstream of the partition plate at intervals; the slope ramp section, the partition plate and the multiple turbulent flow piers are combined outside the main fishway section to form a vortex fish guiding channel. According to the vortex type fishway, the effect of ensuring fish to trace upwards under different water flow working conditions is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy and hydropower, and in particular to a vortex fishway. Background Art

[0002] With the increasing demand for water resources, the construction of river-blocking facilities on natural river channels has benefited mankind, but it has also destroyed the original appearance of the river. The original river channel is suitable for the reproduction and growth of local fish. Due to the change of water flow patterns caused by water conservancy projects, the migratory fish channels in the river are blocked, and the continuity of the river is damaged to a certain extent. At the same time, the environment of the habitat on which fish depend for survival has also changed, and even led to the extinction of some migratory fish populations. In today's society where environmental requirements are increasing, the requirements for the protection of fish resources, river biodiversity and ecosystems are also increasing. In this context, while building water conservancy projects, fishways have emerged as eco-friendly water conservancy measures to help fish migrate.

[0003] Fishways are structures built at dams or natural obstacles for fish migration. They are an ecological measure to reduce the interference of dams on fish survival and reproduction. In the study of fish luring at the entrance of fishways, people have tried various fish luring measures, such as using water flow, sound, color light, smell and other methods to lure fish. These measures have certain effects, but they are also limited by the different types and habits of fish. Using the common characteristics of fish's induction of water flow to lure fish is a more conventional way.

[0004] Please refer to Figure 1 The current method is to form a fish-attracting water flow at the entrance of the fishway, and use the fish's tendency to flow to attract them into the fishway. Since the water flow at the entrance of the fishway is both a means of attracting fish and an obstacle that fish must overcome to enter the fishway, the flow rate of the water flow at the entrance of the fishway should be greater than the induced flow rate of the target fish and less than the critical flow rate of the fish. In order to adapt to different working conditions, the main inlet water supply pipe of the fishway and the fish collection tank water supply pipe are usually arranged on the fishway for water supply; the patent application publication number is CN116623621A, and the patent name is an invention patent for a fish guide device for the entrance of the fishway, which records that the baffle is fixed at different angles by rotating to block and isolate water to adapt to different tailwater flows.

[0005] Fish have the habit of swimming upstream, so the water flow conditions that can guide fish in water conservancy hubs are mainly the overflow when the power station generates electricity and the overflow when the sluice gate releases water. In water conservancy hubs with power generation functions, the overflow of the power station is the most common operating condition, so generally the fishway and the main entrance of the fishway will be arranged near the tailwater channel or the sluice gate of the power station. Appropriate water flow is an important factor in attracting fish, but too fast water flow is an obstacle that affects the upstream migration of fish. When the power station generates electricity, the downstream flow is large, the water flow in the tailwater channel of the power station is turbulent, and the operation and scheduling of the power station is affected by many factors such as season, electricity demand, and hydrological conditions. The combined operating conditions of multiple units are complex, which leads to complex and changeable water flow conditions in the tailwater of the power station. The flow velocity in the tailwater area is large, and the flow velocity in most areas is greater than the limit flow velocity of fish. The existing fishway cannot adapt to the changes in the flow field under different discharge conditions. It is difficult for fish to reach the fishway entrance smoothly, resulting in poor fish entry effect and poor fish upstream effect.

[0006] In view of this, it is necessary to develop a vortex fishway to solve or at least partially alleviate the above technical problems. Summary of the invention

[0007] The vortex fishway provided by the present invention solves the technical problem that the existing fishway can only play a fish attracting role under specific flow field conditions, cannot adapt to changes in flow fields under different power generation conditions and different discharge conditions, resulting in poor fish entering effect and poor fish upstreaming effect.

[0008] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0009] A vortex fishway comprises a main fishway section and a fishway fish attracting section which is connected to a main inlet of the main fishway section and is located downstream, the fishway fish attracting section comprises a fish attracting device and a ramp section which is inclined and extends downward, the ramp section is located outside the main fishway section, the fish attracting device is arranged on the ramp and protrudes from the surface of the ramp section, the fish attracting device comprises a partition and a spoiler pier, the partition is arranged at the top surface of the slope of the ramp section near the main inlet of the main fishway section, a plurality of spoiler piers are arranged at intervals downstream of the partition, and the ramp section, the partition and the plurality of spoiler piers are combined outside the main fishway section to form a vortex fish attracting channel.

[0010] Furthermore, the fish attracting device also includes turbulence blocks laid on the surface of the ramp section, and the turbulence blocks are arranged to protrude from the surface of the ramp section.

[0011] Furthermore, the spoiler pier is a cylindrical pier or a semicircular pier.

[0012] Furthermore, all spoiler piers have the same radial size, and the spacing between adjacent spoiler piers is the same. The radial size of the spoiler pier is determined by the formula d=(1 / 2-1 / 3)l, and the spacing between adjacent spoiler piers is determined by the formula s=(2-3)d, wherein l is the body length of an adult target fish, d is the radial size of the spoiler pier, and s is the spacing between two adjacent spoiler piers.

[0013] Furthermore, the formula B=(3-4)b is used to determine the width of the ramp section, where B is the width value of the ramp section and b is the inlet width value of the vortex fish attracting channel (ramp section). The formula L=(30-40)l is used to determine the layout length of the column group, where L is the layout length of the column group.

[0014] Furthermore, the spoiler pier is arranged close to the outer edge of the ramp section.

[0015] Furthermore, it also includes a water collection tank water supply pipe, and the output side of the water collection tank water supply pipe extends into the water collection tank.

[0016] Furthermore, the ramp section, the partition and the plurality of spoiler piers are integrally cast and formed.

[0017] The present invention also provides a power station hydraulic project, including a dam, power station equipment and a sluice gate arranged on the dam, and also includes the above-mentioned vortex fishway, the fish outlet section of the vortex fishway is located upstream of the dam, and the fish attracting section of the vortex fishway is located downstream of the dam.

[0018] The present invention has the following beneficial effects:

[0019] The vortex fishway of the present invention comprises a main fishway section, a fishway fish outlet section connected to the outlet of the main fishway section and located upstream, and a fishway fish attracting section connected to the main inlet of the main fishway section and located downstream, a downwardly inclined and extended ramp section is arranged at the main inlet position of the main fishway section, a fish attracting device is arranged on the ramp section, and the fish attracting device comprises a partition and a spoiler pier, the partition is arranged near the main inlet of the main fishway section, a plurality of spoiler piers are arranged at intervals downstream of the partition, the ramp section, the partition and the plurality of spoiler piers are combined outside the main fishway section to form a vortex fish attracting channel, the fishway fish attracting section generates a vortex to guide fish into the main inlet of the fishway, and finally the fish go upstream and exit the fishway fish swim out; a ramp section is arranged at the main inlet, and a fish attracting device is arranged on the ramp section. The ramp section is used to connect the bottom of the riverbed with the main inlet of the fishway to construct a reflow area suitable for fish migration; the fish attracting device includes a baffle and a spoiler pier, and the baffle and spoiler pier are arranged on the ramp section respectively. The baffle is arranged at the main inlet to block the water flow to prevent the main inlet of the fishway from being directly impacted by the unstable water flow of the tail channel of the power station, weaken the water flow impact of the main inlet of the fishway and avoid excessive flow velocity at the main inlet of the fishway. Multiple spoiler piers are arranged at intervals downstream of the baffle, and the extended gap between the baffle and the spoiler pier forms a side fish inlet. The space between adjacent spoiler piers The extended gap forms a side fish inlet, and the open gap at the front end of the spoiler pier forms a front fish inlet. Under the action of the tailwater flow of the power station and / or the existing working water flow of the main inlet, the spoiler pier will form a continuous vortex in the recirculation area, which is similar to the vortex generated by the tail of a fish when swimming, and has the effect of attracting and guiding fish, so that the fish enter the channel from the side fish inlet and / or the front fish inlet and find the main inlet of the fishway more quickly; the ramp section, the partition and a plurality of spoiler piers are combined outside the main fishway section to form a vortex fish-attracting channel. When the impact flow velocity of the tailwater flow of the power station is large, the tailwater flow enters the fishway inlet from the outside of the spoiler pier and generates a vortex in the channel. The vortex rotates by itself Friction eliminates part of the energy. At the same time, the local resistance generated by the eddy current can also limit the flow entering the channel and reduce the impact on the existing working water flow. The eddy current generated in the channel of the fish guide section of the fishway creates a suitable water flow environment for upstream fish, making it convenient to find the front inlet and then enter the main inlet of the fishway. When the impact flow velocity of the tail water flow of the power station is relatively small, the existing working water flow coming out of the main inlet of the fishway can make the upstream fish sense to enter from the front inlet and enter the main inlet along the side wall. At the same time, the existing working water flow generates eddies on the outside of the cylinder group, attracting external fish to enter the channel from the side inlet, thereby achieving the effect of ensuring the upstreaming of fish under different water flow conditions.

[0020] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention.

[0022] In the attached figure:

[0023] Figure 1 It is a schematic diagram of the planar structure of a fishway in the prior art;

[0024] Figure 2 is a schematic diagram of the planar structure of a vortex fishway in one embodiment of the present invention;

[0025] Figure 3 yes Figure 2 A lateral cross-sectional view of the fish guide section of the fishway;

[0026] Figure 4 This is a schematic diagram of the study of the group effect of fish; Figure a shows the vortex generated by the tail of a natural school of fish when swimming, and Figure b shows the artificial vortex generated by a cylindrical turbulence;

[0027] Figure 5 It is a schematic diagram of the research on the circulation and eddy current of the vortex fishway of the present invention and the effect of fish swimming upstream;

[0028] Figure 6 It is a schematic diagram of fish swimming upstream when the impact flow velocity of the tailwater flow of a power station is relatively large in one embodiment of the present invention;

[0029] Figure 7 It is a schematic diagram of fish swimming upstream when the impact flow velocity of the tailwater flow of a power station is relatively small in one embodiment of the present invention.

[0030] Legend:

[0031] 10. Main fishway section; 20. Fishway fish attracting section; 21. Fish attracting device; 211. Baffle; 212. Disturbance pier; 213. Turbulence stone; 22. Ramp section. DETAILED DESCRIPTION

[0032] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0035] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0036] like Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 ,and Figure 7 As shown, a vortex fishway (a fishway that uses vortexes to attract fish) provided by the present invention comprises a main fishway section 10 and a fishway fish attracting section 20 that is connected to the main inlet of the main fishway section 10 and is located downstream, the fishway fish attracting section 20 comprises a fish attracting device 21 and a ramp section 22 that is inclined and extended downward, the ramp section 22 is located outside the main fishway section 10, the fish attracting device 21 is arranged on the ramp and protrudes from the surface of the ramp section 22, the fish attracting device 21 comprises a partition 211 and a spoiler pier 212, the partition 211 is arranged at the top surface of the slope of the ramp section 22 near the main inlet of the main fishway section 10, a plurality of spoiler piers 212 are arranged at intervals downstream of the partition 211, and the ramp section 22, the partition 211 and the plurality of spoiler piers 212 are combined outside the main fishway section 10 to form a vortex fish attracting channel.

[0037] The vortex fishway provided by the present invention comprises a main fishway section 10 and a fishway fish attracting section 20 connected to the main inlet of the main fishway section 10 and located downstream, a downwardly inclined and extended ramp section 22 is arranged at the main inlet position of the main fishway section 10, a fish attracting device 21 is arranged on the ramp section 22, the fish attracting device 21 comprises a partition 211 and a spoiler pier 212, the partition 211 is arranged near the main inlet of the main fishway section 10, a plurality of spoiler piers 212 are arranged at intervals downstream of the partition 211, the ramp section 22, the partition 211 and the plurality of spoiler piers 212 are combined outside the main fishway section 10 to form a vortex fish attracting channel, the fishway fish attracting section 20 generates a vortex to guide fish into the main inlet of the fishway, and finally the fish are caught in the fishway. After swimming upstream, the fish swim out from the fish exit section of the fishway; a ramp section 22 is arranged at the main inlet position, and a fish attracting device 21 is arranged at the ramp section 22. The ramp section 22 is used to connect the bottom surface of the riverbed with the main inlet of the fishway to construct a reflow area suitable for fish migration; the fish attracting device 21 includes a baffle 211 and a spoiler pier 212. The baffle 211 and the spoiler pier 212 are respectively arranged on the ramp section 22. The baffle 211 is arranged at the main inlet position to block the water flow to prevent the main inlet of the fishway from being directly impacted by the unstable water flow of the tail channel of the power station, reduce the water flow impact of the main inlet of the fishway and avoid excessive flow velocity at the main inlet of the fishway. A plurality of spoiler piers 212 are arranged at intervals downstream of the baffle 211, and the baffle 211 and the spoiler pier 212 are arranged between the baffle 211 and the spoiler pier 212. The extending gap between the two adjacent spoiler piers 212 forms a side fish inlet, the extending gap between the adjacent spoiler piers 212 forms a side fish inlet, and the opening gap at the front end of the spoiler pier 212 forms a front fish inlet. Under the action of the tailwater flow of the power station and / or the existing working water flow of the main inlet, the spoiler pier 212 will form a continuous vortex in the recirculation area, which is similar to the vortex generated by the tail of a fish when swimming, and has the effect of attracting and guiding fish, so that the fish enter the channel from the side fish inlet and / or the front fish inlet and find the main inlet of the fishway more quickly; the ramp section 22, the partition plate 211 and the plurality of spoiler piers 212 are combined on the outside of the main fishway section 10 to form a vortex fish-attracting channel. When the impact flow velocity of the tailwater flow of the power station is large, the tailwater flow enters the fishway from the outside of the spoiler pier 212. The inlet generates eddies in the channel, which eliminate part of the energy through their own rotational friction. At the same time, the local resistance generated by the eddies can also limit the flow entering the channel and reduce the impact on the existing working water flow. The eddies generated in the channel of the fishway fish-guiding section 20 create a suitable water flow environment for upstream fish, which is convenient for finding the front inlet and then entering the main inlet of the fishway. When the impact flow rate of the tailwater flow of the power station is relatively small, the existing working water flow coming out of the main inlet of the fishway can make the upstream fish sense to enter from the front inlet and enter the main inlet along the side wall. At the same time, the existing working water flow generates eddies on the outside of the cylinder group, attracting external fish to enter the channel from the side inlet, thereby achieving the effect of ensuring the upstreaming of fish under different water flow conditions.

[0038] It is understandable that in order to ensure a suitable flow rate, the main fishway section 10 can be a winding fishway; it is understandable that the spoiler pier 212 can be a semi-cylindrical pier or a cylindrical pier. In specific implementation, in order to facilitate construction and ensure structural mechanical properties, the spoiler pier 212 uses a concrete pier body.

[0039] Furthermore, in order to induce bottom fish to swim upstream, the fish attracting device 21 further includes turbulent blocks 213 laid on the surface of the ramp section 22, and the turbulent blocks 213 are arranged protruding from the surface of the ramp section 22. Optionally, the turbulent blocks 213 can be pebbles or masonry stones.

[0040] Further, the spoiler pier 212 is a cylindrical pier or a semicircular pier. In the present invention, by using the cylindrical pier or the semicircular pier, the tailwater flow of the power station and / or the existing working water flow of the main inlet passes through the spoiler pier 212, and the vortex is similar to the behavior characteristics of fish based on the Karman vortex street principle, which has the effect of attracting and helping fish.

[0041] Please refer to Figure 4 and Figure 5 Through research, the inventors found that the swimming of fish has a group effect. When a fish swims, a vortex is generated at the tail of the fish. The fish following closely behind can save energy by swimming with the help of this vortex. This is one of the reasons why fish have the habit of swimming in groups. In the scheme of the present invention, the vortex is used to generate the fish group effect. It is arranged in front of the main inlet of the fishway. Following the water flow direction of the fishway inlet, a group of cylindrical piles with a diameter of D and an interval of L are arranged. Under the joint action of the water flow of the main inlet of the fishway (water flow outlet) and the side power station (or sluice), a series of artificial vortices will be generated on the side of the cylindrical group. This vortex structure is beneficial to inducing fish to swim upstream into the fishway entrance and has the positive effect of saving physical strength.

[0042] Further, all the spoiler piers 212 have the same radial dimensions, and the spacing between adjacent spoiler piers 212 is the same. The radial dimensions of the spoiler piers 212 are determined by the formula d=(1 / 2-1 / 3)l, and the spacing between adjacent spoiler piers 212 is determined by the formula s=(2-3)d, wherein l is the body length of the adult target fish, d is the radial dimension value of the spoiler pier 212, and s is the spacing value between two adjacent spoiler piers 212. More preferably, the width of the ramp section 22 is determined by the formula B=(3-4)b, B is the width value of the ramp section 22, and b is the inlet width value of the vortex fish attracting channel. The arrangement length of the column group is determined by the formula L=(30-40)l, and L is the arrangement length of the column group. It can be understood that the height of the spoiler pier 212 is determined by the water depth at the arrangement location and the bending strength of the column under the action of the water flow. Other dimensions are mainly determined based on the body length (l) of the adult target fish and the width b of the fishway entrance. In a specific implementation, the body length l of an adult grass carp is about 80 cm, at which time d is 30 to 40 cm, and the cylinder spacing s is about 24 to 32 cm, taking into account the influence range and intensity of the tailwater of the power station; width B = (3-4) b, for example, if the inlet width of the vertical slot fishway is 30 cm, then B = 90 to 120 cm. In specific operation, it can ensure that adult fish can go upstream after passing through, and by designing the radial size and spacing of the spoiler pier 212, it is convenient to generate 2-3 vortices between two adjacent spoiler piers 212, which is conducive to forming vortices similar to the behavioral characteristics of fish, and has a good effect of attracting and helping fish, which is conducive to guiding fish to go upstream.

[0043] Furthermore, the length of the column group arrangement is L = (30-40) l (about 24m-32m, taking into account the influence range and intensity of the power station tailwater)

[0044] Furthermore, the spoiler pier 212 is arranged close to the outer edge of the ramp section 22, and the turbulent block stones 213 are laid on the surface of the ramp section 22 to form a concave and convex flow surface.

[0045] Through research, it is found that when the diameter of the vortex is larger than the body length of the fish, the fish will sense the direction of the vortex and swim against the current, making it difficult to swim out of the vortex, which affects the upstream swimming; when two vortices act within the body length of the fish, the forces on both sides of the fish are unbalanced, thus becoming unstable and affecting the upstream swimming; when more than three vortices act within the body length of the fish, the forces on both sides of the fish are balanced, and the vortices help the fish to swim upstream; please refer to Figure 4 and 5 ,in Figure 4 a is that when a school of fish swims naturally, a vortex is generated at the tail end. Figure 4 b is to use artificial vortices generated by cylindrical disturbances. By scientifically and reasonably setting the cylinder diameter, spacing, etc., the number of artificial vortices is 3 to 5. 3 to 5 vortices are close to the vortex generated by the tail of fish when swimming, thereby luring fish to swim upstream.

[0046] Please refer to Figure 6 and Figure 7 , in a water conservancy project with four generating shafts, two typical operating conditions are analyzed; if turbine units 3 and 4 generate electricity, the main inlet of the fishway and the vicinity of the cylinder group are slow flow areas or recirculation areas, and the flow of the existing working water flow from the main inlet of the fishway can be sensed by the upstream fish and enter the main inlet of the fishway along the side wall; at the same time, the existing working water flow generates eddies on the outside of the cylinder group, attracting the fish in the slow flow area to enter the fish attracting and guiding device from between the column gaps to find the main inlet of the fishway. If turbine units 1, 2, 3, and 4 generate electricity, the tailwater channel of the power station is a rapid flow area, and the rapid flow enters the fish attracting and guiding device from the outside of the cylinder group and generates eddies in the channel. The eddies eliminate part of the energy through their own rotational friction. At the same time, the local resistance generated by the eddies can also limit the flow entering the channel, slowing down the water flow speed in the channel, thereby creating a suitable water flow environment for upstream fish and facilitating their finding the fishway entrance. In the present invention, the fish-attracting effect produced by the vortex can adapt to complex water flow conditions and produce an ideal vortex structure, which is helpful to induce upstream fish to overcome the rapids near the power station or the sluice gate and find the main entrance of the fishway.

[0047] Furthermore, it also includes a water collection tank water supply pipe, and the output side of the water collection tank water supply pipe extends into the water collection tank.

[0048] Furthermore, the ramp section 22, the partition 211 and the plurality of spoiler piers 212 are integrally cast and formed.

[0049] The present invention also provides a power station hydraulic project, including a dam, power station equipment and a sluice gate arranged on the dam, and also includes the above-mentioned vortex fishway, the fish outlet section of the vortex fishway is located upstream of the dam, and the fishway fish attracting section 20 of the vortex fishway is located downstream of the dam.

[0050] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A vortex fishway, It is characterized in that The fishway comprises a main fishway section and a fishway fish guide section which is connected to a main inlet of the main fishway section and is located downstream. The fish-attracting section of the fishway comprises a fish-attracting device and a ramp section which is inclined and extends downward, wherein the ramp section is located outside the main fishway section, and the fish-attracting device is arranged on the ramp and protrudes from the surface of the ramp section. The fish attracting device comprises a baffle and a spoiler pier, wherein the baffle is arranged at the top surface of the slope of the ramp section near the main inlet of the main fishway section, and a plurality of spoiler piers are arranged at intervals downstream of the baffle, and the ramp section, the baffle and the plurality of spoiler piers are combined outside the main fishway section to form a vortex fish attracting channel.

2. The vortex fishway according to claim 1, It is characterized in that The fish attracting device further comprises turbulence blocks laid on the surface of the ramp section, and the turbulence blocks are arranged to protrude from the surface of the ramp section.

3. The vortex fishway according to claim 2, It is characterized in that The spoiler pier is a cylindrical pier or a semicircular pier.

4. The vortex fishway according to claim 2, It is characterized in that All the spoiler piers have the same radial dimensions, and the spacing between adjacent spoiler piers is the same. The radial dimensions of the spoiler piers are determined by the formula d=(1 / 2-1 / 3)l. The spacing between adjacent spoiler piers is determined by using the formula s=(2-3)d. Wherein, l is the body length of an adult target fish, d is the radial dimension of the spoiler pier, and s is the spacing between two adjacent spoiler piers.

5. The vortex fishway according to claim 4, It is characterized in that The width of the ramp section is determined by the formula B=(3-4)b, where B is the width value of the ramp section and b is the inlet width value of the ramp section. The formula L=(30-40)l is used to determine the layout length of the column group, L is the layout length of the column group.

6. The vortex fishway according to claim 2, It is characterized in that The spoiler pier is arranged close to the outer edge of the ramp section.

7. The vortex fishway according to claim 2, It is characterized in that It also includes a water collection tank water replenishment pipeline, and the output side of the water collection tank water replenishment pipeline extends into the water collection tank.

8. The vortex fishway according to claim 2, It is characterized in that The ramp section, the partition and the plurality of spoiler piers are integrally cast and formed.