Underground first dilution pre-separation hydraulic lifting green mining method for ultra-thin vein

Through the combined process of first-poverty recovery, presortment and hydraulic enhancement, the problem of extremely thin veins mining has been solved, the production efficiency and the ability to improve deep mines has been improved, the emissions of waste rock and tailings have been reduced, and the construction of green mines has been promoted. .

CN118895973APending Publication Date: 2024-11-05SHANDONG GOLD GROUP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411262747.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In gold mines, with the mining of medium-thick ore bodies exhausted, the problem of mining extremely thin ore veins has emerged. The existing technology has led to the depletion of ore mining, high cost of improvement, environmental pollution, and the improvement capacity of deep mines has been reduced.

Method used

Adopt a combined process of first-pollution mining, pre-sorting and hydraulic power improvement, and improve the sorting efficiency and efficiency of ore through horizontal route mining, sectional transportation, primary crushing and sorting, secondary crushing and hydraulic transportation. , reduce waste rock and tailings emissions.

Benefits of technology

Effectively solve the problem of extremely thin ore veins mining, improve production efficiency, reduce waste stone improvement and tailings emissions, reduce cost improvement, accelerate the construction of green mines, and improve the improvement capabilities of deep mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895973A_ABST
    Figure CN118895973A_ABST
Patent Text Reader

Abstract

The invention provides an ultra-thin vein underground first dilution pre-separation hydraulic lifting green mining method, and relates to the technical field of metal mine underground mining, the ultra-thin vein underground first dilution pre-separation hydraulic lifting green mining method comprises the following steps: S1, dilution stoping: stope arrangement is carried out, a horizontal drift type stoping method is adopted for mining, the ore-rock mixture obtained through stoping is transported to a first draw shaft through a segmented haulage roadway; s2, pre-sorting: constructing a pre-sorting chamber at the bottom of the first draw shaft, sequentially performing primary crushing and sorting treatment on the ore-rock mixture, and then performing secondary crushing on the sorted ore to finish pre-sorting; and S3, hydraulic lifting is conducted, specifically, the pre-separated ore is conveyed into an underground special ore bin, and the ore is conveyed to an earth surface ore separation workshop through a pipeline by adopting a hydraulic lifting method. According to the method, the three combined processes of dilution stoping, pre-separation and hydraulic lifting are adopted, the mining problem of the ultra-thin vein can be effectively solved, the production efficiency is improved, the lifting pressure is relieved, and the construction problem of a green mine is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground mining of metal mines, and in particular to a green mining method of underground pre-diluting and pre-separating extremely thin ore veins with hydraulic lifting. Background Art

[0002] my country's mineral resources are generally characterized by a large number of poor ores, a large total amount, and relatively few per capita resources. For non-ferrous mineral resources, especially gold mines, the ore body conditions are complex. With the exhaustion of medium and thick ore bodies, the thickness of the existing ore bodies is mostly thin veins to extremely thin veins. Horizontal access mining is mostly used in the ore body recovery process. In order to ensure the minimum working space and operating efficiency, it is inevitable to recover a large amount of waste rock, resulting in a large dilution of ore recovery. Secondly, with the mining process of the mine, the ore grade of non-ferrous mines is getting lower and lower. For gold mines, the current ore grade is mostly a few grams per ton. The ore needs to be lifted to the surface, processed in the ore dressing workshop, and then filled into the underground goaf through the filling system. The proportion of mineral components with no utilization value in the lifting process is large, which reduces the effective lifting amount of ore and greatly increases the lifting cost of the mine. Thirdly, with the gradual depletion of shallow mineral resources, various mines have gradually entered the deep mining stage. The depth of shaft construction has exceeded 2,000 meters. The strength of the steel wire rope used in shaft hoisting is mostly used to resist its own weight, resulting in a significant reduction in the hoisting capacity of deep mines. Finally, after the ore is processed by the beneficiation workshop, in addition to the filling station filling into the underground goaf, there will still be a large amount of tailings that cannot be processed and need to be discharged to the tailings pond, causing a certain degree of damage to the ecological environment.

[0003] In view of the above technical problems existing in the prior art, the present invention proposes a green mining method of underground depletion and pre-separation of extremely thin ore veins by hydraulic lifting, which can effectively solve the mining problems of extremely thin ore veins, improve production efficiency, alleviate lifting pressure, and solve the construction problems of green mines. Summary of the invention

[0004] The object of the present invention is to provide a green mining method of underground pre-diluting and pre-separating extremely thin ore veins by hydraulic lifting.

[0005] To achieve the above-mentioned purpose, the present invention provides a green mining method for underground pre-diluting and pre-separating ultra-thin ore veins by hydraulic lifting, which is mainly aimed at the mining conditions of ultra-thin ore veins and includes the following steps:

[0006] S1, depletion recovery: the stope is arranged, and the horizontal approach recovery method is adopted for mining, and the ore-rock mixture obtained by recovery is transported to the first chute through the staged transportation tunnel;

[0007] S2, pre-sorting: A pre-sorting chamber is constructed at the bottom of the first chute, and the ore-rock mixture is crushed and sorted in sequence, and then the sorted ore is transported to the second chute for a secondary crushing process, thereby completing the pre-sorting;

[0008] S3, hydraulic lifting: The pre-sorted ore is transferred to a special ore bin underground, and the ore is transported to the surface beneficiation workshop through a hydraulic transport pipeline using a hydraulic lifting method.

[0009] As a further improvement of the present invention, in step S1, the stope is arranged as follows:

[0010] S11, ore block layout: the ore body is divided into multiple stopes along the ore body strike direction and into multiple different sections along the ore body vertical direction;

[0011] S12, Mining approval project: Construction forms segmented transport tunnels, chutes, mining area connecting tunnels, pre-sorting chambers, fine crushing chambers, underground special ore bins and vertical shafts.

[0012] As a further improvement of the present invention, in step S1, the specific process of the horizontal approach mining method is: construct a mining field connecting tunnel through the segmented transport tunnel vertically to the ore body, and when the mining field connecting tunnel enters the ore body, carry out downward horizontal approach mining along the direction of the ore body, and the ore body is mined layer by layer from top to bottom. After all the approaches to the first layer are mined, the second layer approach mining is started, and so on, until the entire segmented ore body is mined.

[0013] As a further improvement of the present invention, in step S1, a pneumatic rock drill is used to carry out stope layout construction; during the approach-type mining process, a portion of the upper and lower surrounding rocks are mined to increase the approach width and improve the operation efficiency of the stope. The thickness of the upper and lower surrounding rocks mined is based on the type of mining equipment, wherein the approach width of the handheld pneumatic rock drill is not less than 2m, and the rock drilling trolley is not less than 3.5m.

[0014] As a further improvement of the present invention, in step S2, the pre-sorting chamber is provided with primary crushing equipment and pre-sorting equipment; the primary crushing equipment crushes the ore-rock mixture into 20-60 mm after one crushing.

[0015] As a further improvement of the present invention, in step S2, a fine crushing chamber is constructed at the bottom of the second chute, and the ore is crushed to less than 20 mm after secondary crushing.

[0016] As a further improvement of the present invention, the pre-separation equipment separates ore from waste rock, and the separation capacity is related to the equipment selection.

[0017] As a further improvement of the present invention, the sorting capacity is 30-600 t / h.

[0018] As a further improvement of the present invention, in step S3, the hydraulic lifting method is specifically: after water is injected into the ore bin, the ore is transported to the surface beneficiation workshop or to the upper middle ore bin and then to the surface beneficiation workshop for ball milling by a high-pressure water pump.

[0019] As a further improvement of the present invention, the hydraulic lifting pipeline is arranged on the wall of the vertical shaft to realize the ore transportation of the hydraulic transportation pipeline of hydraulic lifting.

[0020] The beneficial effects of the present invention are:

[0021] 1. The green mining method of underground pre-diluting, pre-sorting and hydraulic lifting of ultra-thin ore veins provided by the present invention adopts three combined processes of pre-diluting, pre-sorting and hydraulic lifting, which can effectively solve the mining problems of ultra-thin ore veins, improve production efficiency, alleviate lifting pressure, reduce the lifting of waste rock and the discharge of tailings in the ore dressing workshop, and accelerate the construction of green mines.

[0022] 2. The present invention provides a green mining method for underground pre-diluting pre-sorting hydraulic lifting of extremely thin ore veins. In the pre-sorting process, a combined process of primary crushing-sorting-secondary crushing is adopted. The primary crushing enables the ore-rock mixture to achieve better sorting performance, and the secondary crushing further reduces the particle size of the ore, thereby improving the lifting efficiency of the ore during the hydraulic lifting process. The hydraulic lifting process overcomes the technical defect that the strength of the steel wire rope used for shaft lifting in the prior art is mostly used to resist its own weight, resulting in a significant reduction in the lifting capacity of deep mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A system schematic diagram of the underground pre-diluted, pre-sorted, hydraulically lifted green mining method for extremely thin ore veins provided by the present invention.

[0024] Marking in the accompanying drawings

[0025] 1. Ore body; 2. Surrounding rock; 3. Segmented transportation tunnel; 4. First chute; 5. Ore-rock mixture; 6. Pre-sorting chamber; 61. Primary crushing equipment; 62. Pre-sorting equipment; 7. Fine crushing chamber; 8. Second chute; 9. Special underground ore bin; 10. Surface ore dressing workshop; 11. Hydraulic transportation pipeline. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0027] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the scheme of the present invention are shown in the drawings, while other details that are not closely related to the present invention are omitted.

[0028] In addition, it should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0029] See also Figure 1 As shown, the present invention provides a green mining method for underground pre-diluting pre-separation of extremely thin ore veins by hydraulic lifting, which is mainly aimed at the mining conditions of extremely thin ore veins, and includes the following steps:

[0030] S1, depletion recovery: the stope is arranged, and the horizontal approach recovery method is adopted for mining, and the ore-rock mixture obtained by recovery is transported to the first chute through the staged transportation tunnel;

[0031] S2, pre-sorting: A pre-sorting chamber is constructed at the bottom of the first chute, and the ore-rock mixture is crushed and sorted in sequence, and then the sorted ore is transported to the second chute for a secondary crushing process, thereby completing the pre-sorting;

[0032] S3, hydraulic lifting: The pre-sorted ore is transferred to a special ore bin underground, and the ore is transported to the surface beneficiation workshop through a hydraulic transport pipeline using a hydraulic lifting method.

[0033] Preferably, in step S1, the stope is arranged as follows:

[0034] S11, ore block layout: the ore body is divided into multiple stopes along the ore body strike direction and into multiple different sections along the ore body vertical direction;

[0035] S12, Mining approval project: Construction forms segmented transport tunnels, chutes, mining area connecting tunnels, pre-sorting chambers, fine crushing chambers, underground special ore bins and vertical shafts.

[0036] Preferably, in step S1, the specific process of the horizontal approach mining method is: construct a mining field connecting tunnel through the segmented transport tunnel vertically through the ore body, and when the mining field connecting tunnel enters the ore body, carry out downward horizontal approach mining along the direction of the ore body, and the ore body is mined layer by layer from top to bottom. After all the approaches to the first layer are mined, the second layer approach mining begins, and so on, until the entire segmented ore body is mined.

[0037] Preferably, in step S1, a pneumatic rock drill is used to carry out stope layout construction; during the approach mining process, a portion of the upper and lower surrounding rocks is mined to increase the approach width and improve the operation efficiency of the stope.

[0038] Preferably, the thickness of the surrounding rock of the upper and lower plates to be mined is based on the type of mining equipment, wherein the access width of a handheld pneumatic rock drill is not less than 2m, and that of a rock drilling rig is not less than 3.5m.

[0039] Preferably, in step S1, a pneumatic rock drill is used to carry out stope layout construction; wherein, part of the upper and lower surrounding rocks are mined so that the width of the approach stope is increased to 2.0 m.

[0040] Preferably, in step S2, the pre-sorting chamber is provided with primary crushing equipment and pre-sorting equipment; the primary crushing equipment crushes the ore-rock mixture into 20-60 mm after one crushing.

[0041] Preferably, in step S2, a fine crushing chamber is constructed at the bottom of the second chute, and the ore is crushed to less than 20 mm after secondary crushing.

[0042] Preferably, the pre-separation equipment separates ore from waste rock, and the separation capacity is related to the equipment selection.

[0043] Preferably, in step S3, the hydraulic lifting method is specifically: after water is injected into the ore bin, the ore is transported to the surface mineral processing workshop by a high-pressure water pump for ball milling.

[0044] Preferably, in step S3, the hydraulic lifting method is specifically as follows: after water is injected into the ore bin, the ore is conveyed to the upper middle section ore bin by a high-pressure water pump, and then conveyed to the surface ore dressing workshop via the upper middle section ore bin for ball milling.

[0045] Preferably, the hydraulic lifting pipeline is arranged on the wall of the vertical shaft to realize the ore transportation of the hydraulic transport pipeline of hydraulic lifting.

[0046] Example 1

[0047] See also Figure 1 As shown, Example 1 of the present invention provides a green mining method for underground depletion, pre-separation and hydraulic lifting of extremely thin ore veins, including the following steps: mainly including three main links: pre-depletion and recovery, pre-separation, and hydraulic lifting.

[0048] S1, depleted mining: arrange the mining site, adopt the horizontal approach mining method to carry out mining, and transport the ore-rock mixture 5 obtained by mining to the first chute 4 through the segmented transportation tunnel 3.

[0049] The stope layout is as follows:

[0050] S11, ore block layout: along the strike of ore body 1, a stope is divided every 50m, and ore body 1 is divided into multiple stopes; along the vertical direction of ore body 1, a segment is divided every 15m, and it is divided into multiple different segments;

[0051] S12, mining approval engineering: construction forms segmented transport tunnel 3, chute (first chute 4, second chute 8), stope connection tunnel, pre-sorting chamber 6, fine crushing chamber 7, underground special ore bin 9 and shaft (not marked in the figure);

[0052] S13, mining: The specific process of the horizontal approach mining method is: construct a mining field connecting tunnel through the segmented transport tunnel vertically to the ore body 1, and when the mining field connecting tunnel enters the ore body 1, carry out downward horizontal approach mining along the direction of the ore body 1, and the ore body 1 is mined layer by layer from top to bottom. After all the approaches to the first layer are mined, the second layer is mined, and so on, until the entire segmented ore body 1 is mined.

[0053] Among them, first depletion mining refers to the use of horizontal approach for extremely thin ore veins. The thickness of the ore body 1 is 0.5m. 1.5m of surrounding rock 2 is mined in the upper plate, and 0.5m of surrounding rock 2 is mined in the lower plate. The approach width is increased and the operating efficiency of mechanical equipment is improved.

[0054] During the mining process of the access road, a pneumatic rock drill is used for construction, and the total width of the access road is 3m.

[0055] The ore-rock mixture 5 recovered from different segmented mining areas is transported to the first chute 4 through the segmented transportation tunnel 3.

[0056] S2, pre-sorting: A pre-sorting chamber 6 is constructed at the bottom of the first chute 4, and the ore-rock mixture 5 is crushed and sorted in sequence, and the sorted ore is then transported to the second chute 8 for a secondary crushing process, thereby completing the pre-sorting.

[0057] Specifically, a pre-sorting chamber 6 is constructed at the bottom of the first chute 4, and an ore primary crushing device 61 is installed at the lower mouth of the chute. After the ore-rock mixture 5 is initially crushed, it is sorted by the ore pre-sorting device 62.

[0058] The primary crushing equipment 61 can crush the ore-rock mixture 5 to 20-60 mm.

[0059] The pre-sorting equipment 62 uses a K108 mining intelligent sorting machine to separate ore from waste rock. This type of equipment can sort 20-60 mm crushed stone into ore and waste rock, and the sorting capacity is 30-600 t / h.

[0060] The waste rock obtained after sorting the ore-rock mixture 5 is used for filling the stope after recovery.

[0061] The ore obtained after sorting the ore-rock mixture 5 is transported to the second chute 8 for secondary crushing. A fine crushing chamber 7 is constructed at the bottom of the second chute 8 to crush the ore to less than 20 mm and to a smaller particle size.

[0062] S3, hydraulic lifting: The ore after secondary crushing is transferred to the underground special ore bin 9, and the ore is transported to the surface ore dressing workshop 10 through the hydraulic transportation pipeline 11 by hydraulic lifting method.

[0063] Specifically, the crushed ore is conveyed to the underground special ore bin 9 via a conveyor belt, water is injected into the underground special ore bin 9 and transported to the surface ore dressing workshop 10 through a ball milling process via a high-pressure water pump through a hydraulic transport pipeline 11 for ore dressing treatment.

[0064] In some other embodiments, when the underground dedicated ore bin 9 is far away from the surface ore dressing workshop 10 (the distance is greater than 200 meters), the ore is transported by means of segmented hydraulic lifting. Specifically, a middle ore bin is provided at the middle position of a predetermined height, and the pipelines of the segmented hydraulic lifting are all realized through a vertical shaft. The transport method of segmented hydraulic lifting can achieve the technical effect of improving the hydraulic lifting efficiency and reducing the risk of pipeline burst.

[0065] Specifically, in step S3, the hydraulic lifting method is as follows: after water is injected into the underground dedicated ore bin 9, the ore is transported to the upper middle section ore bin relay by a high-pressure water pump through the hydraulic transport pipeline 11, and then transported to the surface ore dressing workshop 10 through the upper middle section ore bin relay for ball milling process.

[0066] In summary, the present invention provides a green mining method for underground pre-diluting pre-sorting hydraulic lifting of extremely thin ore veins, which relates to the technical field of underground mining of metal mines. It is mainly aimed at the mining conditions of extremely thin ore veins, and includes the following steps: S1, diluting recovery: arrange the mining site, adopt the horizontal approach recovery method for mining, and transport the recovered ore-rock mixture to the first chute through the segmented transportation tunnel; S2, pre-sorting: a pre-sorting chamber is constructed at the bottom of the first chute, and the ore-rock mixture is crushed and sorted in turn, and then the sorted ore is transported to the second chute for a secondary crushing process, thereby completing the pre-sorting; S3, hydraulic lifting: the pre-sorted ore is transferred to a special ore bin underground, and the ore is transported to the surface ore dressing workshop via a pipeline by a hydraulic lifting method. The method adopts three combined processes of pre-diluting recovery, pre-sorting, and hydraulic lifting, which can effectively solve the problem of mining extremely thin ore veins, improve production efficiency, alleviate lifting pressure, and the construction of green mines.

[0067] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A green mining method for underground pre-diluting and pre-separating ultra-thin ore veins by hydraulic lifting, characterized by: For extremely thin vein mining conditions, the following steps are included: S1, depletion recovery: the stope is arranged, and the horizontal approach recovery method is adopted for mining, and the ore-rock mixture obtained by recovery is transported to the first chute through the staged transportation tunnel; S2, pre-sorting: A pre-sorting chamber is constructed at the bottom of the first chute, and the ore-rock mixture is crushed and sorted in sequence, and then the sorted ore is transported to the second chute for a secondary crushing process, thereby completing the pre-sorting; S3, hydraulic lifting: The pre-sorted ore is transferred to a special ore bin underground, and the ore is transported to the surface beneficiation workshop through a hydraulic transport pipeline using a hydraulic lifting method.

2. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 1 is characterized by: In step S1, the stope is arranged as follows: S11, ore block layout: Divide the ore body into multiple stopes along the ore body strike direction; Divide the ore body into multiple different sections along the vertical direction; S12, Mining approval project: Construction forms segmented transport tunnels, chutes, mining area connecting tunnels, pre-sorting chambers, fine crushing chambers, underground special ore bins and vertical shafts.

3. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 2 is characterized by: In step S1, the specific process of the horizontal approach mining method is: construct a mining field connecting tunnel through the segmented transport tunnel vertically through the ore body, and when the mining field connecting tunnel enters the ore body, carry out downward horizontal approach mining along the direction of the ore body, and the ore body is mined layer by layer from top to bottom. After all the approaches to the first layer are mined, the second layer approach mining begins, and so on, until the entire segmented ore body is mined.

4. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 3 is characterized by: In step S1, during the approach-type mining process, a portion of the upper and lower surrounding rocks are mined to increase the approach width and improve the working efficiency of the mining site; the thickness of the upper and lower surrounding rocks mined is based on the type of mining equipment, among which the approach width of a handheld pneumatic rock drill is not less than 2m, and that of a drilling rig is not less than 3.5m.

5. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 1 is characterized by: In step S2, the pre-sorting chamber is provided with primary crushing equipment and pre-sorting equipment; the primary crushing equipment crushes the ore-rock mixture into 20-60 mm after one crushing.

6. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 1 is characterized by: In step S2, a fine crushing chamber is constructed at the bottom of the second chute, and the ore is crushed to less than 20 mm after secondary crushing.

7. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 5 is characterized by: The pre-separation equipment separates ore from waste rock, and the separation capacity is related to the equipment selection.

8. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 1 is characterized by: In step S3, the hydraulic lifting method is specifically as follows: after water is injected into the ore bin, the ore is transported to the surface beneficiation workshop by a high-pressure water pump, or transported to the upper middle ore bin and then transported to the surface beneficiation workshop for ball milling.

9. The green mining method of underground pre-diluting pre-separation hydraulic lifting of ultra-thin ore veins according to claim 2 is characterized by: The hydraulic lifting pipeline is arranged on the wall of the vertical shaft and is used to realize the ore transportation of the hydraulic transportation pipeline of the hydraulic lifting.

Citation Information

Cited By

  • Automatic precise mining robot for thin vein and operation method of automatic precise mining robot