Coal gangue low-temperature heat treatment device and process thereof
By designing a low-temperature heat treatment device for coal gangue, using a three-level structure and a multi-level preheating device, the problems of long calcination cycle, high energy consumption and unstable material quality are solved, and efficient and stable calcination of coal gangue is achieved, suitable for ceramics and Cement field.
Patent Information
- Application Number
- CN202411250507.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-05
AI Technical Summary
The existing coal gangue heat treatment process has problems such as long calcination cycle, easy calcination of raw materials, high energy consumption, unstable material quality, and large equipment investment and complex process.
A low-temperature heat treatment device for coal gangue is designed, including a silo, a first-stage cyclone preheater, a second-stage cyclone preheater and a boiling combustion system. The thermal cycle is realized through a three-way structure, and the first burner and the second burner are arranged. Maintain a stable temperature, use two-stage preheating device and overflow port to increase the collection rate of finished products, and use blowers and hot air devices to improve the uniform calcination of powder.
The quality stability and efficient utilization of calcined products are achieved, with a firing loss of less than 2.5%, and a whiteness of more than 70%. The material is mainly composed of amorphous phase, suitable for ceramics and cement additives, reducing the crystalline phase content of mullite, satisfying the satisfaction of Applications in the field of glass fiber.
Smart Images

Figure HDA0005032106640000011 
Figure HDA0005032106640000012 
Figure HDA0005032106640000021
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of comprehensive utilization of solid waste, in particular to the field of IPC F27B17, and more specifically to a low-temperature heat treatment device for coal gangue and a process thereof. Background Art
[0002] Gangue is a byproduct of coal mining, with a large annual emission. Gangue contains a large amount of beneficial elements such as silicon and aluminum, which are basic elements of inorganic non-metallic materials. In particular, the aluminum content in gangue in some areas is high, the impurity content is low, and it is rich in a large amount of kaolinite components, which has a high development and utilization value. The general heat treatment process of gangue includes the following aspects: using block gangue as raw material, using vertical kiln and tunnel kiln calcination process; using powdered gangue as raw material, using rotary kiln and suspension furnace calcination; after grinding and preparing the green body, the gangue is calcined in tunnel kiln and shuttle kiln. The above heat treatment processes inevitably have some problems. For example, the vertical kiln calcination process of block gangue has problems such as long calcination cycle, raw materials are easy to be calcined but not through, and secondary sorting is required. The block tunnel kiln calcination also has problems such as raw materials are easy to be calcined but not through, and secondary sorting is required, and the energy consumption is high. The calcination process of powdered gangue in rotary kiln has the disadvantages of small contact area between raw materials and hot gas, difficult temperature control, unstable quality, etc. The calcination process of machine-made green body tunnel kiln or shuttle kiln has the disadvantages of complex process, difficult green body to burn through, easy to blacken the core, and the calcined green body needs secondary crushing and grinding, which consumes a lot of energy.
[0003] CN1600687A describes a suspension heat treatment process for ultrafine kaolin. Although the heat utilization efficiency is high, the material residence time is long. During the cyclic calcination process, the material is prone to a mixture of "overburning" due to repeated circulation of some materials and "underburning" due to too short residence time. The stability of the material quality is difficult to control. Patent CN100431957C describes a fluidized instantaneous calcination process for coal-based kaolin. Although it has the characteristics of high heat utilization efficiency and short processing time, it is only a pre-process for other heat treatment systems and has problems such as large equipment investment and complex process. Summary of the invention
[0004] A first aspect of the present invention provides a low-temperature heat treatment device for coal gangue, comprising: a silo, a primary cyclone preheater, a secondary cyclone preheater and a boiling combustion system, wherein the outlet of the silo is connected to the inlets of the primary cyclone preheater and the secondary cyclone preheater at the same time, the outlet of the primary cyclone preheater is connected to the inlet of the secondary cyclone preheater, and the outlet of the secondary cyclone preheater is connected to the boiling combustion system.
[0005] The device also includes a feeder, a dust collector, a chimney, a metering feeding device, a cyclone powder collector and a tee; the outlet of the secondary cyclone preheater is connected to the boiling combustion system through the feeder; the inlet of the primary cyclone preheater is connected to the chimney through the dust collector; the outlet of the silo is connected to the inlets of the primary cyclone preheater and the secondary cyclone preheater at the same time through the metering feeding device; the cyclone powder collector is connected to the boiling combustion system, and the tee connects the following structures to each other: the cyclone powder collector, the secondary cyclone preheater and the boiling combustion system; the inlet of the cyclone powder collector is connected to the inlet of the secondary cyclone preheater through the outlet of the primary cyclone preheater.
[0006] The boiling combustion system includes a blower, a hot air device, a first burner, a second burner, and an overflow port; the hot air device is arranged at the bottom of the boiling combustion system, and the overflow port is arranged at the side of the boiling combustion system; the first burner and the second burner are arranged at the side of the boiling combustion system in sequence from bottom to top, and the blower is connected to the bottom of the boiling combustion system through a tee.
[0007] The device also includes a finished product discharge port, which is arranged at the bottom of the cyclone powder collector.
[0008] The working principle of the device is as follows: after the gangue raw materials are crushed and ground, they enter the first-stage cyclone preheater through the silo through the metering feeding device for preheating and drying, and then enter the second-stage cyclone preheater for high-temperature preheating and dehydration. After preheating and dehydration, the materials enter the boiling combustion system through the feeder for dehydration, decarbonization and impurity removal. After the materials are calcined in the boiling combustion system, some of the materials with finer particles enter the cyclone powder collector from the upper part of the boiling combustion system along with the high-temperature flue gas, and are discharged from the finished product discharge port at the lower part. The discharged materials are cooled and collected to become the finished products. The coarser parts of the calcined particles flow out through the overflow port on the lower side wall of the boiling combustion system, and the outflowing materials are cooled and collected to become the finished products. The high-temperature flue gas during the calcination process enters the secondary cyclone preheater and the primary cyclone preheater in sequence from the upper part of the cyclone powder collector through a part of the tee, serving as the heat source of the two-stage cyclone preheater. The exhaust flue gas is dedusted by the dust collector and then discharged into the chimney; the other part is used as the heat source of the heat exchanger to heat the combustion air. The combustion air preheated by the hot air device enters the boiling combustion system after being heated by the burner and cooperates with the blower to provide the main heat source and hot air flow. At the same time, in order to maintain the stability of the internal temperature of the boiling furnace, the first burner and the second burner are sequentially arranged on the lower side wall of the boiling calcining furnace to supplement the heat required to maintain a stable temperature.
[0009] A second aspect of the present invention provides a low-temperature heat treatment process for coal gangue, comprising the following steps:
[0010] S1, the coal gangue powder enters the device from the silo, and enters the boiling combustion system after being preheated by the first-stage cyclone preheater and the second-stage cyclone preheater;
[0011] S2, the material is calcined in a boiling combustion system, and the fine material obtained after calcination enters the cyclone powder collector with the flue gas from the upper part of the boiling calcination system and is cooled as the finished product 1. The coarse material obtained after calcination is discharged through the overflow port after boiling calcination, and is cooled and collected to be the finished product 2. The finished product 1 and the finished product 2 are mixed to obtain.
[0012] The particle size of the coal gangue powder is not greater than 300 meshes.
[0013] Preferably, the particle size of the coal gangue powder is 300-1000 mesh.
[0014] The calcination temperature is 850-1150°C.
[0015] Preferably, the calcination temperature is 950-1050°C.
[0016] Preferably, the calcination time is 0.5-2 min.
[0017] More preferably, the calcination time is 1-1.5 min.
[0018] The present application has found that the calcination temperature is 850-1150°C, the time is 0.5-5min, and the airflow rate of the boiling combustion system is limited to 0.05-0.5m / min. The obtained material is mainly composed of amorphous phase material, which can reduce the content of mullite crystalline phase and meet the application in the field of glass fiber. It may be that the contact area between the material and the hot air and the calcination are uniform, avoiding under-burning or over-burning.
[0019] Preferably, the temperature of the first-stage cyclone preheater is 150-200°C, and the temperature of the second-stage cyclone preheater is 300-500°C.
[0020] Preferably, the air flow rate in the boiling combustion system is 0.1-0.5 m / min.
[0021] Beneficial Effects
[0022] 1. The present application interconnects the following structures through a tee: a cyclone powder collector, a secondary cyclone preheater and a boiling combustion system to achieve heat circulation and improve heat utilization.
[0023] 2. The present application sequentially arranges a first burner and a second burner on the lower side wall of the fluidized bed calcining furnace to supplement the heat required to maintain a stable temperature and achieve the purpose of precise temperature control.
[0024] 3. The present application sets up a two-stage preheating device, a first-stage cyclone preheater and a second-stage cyclone preheater, which can not only stably preheat the material, but also the high-temperature flue gas can provide a stable heat source for the preheater.
[0025] 4. The present application is provided with an overflow port and a finished product discharge port, and the two-stage discharge port improves the collection rate of the finished product particles.
[0026] 5. The present application is provided with a blower and a hot air device, and the hot air flow can make the powder particles fully and evenly calcine, thereby improving the quality stability of the calcined product.
[0027] 6. The powder prepared by the process has a loss on ignition of less than 2.5%, a whiteness of more than 70%, and high activity, and can be used as a ceramic, cement additive, etc.
[0028] 7. The calcination temperature is 850-1150°C, the time is 0.5-5min, and the air flow velocity in the boiling combustion system is limited to 0.05-0.5.m / min, the loss on ignition is less than 2.5%, the whiteness is greater than 75%, and the obtained material is mainly composed of amorphous phase substances, which can reduce the content of mullite crystalline phase and meet the application in the field of glass fiber. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is the low-temperature heat treatment device for coal gangue of Example 1.
[0030] Figure 2 This is the XRD spectrum of the powder of Example 1.
[0031] Figure 3 This is the XRD spectrum of the powder of Example 2.
[0032] Figure 4 This is the XRD spectrum of the powder of Example 3.
[0033] in Figure 1 In: 1. Silo, 2. Metering feeding device, 3. First-stage cyclone preheater, 4. Second-stage cyclone preheater, 5. Feeder, 6. Boiling combustion system, 7. Cyclone powder collector, 8. Finished product discharge port, 9. Tee, 10. Blower, 11. Hot air device, 12. First burner, 13. Second burner, 14. Overflow port, 15. Dust collector, 16. Chimney. DETAILED DESCRIPTION
[0034] Example 1
[0035] A low temperature heat treatment device for coal gangue, such as Figure 1 As shown, it includes: a silo 1, a primary cyclone preheater 3, a secondary cyclone preheater 4 and a boiling combustion system 6. The outlet of the silo 1 is connected to the inlets of the primary cyclone preheater 3 and the secondary cyclone preheater 4 at the same time, the outlet of the primary cyclone preheater 3 is connected to the inlet of the secondary cyclone preheater 4, and the outlet of the secondary cyclone preheater 4 is connected to the boiling combustion system 6.
[0036] The device also includes a feeder 5, a dust collector 15, a chimney 16, a metering feeding device 2, a cyclone powder collector 7 and a tee 9; the outlet of the secondary cyclone preheater 4 is connected to the boiling combustion system 6 through the feeder 5; the inlet of the primary cyclone preheater 3 is connected to the chimney 16 through the dust collector 15; the outlet of the silo 1 is connected to the inlets of the primary cyclone preheater 3 and the secondary cyclone preheater 4 through the metering feeding device 2; the cyclone powder collector 7 is connected to the boiling combustion system 6, and the tee 7 connects the following structures to each other: the cyclone powder collector 7, the secondary cyclone preheater 4 and the boiling combustion system 6; the inlet of the cyclone powder collector 7 is connected to the inlet of the secondary cyclone preheater 4 through the outlet of the primary cyclone preheater 3.
[0037] The boiling combustion system 6 includes a blower 10, a hot air device 11, a first burner 12, a second burner 13, and an overflow port 14; the hot air device 11 is arranged at the bottom of the boiling combustion system 6, and the overflow port 14 is arranged at the side of the boiling combustion system 6; the first burner 12 and the second burner 13 are arranged on the side of the boiling combustion system 6 from bottom to top, and the blower 10 is connected to the bottom of the boiling combustion system 6 through a tee 9.
[0038] The device further comprises a finished product discharge port 8 , and the finished product discharge port 8 is arranged at the bottom of the cyclone powder collector 7 .
[0039] The working principle of the device is as follows: after the gangue raw material is crushed and ground, it enters the first-stage cyclone preheater 3 through the metering feeding device 2 from the silo 1 for preheating and drying, and then enters the second-stage cyclone preheater 4 for high-temperature preheating and dehydration. After preheating and dehydration, the material enters the boiling combustion system 6 through the feeder 5 for dehydration, decarbonization and impurity removal. After the material is calcined in the boiling combustion system 6, part of the material with finer particles is entered into the cyclone powder collector 7 from the upper part of the boiling combustion system 6 along with the high-temperature flue gas, and is discharged from the finished product discharge port 8 at the lower part thereof. The discharged material is cooled and collected to be the finished product. The coarser part of the calcined particles flows out through the overflow port 14 on the lower side wall of the boiling combustion system 6, and the outflowing material is cooled and collected to be the finished product. The high-temperature flue gas during the calcination process enters the secondary cyclone preheater 4 and the primary cyclone preheater 3 in sequence from the upper part of the cyclone powder collector 7 through a part of the tee 9, and serves as the heat source of the two-stage cyclone preheater. The exhaust flue gas is dedusted by the dust collector 15 and then discharged into the chimney 16; the other part is used as the heat source of the heat exchanger to heat the combustion air. The combustion air preheated by the hot air device 11 enters the boiling combustion system 6 after being heated by the burner and cooperates with the blower 10 to provide the main heat source and hot air flow. At the same time, in order to maintain the stability of the internal temperature of the boiling furnace, the first burner 12 and the second burner 13 are sequentially arranged on the lower side wall of the boiling calcining furnace to supplement the heat required to maintain a stable temperature.
[0040] A low-temperature heat treatment process for coal gangue comprises the following steps:
[0041] S1, the gangue powder enters the device from the silo 1, and enters the boiling combustion system 6 after being preheated by the first-stage cyclone preheater 3 and the second-stage cyclone preheater 4;
[0042] S2, the material is calcined in the boiling combustion system 6, and the fine material obtained after calcination enters the cyclone powder collector 7 with the flue gas from the upper part of the boiling calcination system 6 and is cooled as the finished product 1. The coarse material obtained after calcination is discharged through the overflow port 14 after boiling calcination, and is cooled and collected to be the finished product 2. The finished product 1 and the finished product 2 are mixed to obtain.
[0043] The particle size of the gangue powder is 300 mesh; the calcination temperature is 850°C; the calcination time is 2 minutes; the temperature of the first-stage cyclone preheater 3 is 150°C, the temperature of the second-stage cyclone preheater 4 is 300°C; the air flow rate of the boiling combustion system 6 is 0.2m / min, and the required heat treatment time is 2 minutes
[0044] Example 2
[0045] The specific implementation method is the same as that of Example 1; the difference is that in Example 2: the calcination temperature is 950° C.; the calcination time is 1.5 min.
[0046] Example 3
[0047] The specific implementation is the same as that of Example 1; the difference is that in Example 3: the calcination temperature is 1100° C.; the calcination time is 1 min.
[0048] Performance Testing Methods and Data
[0049] The powder obtained in the example was subjected to performance tests, and the test data are listed in Table 1.
[0050] 1. Loss on ignition and whiteness. Loss on ignition is the mass loss rate of the material when the powder is heated to 1000℃ at a heating rate of 1000℃ / h. Whiteness is tested using the whiteness measurement method of GB_T5950-2008 building materials and non-metallic mineral products.
[0051] 2. Phase analysis, using XRD-7000X-ray diffractometer analysis, such as Figure 2-3 As shown, the powder is mainly composed of amorphous phase substances, the content of mullite crystalline phase is low, and it has high activity. The powder can be used in ceramics, glass fiber and other fields; Figure 4 As shown, a certain amount of mullite crystalline phase appears in the powder, which is not conducive to its application in the optical fiber industry.
[0052] Table 1
[0053] Loss on ignition Whiteness Example 1 2.12% 76.8% Example 2 1.23% 86% Example 3 0.34% 91%
Claims
1. A low temperature heat treatment device for coal gangue, It is characterized in that include: A material bin (1), a primary cyclone preheater (3), a secondary cyclone preheater (4) and a boiling combustion system (6); the outlet of the material bin (1) is communicated with the inlets of the primary cyclone preheater (3) and the secondary cyclone preheater (4); the outlet of the primary cyclone preheater (3) is communicated with the inlet of the secondary cyclone preheater (4); and the outlet of the secondary cyclone preheater (4) is communicated with the boiling combustion system (6).
2. The low-temperature heat treatment device for coal gangue according to claim 1, It is characterized in that The invention also comprises a feeder (5), a dust collector (15), a chimney (16), a metering feeding device (2), a cyclone powder collector (7) and a tee (9); the outlet of the secondary cyclone preheater (4) is connected to the boiling combustion system (6) through the feeder (5); the inlet of the primary cyclone preheater (3) is connected to the chimney (16) through the dust collector (15); the outlet of the silo (1) is connected to the inlets of the primary cyclone preheater (3) and the secondary cyclone preheater (4) through the metering feeding device (2); the cyclone powder collector (7) is connected to the boiling combustion system (6), and the tee (7) interconnects the following structures: the cyclone powder collector (7), the secondary cyclone preheater (4) and the boiling combustion system (6); the inlet of the cyclone powder collector (7) is connected to the inlet of the secondary cyclone preheater (4) through the outlet of the primary cyclone preheater (3).
3. The low temperature heat treatment device for coal gangue according to claim 2, It is characterized in that The boiling combustion system (6) comprises a blower (10), a hot air device (11), a first burner (12), a second burner (13), and an overflow port (14); the hot air device (11) is arranged at the bottom of the boiling combustion system (6), and the overflow port (14) is arranged at the side of the boiling combustion system (6); the first burner (12) and the second burner (13) are arranged at the side of the boiling combustion system (6) in sequence from bottom to top, and the blower (10) is connected to the bottom of the boiling combustion system (6) via a tee (9).
4. The low-temperature heat treatment device for coal gangue according to claim 3, It is characterized in that It also comprises a finished product discharge port (8), wherein the finished product discharge port (8) is arranged at the bottom of the cyclone powder collector (7).
5. A low temperature heat treatment process for coal gangue according to claim 3, It is characterized in that The following steps are involved: S1, coal gangue powder enters the device from the silo (1), is preheated by the first-stage cyclone preheater (3) and the second-stage cyclone preheater (4), and then enters the boiling combustion system (6); S2, the material is calcined in the boiling combustion system (6), and the fine material obtained after calcination enters the cyclone powder collector (7) along with the flue gas from the upper part of the boiling calcination system (6) and is cooled as the finished product 1. The coarse material obtained after calcination is discharged through the overflow port (14) after boiling calcination, and is cooled and collected to obtain the finished product 2. The finished product 1 and the finished product 2 are mixed to obtain.
6. The low temperature heat treatment process for coal gangue according to claim 5, It is characterized in that The particle size of the coal gangue powder is not greater than 300 meshes.
7. The low temperature heat treatment process for coal gangue according to claim 6, It is characterized in that The calcination temperature is 850-1150°C.
8. The low temperature heat treatment process for coal gangue according to claim 7, It is characterized in that The calcination time is 1-2 minutes.
9. The low temperature heat treatment process for coal gangue according to claim 6 or 8, It is characterized in that The temperature of the first-stage cyclone preheater (3) is 150-200°C, and the temperature of the second-stage cyclone preheater (4) is 300-500°C.
10. The low-temperature heat treatment process for coal gangue according to claim 9, It is characterized in that The particle flow velocity in the boiling combustion system (6) is 0.5-1.5 m / s.
Citation Information
Cited By
Method and device for coal gangue decarburization
CN120120863A
A method and device for decarbonizing coal gangue
CN120120863B
System for preparing composite inorganic material from coal gangue
CN120618356A